Siddharth

Assignment:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

 

You will complete an x-bar and R chart similar to the example shown in Chapter 6, figure 6.8, from our textbook “Statistical Process Control and quality Improvement”, starting from the provided Excel template. Two versions of the assignment template are provided; 1A is for the newer version of Excel: .xlsx, 1B is compatible for older versions of Excel: .xls. You will enter the numerical data from the section below, and calculate all of the averages and ranges, then plot these numbers and add the connecting lines, in the appropriate chart sections. You will also calculate and plot the UCLX, LCLX, UCLR, and LCLR.  The control limit formulas are on page 203 of the textbook. Be sure to include your upper and lower control limit calculations below the chart.

 

Numerical Data:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

 

1234567

011121314

908

895

9208908

95

930890895895

8

92896

902

900905902900890909896

928920895

900915902906

91589

3

932

891

933

911

889

882

903

890

892

908

895

916

901

909

897

898

915

913

930

940

912

920

928

904

902

885

900

905

896

922

918

906

894

925

872

932

879

862

873

871

926

893

927

 

1516171819202122232425893909885897912882896912926

906

892904896894912909903917889

917904

916932

907913908918912

911912

928915910

925

916920913917926928885925898

917

884

907

942

941

910

923

936

934

914

919

888

 

Formatting:

 

Text Size: All of the text in this assignment has been preset to the individual cells.

 

Margins: The margins have been preset in this assignment. If you file doesn’t display correctly, you will need to change the page setup. The top, bottom, and right side are set for ¼’ (0.25) margins. The left margin is set to ½” (0.5”).  The view is set to normal; the page is set to US Legal, landscape, and fit to page.

 

Name Block: Place the name block in the upper left corner of the page, in cells A1 through A3. Put your name first, then the class title and then the due date, as per the example:

 

Your Name

TECH 458 Quality Assurance

May 6, 2013

 

2

>Asgnmt

1

Number

1 2

Sample
Sample 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Measurements
Average
Range
Chart of Averages
Chart of Ranges
UCLX=
LCLX=
UCLR=
LCLR=

2

>Asgnmt

1

Number

1 2

4 5

8 9

2

895

896

918

Sample

908

917

926 896 912 912 882 890

885

908 895 896

916

917

905

895

900 890

910

6

909 896 885 897 908 895 910

900 914

885

873

900 925

885 926

913 917 909 896 911 912

928 925

915

903

915 892

913 930 917 889 903 912 909 896 894

912 892 904 920 920

907 890 897 917

894 897 915

899 903 918 900 906 917 915 919 914 911 898 903 905 905 912 911 906 906 904 898

42

89

40 11

41 49 19

59

20

19 26 33 29 35 30

93

916
908

900
892
884
60
40
20

0

Ahmad Binali
TECH

4 5 8
5-May-

0 9
Sample 3 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
873 900 905 89 896 9

30 890 918 912 908 907 913 9

40 9

41 895 9

42 916 922 917 904 891 885
9

26 911 889 901 882 903 884 892 897 909 9

60
Measurements 910 902 925 914 919 945 915 93 934 923 920
862 995 9

33 871 898 928 894 888 879 825
893 985 951 906
Average 899 9

29
Range 53 49 103 59 35 44 61 57 81
940
932 ——————————————————————————————————————
Chart of Averages 924
̿̅
876
Chart of Ranges 100
80
UCLX = 907.496 + (0.577 x 47.08)
907.5 +27.2 934.7
LCLX = 907.496 – (0.577 x 47.08)
907.5 – 27.2 880.3
UCLR=
2.114 x 47.08 99.5
LCLR=
0.47.08

2

>Asgnmt

1

Number

1 2

Sample
Sample 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Measurements
Average
Range
Chart of Averages
Chart of Ranges
UCLX=
LCLX=
UCLR=
LCLR=

Still stressed with your coursework?
Get quality coursework help from an expert!