Project Part 1 is already finsihed, you just need to finish the rest. See attached files for all the needed info.
NT1310:Project
Page 1
PRO JECT D ESC RIPT ION
As the project manager for the Cable Planning team, you will manage the creation of the cable plan for
the new building that will be built, with construction set to begin in six weeks.
The deliverables for the entire Cable Plan will consist of an Executive Summary, a
PowerPoint
Presentation and an Excel Spreadsheet. You will develop different parts of each of these in three parts.
The final organization should contain these elements:
The Executive Summary:
o Project Introduction
o Standards and
Codes
Cable Standards and Codes
Building Standards and Codes
o Project Materials
o Copper Cable, Tools, and Test Equipment
o Fiber-Optic Cable, Tools, and Test Equipment
o Fiber-Optic Design Considerations
o Basement Server Complex
Design
o First Floor Design
o Security and Safety
o Component Cost, Picture, and
source
The Excel Spreadsheet:
Component Names
Component Descriptions
Component Costs
Total Project Costs
The PowerPoint Presentation:
Introductory Slide
Component Slides with Component Name, Quantity Needed, Description, Price, Picture, and
Reference (where
to buy the component)
Description of the Basement Telecommunications and Network
Server Space
Network Equipment Required for the
Server
Farm
Cable Plant Design for the Basement
NT1310:
Project
Page 2
Standard Floor Design for Computers
and Network Equipment
Cable Plant for the
Standard Floor
Course Objectives Tested:
1. Distinguish between bandwidth, frequency, and data rate in a data network
2. Explain the importance of codes, standards, and specifications.
3. Compare and contrast network topologies
4. Describe the characteristics of different copper cables
5. Explain the purpose of network tools
6. Compare and contrast fiber-optic and copper transmission
7. Differentiate between twisted-pair cable connectors, coaxial cable connectors, and fiber-optic
cable connectors
8. Construct a network based on specifications using repeaters, hubs, bridges, switches, servers,
and routers
9. Demonstrate how to test copper and fiber-optic networks
10. Explain how fiber-optic transmission utilizes the basic principles of light for transmission
11. Evaluate the optical fiber characteristics that affect data rates, including dispersion, attenuation,
and bending
12. Compare different fiber-optic light sources
13. Explain the passive components used in fiber-optic networking, including couplers, optical
switches, optical attenuators, optical isolators, optical amplifiers, and optical filters
14. Explain how to install, test and repair fiber-optic cables and networks.
NT1310: Project
Page 3
PRO JECT SUBM ISSIO N P L AN
Project
Part
Description/Requirements of Project Part Evaluation Criteria
Part 1 Project Part 1: Design a Cable Network for a Large
Company
Your first task in creating the Cabling Plan is to develop an
Executive Summary that will contain the Project
Introduction and Infrastructure Cable Specifications and
Standards.
Your manager gives you the overall project plan that
includes:
A detailed description of the new
building.
The total number of computers for all of
the employees of the company.
The server and network topology
hardware that is required to put the
system together.
You can access documents for the project plan through
the Unit 2 Study Lesson.
This week, you will develop the template for
the Executive
Summary format (include headings for all sections.) You
will also fill in the content for the following sections and
subsections in the Executive Summary:
o Project Introduction
o Standards and Codes
Cable Standards and Codes
Building Standards and
Codes
Create the
template for the
Spreadsheet and the
Your instructor will use
the following points for
evaluating your
performance in this
assessment:
Did you create
an Executive
Summary
Document with
the sections
indicated
completed?
Did you use a
minimum of 2
pages: single-
spaced?
Did you include
all pertinent
standards and
codes for your
project?
Did you create
the headings for
all sections in
the Executive
Summary?
Did you create a
template
for the
spreadsheet?
Did you create a
template for the
NT1310: Project
Page 4
Project
Part
Description/Requirements of Project Part Evaluation Criteria
PowerPoint presentation. Complete the Introductory slide
for the PowerPoint
Presentation
Submission Requirements:
Microsoft Word Document
Size: 12-pt.
Font: Times New Roman
Length: Minimum of 2 pages
Line Spacing: Single-Spaced
Executive Summary containing the following
Sections:
o Project Introduction
o Standards and Codes
Cable Standards and Codes
Building Standards and
Codes
Due: Week 2
Grading Weight: 5%
PowerPoint
presentation?
Did you create
the first
introductory slide
for the
PowerPoint
presentation?
Did you use
proper
formatting,
grammar, and
spelling?
Part 2 Project Part 2 Cable Infrastructure and Procedures
Submission Requirements:
Using the Project Plan provided by your supervisor
(accessed from the Unit 2 Study Lesson), the Executive
Summary sections that were created for the Part 1 of the
Project, and templates you created in Part 1 of the Project,
you will design the cable infrastructure
for the basement
where the Telecommunications equipment, Network
equipment, and cable reside. Parameters for the design
such as the size of the building, Computer and Servers,
Cable, and Network Equipment requirements are provided
in the Overall Project Plan provided by your supervisor.
You will also designate the cable Equipment, and fiber
segments for installation in the basement where the
Telecommunications equipment, the Network equipment
Your instructor will use
the following points for
evaluating your
performance in this
assessment:
Did you add to
the Executive
Summary
Document?
Did you describe
the components
required for the
Installation of the
basement cable
structure and the
NT1310: Project
Page 5
Project
Part
Description/Requirements of Project Part Evaluation Criteria
and cable reside and one of the four upper floors in the
building. The basic designs of the upper floors (all have
the same design) are based on the size of the building,
the number of Computer Workstations, Cable, and
Network Equipment requirements. The parameters are
provided by the Overall Project Plan to assist you in
completing the tasks.
The first task will be to define the infrastructure and
network component requirements within
an Excel
Spreadsheet. Research each device and cable and fill in
information including the description, price, and source, in
the spreadsheet.
Define the Power Budget provided by the fiber-optic cable
and determine if the backbone design is adequate to keep
within the Power Budget. Research each type of Fiber-
Optic Cable to determine the best type to use for the
company’s backbone.
Continue the Executive Summary, Spreadsheet, and
presentation and add the following Topics/Items to the
Project Materials:
o Fiber-Optic Design Considerations
o Basement Server Complex Design
o Standard Floor Design
o Fiber-Optic Characteristics:
o Bandwidth
o Attenuation
o Electromagnetic Immunity
o Size and Weight
o Security and Safety
o Link Performance Analysis
o Cable Transmission Performance
Standard Floor
cable structure?
Did you create a
Spreadsheet
with all
components,
tools,
and testing
equipment with
required
information?
Did you create a
PowerPoint
Presentation
with all
components,
cabling, tools,
and testing
equipment?
Did you use
proper
formatting,
grammar, and
spelling?
NT1310: Project
Page 6
Project
Part
Description/Requirements of Project Part Evaluation Criteria
o Splice and Connector Performance
o Power Budget
In the Cost Analysis spreadsheet, fill in the
following information:
o Components Needed
o Quantity of Additional
Components
o Description of Additional Components
o Cost of Additional Components
In the PowerPoint Presentation, fill in the slides
for:
o
Component Slides with Component
Name, Quantity Needed, Description,
Price, Picture, and Reference (where
to buy the component)
o Description of the Basement
Telecommunications and Network
Server Space
o Network Equipment Required for the
Server Farm
o Cable Plant Design for the Basement
o Standard Floor Design for Computers
and Network Equipment
o Cable Plant for the Standard Floor
Submission Requirements:
Microsoft Word Document
Microsoft Word Document: Continue
Executive Summary from Part 1;
Size: 12-pt;
Font: Times New Roman
Length: 4-6 pages (Added to previous
NT1310: Project
Page 7
Project
Part
Description/Requirements of Project Part Evaluation Criteria
Work)
Microsoft Excel Spreadsheet
1 worksheet: Continue Spreadsheet
from Part 1.
PowerPoint Presentation
Introductory Slide: From Executive
Summary.
Component Slides with Component
Name, Description, Price, Picture, and
Source of Purchase
5-6 additional slides with information as
described above
Due: Week 4
Grading Weight: 5%
Part 3 Project Part 3: Completing the Cable Plant and
Network Component Design for the New Building
This week the you will finalize the project including
formatting the entire project document that includes the
Executive Summary, an Excel spreadsheet with the
component description, pricing, and source, and a
PowerPoint presentation that contains the cable
Infrastructure design for the basement and the Standard
Floor, a slide for each component of the network design
with a description, price and source, and a picture of the
Excel Spreadsheet with the component list and total cost
of the project.
Complete and Edit for format and
grammar, the Executive Summary
Document began in Part 1 and continued
in Part 2
Complete a Cost Analysis which will
contain the following:
Your instructor will use
the following points for
evaluating your
performance in this
assessment:
Did you edit and
submit a
professional
project?
Did you submit
an Executive
Summary
detailing the
design of the
building, Server
Farm Complex
and at least one
standard floor?
Did you submit
NT1310: Project
Page 8
Project
Part
Description/Requirements of Project Part Evaluation Criteria
o Quantity of Additional
Components
o Description of Additional
Components
o Cost of Additional Components
o Total Cost of the project
Complete the PowerPoint Presentation
o Edit the Design the Basement
Telecommunications and Network
Server Space in the basement
o Edit the Design of the Network
Equipment required for the Server
Farm
o Edit the Design the Cable Plant
for the basement
o Edit the Design the Cable Plant
for standard floor
Edit all deliverables for:
o Building Design
o Basement Server Complex
Design
o Standard Floor Design
o Component cost, picture, and
source
Submission Requirements:
Submit your completed Microsoft Work
Executive Summary.
Submit your completed Excel
Spreadsheet.
Submit your completed PowerPoint
Presentation
Due: Week 5
an Excel
spreadsheet
detailing
component
selection, price
and source?
Did you submit a
PowerPoint
presentation
describing the
design and
component
selection?
NT1310: Project
Page 9
Project
Part
Description/Requirements of Project Part Evaluation Criteria
Grading Weight: 5%
(End of Project Description)
DesignFactors
Notes
CIO’s Office
5 People
IT Chief’s Office
5 People
LAN/WAN Maint.
20 People
Reception
4 People
Telecommunications
20 People
LAN Management
50 People
Server Room A
2 Person
Server Room B
4 Person
Equipment:
Patch Cable
Computer to Wall
LAN Room
Cable Trays/Runs
Horizontal Runs
Cisco Border Router
Research: Attached to 5 Floor Switches
10 Servers
10 Servers
Computers
One Per Person
Standard floor (first floor) Lesson 2 Project Plan info
Design Factors |
Basement floor
Design Factors |
|
Vertical Riser Run |
On Outside Wall of LAN Room on Each Floor. |
Fiber-Optic Multimode |
Riser Runs: Backbone |
SC Connectors |
Fiber-Optic Cable |
Cisco Catalyst: Switch: WS-C3750G-24PS-S: 24 Ports |
Leave a Minimum of four ports free on each switch |
Color Laser Printer |
Minimum of One per Room or One per 20 people |
Vertical Riser Run |
On Outside Wall of LAN Room on Each Floor and Server RM B on this floor. |
Fiber-Optic Multimode | Riser Runs: Backbone |
SC Connectors | Fiber-Optic Cable |
Cable Trays/Runs | Horizontal Runs |
Leave a Minimum of four ports free on each switch |
Applicataion |
U.S. Minimum Requirement Ranges |
Space per Employee – 1997 |
Two people, such as a supervisor and an employee, can meet in an office with a table or desk between them |
60″ to 72″ x 90″ to 126:/5.78m2 to 11.7m2 |
280Sq. Ft./26.0m2 |
Worker has a primary desk plus a return |
60″ to 72″x60″to 84″/5.78 to 7.8m2 |
193Sq. Ft./17.9m2 |
Executive office – three to four people can meet around a desk |
105 to 130″x96 to 123″/9.75 to 11.4 m2 |
142Sq. Ft./13.2m2 |
Basic workstation such as a call center |
42″ to 52″ x 60″ to 72″/3.9 to 6.7 m2 |
114Sq. Ft./10.6 m2 |