Project Planning 3

PROJECT MANAGEMENT

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

This assignment is in 2 parts: Assignment 1 & 2

Assignment 1 is due on Saturday  03 February; Time 18Hrs GMT

while Assignment B is due on Sunday 04 February; Time 15Hrs GMT

Budget: $25.00

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Assignment 1:   Given the information provided for your assigned rocket assembly project (See Course Resources as per attached):   • Develop the cost management plan for your assigned rocket assembly project.   • Develop the human resource management plan your assigned rocket assembly project.   As limited to the rubric below:  Ensure that your project documents address the criteria of the rubric below and follows the stated requirements.   Cost Management Plan 1.1 Units of Measure  1.2 Level of Precision  1.3 Level of Accuracy  1.4 Process for Formal Acceptances  1.5 Process to Control Requests for Changes  1.6 Organizational Procedural Links  1.7 Control Thresholds  1.8 Rules of Performance Measurement  1.9 Reporting Formats  1.10 Process Descriptions  Human Resource Management Plan 2.1 Roles and Responsibilities  2.2 Project Organization Charts  2.3 Staffing Management Plan     GM592 Unit 3 Team Assignment: 50 Points  Content (0-30 points)   1. Tool Development (Cost Management Plan)    a) Units of measure. Each unit used in measurements (such as staff hours, staff days, weeks for time measures; or meters, liters, tons, kilometers, or cubic yards for quantity measures; or lump sum in currency form) is defined for each of the resources. 10  b) Level of precision. The degree to which activity cost estimates will be rounded up or down (e.g., US $100.49 to US $100, or US $995.59 to US $1,000), based on the scope of the activities and magnitude of the project  c) Level of accuracy. The acceptable range (e.g., :10%) used in determining realistic activity cost estimates is specified, and may include an amount for contingencies  d) Process that specifies how formal acceptances of the completed project deliverables will be obtained?  e) Process to control how requests for changes to the detailed scope statement will be processed as defined in the Integrated Change Control process (PMBOK section 4.5)?  f) Organizational procedures links. The WBS component used for the project cost accounting is called the control account. Each control account is assigned a unique code or account number(s) that links directly to the performing organizations accounting system. g) Control thresholds. Variance thresholds for monitoring cost performance may be specified to indicate an agreed—upon amount of variation to be allowed before some action needs to be taken. Thresholds are typically expressed as percentage deviations from the baseline plan.  h) Rules of performance measurement. Earned value management (EVM) rules of performance measurement are set.  i) Reporting formats. The formats and frequency for the various cost reports are defined.  j) Process descriptions. Descriptions of each of the other cost management processes are documented.    2. Tool Development (Human Resource Management Plan)  a) Roles and responsibilities of assigned skill sets? 10  i) Role?  ii) Authority?  iii) Responsibility?  iv) Competency?  b) Project organization charts?  c) Staffing management plan?  i) Staff acquisition?  ii) Resource calendars?  iii) Staff release plan?  iv) Training needs?  v) Recognition and rewards?  vi) Compliance?  vii) Safety?            Analysis (0-11 points)  Response exhibits strong higher-order critical thinking and analysis (e.g., evaluation). Paper shows original thought. 3  Analysis includes proper classifications, explanations, comparisons and inferences. 4  Critical thinking includes appropriate judgments, conclusions and assessment based on evaluation and synthesis of information.    Writing (0-9 points)  Grammatical skills are strong with typically less than one error per page. Correct use of APA when assigned. 3  Appropriate to the assignment, fresh (interesting to read), accurate, (no far-fetched, unsupported comments), precise (say what you mean), and concise (not wordy). 3  Project is in 12-point font. Narrative sections are double-spaced with a double space between. Project is free of serious errors; grammar, punctuation, and spelling help to clarify the meaning by following accepted conventions.

Assignment 2:  

This Assignment is designed to evaluate your ability to research, organize, and demonstrate project data and financial information pertaining to the development of the feasibility study within the project planning phase.   
In this Assignment, you will be assessed on the following outcome:   Plan cost management with associated resources.   Planning is moving right along. You are in the process of pulling together the Cost Management Plan, your definitive cost estimate, the project spend plan and baseline, your human resource management plan, and your procurement management plan.  
Given the information provided you for your assigned rocket assembly project (See Course Resources):   
• Construct a definitive cost estimate based on your definitive duration estimate for your assigned rocket assembly project.  
• Build a project spend plan with a graph of your cost baseline (Cumulative or S-Curve) with your EAC identified for your assigned rocket assembly project.  
• Ensure that your project documents address the criteria of the rubric below and follows the stated requirements.   •
GM592 Unit 3 Individual Assignment: 40 Points  

(0-24 points)   
1. Tool Development (Definitive Cost Estimate)   
a) Durations reflect task totals that match with deliverables? 12  
b) Sub-task totals properly calculated and rolled up?  
c) Work packages are accurate and controllable?  
d) Work packages total to sub-tasks correctly?  
e) Levels of effort reflect activity effort correctly?  
f) Skill-sets totaled correctly?  
g) Skill-set costs reflect rates and hour totals?  
h) Duration total matches the total of all skill-sets?  
2. Tool Development (Spend Plan with Baseline)  
a) Reflects schedule planning increments (day/week/month)? 12  
b) Incremental costs reflect labor/equipment/material costs (not counting indirect costs) and totaled incrementally as well as cumulatively?  
c) Cumulative costs are depiction of total project costs?  
d) Cumulative cost curve graph (S-curve graph)?  
e) Cost baseline (S-Curve) based on total project cost?  
f) Estimate at Completion (EAC) depicted on cost baseline graph?    
Analysis (9 points)   Response exhibits strong higher-order critical thinking and analysis (e.g., evaluation). Paper shows original thought. 3   
Analysis includes proper classifications, explanations, comparisons and inferences. 3   
Critical thinking includes appropriate judgments, conclusions and assessment based on           3      
evaluation and synthesis of information.      
Writing (7 points)   
Grammatical skills are strong with typically less than one error per page. Correct use of APA when assigned. 3   
Appropriate to the assignment, fresh (interesting to read), accurate, (no far-fetched, unsupported comments), precise (say what you mean), and concise (not wordy). 2   
Project is in 12-point font.
Narrative sections are double-spaced with a double space between.   
Project is free of serious errors; grammar, punctuation, and spelling help to clarify the meaning by following accepted conventions. 2

2

>Hi Lvl

WBS

.

& Dry

.0

.0

Measure body tube

Apply glue

.0

Assembly

.0

.0

WBS # TASKS
1 0
Engine Mount Assembly
1.1
Locate engine mount parts
1.2 Laying mout to ruler
1.

3
Marking mount
1.

4
Cutting mount
1.

5
Inserting hook
1.

6
Testing adapter ring
1.

7
Glue
2.0
Shock Cord Mount Assembly
2.1
Locate cord mount parts
2.2
Cut cord mount
2.3
Crease assembly
2.4
Glue mount assembly
2.5
Fold mount assembly
2.6
Clamp mount assembly
3.0
Fin Preparation
3.1 Select fin pattern
3.2
Trace fin patterns
3.3
Cut fin patterns
3.4
Save scrap
3.5
Course sand fins
3.6
Fine sand fins
4.0
Engine Mount Installation
4.1
Locate body tube
4.2
Measure body tube
4.3
Spread glue
4.4
Insert engine mount
5.0
Tube Marking Detail
5.1
Locate tube marking guide
5.2
Wrap guide
5.3
Mark tube
5.4
Draw fin markings
6.0
Fin Attachment
6.1
Apply glue
6.2
Apply second layer glue
6.3 Adjust fin
6.4
Set aside to dry
7.0
Launch Lug Attachment
7.1
Measure lug attachement
7.2
Glue lug attachment
7.3
Dry lug attachment
8
Glue Reinforcement
8.1
Reinforce fins
8.2 Glue dry
9
Shock Cord Mount Attachment
9.1
9.2
9.3
Set mount
9.4
Set glue
10
Parachute
10.1
Cut out parachute
10.2
Tape removal
10.3
Tape attachment
10.4
Shroud line assembly
10.5 Shroud line attachment
11
Parachute & Shock Cord Attachment to Nose Cone
11.1
Shroud line threading
11.2
Parachute pass throough
1

1.3
Line tightening
1

1.4
Shock cord tie down
12
Finishing Rocket
12.1
Verify dryness
12.2
Prime rocket
12.3
Paint rocket
12.4 Decal rocket
12.5 Decal qualitry assurance
12.6 Large decals

Activity List

Engine Mount Assembly
Locate engine mount parts

Marking mount

Mark tube

mm

mm

Cutting mount

Inserting hook

Testing adapter ring

Apply glue

Shock Cord Mount Assembly
Locate cord mount parts

Cut cord mount

Crease assembly

Glue mount assembly

Spread glue

Fold mount assembly

Clamp mount assembly

Allow to dry
Fin Preparation

Select fin pattern

Select fin pattern

Trace fin patterns

Trace fin #2
Match fin #2
Cut fin patterns

Save scrap

Course sand fins

Fine sand fins

Engine Mount Installation
Locate body tube

Locate body tube

Measure body tube

mm

Spread glue

Insert engine mount

Tube Marking Detail
Locate tube marking guide

Wrap guide

Mark tube

Draw fin markings

mm

Draw straight line

Draw straight line
Extend line 76mm

mm

Fin Attachment

Apply second layer glue

Set aside to dry

Launch Lug Attachment
Measure lug attachement

mm

Glue lug attachment

Dry lug attachment

Allow to dry
Glue Reinforcement
Reinforce fins

Stand rocket on drying table

Allow to dry
Shock Cord Mount Attachment
Measure body tube

Apply glue

Set mount

Set glue

Allow to dry

Cut out parachute

Tape removal

Tape attachment

Shroud line assembly

Parachute & Shock Cord Attachment to Nose Cone
Shroud line threading

Parachute pass throough

Line tightening

Shock cord tie down

Finishing Rocket
Verify dryness

Prime rocket

Paint rocket

Allow to dry

Decal #1
Decal #2
Decal #3
Decal #4
Decal #5
Decal #6
Decal #7
Decal #8
Decal #9
Decal #10
Decal #11
Decal #12

Decal #1
Decal #2
Decal #3
Decal #4
Decal #5
Decal #6
Decal #7
Decal #8
Decal #9
Decal #10
Decal #11
Decal #12
Decal #13

Decal #1
Decal #2
Decal #3
Decal #4
Decal #5
Decal #6
Decal #7
Decal #8
Decal #9
Decal #10
Decal #11
Decal #12
Decal #13

DELIVERABLES & TASKS ACTIVITIES
Locate light blue engine mount tube
Locate engine hook
Locate green adapter ring
Laying mount to ruler
Move tube to ruler
Align with zero mark
Take pencil
Mark

25
Mark

64
Cut 3mm slit
Insert hook
Extend hook
Slide ring into front of engine tube
Slide ring over engine hook to 25mm mark
Glue & Dry
Apply glue to one side
Apply glue to other side
Dry glue
Set assembly aside
Allow to dry
Locate cord mount on pattern sheet
Cut cord mount along outline
Fold on dotted lines
Crease on dotted lines
Lay end of shock cord in glue
Fold section 1
Apply glue section 3
Fold again
Clamp assembly
Cut fin pattern from sheet
Trace fin #1
Match fin #1
Trace fin #2
Match fin #2
Cut fin #1
Chect fin #1
Cut fin #2
Chect fin #2
Cut fin #3
Chect fin #3
Set aside piece scrap basa wood
Lay sandpaper
Stack fins
Sand fins
Fine sand fin #1
Round leading edge fin #1
Round trailing edge fin #1
Streamline training edge fin #1
Fine sand fin #2
Round leading edge fin #2
Round trailing edge fin #2
Streamline training edge fin #2
Fine sand fin #3
Round leading edge fin #3
Round trailing edge fin #3
Streamline training edge fin #3
Measure body tube

38
Spread glue around body tube
Insert engine mount assembly into body tube
Locate tube marking guide on pattern sheet
Cut guide alone outline
Wrap guide around body tube
Tape guide to body tube
Mark tube for fins
Mark tube for fin #1
Mark tube for fin #2
Mark tube for fin #3
Write LL on body tube
Remove guide
Fin #1
Draw straight line
Extend line

76
Fin #2
Extend line 76mm
Fin #3
Draw launch lug line
Draw line

102
Apply glue to root edges of fins
Apply to fin #1
Allow fin #1 to dry
Apply to fin #2
Allow fin #2 to dry
Apply to fin #3
Allow fin #3 to dry
Apply more glue to Fin #1
Set fin #1
Press fin #1
Apply more glue to Fin #2
Set fin #2
Press fin #2
Apply more glue to Fin #3
Set fin #3
Press fin #3
Adjust fins
Adjust fin #1
Attach fin #1
Adjust fin #2
Attach fin #2
Adjust fin #3
Attach fin #3
Stand rocket on drying table
Allow fins to dry
Measure

41
Mark attachment point
Apply glue to launch lug
Attach launch lug to body tube
Ensure launch lug alignment
Reinforce fin fin #1
Reinforce fin fin #2
Reinforce fin fin #3
Reinforce launch lug
Reinforch side 1
Reinforce side 2
Glue drying
Wipe away excess glue
Measure 25mm
Apply glue to shock cord
Insert cord into tube
Set mount 25mm
Press mount into glue
Hold mount attachment
Parachute Assembly
Cut parachute along line
Remove tape
Fold shroud lines
Cut shroud lines
Attach tape rings
Attach tape ring #1
Attach tape ring #2
Attach tape ring #3
Attach tape ring #4
Attach tape ring #5
Attach tape ring #6
Press tape tape rings into place
Press tape tape rings into place #1
Press tape tape rings into place #2
Press tape tape rings into place #3
Press tape tape rings into place #4
Press tape tape rings into place #5
Press tape tape rings into place #6
Punch tape ring holes
Punch tape ring holes #1
Punch tape ring holes #2
Punch tape ring holes #3
Punch tape ring holes #4
Punch tape ring holes #5
Punch tape ring holes #6
Pass shroud line through hole
Tie lines together
Thread shroud lines
Pass parachute through loop
Pull lines tight
Tie down shock cord free end
Check to ensure glue joint are dry
Apply primer coat #1
Sand rocket body #1
Apply primer coat #2
Sand rocket body #2
Insert paint handle
Apply paint to rocket
Apply Water Decals
Cut decals
Decal #1
Decal #2
Decal #3
Decal #4
Decal #5
Decal #6
Decal #7
Decal #8
Decal #9
Decal #10
Decal #11
Decal #12
Decal #

13
Dip in water
Decal #13
Slip decals
Blot decals
Dry decals
Allow to dry overnight
Apply clear spray to decals
Apply spray to rocket
Apply large decals
Peel backing
Cut away backing
Align decal
Peel off backing
Smooth decal

WBS

WBS # TASKS

Engine Mount Assembly

1.1 Locate engine mount parts

Locate light blue engine mount tube

Locate engine hook

Locate green adapter ring

1.2 Laying mount to ruler

Move tube to ruler

Align with zero mark

1.3 Marking mount

Take pencil

Mark tube

1.4 Cutting mount

Cut 3mm slit

Inserting hook

Insert hook

Extend hook

Testing adapter ring

Slide ring into front of engine tube

Slide ring over engine hook to 25mm mark

Glue & Dry

Apply glue

Apply glue to one side

Apply glue to other side

Dry glue

Set assembly aside

Allow to dry

2.0 Shock Cord Mount Assembly
2.1 Locate cord mount parts

Locate cord mount on pattern sheet

2.2 Cut cord mount

Cut cord mount along outline

2.3 Crease assembly

Fold on dotted lines

Crease on dotted lines

2.4 Glue mount assembly

Spread glue

Lay end of shock cord in glue

2.5 Fold mount assembly

Fold section 1

Apply glue section 3

Fold again

2.6 Clamp mount assembly

Clamp assembly

Allow to dry

3.0 Fin Preparation

3.1 Select fin pattern

Select fin pattern

Cut fin pattern from sheet

3.2 Trace fin patterns
3.2.1 Trace fin #1
3.2.2 Match fin #1

Trace fin #2

Match fin #2

Trace fin #2

Match fin #2

3.3 Cut fin patterns

Cut fin #1

Chect fin #1

Cut fin #2

Chect fin #2

Cut fin #3

Chect fin #3

3.4 Save scrap

Set aside piece scrap basa wood

3.5 Course sand fins

Lay sandpaper

Stack fins

Sand fins

3.6 Fine sand fins

Fine sand fin #1

Round leading edge fin #1

Round trailing edge fin #1

Streamline training edge fin #1

Fine sand fin #2

Round leading edge fin #2

Round trailing edge fin #2

Streamline training edge fin #2

Fine sand fin #3

Round leading edge fin #3

Round trailing edge fin #3

Streamline training edge fin #3

4.0 Engine Mount Installation
4.1 Locate body tube

Locate body tube

4.2 Measure body tube
4.3 Spread glue

Spread glue around body tube

4.4 Insert engine mount

Insert engine mount assembly into body tube

5.0 Tube Marking Detail
5.1 Locate tube marking guide

Locate tube marking guide on pattern sheet

Cut guide alone outline

5.2 Wrap guide

Wrap guide around body tube

Tape guide to body tube

5.3 Mark tube

Mark tube for fins

Mark tube for fin #1

Mark tube for fin #2

Mark tube for fin #3

Write LL on body tube

Remove guide

5.4 Draw fin markings

Fin #1

Draw straight line

Extend line 76mm

Fin #2

Draw straight line

Extend line 76mm

Fin #3

Draw straight line

Extend line 76mm

Draw launch lug line

6.0 Fin Attachment
6.1 Apply glue to root edges of fins
6.1.1 Apply to fin #1
6.1.2 Allow fin #1 to dry
6.1.3 Apply to fin #2

Allow fin #2 to dry

Apply to fin #3

Allow fin #3 to dry

6.2 Apply second layer glue
6.2.1 Apply more glue to Fin #1
6.2.2 Set fin #1
6.2.3 Press fin #1

Apply more glue to Fin #2

Set fin #2

Press fin #2

Apply more glue to Fin #3

Set fin #3

Press fin #3

6.3 Adjust fins
6.3.1 Adjust fin #1
6.3.2 Attach fin #1
6.3.3 Adjust fin #2

Attach fin #2

Adjust fin #3

Attach fin #3

6.4 Set aside to dry

Stand rocket on drying table

Allow fins to dry

7.0 Launch Lug Attachment
7.1 Measure lug attachement
7.1.1

7.1.2 Mark attachment point
7.2 Glue lug attachment
7.2.1 Apply glue to launch lug
7.2.2 Attach launch lug to body tube
7.3 Dry lug attachment

Ensure launch lug alignment

Allow to dry

Glue Reinforcement

8.1 Reinforce fins

Reinforce fin fin #1

Reinforce fin fin #2

Reinforce fin fin #3

8.2 Reinforce launch lug

Reinforch side 1

Reinforce side 2

8.2 Glue drying
8.2.1 Stand rocket on drying table
8.2.2 Wipe away excess glue

Allow to dry

Shock Cord Mount Attachment

9.1 Measure body tube

Measure 25mm

9.2 Apply glue

Apply glue to shock cord

Insert cord into tube

9.3 Set mount

Set mount 25mm

Press mount into glue

9.4 Set glue

Hold mount attachment

Allow to dry

Parachute Assembly

10.1 Cut out parachute

Cut parachute along line

10.2 Tape removal

Remove tape

Fold shroud lines

Cut shroud lines

10.3 Tape attachment

Attach tape rings

Attach tape ring #1

Attach tape ring #2

Attach tape ring #3

Attach tape ring #4

Attach tape ring #5

Attach tape ring #6

Press tape tape rings into place

Press tape tape rings into place #1

Press tape tape rings into place #2

Press tape tape rings into place #3

Press tape tape rings into place #4

Press tape tape rings into place #5

Press tape tape rings into place #6

Punch tape ring holes

Punch tape ring holes #1

Punch tape ring holes #2

Punch tape ring holes #3

Punch tape ring holes #4

Punch tape ring holes #5

Punch tape ring holes #6

10.4 Shroud line assembly

Pass shroud line through hole

Tie lines together

Parachute & Shock Cord Attachment to Nose Cone

11.1 Shroud line threading

Thread shroud lines

11.2 Parachute pass throough

Pass parachute through loop

Line tightening

Pull lines tight

Shock cord tie down

Tie down shock cord free end

Finishing Rocket

12.1 Verify dryness

Check to ensure glue joint are dry

12.2 Prime rocket

Apply primer coat #1

Sand rocket body #1

Apply primer coat #2

Sand rocket body #2

12.3 Paint rocket

Insert paint handle

Apply paint to rocket

Allow to dry

12.4 Apply Water Decals

Cut decals

Decal #1

Decal #2

Decal #3

Decal #4

Decal #5

Decal #6

Decal #7

Decal #8

Decal #9

Decal #10

Decal #11

Decal #12

Decal #13

Dip in water

Decal #1

Decal #2

Decal #3

Decal #4

Decal #5

Decal #6

Decal #7

Decal #8

Decal #9

Decal #10

Decal #11

Decal #12

Decal #13

Slip decals

Decal #1

Decal #2

Decal #3

Decal #4

Decal #5

Decal #6

Decal #7

Decal #8

Decal #9

Decal #10

Decal #11

Decal #12

Decal #13

Blot decals

Decal #1

Decal #2

Decal #3

Decal #4

Decal #5

Decal #6

Decal #7

Decal #8

Decal #9

Decal #10

Decal #11

Decal #12

Decal #13

Dry decals

Allow to dry overnight

Apply clear spray to decals

12.4.1 Apply spray to rocket
12.5 Apply large decals
12.5.1 Peel backing

Cut away backing

Align decal

Peel off backing

Smooth decal

1.0
1.1.1
1.1.2
1.1.3
1.2.1
1.2.2
1.3.1
1.3.2
1.

3.2.1 Mark 25mm
1.

3.2.2 Mark 64 mm
1.4.1
1.5
1.5.1
1.5.2
1.6
1.6.1
1.6.2
1.7
1.7.1
1.

7.1.1
1.

7.1.2
1.7.2
1.

7.2.1
1.

7.2.2
2.1.1
2.2.1
2.3.1
2.3.2
2.4.1
2.4.2
2.5.1
2.5.2
2.5.3
2.6.1
2.6.2
3.1.1
3.1.2
3.2.3
3.2.4
3.2.5
3.2.6
3.3.1
3.3.2
3.3.3
3.3.4
3.3.5
3.3.6
3.4.1
3.5.1
3.5.2
3.5.3
3.6.1
3.

6.1.1
3.

6.1.2
3.

6.1.3
3.6.2
3.

6.2.1
3.

6.2.2
3.

6.2.3
3.6.3
3.

6.3.1
3.

6.3.2
3.

6.3.3
4.1.1
4.2.1 Measure body tube 38 mm
4.3.1
4.4.1
5.1.1
5.1.2
5.2.1
5.2.2
5.3.1
5.3.1.1
5.3.1.2
5.3.1.3
5.3.2
5.3.3
5.4.1
5.4.1.1
5.4.1.2
5.4.2
5.4.2.1
5.4.2.2
5.4.3
5.4.3.1
5.4.3.2
5.4.4
5.4.4.1 Draw line 102 mm
6.1.4
6.1.5
6.1.6
6.2.4
6.2.5
6.2.6
6.2.7
6.2.8
6.2.9
6.3.4
6.3.5
6.3.6
6.4.1
6.4.2
Measure 41mm
7.3.1
7.3.2
8.0
8.1.1
8.1.2
8.1.3
8.2.1
8.2.2
8.2.3
9.0
9.1.1
9.2.1
9.2.2
9.3.1
9.3.2
9.4.1
9.4.2
10.0
10.1.1
10.2.1
10.2.2
10.2.3
10.3.1
10.3.1.1
10.3.1.2
10.3.1.3
10.3.1.4
10.3.1.5
10.3.1.6
10.3.2
10.3.2.1
10.3.2.2
10.3.2.3
10.3.2.4
10.3.2.5
10.3.2.6
10.3.3
10.3.3.1
10.3.3.2
10.3.3.3
10.3.3.4
10.3.3.5
10.3.3.6
10.4.1
10.4.2
11.0
11.1.1
11.2.1
11.3
11.3.1
11.4
11.4.1
12.0
12.1.1
12.2.1
12.2.2
12.2.3
12.2.4
12.3.1
12.3.2
12.3.3
12.4.1
12.4.1.1
12.4.1.2
12.4.1.3
12.4.1.4
12.4.1.5
12.4.1.6
12.4.1.7
12.4.1.8
12.4.1.9
12.4.1.10
12.4.1.11
12.4.1.12
12.4.1.13
12.4.2
12.4.2.1
12.4.2.2
12.4.2.3
12.4.2.4
12.4.2.5
12.4.2.6
12.4.2.7
12.4.2.8
12.4.2.9
12.4.2.10
12.4.2.11
12.4.2.12
12.4.2.13
12.4.3
12.4.3.1
12.4.3.2
12.4.3.3
12.4.3.4
12.4.3.5
12.4.3.6
12.4.3.7
12.4.3.8
12.4.3.9
12.4.3.10
12.4.3.11
12.4.3.12
12.4.3.13
12.4.4
12.4.4.1
12.4.4.2
12.4.4.3
12.4.4.4
12.4.4.5
12.4.4.6
12.4.4.7
12.4.4.8
12.4.4.9
12.4.4.10
12.4.4.11
12.4.4.12
12.4.4.13
12.4.5
12.5.1
12.4.6
12.5.2
12.5.3
12.5.4
12.5.5

Network

Engine Mount Assembly Engine Mount Installation Launch Lug Attachment
Fin Preparation Tube Marking Detail Fin Attachment Glue Reinforcement
Shock Cord Mount Assembly Finishing Rocket
Parachute & Shock Cord Attachment to Nose Cone Shock Cord Mount Attachment

Parachute Assembly

Gantt

WBS # TASKS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

25

38

41

64

76

102

1.0 Engine Mount Assembly
2.0 Shock Cord Mount Assembly
3.0 Fin Preparation
4.0 Engine Mount Installation
5.0 Tube Marking Detail
6.0 Fin Attachment
7.0 Launch Lug Attachment
8.0 Glue Reinforcement
9.0 Shock Cord Mount Attachment
10.0 Parachute Assembly
11.0 Parachute & Shock Cord Attachment to Nose Cone
12.0 Finishing Rocket

DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY 8 DAY 9 DAY 10 DAY 11 DAY 12 DAY 13 DAY

14 DAY

15 DAY

16 DAY

17 DAY

18 DAY

19
20 21 22 23 24 26 27 28 29 30 31 32 33 34 35 36 37 39 40 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 65 66 67 68 69 70 71 72 73 74 75 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147

Duration

Est

WBS # TASKS
1.0 Engine Mount Assembly
1.1 Locate engine mount parts
1.1.1 Locate light blue engine mount tube
1.1.2 Locate engine hook
1.1.3 Locate green adapter ring
1.2 Laying mount to ruler
1.2.1 Move tube to ruler
1.2.2 Align with zero mark
1.3 Marking mount
1.3.1 Take pencil
1.3.2 Mark tube

Mark 25mm

Mark 64 mm
1.4 Cutting mount
1.4.1 Cut 3mm slit
1.5 Inserting hook
1.5.1 Insert hook
1.5.2 Extend hook
1.6 Testing adapter ring
1.6.1 Slide ring into front of engine tube
1.6.2 Slide ring over engine hook to 25mm mark
1.7 Glue & Dry
1.7.1 Apply glue

Apply glue to one side

Apply glue to other side
1.7.2 Dry glue

Set assembly aside

Allow to dry
2.0 Shock Cord Mount Assembly
2.1 Locate cord mount parts
2.1.1 Locate cord mount on pattern sheet
2.2 Cut cord mount
2.2.1 Cut cord mount along outline
2.3 Crease assembly
2.3.1 Fold on dotted lines
2.3.2 Crease on dotted lines
2.4 Glue mount assembly
2.4.1 Spread glue
2.4.2 Lay end of shock cord in glue
2.5 Fold mount assembly
2.5.1 Fold section 1
2.5.2 Apply glue section 3
2.5.3 Fold again
2.6 Clamp mount assembly
2.6.1 Clamp assembly
2.6.2 Allow to dry
3.0 Fin Preparation
3.1 Select fin pattern
3.1.1 Select fin pattern
3.1.2 Cut fin pattern from sheet
3.2 Trace fin patterns
3.2.1 Trace fin #1
3.2.2 Match fin #1
3.2.3 Trace fin #2
3.2.4 Match fin #2
3.2.5 Trace fin #2
3.2.6 Match fin #2
3.3 Cut fin patterns
3.3.1 Cut fin #1
3.3.2 Chect fin #1
3.3.3 Cut fin #2
3.3.4 Chect fin #2
3.3.5 Cut fin #3
3.3.6 Chect fin #3
3.4 Save scrap
3.4.1 Set aside piece scrap basa wood
3.5 Course sand fins
3.5.1 Lay sandpaper
3.5.2 Stack fins
3.5.3 Sand fins
3.6 Fine sand fins
3.6.1 Fine sand fin #1

Round leading edge fin #1

Round trailing edge fin #1

Streamline training edge fin #1
3.6.2 Fine sand fin #2

Round leading edge fin #2

Round trailing edge fin #2

Streamline training edge fin #2
3.6.3 Fine sand fin #3

Round leading edge fin #3

Round trailing edge fin #3

Streamline training edge fin #3
4.0 Engine Mount Installation
4.1 Locate body tube
4.1.1 Locate body tube
4.2 Measure body tube
4.2.1 Measure body tube 38 mm
4.3 Spread glue
4.3.1 Spread glue around body tube
4.4 Insert engine mount
4.4.1 Insert engine mount assembly into body tube
5.0 Tube Marking Detail
5.1 Locate tube marking guide
5.1.1 Locate tube marking guide on pattern sheet
5.1.2 Cut guide alone outline
5.2 Wrap guide
5.2.1 Wrap guide around body tube
5.2.2 Tape guide to body tube
5.3 Mark tube
5.3.1 Mark tube for fins
5.3.1.1 Mark tube for fin #1
5.3.1.2 Mark tube for fin #2
5.3.1.3 Mark tube for fin #3
5.3.2 Write LL on body tube
5.3.3 Remove guide
5.4 Draw fin markings
5.4.1 Fin #1
5.4.1.1 Draw straight line
5.4.1.2 Extend line 76mm
5.4.2 Fin #2
5.4.2.1 Draw straight line
5.4.2.2 Extend line 76mm
5.4.3 Fin #3
5.4.3.1 Draw straight line
5.4.3.2 Extend line 76mm
5.4.4 Draw launch lug line
5.4.4.1 Draw line 102 mm
6.0 Fin Attachment
6.1 Apply glue to root edges of fins
6.1.1 Apply to fin #1
6.1.2 Allow fin #1 to dry
6.1.3 Apply to fin #2
6.1.4 Allow fin #2 to dry
6.1.5 Apply to fin #3
6.1.6 Allow fin #3 to dry
6.2 Apply second layer glue
6.2.1 Apply more glue to Fin #1
6.2.2 Set fin #1
6.2.3 Press fin #1
6.2.4 Apply more glue to Fin #2
6.2.5 Set fin #2
6.2.6 Press fin #2
6.2.7 Apply more glue to Fin #3
6.2.8 Set fin #3
6.2.9 Press fin #3
6.3 Adjust fins
6.3.1 Adjust fin #1
6.3.2 Attach fin #1
6.3.3 Adjust fin #2
6.3.4 Attach fin #2
6.3.5 Adjust fin #3
6.3.6 Attach fin #3
6.4 Set aside to dry
6.4.1 Stand rocket on drying table
6.4.2 Allow fins to dry
7.0 Launch Lug Attachment
7.1 Measure lug attachement
7.1.1 Measure 41mm
7.1.2 Mark attachment point
7.2 Glue lug attachment
7.2.1 Apply glue to launch lug
7.2.2 Attach launch lug to body tube
7.3 Dry lug attachment
7.3.1 Ensure launch lug alignment
7.3.2 Allow to dry
8.0 Glue Reinforcement
8.1 Reinforce fins
8.1.1 Reinforce fin fin #1
8.1.2 Reinforce fin fin #2
8.1.3 Reinforce fin fin #3
8.2 Reinforce launch lug
8.2.1 Reinforch side 1
8.2.2 Reinforce side 2

Glue drying

Stand rocket on drying table

Wipe away excess glue

Allow to dry

9.0 Shock Cord Mount Attachment
9.1 Measure body tube
9.1.1 Measure 25mm
9.2 Apply glue
9.2.1 Apply glue to shock cord
9.2.2 Insert cord into tube
9.3 Set mount
9.3.1 Set mount 25mm
9.3.2 Press mount into glue
9.4 Set glue
9.4.1 Hold mount attachment
9.4.2 Allow to dry
10.0 Parachute Assembly
10.1 Cut out parachute
10.1.1 Cut parachute along line
10.2 Tape removal
10.2.1 Remove tape
10.2.2 Fold shroud lines
10.2.3 Cut shroud lines
10.3 Tape attachment
10.3.1 Attach tape rings
10.3.1.1 Attach tape ring #1
10.3.1.2 Attach tape ring #2
10.3.1.3 Attach tape ring #3
10.3.1.4 Attach tape ring #4
10.3.1.5 Attach tape ring #5
10.3.1.6 Attach tape ring #6
10.3.2 Press tape tape rings into place
10.3.2.1 Press tape tape rings into place #1
10.3.2.2 Press tape tape rings into place #2
10.3.2.3 Press tape tape rings into place #3
10.3.2.4 Press tape tape rings into place #4
10.3.2.5 Press tape tape rings into place #5
10.3.2.6 Press tape tape rings into place #6
10.3.3 Punch tape ring holes
10.3.3.1 Punch tape ring holes #1
10.3.3.2 Punch tape ring holes #2
10.3.3.3 Punch tape ring holes #3
10.3.3.4 Punch tape ring holes #4
10.3.3.5 Punch tape ring holes #5
10.3.3.6 Punch tape ring holes #6
10.4 Shroud line assembly
10.4.1 Pass shroud line through hole
10.4.2 Tie lines together
11.0 Parachute & Shock Cord Attachment to Nose Cone
11.1 Shroud line threading
11.1.1 Thread shroud lines
11.2 Parachute pass throough
11.2.1 Pass parachute through loop
11.3 Line tightening
11.3.1 Pull lines tight
11.4 Shock cord tie down
11.4.1 Tie down shock cord free end
12.0 Finishing Rocket
12.1 Verify dryness
12.1.1 Check to ensure glue joint are dry
12.2 Prime rocket
12.2.1 Apply primer coat #1
12.2.2 Sand rocket body #1
12.2.3 Apply primer coat #2
12.2.4 Sand rocket body #2
12.3 Paint rocket
12.3.1 Insert paint handle
12.3.2 Apply paint to rocket
12.3.3 Allow to dry
12.4 Apply Water Decals
12.4.1 Cut decals
12.4.1.1 Decal #1
12.4.1.2 Decal #2
12.4.1.3 Decal #3
12.4.1.4 Decal #4
12.4.1.5 Decal #5
12.4.1.6 Decal #6
12.4.1.7 Decal #7
12.4.1.8 Decal #8
12.4.1.9 Decal #9
12.4.1.10 Decal #10
12.4.1.11 Decal #11
12.4.1.12 Decal #12
12.4.1.13 Decal #13
12.4.2 Dip in water
12.4.2.1 Decal #1
12.4.2.2 Decal #2
12.4.2.3 Decal #3
12.4.2.4 Decal #4
12.4.2.5 Decal #5
12.4.2.6 Decal #6
12.4.2.7 Decal #7
12.4.2.8 Decal #8
12.4.2.9 Decal #9
12.4.2.10 Decal #10
12.4.2.11 Decal #11
12.4.2.12 Decal #12
12.4.2.13 Decal #13
12.4.3 Slip decals
12.4.3.1 Decal #1
12.4.3.2 Decal #2
12.4.3.3 Decal #3
12.4.3.4 Decal #4
12.4.3.5 Decal #5
12.4.3.6 Decal #6
12.4.3.7 Decal #7
12.4.3.8 Decal #8
12.4.3.9 Decal #9
12.4.3.10 Decal #10
12.4.3.11 Decal #11
12.4.3.12 Decal #12
12.4.3.13 Decal #13
12.4.4 Blot decals
12.4.4.1 Decal #1
12.4.4.2 Decal #2
12.4.4.3 Decal #3
12.4.4.4 Decal #4
12.4.4.5 Decal #5
12.4.4.6 Decal #6
12.4.4.7 Decal #7
12.4.4.8 Decal #8
12.4.4.9 Decal #9
12.4.4.10 Decal #10
12.4.4.11 Decal #11
12.4.4.12 Decal #12
12.4.4.13 Decal #13
12.4.5 Dry decals
12.5.1 Allow to dry overnight
12.4.6 Apply clear spray to decals
12.4.1 Apply spray to rocket
12.5 Apply large decals
12.5.1 Peel backing
12.5.2 Cut away backing
12.5.3 Align decal
12.5.4 Peel off backing
12.5.5 Smooth decal

1.3.2.1 1.3.2.2 1.7.1.1 1.7.1.2 1.7.2.1 1.7.2.2 3.6.1.1 3.6.1.2 3.6.1.3 3.6.2.1 3.6.2.2 3.6.2.3 3.6.3.1 3.6.3.2 3.6.3.3
8.3
8.3.1
8.3.2
8.3.3

X

-Impact

WBS # TASKS

1.0 Engine Mount Assembly X X X X
2.0 Shock Cord Mount Assembly X X X
3.0 Fin Preparation X X X X
4.0 Engine Mount Installation X X X

5.0 Tube Marking Detail
6.0 Fin Attachment
7.0 Launch Lug Attachment
8.0 Glue Reinforcement
9.0 Shock Cord Mount Attachment
10.0 Parachute Assembly
11.0 Parachute & Shock Cord Attachment to Nose Cone
12.0 Finishing Rocket

Fitter Draftsman Cutter Gluer Sander

RAM

WBS # TASKS Fitter Draftsman Cutter Gluer

Sander

1.0 Engine Mount Assembly
1.1 Locate engine mount parts
1.1.1 Locate light blue engine mount tube
1.1.2 Locate engine hook
1.1.3 Locate green adapter ring
1.2 Laying mount to ruler
1.2.1 Move tube to ruler
1.2.2 Align with zero mark
1.3 Marking mount
1.3.1 Take pencil

Take pencil

1.3.2 Mark tube
1.3.2.1 Mark 25mm
1.3.2.2 Mark 64 mm
1.4 Cutting mount
1.4.1 Cut 3mm slit
1.5 Inserting hook
1.5.1 Insert hook
1.5.2 Extend hook
1.6 Testing adapter ring
1.6.1 Slide ring into front of engine tube
1.6.2 Slide ring over engine hook to 25mm mark
1.7 Glue & Dry
1.7.1 Apply glue
1.7.1.1 Apply glue to one side
1.7.1.2 Apply glue to other side
1.7.2 Dry glue
1.7.2.1 Set assembly aside
1.7.2.2 Allow to dry
2.0 Shock Cord Mount Assembly
2.1 Locate cord mount parts
2.1.1 Locate cord mount on pattern sheet
2.2 Cut cord mount
2.2.1 Cut cord mount along outline
2.3 Crease assembly
2.3.1 Fold on dotted lines
2.3.2 Crease on dotted lines
2.4 Glue mount assembly
2.4.1 Spread glue
2.4.2 Lay end of shock cord in glue
2.5 Fold mount assembly
2.5.1 Fold section 1
2.5.2 Apply glue section 3
2.5.3 Fold again
2.6 Clamp mount assembly
2.6.1 Clamp assembly
2.6.2 Allow to dry
3.0 Fin Preparation
3.1 Select fin pattern
3.1.1 Select fin pattern
3.1.2 Cut fin pattern from sheet
3.2 Trace fin patterns
3.2.1 Trace fin #1
3.2.2 Match fin #1
3.2.3 Trace fin #2
3.2.4 Match fin #2
3.2.5 Trace fin #2
3.2.6 Match fin #2
3.3 Cut fin patterns
3.3.1 Cut fin #1
3.3.2 Chect fin #1
3.3.3 Cut fin #2
3.3.4 Chect fin #2
3.3.5 Cut fin #3
3.3.6 Chect fin #3
3.4 Save scrap
3.4.1 Set aside piece scrap basa wood
3.5 Course sand fins
3.5.1 Lay sandpaper
3.5.2 Stack fins
3.5.3 Sand fins
3.6 Fine sand fins
3.6.1 Fine sand fin #1
3.6.1.1 Round leading edge fin #1
3.6.1.2 Round trailing edge fin #1
3.6.1.3 Streamline training edge fin #1
3.6.2 Fine sand fin #2
3.6.2.1 Round leading edge fin #2
3.6.2.2 Round trailing edge fin #2
3.6.2.3 Streamline training edge fin #2
3.6.3 Fine sand fin #3
3.6.3.1 Round leading edge fin #3
3.6.3.2 Round trailing edge fin #3
3.6.3.3 Streamline training edge fin #3
4.0 Engine Mount Installation
4.1 Locate body tube
4.1.1 Locate body tube
4.2 Measure body tube
4.2.1 Measure body tube 38 mm
4.3 Spread glue
4.3.1 Spread glue around body tube
4.4 Insert engine mount
4.4.1 Insert engine mount assembly into body tube
5.0 Tube Marking Detail
5.1 Locate tube marking guide
5.1.1 Locate tube marking guide on pattern sheet
5.1.2 Cut guide alone outline
5.2 Wrap guide
5.2.1 Wrap guide around body tube
5.2.2 Tape guide to body tube
5.3 Mark tube
5.3.1 Mark tube for fins
5.3.1.1 Mark tube for fin #1
5.3.1.2 Mark tube for fin #2
5.3.1.3 Mark tube for fin #3
5.3.2 Write LL on body tube
5.3.3 Remove guide
5.4 Draw fin markings
5.4.1 Fin #1
5.4.1.1 Draw straight line
5.4.1.2 Extend line 76mm
5.4.2 Fin #2
5.4.2.1 Draw straight line
5.4.2.2 Extend line 76mm
5.4.3 Fin #3
5.4.3.1 Draw straight line
5.4.3.2 Extend line 76mm
5.4.4 Draw launch lug line
5.4.4.1 Draw line 102 mm
6.0 Fin Attachment
6.1 Apply glue to root edges of fins
6.1.1 Apply to fin #1
6.1.2 Allow fin #1 to dry
6.1.3 Apply to fin #2
6.1.4 Allow fin #2 to dry
6.1.5 Apply to fin #3
6.1.6 Allow fin #3 to dry
6.2 Apply second layer glue
6.2.1 Apply more glue to Fin #1
6.2.2 Set fin #1
6.2.3 Press fin #1
6.2.4 Apply more glue to Fin #2
6.2.5 Set fin #2
6.2.6 Press fin #2
6.2.7 Apply more glue to Fin #3
6.2.8 Set fin #3
6.2.9 Press fin #3
6.3 Adjust fins
6.3.1 Adjust fin #1
6.3.2 Attach fin #1
6.3.3 Adjust fin #2
6.3.4 Attach fin #2
6.3.5 Adjust fin #3
6.3.6 Attach fin #3
6.4 Set aside to dry
6.4.1 Stand rocket on drying table
6.4.2 Allow fins to dry
7.0 Launch Lug Attachment
7.1 Measure lug attachement
7.1.1 Measure 41mm
7.1.2 Mark attachment point
7.2 Glue lug attachment
7.2.1 Apply glue to launch lug
7.2.2 Attach launch lug to body tube
7.3 Dry lug attachment
7.3.1 Ensure launch lug alignment
7.3.2 Allow to dry
8.0 Glue Reinforcement
8.1 Reinforce fins
8.1.1 Reinforce fin fin #1
8.1.2 Reinforce fin fin #2
8.1.3 Reinforce fin fin #3
8.2 Reinforce launch lug
8.2.1 Reinforch side 1
8.2.2 Reinforce side 2
8.3 Glue drying
8.3.1 Stand rocket on drying table
8.3.2 Wipe away excess glue
8.3.3 Allow to dry
9.0 Shock Cord Mount Attachment
9.1 Measure body tube
9.1.1 Measure 25mm
9.2 Apply glue
9.2.1 Apply glue to shock cord
9.2.2 Insert cord into tube
9.3 Set mount
9.3.1 Set mount 25mm
9.3.2 Press mount into glue
9.4 Set glue
9.4.1 Hold mount attachment
9.4.2 Allow to dry
10.0 Parachute Assembly
10.1 Cut out parachute
10.1.1 Cut parachute along line
10.2 Tape removal
10.2.1 Remove tape
10.2.2 Fold shroud lines
10.2.3 Cut shroud lines
10.3 Tape attachment
10.3.1 Attach tape rings
10.3.1.1 Attach tape ring #1
10.3.1.2 Attach tape ring #2
10.3.1.3 Attach tape ring #3
10.3.1.4 Attach tape ring #4
10.3.1.5 Attach tape ring #5
10.3.1.6 Attach tape ring #6
10.3.2 Press tape tape rings into place
10.3.2.1 Press tape tape rings into place #1
10.3.2.2 Press tape tape rings into place #2
10.3.2.3 Press tape tape rings into place #3
10.3.2.4 Press tape tape rings into place #4
10.3.2.5 Press tape tape rings into place #5
10.3.2.6 Press tape tape rings into place #6
10.3.3 Punch tape ring holes
10.3.3.1 Punch tape ring holes #1
10.3.3.2 Punch tape ring holes #2
10.3.3.3 Punch tape ring holes #3
10.3.3.4 Punch tape ring holes #4
10.3.3.5 Punch tape ring holes #5
10.3.3.6 Punch tape ring holes #6
10.4 Shroud line assembly
10.4.1 Pass shroud line through hole
10.4.2 Tie lines together
11.0 Parachute & Shock Cord Attachment to Nose Cone
11.1 Shroud line threading
11.1.1 Thread shroud lines
11.2 Parachute pass throough
11.2.1 Pass parachute through loop
11.3 Line tightening
11.3.1 Pull lines tight
11.4 Shock cord tie down
11.4.1 Tie down shock cord free end
12.0 Finishing Rocket
12.1 Verify dryness
12.1.1 Check to ensure glue joint are dry
12.2 Prime rocket
12.2.1 Apply primer coat #1
12.2.2 Sand rocket body #1
12.2.3 Apply primer coat #2
12.2.4 Sand rocket body #2
12.3 Paint rocket
12.3.1 Insert paint handle
12.3.2 Apply paint to rocket
12.3.3 Allow to dry
12.4 Apply Water Decals
12.4.1 Cut decals
12.4.1.1 Decal #1
12.4.1.2 Decal #2
12.4.1.3 Decal #3
12.4.1.4 Decal #4
12.4.1.5 Decal #5
12.4.1.6 Decal #6
12.4.1.7 Decal #7
12.4.1.8 Decal #8
12.4.1.9 Decal #9
12.4.1.10 Decal #10
12.4.1.11 Decal #11
12.4.1.12 Decal #12
12.4.1.13 Decal #13
12.4.2 Dip in water
12.4.2.1 Decal #1
12.4.2.2 Decal #2
12.4.2.3 Decal #3
12.4.2.4 Decal #4
12.4.2.5 Decal #5
12.4.2.6 Decal #6
12.4.2.7 Decal #7
12.4.2.8 Decal #8
12.4.2.9 Decal #9
12.4.2.10 Decal #10
12.4.2.11 Decal #11
12.4.2.12 Decal #12
12.4.2.13 Decal #13
12.4.3 Slip decals
12.4.3.1 Decal #1
12.4.3.2 Decal #2
12.4.3.3 Decal #3
12.4.3.4 Decal #4
12.4.3.5 Decal #5
12.4.3.6 Decal #6
12.4.3.7 Decal #7
12.4.3.8 Decal #8
12.4.3.9 Decal #9
12.4.3.10 Decal #10
12.4.3.11 Decal #11
12.4.3.12 Decal #12
12.4.3.13 Decal #13
12.4.4 Blot decals
12.4.4.1 Decal #1
12.4.4.2 Decal #2
12.4.4.3 Decal #3
12.4.4.4 Decal #4
12.4.4.5 Decal #5
12.4.4.6 Decal #6
12.4.4.7 Decal #7
12.4.4.8 Decal #8
12.4.4.9 Decal #9
12.4.4.10 Decal #10
12.4.4.11 Decal #11
12.4.4.12 Decal #12
12.4.4.13 Decal #13
12.4.5 Dry decals
12.5.1 Allow to dry overnight
12.4.6 Apply clear spray to decals
12.4.1 Apply spray to rocket
12.5 Apply large decals
12.5.1 Peel backing
12.5.2 Cut away backing
12.5.3 Align decal
12.5.4 Peel off backing
12.5.5 Smooth decal

Painter Sr Sander Dummy
1.3.1.1

Rates

Fitter Draftsman Cutter Gluer Painter Sander Sr Sander
$9.00 $35.00 $12.25 $8.00 $11.50 $7.50 $13.00

Roll-Up Est

WBS # TASKS Fitter Draftsman Cutter Gluer Painter Sander Sr Sander Dummy Duration
1.0 Engine Mount Assembly 10 4 1 2 0 0 0 1 18
1.1 Locate engine mount parts 3 0 0 0 0 0 0 0
1.1.1 Locate light blue engine mount tube 1
1.1.2 Locate engine hook 1
1.1.3 Locate green adapter ring 1
1.2 Laying mount to ruler 2 0 0 0 0 0 0 0
1.2.1 Move tube to ruler 1
1.2.2 Align with zero mark 1
1.3 Marking mount 0 3 0 0 0 0 0 0
1.3.1 Take pencil 1
1.3.2 Mark tube 0 2 0 0 0 0 0 0
1.3.2.1 Mark 25mm 1
1.3.2.2 Mark 64 mm 1
1.4 Cutting mount 0 0 1 0 0 0 0 0
1.4.1 Cut 3mm slit 1
1.5 Inserting hook 2 0 0 0 0 0 0 0
1.5.1 Insert hook 1
1.5.2 Extend hook 1
1.6 Testing adapter ring 2 1 0 0 0 0 0 0
1.6.1 Slide ring into front of engine tube 1
1.6.2 Slide ring over engine hook to 25mm mark 1 1
1.7 Glue & Dry 1 0 0 2 0 0 0 1
1.7.1 Apply glue 0 0 0 2 0 0 0 0
1.7.1.1 Apply glue to one side 1
1.7.1.2 Apply glue to other side 1
1.7.2 Dry glue 1 0 0 0 0 0 0 1
1.7.2.1 Set assembly aside 1
1.7.2.2 Allow to dry 1
2.0 Shock Cord Mount Assembly 7 0 1 3 0 0 0 1 12
2.1 Locate cord mount parts 1 0 0 0 0 0 0 0
2.1.1 Locate cord mount on pattern sheet 1
2.2 Cut cord mount 0 0 1 0 0 0 0 0
2.2.1 Cut cord mount along outline 1
2.3 Crease assembly 2 0 0 0 0 0 0 0
2.3.1 Fold on dotted lines 1
2.3.2 Crease on dotted lines 1
2.4 Glue mount assembly 1 0 0 2 0 0 0 0
2.4.1 Spread glue 1
2.4.2 Lay end of shock cord in glue 1 1
2.5 Fold mount assembly 2 0 0 1 0 0 0 0
2.5.1 Fold section 1 1
2.5.2 Apply glue section 3 1
2.5.3 Fold again 1
2.6 Clamp mount assembly 1 0 0 0 0 0 0 1
2.6.1 Clamp assembly 1
2.6.2 Allow to dry 1
3.0 Fin Preparation 6 6 7 0 0 2 9 0 30
3.1 Select fin pattern 1 0 1 0 0 0 0 0
3.1.1 Select fin pattern 1
3.1.2 Cut fin pattern from sheet 1
3.2 Trace fin patterns 3 6 0 0 0 0 0 0
3.2.1 Trace fin #1 1
3.2.2 Match fin #1 1 1
3.2.3 Trace fin #2 1
3.2.4 Match fin #2 1 1
3.2.5 Trace fin #2 1
3.2.6 Match fin #2 1 1
3.3 Cut fin patterns 0 0 6 0 0 0 0 0
3.3.1 Cut fin #1 1
3.3.2 Chect fin #1 1
3.3.3 Cut fin #2 1
3.3.4 Chect fin #2 1
3.3.5 Cut fin #3 1
3.3.6 Chect fin #3 1
3.4 Save scrap 1 0 0 0 0 0 0 0
3.4.1 Set aside piece scrap basa wood 1
3.5 Course sand fins 1 0 0 0 0 2 0 0
3.5.1 Lay sandpaper 1
3.5.2 Stack fins 1
3.5.3 Sand fins 1
3.6 Fine sand fins 0 0 0 0 0 0 9 0
3.6.1 Fine sand fin #1 0 0 0 0 0 0 3 0
3.6.1.1 Round leading edge fin #1 1
3.6.1.2 Round trailing edge fin #1 1
3.6.1.3 Streamline training edge fin #1 1
3.6.2 Fine sand fin #2 0 0 0 0 0 0 3 0
3.6.2.1 Round leading edge fin #2 1
3.6.2.2 Round trailing edge fin #2 1
3.6.2.3 Streamline training edge fin #2 1
3.6.3 Fine sand fin #3 0 0 0 0 0 0 3 0
3.6.3.1 Round leading edge fin #3 1
3.6.3.2 Round trailing edge fin #3 1
3.6.3.3 Streamline training edge fin #3 1
4.0 Engine Mount Installation 2 1 0 1 0 0 0 0 4
4.1 Locate body tube 1 0 0 0 0 0 0 0
4.1.1 Locate body tube 1
4.2 Measure body tube 0 1 0 0 0 0 0 0
4.2.1 Measure body tube 38 mm 1
4.3 Spread glue 0 0 0 1 0 0 0 0
4.3.1 Spread glue around body tube 1
4.4 Insert engine mount 1 0 0 0 0 0 0 0
4.4.1 Insert engine mount assembly into body tube 1
5.0 Tube Marking Detail 4 11 1 0 0 0 0 0 16
5.1 Locate tube marking guide 1 0 1 0 0 0 0 0
5.1.1 Locate tube marking guide on pattern sheet 1
5.1.2 Cut guide alone outline 1
5.2 Wrap guide 2 0 0 0 0 0 0 0
5.2.1 Wrap guide around body tube 1
5.2.2 Tape guide to body tube 1
5.3 Mark tube 1 4 0 0 0 0 0 0
5.3.1 Mark tube for fins 0 3 0 0 0 0 0 0
5.3.1.1 Mark tube for fin #1 1
5.3.1.2 Mark tube for fin #2 1
5.3.1.3 Mark tube for fin #3 1
5.3.2 Write LL on body tube 1
5.3.3 Remove guide 1
5.4 Draw fin markings 0 7 0 0 0 0 0 0
5.4.1 Fin #1 0 2 0 0 0 0 0 0
5.4.1.1 Draw straight line 1
5.4.1.2 Extend line 76mm 1
5.4.2 Fin #2 0 2 0 0 0 0 0 0
5.4.2.1 Draw straight line 1
5.4.2.2 Extend line 76mm 1
5.4.3 Fin #3 0 2 0 0 0 0 0 0
5.4.3.1 Draw straight line 1
5.4.3.2 Extend line 76mm 1
5.4.4 Draw launch lug line 0 1 0 0 0 0 0 0
5.4.4.1 Draw line 102 mm 1
6.0 Fin Attachment 13 0 0 6 0 0 0 4 23
6.1 Apply glue to root edges of fins 0 0 0 3 0 0 0 3
6.1.1 Apply to fin #1 1
6.1.2 Allow fin #1 to dry 1
6.1.3 Apply to fin #2 1
6.1.4 Allow fin #2 to dry 1
6.1.5 Apply to fin #3 1
6.1.6 Allow fin #3 to dry 1
6.2 Apply second layer glue 6 0 0 3 0 0 0 0
6.2.1 Apply more glue to Fin #1 1
6.2.2 Set fin #1 1
6.2.3 Press fin #1 1
6.2.4 Apply more glue to Fin #2 1
6.2.5 Set fin #2 1
6.2.6 Press fin #2 1
6.2.7 Apply more glue to Fin #3 1
6.2.8 Set fin #3 1
6.2.9 Press fin #3 1
6.3 Adjust fins 6 0 0 0 0 0 0 0
6.3.1 Adjust fin #1 1
6.3.2 Attach fin #1 1
6.3.3 Adjust fin #2 1
6.3.4 Attach fin #2 1
6.3.5 Adjust fin #3 1
6.3.6 Attach fin #3 1
6.4 Set aside to dry 1 0 0 0 0 0 0 1
6.4.1 Stand rocket on drying table 1
6.4.2 Allow fins to dry 1
7.0 Launch Lug Attachment 1 3 0 1 0 0 0 1 6
7.1 Measure lug attachement 0 2 0 0 0 0 0 0
7.1.1 Measure 41mm 1
7.1.2 Mark attachment point 1
7.2 Glue lug attachment 1 0 0 1 0 0 0 0
7.2.1 Apply glue to launch lug 1
7.2.2 Attach launch lug to body tube 1
7.3 Dry lug attachment 0 1 0 0 0 0 0 1
7.3.1 Ensure launch lug alignment 1
7.3.2 Allow to dry 1
8.0 Glue Reinforcement 1 0 0 6 0 0 0 1 8
8.1 Reinforce fins 0 0 0 3 0 0 0 0
8.1.1 Reinforce fin fin #1 1
8.1.2 Reinforce fin fin #2 1
8.1.3 Reinforce fin fin #3 1
8.2 Reinforce launch lug 0 0 0 2 0 0 0 0
8.2.1 Reinforch side 1 1
8.2.2 Reinforce side 2 1
8.3 Glue drying 1 0 0 1 0 0 0 1
8.3.1 Stand rocket on drying table 1
8.3.2 Wipe away excess glue 1
8.3.3 Allow to dry 1
9.0 Shock Cord Mount Attachment 4 1 0 2 0 0 0 1 8
9.1 Measure body tube 0 1 0 0 0 0 0 0
9.1.1 Measure 25mm 1
9.2 Apply glue 1 0 0 1 0 0 0 0
9.2.1 Apply glue to shock cord 1
9.2.2 Insert cord into tube 1
9.3 Set mount 2 0 0 1 0 0 0 0
9.3.1 Set mount 25mm 1
9.3.2 Press mount into glue 1 1
9.4 Set glue 1 0 0 0 0 0 0 1
9.4.1 Hold mount attachment 1
9.4.2 Allow to dry 1
10.0 Parachute Assembly 15 0 8 0 0 0 0 0 23
10.1 Cut out parachute 0 0 1 0 0 0 0 0
10.1.1 Cut parachute along line 1
10.2 Tape removal 2 0 1 0 0 0 0 0
10.2.1 Remove tape 1
10.2.2 Fold shroud lines 1
10.2.3 Cut shroud lines 1
10.3 Tape attachment 12 0 6 0 0 0 0 0
10.3.1 Attach tape rings 6 0 0 0 0 0 0 0
10.3.1.1 Attach tape ring #1 1
10.3.1.2 Attach tape ring #2 1
10.3.1.3 Attach tape ring #3 1
10.3.1.4 Attach tape ring #4 1
10.3.1.5 Attach tape ring #5 1
10.3.1.6 Attach tape ring #6 1
10.3.2 Press tape tape rings into place 6 0 0 0 0 0 0 0
10.3.2.1 Press tape tape rings into place #1 1
10.3.2.2 Press tape tape rings into place #2 1
10.3.2.3 Press tape tape rings into place #3 1
10.3.2.4 Press tape tape rings into place #4 1
10.3.2.5 Press tape tape rings into place #5 1
10.3.2.6 Press tape tape rings into place #6 1
10.3.3 Punch tape ring holes 0 0 6 0 0 0 0 0
10.3.3.1 Punch tape ring holes #1 1
10.3.3.2 Punch tape ring holes #2 1
10.3.3.3 Punch tape ring holes #3 1
10.3.3.4 Punch tape ring holes #4 1
10.3.3.5 Punch tape ring holes #5 1
10.3.3.6 Punch tape ring holes #6 1
10.4 Shroud line assembly 1 0 0 0 0 0 0 0
10.4.1 Pass shroud line through hole 1

10.4.2 Tie lines together

11.0 Parachute & Shock Cord Attachment to Nose Cone 4 0 0 0 0 0 0 0 4
11.1 Shroud line threading 1 0 0 0 0 0 0 0
11.1.1 Thread shroud lines 1
11.2 Parachute pass throough 1 0 0 0 0 0 0 0
11.2.1 Pass parachute through loop 1
11.3 Line tightening 1 0 0 0 0 0 0 0
11.3.1 Pull lines tight 1
11.4 Shock cord tie down 1 0 0 0 0 0 0 0
11.4.1 Tie down shock cord free end 1
12.0 Finishing Rocket 45 1 14 1 4 0 2 9 76
12.1 Verify dryness 0 0 0 1 0 0 0 0
12.1.1 Check to ensure glue joint are dry 1
12.2 Prime rocket 0 0 0 0 2 0 2 0
12.2.1 Apply primer coat #1 1
12.2.2 Sand rocket body #1 1
12.2.3 Apply primer coat #2 1
12.2.4 Sand rocket body #2 1
12.3 Paint rocket 1 0 0 0 1 0 0 1
12.3.1 Insert paint handle 1
12.3.2 Apply paint to rocket 1
12.3.3 Allow to dry 1
12.4 Apply Water Decals 39 0 13 0 1 0 0 8
12.4.1 Cut decals 0 0 13 0 0 0 0 0
12.4.1.1 Decal #1 1
12.4.1.2 Decal #2 1
12.4.1.3 Decal #3 1
12.4.1.4 Decal #4 1
12.4.1.5 Decal #5 1
12.4.1.6 Decal #6 1
12.4.1.7 Decal #7 1
12.4.1.8 Decal #8 1
12.4.1.9 Decal #9 1
12.4.1.10 Decal #10 1
12.4.1.11 Decal #11 1
12.4.1.12 Decal #12 1
12.4.1.13 Decal #13 1
12.4.2 Dip in water 13 0 0 0 0 0 0 0
12.4.2.1 Decal #1 1
12.4.2.2 Decal #2 1
12.4.2.3 Decal #3 1
12.4.2.4 Decal #4 1
12.4.2.5 Decal #5 1
12.4.2.6 Decal #6 1
12.4.2.7 Decal #7 1
12.4.2.8 Decal #8 1
12.4.2.9 Decal #9 1
12.4.2.10 Decal #10 1
12.4.2.11 Decal #11 1
12.4.2.12 Decal #12 1
12.4.2.13 Decal #13 1
12.4.3 Slip decals 13 0 0 0 0 0 0 0
12.4.3.1 Decal #1 1
12.4.3.2 Decal #2 1
12.4.3.3 Decal #3 1
12.4.3.4 Decal #4 1
12.4.3.5 Decal #5 1
12.4.3.6 Decal #6 1
12.4.3.7 Decal #7 1
12.4.3.8 Decal #8 1
12.4.3.9 Decal #9 1
12.4.3.10 Decal #10 1
12.4.3.11 Decal #11 1
12.4.3.12 Decal #12 1
12.4.3.13 Decal #13 1
12.4.4 Blot decals 13 0 0 0 0 0 0 0
12.4.4.1 Decal #1 1
12.4.4.2 Decal #2 1
12.4.4.3 Decal #3 1
12.4.4.4 Decal #4 1
12.4.4.5 Decal #5 1
12.4.4.6 Decal #6 1
12.4.4.7 Decal #7 1
12.4.4.8 Decal #8 1
12.4.4.9 Decal #9 1
12.4.4.10 Decal #10 1
12.4.4.11 Decal #11 1
12.4.4.12 Decal #12 1
12.4.4.13 Decal #13 1
12.4.5 Dry decals 0 0 0 0 0 0 0 8
12.5.1 Allow to dry overnight 8
12.4.6 Apply clear spray to decals 0 0 0 0 1 0 0 0
12.4.1 Apply spray to rocket 1
12.5 Apply large decals 3 1 1 0 0 0 0 0
12.5.1 Peel backing 1
12.5.2 Cut away backing 1
12.5.3 Align decal 1
12.5.4 Peel off backing 1
12.5.5 Smooth decal 1

112 27 32 22 4 2 11 18

$9.00 $35.00 $12.25 $8.00 $11.50 $7.50 $13.00

RESOURCE TOTALS 228 TOTAL DURATION ESTIMATE
RESOURCE RATES
RESOURCE COSTS $1,008.00 $945.00 $392.00 $176.00 $46.00 $15.00 $143.00 $0.00 $2,725.00 TOTAL RESOURCE COST

M&E List

WBS #

Glue

Parachute

1.0 Engine Mount Assembly
2.0 Shock Cord Mount Assembly
3.0 Fin Preparation
4.0 Engine Mount Installation
5.0 Tube Marking Detail
6.0 Fin Attachment
7.0 Launch Lug Attachment
8.0 Glue Reinforcement
9.0 Shock Cord Mount Attachment
10.0 Parachute Assembly
11.0 Parachute & Shock Cord Attachment to Nose Cone
12.0 Finishing Rocket

WBS Task Ball Point Pen Scissors Tube Marking Guide Knife Ruler Sandpaper Masking Tape Enamel Spray Paint Sanding Primer Pencil Shroud Lines Engine Hook

M&E Forecast

WBS # TASKS

1.0 Engine Mount Assembly
1.1 Locate engine mount parts
1.1.1 Locate light blue engine mount tube
1.1.2 Locate engine hook
1.1.3 Locate green adapter ring

1.2 Laying mount to ruler Ruler

1.2.1 Move tube to ruler
1.2.2 Align with zero mark

1.3 Marking mount Pencil

1.3.1 Take pencil

1.3.2 Mark tube Tube Marking Guide

1.3.2.1 Mark 25mm
1.3.2.2 Mark 64 mm

1.4 Cutting mount Knife

1.4.1 Cut 3mm slit
1.5 Inserting hook
1.5.1 Insert hook
1.5.2 Extend hook
1.6 Testing adapter ring
1.6.1 Slide ring into front of engine tube
1.6.2 Slide ring over engine hook to 25mm mark
1.7 Glue & Dry

1.7.1 Apply glue Glue

1.7.1.1 Apply glue to one side
1.7.1.2 Apply glue to other side
1.7.2 Dry glue
1.7.2.1 Set assembly aside
1.7.2.2 Allow to dry
2.0 Shock Cord Mount Assembly
2.1 Locate cord mount parts
2.1.1 Locate cord mount on pattern sheet

2.2 Cut cord mount Scissors

2.2.1 Cut cord mount along outline
2.3 Crease assembly
2.3.1 Fold on dotted lines
2.3.2 Crease on dotted lines

2.4 Glue mount assembly Glue

2.4.1 Spread glue
2.4.2 Lay end of shock cord in glue
2.5 Fold mount assembly
2.5.1 Fold section 1

2.5.2 Apply glue section 3 Glue

2.5.3 Fold again
2.6 Clamp mount assembly
2.6.1 Clamp assembly
2.6.2 Allow to dry
3.0 Fin Preparation
3.1 Select fin pattern
3.1.1 Select fin pattern

3.1.2 Cut fin pattern from sheet Scissors
3.2 Trace fin patterns Pencil

3.2.1 Trace fin #1
3.2.2 Match fin #1
3.2.3 Trace fin #2
3.2.4 Match fin #2
3.2.5 Trace fin #2
3.2.6 Match fin #2

3.3 Cut fin patterns Scissors

3.3.1 Cut fin #1
3.3.2 Chect fin #1
3.3.3 Cut fin #2
3.3.4 Chect fin #2
3.3.5 Cut fin #3
3.3.6 Chect fin #3
3.4 Save scrap
3.4.1 Set aside piece scrap basa wood

3.5 Course sand fins Sandpaper

3.5.1 Lay sandpaper
3.5.2 Stack fins
3.5.3 Sand fins

3.6 Fine sand fins Sandpaper Sandpaper

3.6.1 Fine sand fin #1
3.6.1.1 Round leading edge fin #1
3.6.1.2 Round trailing edge fin #1
3.6.1.3 Streamline training edge fin #1
3.6.2 Fine sand fin #2
3.6.2.1 Round leading edge fin #2
3.6.2.2 Round trailing edge fin #2
3.6.2.3 Streamline training edge fin #2
3.6.3 Fine sand fin #3
3.6.3.1 Round leading edge fin #3
3.6.3.2 Round trailing edge fin #3
3.6.3.3 Streamline training edge fin #3
4.0 Engine Mount Installation
4.1 Locate body tube
4.1.1 Locate body tube

4.2 Measure body tube Ruler

4.2.1 Measure body tube 38 mm

4.3 Spread glue Glue

4.3.1 Spread glue around body tube
4.4 Insert engine mount
4.4.1 Insert engine mount assembly into body tube
5.0 Tube Marking Detail
5.1 Locate tube marking guide
5.1.1 Locate tube marking guide on pattern sheet

5.1.2 Cut guide alone outline Scissors
5.2 Wrap guide Masking Tape

5.2.1 Wrap guide around body tube
5.2.2 Tape guide to body tube

5.3 Mark tube Pencil

5.3.1 Mark tube for fins
5.3.1.1 Mark tube for fin #1
5.3.1.2 Mark tube for fin #2
5.3.1.3 Mark tube for fin #3

5.3.2 Write LL on body tube Ball Point Pen

5.3.3 Remove guide

5.4 Draw fin markings Pencil
5.4.1 Fin #1 Ruler

5.4.1.1 Draw straight line
5.4.1.2 Extend line 76mm
5.4.2 Fin #2
5.4.2.1 Draw straight line
5.4.2.2 Extend line 76mm
5.4.3 Fin #3
5.4.3.1 Draw straight line
5.4.3.2 Extend line 76mm

5.4.4 Draw launch lug line Pencil
5.4.4.1 Draw line 102 mm Ruler

6.0 Fin Attachment

6.1 Apply glue to root edges of fins Glue

6.1.1 Apply to fin #1
6.1.2 Allow fin #1 to dry
6.1.3 Apply to fin #2
6.1.4 Allow fin #2 to dry
6.1.5 Apply to fin #3
6.1.6 Allow fin #3 to dry

6.2 Apply second layer glue Glue

6.2.1 Apply more glue to Fin #1
6.2.2 Set fin #1
6.2.3 Press fin #1
6.2.4 Apply more glue to Fin #2
6.2.5 Set fin #2
6.2.6 Press fin #2
6.2.7 Apply more glue to Fin #3
6.2.8 Set fin #3
6.2.9 Press fin #3
6.3 Adjust fins
6.3.1 Adjust fin #1
6.3.2 Attach fin #1
6.3.3 Adjust fin #2
6.3.4 Attach fin #2
6.3.5 Adjust fin #3
6.3.6 Attach fin #3
6.4 Set aside to dry
6.4.1 Stand rocket on drying table
6.4.2 Allow fins to dry
7.0 Launch Lug Attachment

7.1 Measure lug attachement Ruler

7.1.1 Measure 41mm

7.1.2 Mark attachment point Pencil
7.2 Glue lug attachment Glue

7.2.1 Apply glue to launch lug
7.2.2 Attach launch lug to body tube
7.3 Dry lug attachment
7.3.1 Ensure launch lug alignment
7.3.2 Allow to dry

8.0 Glue Reinforcement Glue

8.1 Reinforce fins
8.1.1 Reinforce fin fin #1
8.1.2 Reinforce fin fin #2
8.1.3 Reinforce fin fin #3
8.2 Reinforce launch lug
8.2.1 Reinforch side 1
8.2.2 Reinforce side 2
8.3 Glue drying
8.3.1 Stand rocket on drying table
8.3.2 Wipe away excess glue
8.3.3 Allow to dry
9.0 Shock Cord Mount Attachment

9.1 Measure body tube Ruler

9.1.1 Measure 25mm

9.2 Apply glue Glue

9.2.1 Apply glue to shock cord
9.2.2 Insert cord into tube
9.3 Set mount
9.3.1 Set mount 25mm
9.3.2 Press mount into glue

9.4 Set glue Glue

9.4.1 Hold mount attachment
9.4.2 Allow to dry
10.0 Parachute Assembly

10.1 Cut out parachute

10.1.1 Cut parachute along line
10.2 Tape removal
10.2.1 Remove tape
10.2.2 Fold shroud lines

10.2.3 Cut shroud lines Knife
10.3 Tape attachment Masking Tape

10.3.1 Attach tape rings
10.3.1.1 Attach tape ring #1
10.3.1.2 Attach tape ring #2
10.3.1.3 Attach tape ring #3
10.3.1.4 Attach tape ring #4
10.3.1.5 Attach tape ring #5
10.3.1.6 Attach tape ring #6
10.3.2 Press tape tape rings into place
10.3.2.1 Press tape tape rings into place #1
10.3.2.2 Press tape tape rings into place #2
10.3.2.3 Press tape tape rings into place #3
10.3.2.4 Press tape tape rings into place #4
10.3.2.5 Press tape tape rings into place #5
10.3.2.6 Press tape tape rings into place #6
10.3.3 Punch tape ring holes
10.3.3.1 Punch tape ring holes #1
10.3.3.2 Punch tape ring holes #2
10.3.3.3 Punch tape ring holes #3
10.3.3.4 Punch tape ring holes #4
10.3.3.5 Punch tape ring holes #5
10.3.3.6 Punch tape ring holes #6

10.4 Shroud line assembly Shroud Lines

10.4.1 Pass shroud line through hole
10.4.2 Tie lines together
11.0 Parachute & Shock Cord Attachment to Nose Cone
11.1 Shroud line threading
11.1.1 Thread shroud lines
11.2 Parachute pass throough
11.2.1 Pass parachute through loop
11.3 Line tightening
11.3.1 Pull lines tight
11.4 Shock cord tie down
11.4.1 Tie down shock cord free end
12.0 Finishing Rocket
12.1 Verify dryness
12.1.1 Check to ensure glue joint are dry

12.2 Prime rocket Sanding Primer

12.2.1 Apply primer coat #1
12.2.2 Sand rocket body #1
12.2.3 Apply primer coat #2
12.2.4 Sand rocket body #2

12.3 Paint rocket Enamel Spray Paint

12.3.1 Insert paint handle
12.3.2 Apply paint to rocket
12.3.3 Allow to dry
12.4 Apply Water Decals

12.4.1 Cut decals Sissors

12.4.1.1 Decal #1
12.4.1.2 Decal #2
12.4.1.3 Decal #3
12.4.1.4 Decal #4
12.4.1.5 Decal #5
12.4.1.6 Decal #6
12.4.1.7 Decal #7
12.4.1.8 Decal #8
12.4.1.9 Decal #9
12.4.1.10 Decal #10
12.4.1.11 Decal #11
12.4.1.12 Decal #12
12.4.1.13 Decal #13
12.4.2 Dip in water
12.4.2.1 Decal #1
12.4.2.2 Decal #2
12.4.2.3 Decal #3
12.4.2.4 Decal #4
12.4.2.5 Decal #5
12.4.2.6 Decal #6
12.4.2.7 Decal #7
12.4.2.8 Decal #8
12.4.2.9 Decal #9
12.4.2.10 Decal #10
12.4.2.11 Decal #11
12.4.2.12 Decal #12
12.4.2.13 Decal #13
12.4.3 Slip decals
12.4.3.1 Decal #1
12.4.3.2 Decal #2
12.4.3.3 Decal #3
12.4.3.4 Decal #4
12.4.3.5 Decal #5
12.4.3.6 Decal #6
12.4.3.7 Decal #7
12.4.3.8 Decal #8
12.4.3.9 Decal #9
12.4.3.10 Decal #10
12.4.3.11 Decal #11
12.4.3.12 Decal #12
12.4.3.13 Decal #13
12.4.4 Blot decals
12.4.4.1 Decal #1
12.4.4.2 Decal #2
12.4.4.3 Decal #3
12.4.4.4 Decal #4
12.4.4.5 Decal #5
12.4.4.6 Decal #6
12.4.4.7 Decal #7
12.4.4.8 Decal #8
12.4.4.9 Decal #9
12.4.4.10 Decal #10
12.4.4.11 Decal #11
12.4.4.12 Decal #12
12.4.4.13 Decal #13
12.4.5 Dry decals
12.5.1 Allow to dry overnight

12.4.6 Apply clear spray to decals Enamel Spray Paint

12.4.1 Apply spray to rocket
12.5 Apply large decals
12.5.1 Peel backing

12.5.2 Cut away backing Sissors
12.5.3 Align decal Knife

12.5.4 Peel off backing
12.5.5 Smooth decal

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13 Day 14 Day 15 Day 16 Day 17 Day 18 Day 19
Sissors

Budget

BCWS or,

PV

Actual

Cost

AC

WP or,

AC

Earned Value

BCWP or,

EV

SV = BCWP – BCWS

CV = BCWP – ACWP

Date

Cost

EAC

Time

S – Curves

2

>Gantt

1 2 3 4 5 6 7 8 9

11 12 13 14

week

1 week 2 week

3 week

4 week

5 week

6 week

7 week

8 week

9 week

1

0 week

11 week

12 week

13 week

14
10 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
WBS # TASKS
1.0 ENGINE MOUNT ASSEMBLY
2.0 FIN PREPARATION
3.0 MARK FIN AND LAUNCH LUG LINES
4.0 INSERTING ENGINE MOUNT
5.0 ATTACH FINS
6.0 ATTACH SHOCK CORD
7.0 ASSEMBLE NOSE CONE
8.0 ATTACH PARACHUTE/SHOCK CORD
9.0 ATTACH LAUNCH LUG
10.0 PAINT SCHEME
11.0 APPLICATION OF DECALS
12.0 APPLYING CLEAR COAT
13.0 DISPLAY NOZZLE ASSEMBLY
14.0 ROCKET PREFLIGHT
15.0 PREPARE FOR TEST LAUNCH

Network-New

0

h

107

107

142

228

268

0 0 107

107 0 142 142 0 228 228 0 268 268 0 279

11h

0

49

325 0 336

0 0 49 279

142

0

28h

228

279 0 300 336

52 228

79 79 107

26 268 336 0 393

300

325

300 0 325 393

393 0 441
441

441 0 453
107
1:
Assemble Engine Mount
35h 142 86 228 40h 268 11h 2

79
4:
Insert Engine Mount
5:
Attach Fins
6:
Attach Shock Cord
7:
Attach Launch Lug
325 336
49h 12:
Applying Clear Coat
2:
Fin Preparation
21h 300
34h 176 9:
Attach Launch Lug
28h 11:
Application of Decals
14h 242 57h 393
3:
Mark Fin And Launch Lug Lines
194 8:
Attach Chute Shock Cord
13:
Applying Clear Coat
254
25h
10:
Painting the Rocket
48h 441
14:
Rocket Pre-Flight
12h 453
15:
Prepare for Test Launch
Legend
Early Start Duration Early Finish
Task Name
Late
Start
Slack Late Finish

Duration Est

WBS # TASKS

er

Duration

1.0

48 0 10 25 0 0 19 5 107

12 0 0 0 0 0 0 0

6

6

1.2

0 0 10 0 0 0 0 0

5

5

0 0 0 5 0 0 13 0

5

5

8

8 0 0 0 0 0 0 1

8

1

0 0 0 4 0 0 6 1

4

6

Let Dry 1

5 0 0 0 0 0 0 0

5

.

23 0 0 11 0 0 0 2

5

5

6

1

6

6

6

Let Dry 1

0 0 0 5 0 0 0 1

5

Let Dry 1

2.0 FIN PREPARATION 5 0 12 0 11 0 0 0 28
2.1

0 0 5 0 5 0 0 0

5

5

2.2

0 0 7 0 0 0 0 0

7

5 0 0 0 6 0 0 0

5

6

3.0 MARK FIN AND LAUNCH LUG LINES 27 0 12 0 0 0 10 0 49
3.1

, Tape tube, Mark body tube & launch lug line

13 0 12 0 0 0 0 0

Cut out tube marking guide 6

6

8

5

3.2

14 0 0 0 0 0 6 0

6

8

6

3.3

0 0 0 0 0 0 4 0

4

4.0 INSERTING ENGINE MOUNT 19 0 0 14 0 0 0 2 35
4.1

7 0 0 0 0 0 0 0

7

4.2

0 0 0 6 0 0 0 0

6

12 0 0 0 0 0 0 1

6

6

Let Dry 1

0 0 0 8 0 0 0 1

8

Let dry 1

5.0 ATTACH FINS 32 0 0 42 0 0 6 6 86
5.1

3 0 0 6 0 0 0 1

1

6

3

5.2

3 0 0 12 0 0 0 1

Apply glue to edge of fin 6

Wait for 1 minute for model 1

Apply second layer of glue to edge of fin 6

Attach Fin to body tube along one of fin lines flush w/end 3

5.3

5 0 0 12 0 0 0 1

Apply glue to edge of fin 6

Wait for 1 minute for model 1

Apply second layer of glue to edge of fin 6

Attach Fin to body tube along one of fin lines flush w/end 5

5 0 0 12 0 0 0 1

Apply glue to edge of fin 6

Wait for 1 minute for model 1

Apply second layer of glue to edge of fin 6

Attach Fin to body tube along one of fin lines flush w/end 5

16 0 0 0 0 0 0 1

4

4

4

4

1

0 0 0 0 0 0 6 1

6

1

6.0 ATTACH SHOCK CORD 4 9 4 21 0 0 0 2 40
6.1

0 0 4 0 0 0 0 0

4

6.2

0 5 0 6 0 0 0 0

6

forward

5

0 4 0 7 0 0 0 0

Apply glue to shock cord mount 7

Fold forward 4

4 0 0 0 0 0 0 1

4

1

0 0 0 8 0 0 0 1

5

3

1

7.0 ASSEMBLE NOSE CONE 5 0 0 5 0 0 0 1 11
7.1

5 0 0 5 0 0 0 1

5

5

Let Dry 1

8.0 ATTACH PARACHUTE/SHOCK CORD 6 0 0 0 0 0 8 0 14
8.1

0 0 0 0 0 0 4 0

4

8.2

0 0 0 0 0 0 4 0

4

6 0 0 0 0 0 0 0

6

9.0 ATTACH LAUNCH LUG 0 0 0 20 0 0 0 1 21

0 0 0 4 0 0 0 0

4

0 0 0 16 0 0 0 1

5

5

6

1

10.0 PAINT SCHEME 0 0 0 0 10 13 0 2 25

0 0 0 0 6 8 0 1

8

Let Dry 1

Sand 6

0 0 0 0 4 5 0 1

5

Let dry 1

Sand 4

11.0 APPLICATION OF DECALS 0 12 0 0 0 0 22 0 34

0 3 0 0 0 0 5 0

3

2

3

0 3 0 0 0 0 5 0

3

Place on Rocket where indicated 2

Rub decal to remove bubbles 3

0 3 0 0 0 0 5 0

3

Place on Rocket where indicated 2

Rub decal to remove bubbles 3

0 3 0 0 0 0 7 0

3

Place on Rocket where indicated 4

Rub decal to remove bubbles 3

12.0 APPLYING CLEAR COAT 0 0 0 0 0 6 0 5 11

0 0 0 0 0 6 0 5

6

Dry Completely 5

13.0 DISPLAY NOZZLE ASSEMBLY 16 0 0 20 0 16 0 5 57

0 0 0 0 0 16 0 1

4

4

4

4

Let dry 1

16 0 0 20 0 0 0 4

5

4

1

5

4

Let to dry 1

5

4

Let to dry 1

5

4

1

14.0 ROCKET PREFLIGHT 34 9 0 0 0 0 5 0 48

16 0 0 0 0 0 0 0

6

2

8

0 0 0 0 0 0 5 0

5

Fold 0 6 0 0 0 0 0 0

6

6 0 0 0 0 0 0 0

6

12 3 0 0 0 0 0 0

3

4

4

4

15.0 PREPARE FOR TEST LAUNCH 9 0 0 0 0 0 3 0 12

9 0 0 0 0 0 3 0

3

4

5

30 38

21 35

29

WBS # TASKS Fitter Drafter Cutter Gluer

Painter Engineer Dummy

1.0 ENGINE MOUNT ASSEMBLY 48 0 10 25 0 0 19 5 107 13
2.0 FIN PREPARATION 5 0 12 0 11 0 0 0 28 4
3.0 MARK FIN AND LAUNCH LUG LINES 27 0 12 0 0 0 10 0 49 6
4.0 INSERTING ENGINE MOUNT 19 0 0 14 0 0 0 2 35 4
5.0 ATTACH FINS 32 0 0 42 0 0 6 6 86 11
6.0 ATTACH SHOCK CORD 4 9 4 21 0 0 0 2 40 5
7.0 ASSEMBLE NOSE CONE 5 0 0 5 0 0 0 1 11 1
8.0 ATTACH PARACHUTE/SHOCK CORD 6 0 0 0 0 0 8 0 14 2
9.0 ATTACH LAUNCH LUG 0 0 0 20 0 0 0 1 21 3
10.0 PAINT SCHEME 0 0 0 0 10 13 0 2 25 3
11.0 APPLICATION OF DECALS 0 12 0 0 0 0 22 0 34 4
12.0 APPLYING CLEAR COAT 0 0 0 0 0 6 0 5 11 1
13.0 DISPLAY NOZZLE ASSEMBLY 16 0 0 20 0 16 0 5 57 7
14.0 ROCKET PREFLIGHT 34 9 0 0 0 0 5 0 48 6
15.0 PREPARE FOR TEST LAUNCH 9 0 0 0 0 0 3 0 12 2

205 30 38 147 21 35 73 29 578

Fitter Drafter Cutter Gluer Sand Painter Engineer Dummy
Engine Mount Assembly
1.1 Measure, Mark and Cut & Slit Engine Tube
1.1.1 Measure engine tube
1.

1.2 Mark engine Tube
Cut and Slit engine tube
1.

2.1 Cut @ 1/8″
1.

2.2 Slit @ 1 1/2″
1.3 Apply glue, Position, Insert Hook
1.

3.1 Apply glue around tube at 3/4″” mark”
1.

3.2 Position Hook
1.

3.3 Insert Engine Hook into slit
1.4 Slide Mylar Retainer Ring
1.

4.1 Slide Mylar ring onto Engine Mount tube at 3/4″ mark
1.

4.2 Let Dry
1.5 Apply glue, insert engine block, let dry
1.

5.1 Apply glue inside front of Engine Mount tube
1.

5.2 Insert Yellow Engine Block flush with end
1.

5.3
1.6 Remove Centering Rings
1.

6.1 Remove Centering rings from card with modeling knife
1.7 Apply glue, mark and slide notched, Ring into place, Let glue, apply glue, slide un-notched centering ring, flush with end tube,

Let dry
1.

7.1 Apply glue around tube @ 1/8″” mark”
1.7.2 Mark notched Ring into place
1.7.3 Slide notched Centering Ring
1.7.4 Let Glue Set
1.7.5 Apply glue around end of tube
1.7.6 Slide un-notched Centering Ring in place
1.7.7 Flush with end tube
1.7.8
1.8 Application of Glue Fillets, let dry
1.

8.1 Apply Glue Fillets to both sides of Centering Rings
1.

8.2
Sand/Cut fins
2.1.1 Sand Laser
2.1.2 Cut Balsa Sheet w/Fine Sandpaper
Cutting Out Fins
2.2.1 Cut out fins free with modeling knife
2.3 Stack and Sand Fins
2.3.1 Stack Fins
2.3.2 Sand Edges of fins
Cut out tube marking guide
3.1.1
3.1.2 Tape tube marking guide around body tube
3.1.3 Mark body tube at arrows
3.1.4 Mark Launch Lug Line as LL on Body tube
Remove guide, connect fins and launch lug lines
3.2.1 Remove the guide
3.2.2 Connect Fins
3.2.3 Launch lug lines using door frame
Extend Launch Lug Line
3.3.1 Extend launch lug line 3 3/4″” from end of tube”
Mark inside of tube @ 5/8″
4.1.1 Mark inside tube at 5/8″
Glue Tube
4.2.1 Use finger to smear glue 1 3/4″” inside rear of body tube
4.3 Align Engine Hook, insert engine mount, let dry
4.3.1 Align engine hook with Launch Lug line
4.3.2 Insert engine mount until centering ring is even with 5/8″ mark”
4.3.3
4.4 Gluing, Let dry
4.4.1 Use a scrap piece of balsa to apply glue fill to Centering Ring/Body Tube joint.
4.4.2
Attach Fin 1, Apply glue #1, Wait, Apply glue # 2, Attach fin to body tube
5.1.1 Apply glue to edge of fin
5.1.2 Wait for 1 minute for model
5.1.3 Apply second layer of glue to edge of fin
5.1.4 Attach Fin to body tube along one of fin lines flush w/end
Attach Fin 2
5.2.1
5.2.2
5.2.3
5.2.4
Attach Fin 3
5.3.1
5.3.2
5.3.3
5.3.4
5.4 Attach Fin 4
5.4.1
5.4.2
5.4.3
5.4.4
5.5 Check Fin Alignment, allow glue to set
5.5.1 Check Fin #1 as per diagram
5.5.2 Check Fin #2 as per diagram
5.5.3 Check Fin #3 as per diagram
5.5.4 Check Fin #4 as per diagram
5.5.5 Allow glue to set
5.6 Stand rocket, let glue dry
5.6.1 Stand rocket on flat table
5.

6.2 Let Glue dry completely
Cut out shock cord mount
6.1.1 Cut out shock cord from front page
Glue Application, fold forward
6.2.1 Apply glue to shock cord mount
6.2.2 Fold
6.3 Glue Application 2, fold forward
6.3.1
6.3.2
6.4 Squeeze and Hold
6.4.1 Squeeze shock cord/shock cord mount tightly
6.4.2 Hold for 1 minute
6.5 Glue mount, hold, let glue dry
6.5.1 Glue mount 1″” inside body tube”
6.5.2 Hold until glue sets
6.5.3 Let

Dry Completely
Apply tube type cement, press insert, let dry
7.1.1 Apply tube type cement to inside nose cone
7.1.2 Press Insert into place
7.1.3
Pass Lines
8.1.1 Pass shroud line on parachute through eyelet
Pass chute
8.2.1 Pass chute through loop
8.3 Tie Shock Cord
8.3.1 Tie shock cord to nose cone using a double knot
9.1 Glue launch lines
9.1.1 Glue LL centered onto LL Line where shown
9.2 Apply Glue Fillets & Fin/body tube joints, smoothing each, let dry
9.2.1 Apply glue fillets along launch lug
9.2.2 Apply glue fillets along fin/body tube joints
9.2.3 Smooth each fillet with finger
9.2.4 Let glue dry completely
10.1 Spray, let dry, sand
10.1.1 Spray rocket with white primer
10.1.2
10.1.3
10.2 Apply final Spray, let dry, sand
10.2.1 Spray completed rocket with white second coat of primer
10.2.2
10.2.3
11.1 Remove decal #1, place on rocket, and rub decal
11.1.1 Remove First decal from back sheet
11.1.2 Place on Rocket where indicated
11.1.3 Rub decal to remove bubbles
11.2 Remove decal #2, place on rocket, and rub decal
11.2.1 Remove second decal from backing sheet
11.2.2
11.2.3
11.3 Remove decal #3, place on rocket, and rub decal
11.3.1 Remove third decal from backing sheet
11.3.2
11.3.3
11.4 Remove decal #4, place on rocket, and rub decal
11.4.1 Remove fourth decal from backing sheet
11.4.2
11.4.3
12.1 Apply clear coat, and let dry
12.1.1 Apply clear coat to entire rocket
12.1.2
13.1 Spray Nozzle Base white with silver paint, let dry
13.1.1 Paint Nozzle #1 w/Silver Paint Pen
13.1.2 Paint Nozzle #2 w/Silver Paint Pen
13.1.3 Paint Nozzle #3 w/Silver Paint Pen
13.1.4 Paint Nozzle #4 w/Silver Paint Pen
13.1.5
13.2 Apply tube type cement, place nozzle tab, let dry
13.2.1 Apply glue to tab on nozzle #1
13.2.2 Place Nozzle #1 into hole on base
13.2.3 Let to dry
13.2.4 Apply glue to tab on nozzle #2
13.2.5 Place Nozzle #2 into hole on base
13.2.6
13.2.7 Apply glue to tab on nozzle #3
13.2.8 Place Nozzle #3 into hole on base
13.2.9
13.2.10 Apply glue to tab on nozzle #4
13.2.11 Place Nozzle #4 into hole on base
13.2.12 let to dry
14.1 Remove cone, locate wadding, and insert squares
14.1.1 Remove Nose Cone from Rocket
14.1.2 Locate recovery wadding
14.1.3 Insert 4-5 loosely crumpled squares of recovery wadding
14.2 Pull parachute
14.2.1 Pull parachute into a spike
14.3
14.3.1 Fold parachute
14.4 Roll
14.4.1 Roll parachute
14.5 Wrap lines, Insert parachute, insert shock cord, and insert nose cone
14.5.1 Wrap lines around rolled parachute
14.5.2 Insert parachute into body tube of rocket
14.5.3 Insert shock cord into body tube of rocket
14.5.4 Insert nose cone into body tube of rocket
15.1 Remove Engine, Insert tip, Insert engine
15.1.1 Remove engine
15.1.2 Insert tip to touch propellant
15.1.3 3 Insert engine into rocket
Resource Totals 205 147 73 578
DURATION
Sander Hrs Days
RESOURCE TOTALS 72

Table of Contents

Cost Management Plan

1.1 Units of Measure

1.2 Level of Precision

1.3 Level of Accuracy

1.4 Process for Formal Acceptances

1.5 Process to Control Requests for Changes

1.6 Organizational Procedural Links

1.7 Control Thresholds

1.8 Rules of Performance Measurement

1.9 Reporting Formats

1.10 Process Descriptions


Human Resource Management Plan

2.1 Roles and Responsibilities

2.2 Project Organization Charts

2.3 Staffing Management Plan

Procurement Management Plan

3.1 Procurement Management Approach

3.2 Procurement Definition

3.3 Type of Contract to be Used

3.4 Procurement Risks

3.5 Procurement Risk Management

3.6 Cost Determination

3.7 Standardized Procurement Documentation

3.8 Procurement Constraints

3.9 Contract Approval Process

3.10 Decision Criteria

3.11 Vendor Management

3.12 Performance Metrics  