HRM 538

Looking for someone that  can completely adhere to ALL requirements without any PLAGARISM, yet with honesty, originality and timely.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The assignment requires 4-5 pages. Please consider page length as opposed to “word count”! I need at LEAST 4 pages.

Please read assignment and complete utilizing attachment (XanEdu)

Thank you!

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

No return if unwrapped

HRM

5

3

8

: Performance Management

Jack Welch Management Institute

Winter

2

01

8

CPID

7

35

4

78

Strayer University−Online

THIS PRINT COURSEPACK AND ITS ELECTRONIC COUNTERPART (IF ANY) ARE INTENDED SOLELY FOR THE PERSONAL USE

OF PURCHASER. ALL OTHER USE IS STRICTLY PROHIBITED.

HRM 538: Performance Management – Winter

20

18

XanEdu™ publications may contain copyrighted materials of XanEdu, Inc. and/or its licensors.

The original copyright holders retain sole ownership of their materials. Copyright permissions

from third parties have been granted for materials for this publication only. Further reproduction

and distribution of the materials contained herein is prohibited.

WARNING: COPYRIGHT INFRINGEMENT IS AGAINST THE LAW AND WILL RESULT IN
PROSECUTION TO THE FULLEST EXTENT OF THE LAW.

THIS COURSE PACK CANNOT BE RESOLD, COPIED

OR OTHERWISE REPRODUCED.

XanEdu Publishing, Inc. does not exert editorial control over materials that are included in this
course pack. The user hereby releases XanEdu Publishing, Inc. from any and all liability for any
claims or damages, which result from any use or exposure to the materials of this course pack.

Items are available in both online and in print, unless marked with icons.

− Print only − Online only

Table of Contents

  • Strategy and Performance Management at DSM
  • ” by Bloemhof, Marjolein;

    Haspeslagh, Philippe; Slagmulder, Regine

    1

  • Bibliography
  • 31

    i

    HRM 538: Performance Management – Winter 20

    18

    ii

    Strategy and

    Performance

    Management at DSM

    01/2004-51

    6

    5

    This case was written by Marjolein Bloemhof, Research Associate at INSEAD, under the supervision of

    Philippe Haspeslagh, Professor of Strategy and Management, and Regine Slagmulder, Associate Professor

    of Accounting and Control, both at INSEAD. It is intended to be used as a basis for class discussion rather

    than to illustrate either effective or ineffective handling of an administrative situation. Support from DSM

    in assembling the information presented in the case is gratefully acknowledged. Some case facts have

    been disguised for confidentiality reasons.

    The authors gratefully acknowledge the financial support provided by the ABN AMRO Research Initiative in

    Managing for Value.

    Copyright © 2004 INSEAD, Fontainebleau, France.

    N.B. PLEASE NOTE THAT DETAILS OF ORDERING INSEAD CASES ARE FOUND ON THE BACK COVER. COPIES MAY NOT BE MADE WITHOUT
    PERMISSION. 1

    INSEAD
    5

    16

    5

    1
    Copyright © 2004 INSEAD, Fontainebleau, France.

    It was April 2003, and Hans Dijkman, Business Group Director of DSM Melamine, had just
    attended a Business Strategy Dialogue (BSD) meeting. DSM Melamine was the global leader
    in the manufacture and marketing of melamine, a chemical compound used to make highly
    resistant surfaces, supplying almost one third of world demand. However, Dijkman and his
    team faced significant challenges in terms of cost competitiveness, aggressive competition,
    market maturity in Europe and the US, and emerging growth, particularly in China.

    Business Strategy Dialogues had been introduced at DSM in the mid-

    9

    0s to help structure the
    firm’s strategy development process. The BSD process consisted of five distinct phases
    resulting in a thorough review of the industry, market trends, customer needs, competition and
    the position of the relevant business group. In 2001, as part of its new Value Based Business
    Steering (VBBS) system, DSM had also started to align its strategic planning and financial
    management processes by introducing Strategic Value Contracts. These contracts contained
    both performance indicators to monitor the implementation of strategy, and value drivers to
    measure economic value-creation.

    BSDs were initiated whenever either the business or corporate felt the need, on average every
    three years. DSM Melamine was currently performing its fourth BSD at the request of
    Dijkman who felt that the current ‘actively maintain’ strategy would soon fail to achieve the
    financial performance targeted in his Strategic Value Contract.

    Management of DSM Melamine had been discussing the possibility of pursuing a ‘grow and
    build’ strategy. They felt that they had reached the limits of cost reduction and that the only
    way to grow for DSM Melamine was by investing in new melamine plants. Dijkman,
    however, doubted whether corporate management would agree with this change. Would they
    emphasize the corporate strategy of becoming a specialties company and thus be reluctant to
    invest heavily in a commodity such as melamine, or would they let VBBS principles prevail
    and let themselves be swayed by Melamine’s financial track record?

    From State Mines to Specialty Company

    DSM origins go back to

    19

    02 when the Dutch government founded Dutch State Mines (DSM)
    as a state-owned coal-mining company. In the

    10

    0 years of its existence DSM reinvented
    itself several times from what was originally a coal mining company, first, as a
    petrochemicals business, then a commodity chemicals business, and more recently a
    specialties company.

    DSM became a public company in 1989. In 1993, Simon de Bree was appointed CEO and
    under his leadership DSM continued working on a portfolio shift towards advanced chemical
    and biotechnical products for the life sciences industry and performance materials. These
    activities were characterized by good earnings, quality, and strong growth. When de Bree
    stepped down in July 1999 he was hailed for having reduced the company’s exposure to
    cyclicality and improved its structure by shifting towards a larger share of value-added
    products. He left the company in good shape both financially and portfolio-wise. Peter
    Elverding, the board member in charge of integrating Gist Brocades at that time, succeeded de
    Bree as CEO. Under his guidance, DSM was able to complete its strategic transformation into
    a specialty chemical company.

    2

    INSEAD
    5165

    2
    Copyright © 2004 INSEAD, Fontainebleau, France.

    By 2003, the company had more than 20,000 employees spread across 200 offices and
    production sites in 40 countries. It was the leading producer of life science products,
    performance materials and industrial chemicals, and had a turnover of €6 billion in 2002 (see
    Exhibit 1 for key figures). Its headquarters were located in Heerlen, in the south of the
    Netherlands, close to the site of the former coal-mines. In 2002, on the 10

    0

    th
    anniversary of its

    foundation, DSM was given royal status and re-named Royal DSM.

    Vision 2005: “Focus and Value Strategy”

    One year after his appointment, Elverding announced the outcome of the Corporate Strategy
    Dialogue conducted in 2000 and labeled ‘Vision 2005: Focus and Value’. With the
    implementation of Vision 2005, DSM would complete its strategic transformation into a
    specialty chemicals company. Elverding announced that DSM was planning to spin off its
    petrochemical business. This decision was not without emotion as the petrochemicals
    business was regarded by many as the ‘roots’ of the chemical company.

    In addition, Elverding announced ambitious targets of increasing annual sales by
    approximately 60% to €10 billion by 2005, despite the planned withdrawal from the
    petrochemicals business, which provided one-third of the company’s turnover in 2000. At
    least 80% of sales would have to be generated by specialty products; the rest would come
    from industrial chemicals, such as melamine and caprolactam, where DSM was already the
    global leader. Acquisitions would account for half of the sales increase and the remainder
    would be achieved through organic growth, roughly 6% per year.

    Besides focusing on a global leadership position in the specialties business, Vision 2005 also
    addressed DSM’s desire to increase its market capitalization as management felt that the
    company’s stock was undervalued. There were several reasons for this underperformance,
    including concerns about DSM’s portfolio breadth relative to the size of the company, but
    management believed that the main reason was the market’s perception that DSM still was a
    cyclical stock with predominantly a commodity profile. Management hoped that the
    implementation of Vision 2005 would turn DSM into a real specialties company, leading to a
    re-rating and appreciation of its market capitalization. A major part of the Vision 2005
    strategy was accomplished when DSM successfully sold its petrochemicals business to Saudi
    Arabian Basic Industry Corp (SABIC) in June 2002. With a total net consideration of €2.

    25

    billion, this transaction was the largest single deal in DSM’s history. In a separate transaction,

    DSM sold its entitlement to an annual portion of the net profits of EBN1 to the Dutch
    government in December 2001. These transactions created a solid cash cushion of over €3
    billion to fund the expansion of the specialty portfolio targeted in Vision 2005. To protect its
    cash trove from unwanted parties, and to keep the funds and transformation process
    transparent, DSM took the unusual step of placing the revenues from the disposals of EBN
    and the petrochemicals business into a new subsidiary, DSM Vision 2005 BV. The use of
    these resources required approval by the governing board of the foundation, which consisted
    of three members of DSM’s managing board and three members of the supervisory board.
    After the divestment of petrochemicals, DSM had become a substantially smaller company,

    1 EBN: Energie Beheer Nederland, the entity controlling the state participations in the exploration,

    production and marketing of natural gas in the Netherlands, the management of which was entrusted by the
    State to DSM.

    3

    INSEAD
    5165
    3
    Copyright © 2004 INSEAD, Fontainebleau, France.

    but with a portfolio that matched the desired profile. Specialties now represented well over
    two-thirds of total sales, justifying a reclassification from ‘bulk commodity player’ to
    ‘specialty player’.

    In February 2003, Elverding was able to announce the next step in implementing Vision 2005
    as DSM signed a contract to acquire Hoffman-La Roche’s vitamins, carotenoids and fine

    chemicals business for €1.75 billion, the largest acquisition it had ever made.2 The acquisition
    would help restore its total sales, which had been reduced to less than €6 billion as a result of
    the divestment of petrochemicals, to over €8 billion. More importantly, it would boost the
    specialty part of DSM’s portfolio and help achieve the goal of 80% of sales in specialties two
    years ahead of the scheduled date (2005). Various analysts were skeptical about the
    acquisition, however, because of the price pressure and the low growth prospects of the
    business.

    The DSM Organization

    DSM had a decentralized organizational structure built around

    15

    business groups (consisting
    of various business units) that were empowered to execute all business functions. The
    business groups were grouped into three strategic clusters, mainly for reporting purposes. (see
    Exhibit 2). DSM believed that this structure ensured a flexible, efficient and fast response to
    market changes. The business group directors reported directly to the managing board of
    directors. Staff departments at corporate level supported the managing board and the business
    groups. The business groups contracted the services of a number of shared service
    departments, DSM Research, and intergroup product supplies at market prices.

    The managing board of directors was a collegial board with five members. It was responsible
    for making decisions about the company’s strategy, its portfolio policy, and the deployment of
    resources. Most board members were ‘board delegates’ for various business groups. The top
    management team consisted of the 15 business group directors and the corporate vice-
    presidents reporting to the board. The third layer of management consisted of

    30

    0 senior
    executives. The top 300 were considered ‘corporate property’; they were on one central
    payroll and Corporate had the authority to relocate these executives within DSM if they felt
    the need to do so.

    DSM’s corporate culture was traditionally informal and consensus-oriented, as is the case in
    many Dutch companies. Long-standing careers at DSM were encouraged. However, because
    DSM had been a cyclical company where 90% of the business results were the outcome of
    external circumstances that could not be influenced, DSM historically did not have a strong
    accountability culture.

    The Strategic Planning Process at DSM

    Until the early 1990s, DSM had operated a traditional strategic planning process with
    planning and budget cycles taking place throughout the year However, DSM management
    was no longer satisfied with this process. They felt that Corporate Planning owned the

    2 The deal was closed in September 2003, after the final approval of the anti-trust authorities was obtained.

    Roche’s Vitamins & Fine Chemicals business was renamed DSM Nutritional Products (DNP).

    4

    INSEAD
    5165
    4
    Copyright © 2004 INSEAD, Fontainebleau, France.

    strategic planning process and that it served too many different purposes (corporate,
    divisional, business and functional strategy, internal and external). The process had become
    routine over time and had degenerated into a ‘numbers exercise’. The link between strategy
    and performance was not clear, but more importantly, top management felt that the quality of
    strategy development was poor. Most of the strategies focused mainly on cost reduction. The
    primary beneficiary of such strategies was not the company but its customers, since most of
    the cost savings were typically passed on to them through price reductions. To enhance the
    quality of the strategy development process, a new approach called the Business Strategy
    Dialogue (BSD) was introduced in 1992. These BSDs led to Corporate Strategy Dialogues
    (CSDs) which were intended to improve the corporate strategy development process.

    Corporate Strategy Dialogue

    DSM’s strategy development process started with an extensive study of the current situation
    and the outlook for the company for the next few years. The Corporate Strategy Dialogue was
    held every three years with a team of 40-50 company-wide executives. It was aimed at
    developing a long-term corporate strategy, with evaluations and choices being made about
    portfolio composition, investment priorities and geographical spread. The whole process took
    six to nine months and was wide-ranging, involving intensive discussions in DSM

    Corporate

    top meetings, with the supervisory board and the Central Works Council. The end product
    was a shortlist of corporate top priorities.

    The first CSD was performed in 1994, followed by another in 1997 and a third in 2000.
    Besides new themes that were defined in each CSD, a number of common themes had
    consistently been part of the CSD, such as profitable growth, leadership position, coherent
    portfolio, reduction of cyclicality, growth markets, reduction of dollar-sensitivity,
    geographical spread, and being an attractive employer.

    Once the priorities were set, the corporate strategic plan was to be implemented over the next
    two to three years. Focusing all energy on realizing its corporate priorities had allowed DSM
    to achieve most of them before their target dates.

    Business Strategy Dialogue

    The businesses were responsible for developing and implementing their (approved) Business
    Strategy Dialogues (BSDs). The purpose of a BSD was to provide a consistent method and
    terminology to help structure the strategy development process and improve its quality. BSDs
    were mostly initiated by the business groups themselves, but were sometimes requested by
    corporate. They occurred at regular intervals of three years on average.

    The BSD process consisted of five phases with several steps within each phase. The five
    phases were: Characterizing the Business Situation; Analyzing the Business System at Macro
    Level; Analyzing the Business System at Micro Level; Options and Strategic Choice and
    Action Planning and Performance Measurement (see Exhibit 3). But before a BSD could be
    started, some preparatory work had to be done.

    5

    INSEAD
    5165
    5
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Starting up

    One of the first things to be done was to identify a facilitator and a challenger. To facilitate
    the implementation of the BSDs, Corporate had trained around 30 “facilitators” to support the
    business teams in its creative thinking process. They were selected from the top 350
    executives and asked by the Chairman of DSM to become a facilitator. The task of a
    facilitator was to prepare the strategy development process with the business group director
    by defining the scope of the exercise, discussing the composition of the core team, examining
    the time schedule, drafting a list of important strategic issues, and appointing a project
    manager who was responsible for the operational part of the strategy development process.
    The most important role of the facilitator, however, was to make sure that the BSD led to real
    strategic options and a real choice, as expressed by Marthijn Jansen, facilitator:

    “The role of the facilitator is to make sure that the BSD focuses on the right

    issues, that in the “options phase” the conversation diverges, and that in the

    defining of the KPIs phase, everything converges to a clear path and a clear view

    of the implications of the choices made.”

    In addition to a facilitator, a ‘challenger’ was selected. The challenger had an important role
    as he/she had to question the BSD team about the assumptions, analyses and conclusions it
    made. Challengers were chosen from the top 100 managers within DSM. In addition to the
    internal challenger, a business group could also ask ‘outsiders’ to challenge them on specific
    issues. These outsiders – often (technology) specialists – also shared their knowledge.

    The core team in the BSD typically consisted of the complete business management team
    supported by specialists from further down the organization. They were advised not to have
    more than 10 to

    12

    people as management felt that larger groups did not allow for effective
    discussion and hampered the creativity of the process. In large or complicated businesses sub-
    groups were formed to address specific questions. The BSD process consisted of workshops
    and discussion sessions led by the facilitator. Input and participation by all concerned was
    considered very important.

    Characterizing the Business Situation

    The objective of this phase was to collect and structure the necessary information to be used
    as input to the BSD. The Group provided the businesses with a strategic data checklist of the
    information that might be useful for the BSD such as environmental and market analysis,
    competitor assessments and analysis of manufacturing, R&D, HRM, finance and processes.
    Data were supplied by functional discipline. In addition to data gathering, the checklist
    offered a useful format for summarizing and presenting the information. The data set was
    structured in accordance with questions such as:

    • What business are you competing in?

    • Which other businesses and products are you competing with?

    • How attractive is the industry in terms of growth and profitability?

    • What is your competitive position (benchmarks)?

    • What are the dynamics? What trends can be expected in your business system?

    6

    INSEAD
    5165
    6
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Practice showed that this phase could take two to four months. Corporate management
    emphasized that the businesses should not view this information-gathering phase as a
    checklist exercise but rather approach it from an ‘issue-driven’ angle.

    Analyzing the Business System at Macro Level

    In this phase, which took approximately two days, the industry in which the business unit
    competed was analyzed from the outside in, based on Porter’s Five Forces model. The
    discussion focused on the examination of the value added in the business chain, the
    customers, the competitors, the business dynamics and the drivers of the industry. An
    important step was the analysis of the different generic strategies followed by key
    competitors. Understanding generic strategies forced the businesses to categorize the different
    ways in which a business could compete in the industry. A strategic group was defined as a
    cluster of companies following the same generic strategy. The outcome of this phase included
    a basic understanding of the ‘rules of the game’, i.e. the strategic groups in which the business
    might compete and a preliminary view of the key success factors (KSFs) that must be met in
    order to compete successfully within a certain strategic group.

    Analyzing the Business System at Micro Level

    In this phase the organization was analyzed from the inside out, by looking at the internal
    process. Important tools for the analysis of the internal value chain were market segmentation,
    activity-based costing, internal or (preferably) external benchmarking of functions, and
    assessment of the technological position. The conclusions of the micro-discussion included an
    analysis of the business unit’s capabilities – both strengths and weaknesses – to compete in its
    strategic group. This phase took on average two days.

    Options and Strategic

    Choice

    After having assessed the competitive environment and the business unit’s capabilities to
    compete successfully in its environment, the outcome of both steps were compared, i.e.
    internal capabilities were compared with the list of KSFs (see Exhibit 4 for an example of
    DSM Melamine). This allowed the business to make a choice as to the strategic group in
    which it wanted to compete. Furthermore, it allowed the business to verify whether it really
    could serve the selected market segments and determine what steps were necessary to achieve
    or sustain leadership within the strategic group.

    Action Planning and Performance

    Measurement

    Once the strategic choice had been made, the strategy had to be translated into an action plan
    and linked to performance measurement. Based on the strategic mission and objectives of the
    business unit a limited number of performance indicators that were important to the
    corresponding KSFs were selected. Performance indicators monitored the implementation of
    the strategy and were the measurable part of the KSFs, allowing comparisons with
    competitors and performance monitoring over time. Examples of performance indicators
    included market share, pipeline of products, quality, customer satisfaction, and cost per unit.
    The objective of performance measurement was to provide periodic information on the
    progress made toward the defined targets for each performance indicator. Furthermore, it
    helped management set objectives and target levels for the next period.

    7

    INSEAD
    5165
    7
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Annual Strategic Review (ASR)

    The Annual Strategic Review (ASR) was performed by each business group, and comprised a
    progress report on the implementation of the BSD, an update or reassessment of major
    business risks, an updated sensitivity analysis and updated financial projections. The ASRs of
    the business groups constituted the building blocks of the corporate ASR whose purpose was
    to monitor the execution of the Corporate Strategy Dialogue. An important element in the
    review was the confirmation that the chosen strategy in the BSD was still valid and that the
    implementation was on track. Therefore, the validity of the main assumptions on which the
    strategy was based had to be checked and the consequences of changes in the business
    environment for the strategy evaluated.

    Benefits and Challenges of the BSD

    System

    Benefits

    In 2000, six years after its implementation, the BSD had become an accepted system for
    developing business strategy. DSM management was pleased with the improved quality of
    strategy formulation and the team-building aspects. One business group director coming from
    outside DSM commented:

    “The strategic planning process is very good at DSM. It is a robust and effective

    process. And it is a living system, contrary to many other companies where people

    just ‘feed’ the system.”

    Many people valued the ‘challenger’ part of the BSD, where someone from outside the
    business group challenged the assumptions and outcomes of the BSD. One business group
    director recalled:

    “Corporate said to us: ‘The BSD is nice but not rigorous enough. Come back

    when you have really looked at the intrinsic value of each market segment. Not at

    macro level, but at market segment level.’ This was very good because it forced us

    to get a real grounding in segments.”

    People agreed that the BSD process greatly enhanced the insights and understanding of the
    business. In addition, it forced alignment, both across functions in the business unit and with
    respect to the strategy. Furthermore, people felt that the BSD gave legitimacy to initiate
    changes later on when the business got to the implementation phase. Another big advantage of
    the process was that strategy development became a three-yearly process with just an annual
    update. One top executive of corporate planning commented:

    “Performing a BSD is a lot of work. But once you are done, you are done for two

    to three years.”

    Challenges

    The final phase of the BSD – translating strategy into performance measurement – remained a
    challenge. Hein Schreuder, Corporate Vice President Strategy & Development, expressed his
    concern:

    8

    INSEAD
    5165
    8
    Copyright © 2004 INSEAD, Fontainebleau, France.

    “DSM invests heavily in a good strategic diagnosis, but the ultimate focus should

    be on delivery.”

    Although DSM had improved the quality of strategic thinking in the planning process, the
    question remained indeed how to link it with execution.

    Value Based Business Steering

    In 2000, Henk van Dalen, Director of the DSM Polyethylenes business group, was appointed
    to the managing board. He believed that the necessary step to implement Vision 2005 and its
    promise for performance was a more intense focus on value-creation in the businesses.
    According to the newly introduced Value-Based-Business Steering (VBBS) concept, the
    overall target for DSM was to create value for all of its stakeholders, i.e. shareholders,
    employees, customers, and society.

    DSM approached VBBS from three different angles. The first was accountability as the basis
    for financial control. The second was alignment of DSM’s strategic business planning
    processes to materialize its promise for performance. The third was the introduction of new
    financial operating metrics that translated Vision 2005 and BSDs into economic value terms.
    DSM decided to start with the third angle because it had the biggest impact on the
    organization and was a first step in aligning strategy with performance measurement. As a
    result, VBBS was strongly driven by the finance department – at least initially.

    New Financial Business Steering Metrics

    A new set of performance metrics was developed for internally measuring and managing
    financial performance in terms of value-creation (see Appendix 1). Cash Flow Return on
    Investment (CFROI) became DSM’s new yardstick for measuring the performance of its
    businesses. Contrary to other value-based management companies, DSM decided to use
    CFROI only for internal reporting and financial performance measurement, while ROI
    remained the performance measure for external reporting. A reason for this decision was that
    DSM felt that the complex CFROI calculations were difficult to explain to investors.
    Furthermore, DSM first wanted to see if the new metrics would work.

    Total Shareholder Return was an important external performance indicator related to value-
    creation for DSM as a whole, but could not be directly linked to the performance of individual
    business groups. DSM chose to introduce Cash Value Added (CVA) to translate value-
    creation from a capital market point of view into an objective internal DSM measure. CVA
    represented the cash surplus generated (“value realized”) by a business once all capital
    providers had been compensated. To determine the “value created” by a business, DSM
    measured the increase in value (delta CVA) from year to year. Because DSM was a
    decentralized company, the group did not impose delta CVA targets; instead, target setting
    was done in a bottom-up fashion. To achieve a positive delta CVA and thus create value, a
    business could work on two key value drivers: by improving CFROI or by investing in
    profitable projects.

    Investments were evaluated against the Internal Rate of Return (IRR) hurdle, i.e. the before-
    tax weighted average cost of capital (WACC). If an investment met the WACC hurdle, it

    9

    INSEAD
    5165
    9
    Copyright © 2004 INSEAD, Fontainebleau, France.

    created value. However, DSM imposed an additional performance standard by plotting the
    current business position and the historical performance of a business group on a so-called
    “C-curve” (see Exhibit 5).

    The C-curve provided a clear indication of the preferred route to value-creation for a business
    depending on its current return. Three basic scenarios could be distinguished. For businesses
    that generated returns below the WACC, restructuring and improving the return was priority
    number one. Businesses that had returns around the WACC needed to improve their
    performance and were encouraged to explore methods to increase CFROI. Finally, businesses
    that had returns well above the WACC found themselves in a position that was profitable; the
    way to create value for this kind of businesses was to grow while improving or maintaining
    CFROI.

    Operationalizing VBBS

    Value-creation for DSM as a whole was translated into the internal value-creation measure
    delta CVA. This measure could be applied at the business group level, but also at lower levels
    such as business units or product/market combinations. The next step in the VBBS process
    was to translate the abstract concept of value-creation into operational actions using the
    concept of value drivers. DSM defined a value driver as an “operational variable which can be
    influenced by acts of management and which has a direct link with value-creation.” Examples
    of value drivers included: working capital as a percentage of sales, raw material costs per ton,
    production costs per ton, and sales price per ton.

    At this stage, the difference between value drivers and performance indicators became clear.
    Performance indicators were developed during the BSD and monitored the implementation of
    the strategy. Value drivers were developed during the VBBS analyses and monitored how the
    implemented strategy resulted in economic value-creation. Performance indicators applied to
    the strategic and tactical level and provided early warning signs (‘leading indicators’). In
    contrast, value drivers applied to the operational level of the organization and were financial
    and often results-based and therefore ‘lagging indicators’.

    Value drivers and performance indicators did not necessarily have a one-to-one relationship.
    One performance indicator (e.g. market share) could influence multiple value drivers (e.g.,
    volume, margin, cost), and vice versa, one value driver could be affected by several
    performance indicators. For the commodity businesses, value drivers and performance
    indicators often covered the same variables. For example, a value driver could be cost per ton,
    while the corresponding performance indicator would be a relative measure – costs compared
    to competitors. However, the link was much less clear for the specialty activities where
    factors such as the management of the innovation pipeline would be decisive for success.
    There could be a significant time lag between the filling of the pipeline with new products and
    the value-creation caused by higher sales volume resulting from these new products.

    Once the metrics were defined and the concept of VBBS was clear, DSM started with the
    strategic assessment of its various businesses. These assessments yielded valuable new
    insights into the positioning of specific businesses. For example, some businesses that
    accounting wise (i.e., based on ROI) looked like diamonds in the portfolio, turned out to be
    value-destroying businesses from a CFROI perspective. Loek Radix, Director of Corporate
    Finance, explained:

    10

    INSEAD
    5165
    10
    Copyright © 2004 INSEAD, Fontainebleau, France.

    “I was almost physically attacked when I delivered that message. But the strategic

    assessments were a huge eye-opener about how we should manage a certain type

    of business. Before, there was an atmosphere of complacency in successful

    businesses. There was no mindset at all about delta value. However, it is not

    important what today’s value is; it is important what the evolution in value is.”

    Although people got excited about the results from the VBBS assessments, implementing the
    new metrics and coming up with value drivers turned out to be a technically difficult and time
    consuming process. Although the consultants were able to explain the concept of CFROI and
    CVA, translating this into specific measures was extremely complex. According to Radix:

    “The sweaty part starts when you really have to develop the metrics in detail.

    Questions like: ‘What do I do with foreign investment?’ or ‘What is the

    percentage of economic depreciation?’ were difficult to answer. We had to re-

    define items during the process. That was not really helping us in the introduction

    of VBBS and we got pushback from the operating managers.”

    In early 2002, the general knowledge of the VBBS system in the DSM organization was still
    limited. Although top management understood the big picture, a survey testing more detailed
    knowledge showed that even at the executive level a lot still had to be learned. One corporate
    manager estimated that it would take three to five years for people to really understand and
    work with the new system. However, at corporate level, VBBS thinking had already
    significantly changed the strategic approach vis-à-vis the businesses. Whereas previously
    corporate finance used to strive for consensus, the department was now more able to
    challenge the businesses, helped by the C-curve. According to Radix:

    “Before we had a culture of managing conflict in our department. Now we are

    able to say, ‘No, we don’t agree, we oppose this investment.’ We now challenge

    businesses whose CFROI is above the WACC to grow, and we refuse to give

    additional investment money to businesses whose CFROI is below WACC. We

    now say ‘If you don’t have 8% CFROI, then your first task is to get that CFROI

    before you get money for investments.’ As a business unit manager you can no

    longer say: ‘I will grow out of the misery.’ VBBS and the C-curve really helped to

    challenge in a different way.”

    More than New Metrics: Creating Strategic Alignment through
    Strategic Value Contracts

    Although VBBS within DSM was still very much metrics oriented, right from the early days
    DSM was aware that it was much more than just adopting new metrics: DSM management
    felt that it gave them the tools and insights to align the business strategies to performance
    measurement. The connection between strategy and performance measurement was made by
    elaborating the BSD into Strategic Value Contracts (SVCs).

    From 2001 on, each new BSD had to result in a SVC. A SVC was a summary of the main
    conclusions of a BSD translated into measurable targets for the next three years. It contained
    two main sections which had to be explicitly approved by the managing board: 1) bottom line
    results focusing on CFROI and CVA and the breakdown thereof in controllable value drivers,
    and 2) strategic goals laid down in the strategic mission and the implementation specified in

    11

    INSEAD
    5165

    11

    Copyright © 2004 INSEAD, Fontainebleau, France.

    terms of key success factors, performance indicators and strategic milestones. Thus, both
    performance indicators for monitoring strategy implementation, and value-based measures for
    monitoring value-creation were incorporated into the contract. Future performance of the
    business would be monitored against the agreed-upon SVC.

    DSM felt that the SVC was a strong communication tool and helped the implementation of
    strategy and VBBS at the business group levels. It explained the steps of how businesses were
    planning to execute their strategy. This led to more transparency and helped the management
    board ask the right questions and challenge the business groups. One management board
    member explained:

    “What always had frustrated me about the BSD was that a strategy was

    developed, but monitoring the implementation of this strategy was difficult. I am

    very pleased with the Strategic Value Contract because people are now forced to

    implement the strategy. Now, people really have to finish the BSD. That is much

    clearer.”

    The SVC was signed by the business group director and the business group referee in the
    managing board, who signed on behalf of the entire managing board. A successor taking over
    responsibility for someone’s business also had to take over the existing SVC. Proposals for
    substantial modifications to the contract could only result from major changes in the business
    environment and had to be approved by the managing board. In early 2002, two business
    groups had their SVC and five other contracts were in progress. By 2003, nearly all business
    groups had their SVC.

    Compensation

    In the past, not meeting targets was widely tolerated at DSM, largely as a result of the fact
    that DSM had been a cyclical company where 90% of the businesses results were beyond the
    firm’s control. DSM management felt that it had to change this ‘culture of excuse’ and high
    level of ‘cyclicality tolerance’ as DSM transformed into a specialties company. The
    implementation of SVCs supported this change in culture.

    DSM felt that the next step in the implementation of VBBS was to link it with the managers’
    performance evaluation system. In 2002, it rolled out a new performance appraisal system for
    its executives which evaluated managers based on their ability to develop sustainable
    strategies and get them approved (BSD), the achievement of targets set in the SVC, and a
    number of enabling factors, such as having the right processes and workforce in place. The
    management board evaluated the top 30 executives, who in turn appraised the managers
    below them. This appraisal was used to determine managers’ salary evolution.

    The second element of the compensation system was a short-term incentive program which
    ranged from 20% to 30% on top of the base salary. This incentive scheme was linked to
    VBBS by replacing ROI with delta CVA and calculating bonuses based on the current year’s
    delta CVA. Thus, executive compensation was linked both to personal targets and to financial
    performance measures, such as CFROI, delta CVA and CVA. Lower management was held
    responsible for the relevant value drivers. Finally, DSM introduced a personnel share option
    scheme alongside the existing management option scheme in 2001.

    12

    INSEAD
    5165
    12
    Copyright © 2004 INSEAD, Fontainebleau, France.

    When SVCs and the new performance appraisal system were first introduced, managers felt
    uncomfortable as the pressure on them gradually mounted. On the other hand, the contracts
    made it clear what was expected of them and improved communication both between the
    business groups and Corporate and within the business group itself. SVCs also led to a
    demand from the business group directors with respect to key individuals in their
    organization. Previously, corporate HR had the authority to move people around and
    managers typically changed jobs every 18 months to two years. Under the new system,
    however, some business group directors claimed that they were unable to achieve their SVC
    targets if they could not keep their key managers. DSM management therefore decided that
    employees would not move around for a period of three years, but also stated that business
    group directors had ‘corporate’ responsibilities in terms of training and follow up of people.

    In 2002, DSM was unable to meet its ambitious profitability targets due to unfavorable
    economic developments. However, a number of corporate improvement targets relating to
    safety, health and the environment, and a number of targets linked to the Group’s strategy
    were realized. The overall realization was 20%. Moreover, the Supervisory Board had used its
    discretionary powers to grant an additional bonus to the members of the Managing Board
    amounting to 10% of their fixed annual salary, in recognition of their extraordinary efforts in

    strategically repositioning the company.3

    The BSD and VBBS Process at Work at DSM Melamine

    The DSM Melamine business group was part of the ‘Industrial Chemicals’ cluster. It was the
    global leader in the manufacturing and marketing of melamine, supplying almost one third of
    global demand. Melamine is a heat- and scratch-resistant plastic mainly used in impregnating
    resins and adhesive resins for laminated flooring and panels in the wood-processing industry.
    It is also used in car paints, durable plastic tableware, euro bank notes, and flame-retardants.
    The gas-phase production technology that DSM Melamine used to produce melamine was a
    proprietary technology developed in 1967 and was a highly sophisticated process technology.
    The raw materials for the production of melamine were natural gas, ammonia, carbon dioxide,
    and urea. Since ammonia and carbondioxide were by-products of melamine production,
    melamine plants had to be built close to a urea plant.

    In 2001, world consumption of melamine was nearly 700,000 metric tons, valued at
    approximately $700 million. DSM Melamine was well established with advanced production
    plants on three continents and a sophisticated technical support system in place for its
    customers. In 2002, DSM Melamine’s image was one of a global reliable supplier of ‘hassle-
    free’ product in Europe, Americas, and Asia Pacific. It earned more than half of its sales from
    long-term contracts with large customers who considered melamine a strategic purchase item
    and valued security of supply.

    The melamine market was subject to high volatility. Demand for most downstream markets
    for melamine was greatly influenced by general economic conditions. Consequently, demand
    followed the fortunes of the leading world economies. Furthermore, demand and capacity had
    not always been in balance, leading to significant price fluctuations. In 1998, for example, the

    3 Source: DSM Annual Report 2002, page 43.

    13

    INSEAD
    5165

    13

    Copyright © 2004 INSEAD, Fontainebleau, France.

    melamine market was characterized by supply shortages caused by technical problems at
    several melamine producers worldwide. High imports from overseas by melamine consumers
    via traders raised spot prices to levels of € 3,500 /ton. In 1999, however, prices collapsed to
    €800-900/ton. One of the major challenges for melamine producers was therefore to balance
    supply and demand.

    Forecasting demand was not sufficient, however. An accurate estimate of global melamine
    supply was also needed to avoid major under- or over-supply. This was hard to predict
    because of the many unplanned maintenance shutdowns at several melamine producers
    worldwide. The management of DSM Melamine had worked hard to improve its estimates of
    capacity utilization vis-à-vis global nameplate capacity.

    The Early BSDs

    DSM Melamine started in 1992 with its first BSD, followed by others in 1995 and 1999. The
    BSD process proved to be very helpful in addressing the problems and challenges the
    business group was facing and dramatically changed its performance (see exhibit 6 for the C-
    curve for DSM Melamine for the period 1992-1997).

    BSD 1992

    The main outcome of the 1992 BSD was the final approval of a US$80 million project to
    dismantle a relatively new melamine plant at Geleen in the Netherlands, and reconstruct it in
    Indonesia. DSM Melamine had made the decision to build the plant in Geleen in 1989 when it
    predicted a 5% annual growth in melamine in Europe. However, since then melamine sales
    and prices in Western Europe had declined as demand in key markets in the former Soviet
    Union stagnated and exports to Eastern Europe slumped. The management team of DSM
    Melamine had to decide whether to close, sell, or relocate the plant that had been built only in
    1992. Management decided to rebuild it in Indonesia where its Jakarta-based business Joint
    Venture, DSM Kaltim Melamine, in which it had a 60% stake, would own and operate the
    plant. DSM had wanted to build a Southeast Asian melamine plant for some time as the
    Asia/Pacific region was a fairly new market that was developing at a fast pace, especially in
    countries with major wood-processing industries. The Geleen plant was dismantled in 1994
    and rebuilt in Indonesia in 1997, thereby reducing the company’s worldwide melamine
    capacity for three to four years. The plant was the largest melamine plant in the Far East and
    the first to be built in Southeast Asia.

    BSD 1995

    In 1995, the second BSD led to a major strategic breakthrough in the eyes of management.
    The strategy was to ‘actively maintain’ its global leadership position in terms of market share,
    technology, cost and customer image. Competition was based on ‘price over volume’ and
    DSM Melamine wanted to grow at the prevailing market rate. A breakthrough in the BSD
    process occurred when DSM Melamine woke up to the fact that it did not have the right
    technology to grow with the market. Instead of continuing to build large plants with gas-phase
    production technology – which would cover the growth of the market for the next four to five
    years – management decided to acquire Shortened Liquid Phase (SLP) technology in 1997.
    This technology, which required fewer production steps to produce high-quality melamine,
    would enable DSM Melamine to build smaller plants while still being cost competitive with

    14

    INSEAD
    5165

    14

    Copyright © 2004 INSEAD, Fontainebleau, France.

    the traditional gas-phase plants. However, to achieve the same quality level as the melamine
    obtained in DSM’s gas-phase process, the SLP technology had to be upgraded.

    BSD 1999

    In 1999, a third BSD was performed. The project motivated by the new review was to build a
    fourth Melamine plant in Geleen based on the new liquid phase technology, which required an
    investment of €90 million. A portion of that investment would be used to expand urea
    production at the site. The melamine plant was expected to come on-stream by end 2003.

    The strategy that followed the 1999 BSD was to continue the ‘actively maintain’

    strategy. Management of DSM Melamine expected worldwide consumption of

    melamine to grow by 5-6% per annum. This growth was concentrated in Europe

    and to a lesser extent Asia (China) and the Americas. Accordingly, DSM

    Melamine planned to expand its global capacity by 30kt every two to three years

    in addition to de-bottlenecking the existing plants.

    Key success factors for the actively maintain strategy were ‘lowest cost delivered’ by de-
    bottlenecking existing gas-phase plants and new low cost technology, and ‘security of sales’.
    The latter could be achieved by negotiating long-term contracts with global key customers,
    meeting the requirements for strategic customer alliances, and differentiating service levels.

    The Strategic Value Contract

    In 2001, the first SVC was drafted for DSM Melamine. Since it was DSM’s first experience
    with these contracts, it was primarily viewed as a learning experience. The subsequent 2003
    contract, signed in September 2002, was considered the first “real” contract. It was based on
    the 1999 BSD and would be revised at the end of 2003, once the 2003 BSD was finished.
    (Exhibit 7 shows an extract of the SVC for the period 1999-2003).

    The 2003 BSD Process

    The 2003 BSD was initiated by the management of DSM Melamine (DMM), as the Annual
    Strategic Review of 2002 had shown that its current strategy would not enable the business
    group to achieve the ambitious targets set forth in the SVC. Projections by DMM showed that
    the group would have a zero or negative delta CVA from 2004 onwards and reach a major
    negative delta CVA in 2007. These calculations were based on assumptions from the
    corporate planning group which had predicted a major economic slowdown for 2007.

    In addition, the environment had changed considerably. After experiencing strong demand in
    1998 and most of 2000, melamine markets declined or remained stagnant in most regions in
    2001. High natural gas costs, lower margins, depressed demand, and significant capacity
    additions during 1998-2001 forced many melamine producers to curtail production in 2001.
    Producers such as Melamine Chemicals and Namhae Chemical exited the market. However,
    industry experts expected the demand for melamine in the US and Western Europe to recover
    and grow at nearly 3% per year from 2001 to 2006. Demand in Southeast Asia, particularly in
    China, was expected to experience much higher growth rates because of increasing production
    of laminates for both domestic use and exports. In the 1999 BSD, DMM had not actively
    looked into China, as the main investment opportunities were seen to be in Europe (see

    15

    INSEAD
    5165
    15
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 8 for regional growth forecasts and realization). However, because of the impressive
    annual growth rate (15%) of the Chinese melamine market, the management of DMM wanted
    to investigate the impact of China on its current strategy.

    Kick-off

    The BSD 2003 of DMM started with a kick-off meeting in September 2002 with the BSD
    global management team, including the management team from Sittard, the general manager
    of America, the general manager of Indonesia, and the facilitator. Although the facilitator
    typically came from outside the business group, DMM decided to ask its own Director of
    Planning and Projects, Marthijn Jansen, to act as facilitator. In his former function at
    corporate planning, Mr. Jansen had been facilitator for various business groups and was
    therefore perceived as very experienced in this role. He was expected to spend half of his time
    on the BSD process for a period of six months. The challenger, Jos Goessens, Business Group
    Director of Plastic and Engineering, was asked to join the BSD team in January 2003.

    One of the criticisms of previous BSDs was that people felt that they were used to ‘sell’ a
    project to top management. The BSD team wanted to prevent this from happening again in
    2003 and therefore stressed the importance of challenging each other during the whole
    process and making a serious effort at identifying alternatives.

    As DMM wanted to perform an ‘issue-driven’ BSD, the BSD team started with identifying
    the subjects on which they thought decisions were needed. A total of 35 issues were identified
    ranging from subjects such as marketing & sales, operations, R&D, personnel & organization,
    and finance, to regional issues related to DMM Indonesia, America, Europe, and China. The
    next step was to decide which information was needed on these issues to make decisions and
    who should provide it.

    Value Teams

    The BSD team decided to create so-called ‘value teams’ for each issue, who were responsible
    for gathering information (i.e. phase I of the BSD – characterizing the business situation) and
    performing phase II (i.e., analyzing the business system at macro level). By implementing
    value teams DMM wanted to involve as many people as possible in the BSD process, thereby
    creating a large platform for the BSD. The value teams presented the results of phase I and II
    to the BSD team in December 2002. The micro analysis was finalized in February 2003. The
    next phase was options and strategic choice (phase IV).

    Options and Strategic Choice

    A main point of discussion in the BSD 2003 was DSM Melamine’s position in the US,
    Indonesia and China. Its 50-50 joint venture with Cytec was the largest player in the US with
    the highest prices. However, the business was not profitable because of high raw material
    costs. DSM Melamine had the best plant in the world located in Indonesia, but profits there
    were unsatisfactory due to unstable raw material supply and the negative impact on demand
    of the Asian crisis. Consequently, it was unable to realize the low cost production necessary.
    Furthermore, DSM Melamine did not yet have a position in China, which the marketing
    managers viewed as the fastest growing market.

    16

    INSEAD
    5165
    16
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Management felt that the existing ‘actively maintain’ strategy may no longer be the best,
    especially since VBBS required businesses to deliver a positive delta CVA every year.
    According to one of the managers at DMM:

    “VBBS has its limits. It is nice for a start-up business but for a mature business it

    is very difficult to produce a positive delta CVA year after year. It is not easy to

    create value within a three-year contract in a business like melamine where it

    takes two to four years for a plant to be operational. So VBBS can lead to short-

    termism. You have the choice to either increase CFROI on the existing asset base

    by cutting costs or raising prices, or you can increase the asset base. However,

    the latter takes more time and involves greater risk.

    “If DSM did not have VBBS, we would probably continue with our current

    ‘actively maintain’ strategy.”

    In February, after the macro and micro session, management felt that it should present
    Corporate with the basic choice to either grow the business – as Dijkman and his team felt
    that they had reached the limits of cost reduction – or otherwise divest.

    Growing the Business

    In the ASR 2002, it was concluded that DSM Melamine could grow faster than was currently
    the case but that it lacked the capacity to do so. Management wondered if it should be more
    aggressive and investigated growth opportunities in, for example, Trinidad, a Caribbean
    island with natural gas production, the Middle East, Europe, and China (see Exhibit 10 for the
    choice on growth ambitions, ranging from ‘give up market share’ to ‘aggressive growth’). In
    Europe, DMM’s main competitors, such as Agrolinz, were following ‘grow/build’ scenarios
    in response to growing worldwide demand. Leon Halders, Vice-President Marketing & Sales
    DSM Melamine, noted:

    “Our two main competitors in Europe are growing heavily, one is tripling and the

    other is doubling. They are not part of a large company like DSM, but part of a

    company where melamine is the most attractive business. Melamine is profitable,

    but because we are part of DSM with a certain strategic mission, we are not the

    spearhead of DSM strategy.”

    Although DMM had looked into several growth options, China still seemed the most natural
    and promising market because of its high growth rates. However, questions remained. First of
    all there was the question of how DMM, which positioned itself as a main supplier, should
    enter the Chinese market which was currently a spot market. Another issue was the fact that
    DMM’s existing customers had no significant production base yet in China, which meant that
    it would have to build a customer base. Finally, a wave of capacity expansion in 2004-2006
    was expected to result in oversupply. According to industry analysts, approximately

    21

    0
    thousand metric tons of melamine was added between 1998-2001, with China accounting for
    nearly half of new capacity. If all announced capacity expansions were completed, global
    capacity utilization was expected to fall to approximately 80% in 2006 from 86% in 1998.
    Some anticipated melamine projects were likely to be postponed or cancelled as a result. But,
    despite the above challenges, the BSD team still believed in major growth opportunities in
    China.

    17

    INSEAD
    5165

    17

    Copyright © 2004 INSEAD, Fontainebleau, France.

    As DSM Melamine’s financial performance exceeded the WACC, requests for investment to
    build new melamine plants were justifiable from a VBBS point of view. Dijkman, however,
    wondered if corporate management would agree with this new strategy, as it was not in line
    with DSM’s corporate strategy of becoming a specialties company. Furthermore, investments
    in melamine plants always involved large amounts of money (between 50 and 100 million
    euro), which in the first few years would significantly lower DMM’s CFROI.

    The Corporate Perspective on DSM Melamine

    At corporate level, DSM management faced a dilemma. From a financial perspective and in
    line with VBBS principles, investments in DSM Melamine would make perfect sense. On the
    other hand, following the corporate strategy of becoming a specialty company, one could
    question how much more to invest in the remaining commodities business such as melamine.
    It was also important to think through how investors and analysts would react if DSM were to
    invest further in its melamine business. Earlier in 2003, the management board had already
    committed to a €50 million proposal of Caprolactam, its other remaining commodity business.

    Another issue confronting the management board was the permanent challenge of balancing
    short-term requirements and long-term value. Big investments would significantly lower
    DMM’s CFROI and only increase CVA in the long-term.

    While debating the dilemma on the growth opportunities for DSM Melamine, however,
    Corporate was also challenging the business on the cost side. It agreed that DSM Melamine
    had a good low cost position, but as one corporate executive explained:

    “We push DSM Melamine. The business has excellent low costs but we are not

    interested in costs per ton. We would like DSM Melamine to benchmark itself

    against competitors in its BSD 2003 so that they can see their relative cost

    position.”

    The Broader Issues

    In addition to the strategic issues facing DSM Melamine, Corporate also had to tackle the
    remaining challenges of the BSD and VBBS processes. First, VBBS implementation was
    heavily centralized in the sense that the corporate center, as opposed to the business groups,
    was driving the change. Although the corporate center had trained facilitators and provided
    tools to support the implementation, the process was complex and somewhat slow, with
    significant differences in progress on implementation between the various business groups.
    The question was how DSM could speed up the process. Top management hoped that the new
    appraisal system would help the implementation move forward.

    Another concern related to how BSDs and SVCs could be effectively translated into specific
    actions and program management. Thus far, it had been entirely up to the business groups
    whether and how to operationalize the chosen strategy in terms of value drivers, or how to
    integrate the SVC with the performance measurement system such as the balanced scorecard.
    Business groups chose their own way to resolve these issues, with the outcome often being
    dependent on the consultant that had been hired.

    18

    INSEAD
    5165
    18
    Copyright © 2004 INSEAD, Fontainebleau, France.

    The real test for the future was ‘consequence management’. What should DSM do if a
    business group did not meet its contract, given DSM’s historical culture of tolerance for
    mediocre performance?

    Finally, there were some more fundamental questions. Implementing the new financial
    metrics had led to greater emphasis on short-term performance. DSM felt that this short-term
    focus could be hazardous for a specialty company that heavily depended on innovation and
    R&D. For example, in 2000 one of DSM’s most successful and profitable products was
    Stanyl, a product which had been 10 years in development, with negative EPs throughout all
    those years. How would these kinds of investment projects be handled under the new
    approach?

    19

    INSEAD
    5165
    19
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 1

    Key Figures on DSM

    Balance Sheet

    ( €million)

    2002 2001

    Fixed assets
    Current assets
    Total assets
    Capital employed

    3,639
    5, 357
    8,996
    4,570

    4,442
    4,133

    8,575

    5,763

    Group equity
    Provisions
    Net debt
    Total group equity and liabilities

    5,186
    682

    -1,038
    8,996

    4,

    29

    8
    809
    8

    67

    8,575

    Income Statement
    (€million)

    2002 2001

    Ongoing

    Activities

    Net sales Life Science Products
    Net sales Performance Materials
    Net sales Polymers & Industrial Chemicals
    Net sales Other Activities
    Total, ongoing activities
    Operating profit plus depreciation and amortization (EBITDA)
    Operating profit (EBIT)
    Capital expenditure (including acquisitions)

    Discontinued activities

    Net sales
    Operating profit plus depreciation and amortization (EBITDA)
    Operating profit (EBIT)

    Total

    Net sales
    Operating profit plus depreciation and amortization (EBITDA)
    Operating profit (EBIT)
    Capital expenditure (including acquisitions)

    Profit on ordinary activities after taxation
    Net profit
    Dividend
    Depreciation and amortization
    Cash flow

    Workforce at 31 December

    2,168
    1,767
    1,

    26

    8

    433
    5,636

    767
    383
    496

    1,029
    1

    25

    67

    6,665
    892
    450
    536

    349
    1,188

    199
    442

    1,630

    18,375

    2,

    23

    7
    1,855
    1,302

    357
    5,751

    741
    336
    561

    2,219
    301
    185

    7,790
    1,042

    5

    21

    652

    369
    1,415

    199
    521

    1,936

    21,504

    20

    INSEAD
    5165
    20
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 2

    Organizational Structure, as of March 2003

    P. Elverding

    Chairman

    J. Dopper

    J. Zuidam

    Deputy

    Chairman

    H. van

    Dalen
    F. Sijbesma

    DSM N.V. Managing Board of DirectorsCorporate
    Operational

    Audit

    Energie

    Beheer

    Nederland

    Corporate

    Secretariat Finance &

    Economics

    Planning &

    Development

    Human

    Resources

    Research

    Legal

    Affairs

    Corporate Staff Departments

    Communi-

    cations

    Safety,

    Health

    Environment &

    Manufacturing

    ICT

    DSM Fine

    Chemicals

    DSM Anti-

    Infectives

    DSM Pharma-

    Ceutical

    Products

    DSM Food

    Specialties

    DSM Bakery

    Ingredients

    DSM

    Elastometers

    DSM Coating

    Resins

    DSM

    Engineering

    Plastics

    DSM

    Composite

    Resins
    DSM

    Fibre

    Intermediates

    DSM

    Agro

    DSM

    Melamine

    DSM

    Energy

    Life Science

    Products

    Performance

    Materials

    Industrial

    Chemicals
    Other

    Activities
    DSM

    Venturing &

    Business

    Development
    DSM
    Industrial

    Services

    Stamicarbon

    Participations

    P. Elverding

    Chairman
    J. Dopper

    J. Zuidam
    Deputy
    Chairman
    H. van
    Dalen
    F. Sijbesma
    DSM N.V. Managing Board of DirectorsCorporate
    Operational
    Audit
    Energie
    Beheer
    Nederland
    Corporate
    Secretariat Finance &
    Economics
    Planning &
    Development
    Human
    Resources
    Research
    Legal
    Affairs
    Corporate Staff Departments
    Communi-
    cations
    Safety,
    Health
    Environment &
    Manufacturing
    ICT
    DSM Fine
    Chemicals
    DSM Anti-
    Infectives
    DSM Pharma-
    Ceutical
    Products
    DSM Food
    Specialties
    DSM Bakery
    Ingredients
    DSM
    Elastometers
    DSM Coating
    Resins
    DSM
    Engineering
    Plastics
    DSM
    Composite
    Resins
    DSM
    Fibre
    Intermediates
    DSM
    Agro
    DSM
    Melamine
    DSM
    Energy
    Life Science
    Products
    Performance
    Materials
    Industrial
    Chemicals
    Other
    Activities
    DSM
    Venturing &
    Business
    Development
    DSM
    Industrial
    Services
    Stamicarbon
    Participations
    21

    INSEAD
    5165
    21
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 3

    The Strategy Development Process

    Phase I

    Business

    Situation

    II

    Macro

    Business
    System

    III

    MicroBusiness

    System

    IV

    Options/

    Strategic

    Choice

    V

    Actions &

    Performance
    Measurement

    Tools Strategic data
    checklist

    Facilitators Facilitators Facilitators Management
    reporting

    format

    Duration 2-4 months 2 days 2 days 1-2 days Continuous

    Objective Gather basic
    information for
    BSD

    Analyze
    business
    dynamics,
    drivers and
    strategic
    groups

    Understand own
    capabilities, analyze
    strength/weaknesses

    Understand
    options,
    select
    performance
    indicators
    and targets

    Continuously
    measure
    progress

    Tasks *Environmental
    and market
    analysis
    * Competitor
    assessment
    *Analysis of
    manufacturing,
    R&D,
    technology,
    HRM, finance,
    processes

    * Discuss
    business
    chain
    * Analyze
    dynamics
    * Determine
    industry
    drivers
    *
    Characterize
    strategic
    groups

    * Formulation
    and evaluation
    of options
    * Detailed KSF
    analysis
    * Qualifiers
    * Differentiators
    * Formulation of
    indicators
    * Targets from
    competitive
    benchmarking

    * Progress
    control
    * Action plan
    * Target
    setting
    * Continuous
    improvement
    program

    Output * Document
    with required
    information
    * Strategy
    support
    database

    * Strategic
    groups
    * Industry
    drivers

    * Capabilities
    * Organizational /
    HR assessment

    * Strategic
    plan
    outline
    * Strategic
    mission
    * KSFs
    * Indicators
    * Targets

    * Strategic
    contract
    versus
    targets

    22

    INSEAD
    5165

    22

    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 4

    DSM Melamine: Strategic Groups, BSD 1999

    DSM

    Competitor 1

    Competitor 2

    Competitor 3

    Competitor 4

    Competitor 5

    Competitor 6

    Competitor 7

    merchant players

    KSF’s:

    – low cost

    – security of sales

    Regional < > Global Sales

    lo
    w

    < >

    h
    ig

    h

    s
    e
    rv

    ic
    e
    i

    n
    te

    n
    s

    it
    y

    Captive players

    KSF:

    – cost competitiveness in

    production

    ‘Local for local’ players:

    KSF:

    – customer loyalty

    Three strategic groups

    DSM
    DSM
    Competitor 1
    Competitor 2
    Competitor 3
    Competitor 4
    Competitor 5
    Competitor 6
    Competitor 7
    merchant players
    KSF’s:
    – low cost
    – security of sales
    Regional < > Global Sales
    lo
    w
    < >
    h
    ig
    h

    s
    e
    rv
    ic
    e
    i
    n
    te
    n
    s
    it
    y
    Captive players
    KSF:
    – cost competitiveness in
    production
    ‘Local for local’ players:
    KSF:
    – customer loyalty
    Three strategic groups
    DSM
    Competitor 1
    Competitor 2
    Competitor 3
    Competitor 4
    Competitor 5
    Competitor 6
    Competitor 7
    merchant players
    KSF’s:
    – low cost
    – security of sales
    Regional < > Global Sales
    lo
    w
    < >
    h
    ig
    h

    s
    e
    rv
    ic
    e
    i
    n
    te
    n
    s
    it
    y
    Captive players
    KSF:
    – cost competitiveness in
    production
    ‘Local for local’ players:
    KSF:
    – customer loyalty
    Three strategic groups
    DSM

    KSFs Capabilities

    Strategic Choice

    23

    INSEAD
    5165
    23
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 5

    C-curve

    0
    5

    wacc

    Top 20% S&P 500 index stock market performers

    whose return was initially lower than the WACC

    CFROI %

    10
    15
    20

    0.6 0.8 1 1.2

    Gross Assets (index)

    (N =

    27

    )

    1992

    1991

    1993

    1994

    1995

    1996

    Grow

    Improve

    Shrink

    1
    2
    3

    Three dos lead to the C-

    curve

    0
    5
    wacc
    Top 20% S&P 500 index stock market performers
    whose return was initially lower than the WACC
    CFROI %
    10
    15
    20
    0.6 0.8 1 1.2
    Gross Assets (index)
    (N = 27)
    1992
    1991
    1993
    1994
    1995
    1996
    Grow
    Improve
    Shrink
    1
    2
    3
    Three dos lead to the C-
    curve

    24

    INSEAD
    5165

    24

    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 6

    C-curve for DSM Melamine 1992-1997

    Gross Assets (Index: 1992 = 100)

    25

    INSEAD
    5165
    25
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 7

    Extract of the Strategic Value Contract for DSM Melamine 1999-2003

    Strategic mission.

    Actively maintain global leadership in market share, technology, cost, and customer image.

    1. Financial Performance Measures:
    * EBITDA (m€)
    * CFROI (%)
    * CVA (m€)
    * Delta CVA (m€)

    2. Key Success Factors and Performance Indicators
    Security of sales
    * Long-term contract with global key-customers
    * Meet the requirements for strategic customer alliances
    * Differentiate service levels
    * Volume sold under contract
    * Share of Integrated Panel Producers
    * Share global customers

    Lower cost
    * De-bottlenecking existing gas-phase plants
    * New low cost technology
    * Capability to Produce (CTP)
    * Controllable fixed out of pocket cost/m ton

    3. Value Drivers:
    * Unit production cost DSM Kaltim Melamine
    * Unit production cost DSM Melamine Americas
    * Unit production cost DSM Melamine Europe
    * Production volume
    * Average sales price
    * Sales volume existing plants

    4. Strategic Actions and Milestones
    * Defined per project

    5. Required Resources
    * Pre-approval for the next 3 years

    6. Sensitivity Items
    * Global utilization rate
    * USD/EUR currency rate

    26

    INSEAD
    5165
    26
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 8

    BSD 1999 Regional Growth Rates: Forecasts versus Realization

    1999 Forecast 1998-2002 Realization

    Europe 4,0% 4,5%

    Americas 5,4% 0,0%

    Asia Pacific (APAC) 5,9% 2,9%

    China 7,7% 33%

    27

    INSEAD
    5165
    27
    Copyright © 2004 INSEAD, Fontainebleau, France.

    Exhibit 9

    DSM Melamine Choice on Growth Ambitions

    Market Share Target

    20% 25% 30%

    Give up market share Organic growth Active growth Aggressive growth

    • Price over volume

    • “Europe only”

    • Lose market
    leadership

    • Max short term
    cash

    • Irreversible:

    – give up China
    – lose scale economies
    – technology standstill
    – competitors build

    • Organic growth
    with existing
    customer base

    • China as
    opportunity
    market only

    • No new
    production
    capacity

    • Accept gradual
    loss of market
    share

    • Gain market share

    • Access to new
    Integrated Panel
    Producers
    customers

    • Significant market
    share in China

    • Build lowest cost
    plant, leave high
    cost plant

    • Signal
    commitment to
    leadership

    • “volume over
    price” policy for
    plant load

    • Secure lowest cost
    position
    worldwide

    • Acquisition may
    bring growth
    without price
    erosion

    28

    INSEAD
    5165

    28

    Copyright © 2004 INSEAD, Fontainebleau, France.

    Appendix 1

    Definition of Metrics

    CFROI: The Cash Flow Return on Investment is a return measure that is the ratio of
    the Sustainable Cash Flow divided by the Gross Assets.

    CVA: Cash Value Added is the Sustainable Cash Flow remaining after a reservation
    has been made for the capital charge. Formula: (CFROI-WACC) * Gross
    Assets

    EBITDA: Earnings Before Interest & Tax, Depreciation & Amortization. EBITDA
    equals the Revenue minus the Cost of Sales.

    Gross Assets: The sum of all historical costs of the assets that are being used by a business
    plus Working Capital and Economic Goodwill paid for any acquired
    company.

    IRR: Internal Rate of Return. Discounting of future cash flows to the year in which
    the planned investment is made.

    ROI: Return on Investment. This is a return measure expressed as the ratio of the
    Operating Profit of a business and the Capital Employed.

    Sustainable Cash Flow (SCF): EBITDA – Tax – Economic Depreciation + Other SCF
    from non-consolidated companies.

    Total Shareholder Return (TSR): Dividend + stock value increase

    WACC: Weighted Average Cost of Capital is the average return on invested capital
    (debt and/or equity) that capital providers demand from a business. In the
    case of DSM, the WACC equals 8%.

    29

    To order INSEAD case studies please contact one of the three distributors below:

    The European Case Clearing House (ECCH) Centrale des Cas et de Médias Pédagogiques

    www.ecch.cranfield.ac.uk www.ecch.cranfield.ac.uk www.ccip.fr/ccmp/
    Tel: 44 (0) 1234 750 903 Tel: 1 781 239 5884 Tel: 33 (0) 1.55.65.64.44
    Fax: 44 (0) 1234 751 125 Fax: 1 781 239 5885 Fax: 33 (0) 1.40.54.06.93
    E-mail: ECCH@cranfield.ac.uk E-mail: ECCHBabson@aol.com E-mail: Ccmp@ccip.fr

    Boulevard de Constance, 77305 Fontainebleau Cedex, France. 1 Ayer Rajah Avenue, Singapore 138676

    Tel: 33 (0)1 60 72 40 00 Fax: 33 (0)1 60 74 55 00/01 www.insead.edu Tel: 65 6799 5388 Fax: 65 6799 5399

    Printed by INSEAD

    30

    Bibliography

    “Strategy and Performance Management at DSM.” Bloemhof, Marjolein; Haspeslagh,

    Philippe; Slagmulder, Regine. Case No. 5165. Published 01/2004, INSEAD, (30 pages).

    31

    32

    These course materials were produced by XanEdu and are intended for your

    individual use. If you have any questions regarding these materials, please

    contact:

    Customer Service

    cust.serv@xanedu.com

    800-218-5971

    XanEdu is changing the course of how knowledge is shared and how students

    engage with content. Learn more about our award-winning digital solutions for

    web, iPad, and Android tablets at:

    www.xanedu.com

    XanEdu

    4750 Venture Drive, Suite 400

    Ann Arbor, MI 48108

    • Front Cover
    • Title Page
    • Table Of Contents
    • Strategy and Performance Management at DSM
      Bibliography

    • Back Cover

    Assignment 1: Strategy and Performance Management at DSM

    Due Week 3 and worth 150 points

    Read the case study titled “Strategy and Performance Management at DSM” located in the XanEdu case pack (Link Below)

    Write a four to five (4-5) page paper in which you:

    1. Using the stages from the performance management process, suggest the key processes that DSM needs to provide within its system in order to successfully link its key success factors (KSF). (Note: See Exhibit 4.) Provide a rationale for your suggestions.

    2. Select three (3) drivers, and examine the central manner in which DSM management has aligned its business strategies to performance measurement.

    3. Critique or defend DSM’s competitive advantage by using three (3) of the six (6) assessment points from the textbook. Justify your response.

    4. Use two (2) external sources to support your responses. Note: Wikipedia and other Websites do not qualify as academic resources.

    Your assignment must follow these formatting requirements:

    Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

    Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

    The specific course learning outcomes associated with this assignment are:

    Summarize the components of performance management processes and systems.

    Evaluate how the performance management system aligns with organizational goals.

    Assess the effectiveness of performance management programs and policies.

    Use technology and information resources to research issues in performance management.

    Write clearly and concisely about performance management using proper writing mechanics.

    Still stressed from student homework?
    Get quality assistance from academic writers!

    Order your essay today and save 25% with the discount code LAVENDER