Consider the following data.
Inventory Item | Average Demand (Annual) | Sigma (Std. Dev.) of Demand During Lead Time | Item Unit Cost | |
F-1 | 100 | 15,000 | $250.00 | |
K-1 | 200 | 100,000 | 300 | $2.00 |
L-13003 | 2 | 50,000 | $0.20 | |
N-1 | 400 | 300,000 | $1.00 | |
P-21001 | $125.00 | |||
S-22002 | 80,000 | $30.00 |
Note: All items are independent demand items.
Based on the above data:
- Calculate the safety stock quantities and the inventory cost associated with safety stock (based on the item unit cost) for the inventory items at four different service levels (50%, 80%, 90%, and 95%).
- Develop a table to present the inventory quantities and the safety stock costs at each service level.
- Assuming that demand occurs at a steady pace every month (in other words, there is no seasonality or cyclical change in the level of demand), calculate the reorder point for each item assuming a lead time of two months and a service level of 90%.
- Develop a table to present the reorder points for all products under these conditions (two month lead time and service level of 90%).
Support your responses with examples.
Cite any sources in APA format.
Submission Details
Name your document SU_MGT4059_W2_A2_LastName_FirstInitial.xlsx.
Submit your document to the W2 Assignment 2 Dropbox by Tuesday, November 19, 2013.
Assignment 2 Grading Criteria | Maximum Points |
Developed a table showing the safety stocks, and inventory costs associated with the safety stocks, for each product at each service level. | |
Developed a table showing the reorder points for each product at a 90% service level (assuming a two month lead time). | |
Used correct spelling, grammar, and professional vocabulary. Cited all sources using APA format. | |
Total: |