Course Project
Course Project Overview
|
Part I (PP1)
|
Part II (PP2)
|
Part III (PP3)
The course project for PM598 consists of three parts, which provide familiarization to processes associated with contract and procurement management.
Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through
https://www.Fbo.gov
and follow the instructions, which are located in the Doc Sharing section.
This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. The points assigned to each part of the Course Project are listed below:
Course Project AssignmentDuePointsPart I (PP1) – RFP Section 1Week 240Part II (PP2) – Complete RFPWeek 4125
Assignment: Select one of the three RFP procurement cases listed below (A New Practice Field, An Environment Impact Study, and an Inventory Control System) for your Course Project. Use the RFP template located in the Doc Sharing area to complete the cover page and the following sections of the RFP (1.1, 1.2, 1.3, and 1.4).
Resources: Obviously, Chapters 1 through 6 of the text would serve as a starting point. Please be advised that considerable relevant material is also available on the Internet, so you might want to conduct a search for some materials that may yield insights into the RFP development process. Download and use the RFP template from the Doc Sharing area.
Procedures and Deadline: All project issues should be directed in the Q & A Forum or addressed in class. The PP1 RFP should be prepared in a MS Word format suitable for electronic transmission. Any resources used beyond the textbook need to be cited in your document, including links to relevant websites. Be sure to include footnotes and bibliography.
Submission Details:
All PP1 documents must be submitted no later than the end of Week 2. There will be a penalty for late submissions. Submit a soft copy of your RFP in the Dropbox created for this purpose.
Clarification on Assignment: All questions of a clarification nature should be asked in the weekly Q & A Forum discussion topic.
Grading: Eighty percent of points will be for content (including proper use of the English language) and 20percent of points will be based following the instructions for the assignment.
RFP Content:
Your RFP should utilize the best practices of the Pre-award Phase that apply to your project. You must choose the type of contract that you feel is most appropriate for this procurement. I will set the length limit at three double-spaced pages (12-point font) for the main body of the RFP (sections 1.1 – 1.4). (Please do not feel obligated to reach that limit.) All other section content should be noted as to-be-determined (tbd).
The first page of your overall submission must be a cover sheet that contains the project title (hopefully, not “PP1” or anything like that—be inventive), your name, your e-mail address, and course identifying information (e.g., “PM598 for this term” will suffice—obviously, use the correct term identifier). The second page will be a Table of Contents (TOC) listing the major RFP sections together with page numbers. Include on this page a listing of the references that you used in the RFP preparation, including websites, if any. The next one-to-three pages constitutes the main body of the RFP. Appendix B contains a list of suppliers to whom you would send the RFP. These must be real bona fide contractors—not hypothetical ones. On that page, say how you chose these potential suppliers. The cover sheet, TOC/references page, and supplier list do not count toward the three-page limitation.
RFP Procurement Cases
Select one of the following RFP procurement cases to develop your PP1 RFP:
A New Practice Field You own a semipro baseball team (in the location of your choice) and you want to construct a new practice field. You own the land already (20 acres). The land is relatively flat and it has only a few dilapidated structures (barns) and trees on it. Connecting up with existing water and sewer lines would present no unusual technical problems. It is now September, and you would love to have that field ready to go by March two years hence. Your vision would include the playing field, a small clubhouse, and a parking area that would hold about 50 cars. No spectator seating would be required. The decision to go with one general contractor has already been made.
Submit your PP1 assignment to the Week 2 Dropbox.
Scoring
Cover Page & Table of Content3RFP Section 1.18RFP Section 1.28RFP Section 1.38RFP Section 1.48Document Organization5Total Points40
Assignment: Project Part 2 (PP2) entails completing the remaining sections of the Request for Proposal (RFP) that was selected and prepared for Project Part 1 (PP1).
Background: The project directly addresses TCO E and covers material in Chapters 1 through 8 of the text. These chapters develop the procurement process up to the point of issuing the RFP. The remaining chapters of the book consider procurement activities undertaken subsequent to this milestone RFP event. Part 3 (PP3) will deal with material from a wider range of the Garrett text.
Terminal Course Objectives (TCOs): The following TCOs are addressed in the PP2 assignment:
TCO A: Given a project situation, discuss and document the six phases of the procurement cycle and the impact each procurement has on the overall project.
TCO B: Given a project situation, analyze the factors that are important when qualifying and selecting suppliers for a project requirement.
TCO C: Given a project situation for a major contract, examine the key factors, including risk factors, that affect buyer and supplier decisions concerning contract pricing and the selection of the proper contract type.
TCO D: Given a procurement situation for a major contract, analyze the application of e-procurement and other types of supplier bidding models available.
TCO E: Given a situation to solicit a bid proposal, evaluate technical, management, commercial, and ethical requirements, and then prepare a Request for Proposal (RFP).
Resources: Obviously, Chapters 1 through 8 of the text would serve as a starting point. Please be advised that considerable relevant material is also available on the Internet, so you might want to conduct a search for materials that may yield insights into the RFP development process. Use the RFP template from your PP1 assignment, which was downloaded from the Doc Sharing area.
Procedures and Deadline: All project issues should be directed in the Q & A Forum or addressed in class. The PP2 RFP should be prepared in a MS Word format suitable for electronic transmission. Any resources used beyond the textbook need to be cited in your document—including links to relevant websites. Be sure to include footnotes and bibliography.
Submission Details: All PP2 documents must be submitted no later than the end of Week 4. Submit a copy of your RFP in the Dropbox created for this purpose.
Clarification on Assignment: All questions of a clarification nature should be asked in the weekly Q & A Forum discussion topic.
Grading: Eighty percent of points will be for content (including proper use of the English language) and 20 percent of the points will be based following the instructions for the assignment.
RFP Content:
Your RFP should utilize the best practices of the pre-award phase that apply to your project. You must choose the type of contract that you feel is most appropriate for this procurement. I will set the length limit at 10 double-spaced pages (12-point font) for the main body of the RFP. (Please do not feel obligated to reach that limit.) You may attach additional appendices if you wish, but these must be limited to clarifying material that has been borrowed from elsewhere or developed as an exhibit.
The first page of your overall submission must be a cover sheet that contains the project title (hopefully, not “PP2” or anything like it—be inventive), your name, your e-mail address, and course identifying information (e.g., “PM598 for this term” will suffice—obviously, use the correct term identifier). The second page will be a Table of Contents (TOC) listing the major RFP sections together with page numbers. Include on this page a listing of the references that you used in the RFP preparation, including websites, if any. The next 1-to-10 pages constitute the main body of the RFP. Appendix B contains a list of suppliers to whom you would send the RFP. These must be real bona fide contractors—not hypothetical ones. On that page, say how you chose these potential suppliers. The cover sheet, TOC/references page, and supplier list do not count toward the 10-page limitation.
The structure should, therefore be:
- Cover sheet (one page)
- Table of contents and references (one page)
- RFP main body (no more than 10 pages)
- Appendices (no page limit)
- Appendix B: Supplier list (one page)
Deadline: PP2 is due by the end of Week 4.
Submit your PP2 assignment to the Week 4 Dropbox.
Scoring:
Cover Page10Table of Content and References15RFP Main Body Section 1&220RFP Main Body Section 3&420RFP Main Body Section 5&620Appendix A & B20Document Organization20Total Points125
Assignment: PP1 and PP2 were designed to highlight TCOs A, B, C, D, and E. In terms of textbook coverage, PP1 dealt with material in Chapters 1 through 8. In contrast, PP3 covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through
https://www.Fbo.gov and follow the instructions which are located in the Doc Sharing section.
This project is to be prepared and submitted in accordance with the guidelines presented below.
Submission Details:
Please submit your PP3 document to the Week 6 Dropbox. Instructions could be found in the PP3 – Formal Proposal Submission in the Doc Sharing section.
Clarification Issues: As a service to everyone in the class, all questions of a clarification nature should be posted in the weekly Q & A Forum during the week in which your question arises.
Grading: see scoring grid below.
Deadline: PP3 is due by the end of Week 6.
Submit your PP3 assignment to the Week 6 Dropbox.
Scoring:Cover Page5Technical Approach 35Personnel quals and management approach35Past performance and teaming agreements25Capabilities and format25Total Points125