I have a spreadsheet that holds my primary info, daily I receive a similar spreadsheet with some changes to the sites. What I need help with is either a formula or macro that I can use to automatically update only changed data to my spreadsheet from the daily tracker I receive. I’ve attached an older spreadsheet and a newer spreadsheet dated 7/24/2013 that I would like to be able to transfer only changed data from the June Spreadsheet to the July spreadsheet

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

2

>Sheet1

nformation

M

otes

s

0% Review Completed

& Equipment Structural Recv.

tes

Date Reviewed Approved Notes

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Notes

review

Notes

CM Name

/

Submit Date Approved Date

Notes AC Panel

CM

9

Complete

es

Approved

5/20/13 Approved

Yes

Outdoor

0

180 n/a

1/2/13

Tower Nick 3

3

3 O O

3/29/13 3/29/13

N N

Holt

3

/13

Lane

Yes n/a

Yes 2/12/13

Rejected

tower and this is a Lam

Yes

lbs. not 201 lbs. as it shows.)

Nick Utah Outdoor

H

75H 75H n/a

1/10/13 Mary Tower Nick 3

6 9 8 O O

200 A N N

n/a

Lane

TAIC Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah

150H 150H n/a 1/10/13 1/10/13 Mary Tower Nick 3

Self Support 6 9 6 O

Steel Platform

3/28/13

200 A N Y

Jerry Tweden

Lane

TAIC No n/a

n/a

Structural Analysis at this time

Yes

5/29/13 n/a

No

Nick Utah Outdoor

H

90H n/a 1/10/13 1/10/13

Mary Tower Nick 3

/

Wooden Pole 6 9 6 O S/O Steel Platform

is not going to work for what is shown.

200 A N Y Jacob Walker

Lane 2/12/13 TAIC Yes n/a

Approved n/a Yes n/a 5/1/13 Approved n/a No

Nick Utah Outdoor 180 180 180 n/a 1/10/13 1/10/13 Mary Tower Nick 3

Monopole 3 6 3 I O

w/ Concrete floor

3/28/13 3/28/13 200 A N N Jerry Tweden Jerry Tweden

Lane

Yes

5/14/13 Approved

at Inerim at the base at 150.9%, but Passes at Final at 100.8%

Yes

5/14/13 Approved n/a No n/a Nick Utah Outdoor

120 120 n/a 1/10/13 1/10/13

Mary Tower Nick 3

Monopole 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N N Jacob Walker Clay Schutzer

Lane

Yes

Approved n/a Yes

6/21/13 Approved n/a No n/a

Utah Single Outdoor

135 135 n/a 1/2/13 1/2/13 6/11/13 Mary Tower Nick 3

Monopole 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N N Jacob Walker n/a

Lane 1/25/13 TAIC Yes n/a

Approved n/a Yes 5/30/13 6/11/13 Approved

No

Nick Utah Outdoor

195 195 n/a 1/10/13 1/10/13 3/22/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13

N N Jacob Walker n/a

5/29/13 Lane

TAIC No n/a 5/29/13 n/a

Analysis at this time

Yes

5/29/13 Approved n/a No

Nick Utah Single Outdoor 135 135 135 n/a 1/10/13 1/10/13 Mary Tower Nick 3

Wooden Pole 3 6 3 O S/O Steel Platform

200 A N Y Jacob Walker n/a

Lane

TAIC No n/a 5/14/13 n/a

Yes 2/20/13

Approved

No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/10/13 1/10/13 Mary Tower Nick 3

Wooden Pole 3 6 3 O S/O

100 A N Y Jacob Walker n/a

Lane TAIC Yes n/a 4/30/13 Rejected

Yes n/a 4/30/13 Rejected “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. Yes

Nick Utah Outdoor 90 90 90 n/a 1/10/13 1/10/13

Mary Tower Nick 3

Wooden Pole 3 6 3 O S/O Steel Platform sent to Mary to look at 100 A N N Jacob Walker n/a

Lane

Yes n/a 4/30/13 Approved

Yes

5/24/13 Approved

No n/a Nick Utah Outdoor

255 255 n/a 1/10/13 1/10/13 Mary Tower Nick 3

Self Support 3 6 5 O O Steel Platform

3/25/13 200 A N N

n/a

3/30/13 Lane

Caltrop Yes n/a

Approved

Structural at Interim at 133%, but passes at Final at 100.6% – need to remove the existing pipe mounts.

Yes n/a 5/17/13 Approved

No n/a Nick Utah Outdoor

285 n/a n/a 1/10/13 1/10/13 3/28/13 Mary Tower Nick 2

Self Support 2 4 4 O O Steel Platform 3/28/13 3/28/13 200 A N N Daren Holt n/a

Lane

Smith Hyatt Yes

Approved n/a Yes 5/30/13

Approved

and showing the 6 RRUs

Yes

Nick Utah Outdoor

240 240 n/a

1/11/13 3/28/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/28/13 3/28/13 200 A N N Jerry Tweden Jerry Tweden

4/6/13 Lane

Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Utah Single Outdoor 135 150 135 n/a 1/11/13 1/11/13 3/28/13 Mary Tower Nick 3

Self Support 3 6 4 O O Steel Platform 3/28/13 3/28/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13

Lane 2/8/13 Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved

No n/a Nick Utah Single Outdoor 180 180 n/a n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 2

Self Support 2 4 4 O S/O Steel Platform 3/29/13 3/29/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13

Lane 1/30/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Outdoor 240 240 240 n/a 1/11/13 1/11/13 3/25/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/25/13 3/25/13 200 A N Y Daren Holt n/a

Lane Smith Hyatt Yes

6/11/13 Approved n/a No n/a 6/11/13 n/a

No n/a Group Utah Mary Jerry Tweden Jerry Tweden

4/10/13 Lane Smith Hyatt Yes 5/31/13

Approved

. Install 3 Cantilever mounts and have 3 existing antennas standing off the existing mount.

Yes 5/31/13 6/3/13 Approved

No

Nick Utah Single Outdoor

60H 90H n/a 1/11/13 1/11/13 Mary Tower Nick 3

6 9 6 O S/O Steel Platform

6/20/13

200 A N Y Daren Holt Steve Mann

Lane Smith Hyatt Yes

6/11/13 Approved

Yes 6/7/13 6/11/13 Approved

No n/a Nick Utah Single Outdoor 150H 150H 150H n/a 1/11/13 1/11/13 Mary Tower Nick 3

Monopole 6 9 6 O S/O Steel Platform

, also need to paint mounts, hybrid cables, and antennas.

200 A N Y Daren Holt n/a

Lane 2/21/13 Smith Hyatt Yes

6/7/13 Rejected

Yes

6/21/13 Approved

Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace.

Yes

Nick Utah Single Outdoor

120H 120H n/a 1/11/13 1/11/13 Provide 2″ std pipe with plates and ubolts to tie the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace. Mary Tower Nick 3

Self Support 6 9 6 O S/O Steel Platform

4/18/13 200 A N Y Jerry Tweden Jerry Tweden 5/15/13 Provide 2″ std pipe with plates and ubolts to tie the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace.

3/30/13 Lane

Fullerton Yes 1/23/13 6/11/13 Rejected

Yes

6/11/13 Rejected the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. No n/a Group Utah Single Outdoor 135 135 135 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Concrete Pad 3/28/13 3/28/13 200 A N N Daren Holt n/a

Lane

Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 165 n/a

12/31/12 3/25/13

Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/29/13

Lane Smith Hyatt No n/a 5/29/13 n/a

No n/a 5/29/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor

105H 105H n/a 1/11/13 1/11/13 Mary Tower Nick 3 Wooden Pole 6 9 6 Daren Holt n/a

5/2/13 Lane Smith Hyatt Yes 4/24/13 6/11/13 Rejected

No n/a 6/11/13 n/a No MA provided at this time Yes

Group Utah Jerry Tweden Jerry Tweden

Lane Smith Hyatt Yes

Approved

– Verified and approved.

Yes 3/27/13 6/11/13 Approved n/a Yes

Utah Nick 2 Self Support 4 4 4 Daren Holt n/a

4/29/13 Lane

Smith Hyatt Yes 4/24/13 6/11/13 Rejected

Yes 6/21/13 6/21/13 Approved n/a Yes

Utah Single Outdoor Daren Holt n/a

Lane Smith Hyatt Yes 4/22/13 6/11/13 Approved n/a Yes

6/19/13 Approved n/a No n/a

Utah Mary

Self Support Jerry Tweden Jerry Tweden

3/30/13 Lane

TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved

No n/a Nick

Single Outdoor 195 195 195 n/a

1/3/13 3/27/13 Mary Tower Nick 3

Self Support 3 6 3 O S/O Steel Platform 3/27/13 3/27/13

200 A N Y Jerry Tweden Jerry Tweden 4/29/13

4/17/13 Lane

TAIC Yes n/a 5/7/13 Rejected

Yes n/a 5/14/13 Rejected

No n/a Nick Idaho Single Outdoor 165 165 165 n/a 1/3/13 1/3/13 4/23/13 Mary Tower Nick 3 100′ Self Support 3 6 3

S/O Steel Platform 4/23/13 4/23/13 200 A N Y Jacob Walker

3/30/13 Lane

TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Idaho Single Outdoor

300 300 n/a

1/4/13 3/27/13 Mary Tower Nick 3

Self Support 3 6 3 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden

3/30/13 Lane 2/18/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Outdoor n/a 135 135 n/a 1/4/13 1/4/13 3/27/13

Mary Tower Nick 2 50′ Self Support 2 4 2 I O Shelter 3/27/13 3/27/13 200 A N N Jacob Walker n/a 4/23/13

3/30/13 Lane 2/12/13 TAIC Yes

Approved n/a Yes

5/13/13 Approved

Yes

Nick Idaho Outdoor

315 315 n/a 1/4/13 1/4/13 3/27/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 5/15/13

5/13/13 Lane 2/7/13 WT Yes n/a 5/7/13 Approved n/a Yes 2/14/13

Rejected

not at 1

that the mount was ran at.

No n/a Nick Idaho Single Outdoor 165 165 165 n/a 1/3/13 1/3/13 5/2/13 Daren Tower Nick 3 117′ Monopole 3 6 3 O S/O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker Shane M.

3/27/13 Lane 2/21/13 TAIC Yes

5/13/13 Rejected

CD shows

Need verifications

Yes 4/22/13 5/13/13 Rejected

Yes

Nick Idaho Single Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/26/13 Mary Tower Nick 3 200′

3 6 3 O S/O Steel Platform 3/27/13 3/27/13 Need to paint coax Red and White 200 A N N Jerry Tweden Jerry Tweden 4/30/13

4/24/13 Lane 3/29/13 TAIC Yes

6/11/13 Approved

No n/a 6/11/13 n/a No MA provided at this time No

Craig Idaho Outdoor 285 285 285 n/a 1/3/13 1/3/13 Mary Tower Nick 3

Self Support 3 6 3 OD O Steel Platform 4/23/13 4/23/13 200 A N Y Jacob Walker Shane M.

Lane n/a TAIC Yes

6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Outdoor 255 270 270 n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 3 6 3 O O Jacob Walker Shane M.

Lane 1/24/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a

1/3/13 3/22/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a 3/29/13

2/21/13 Lane

TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/22/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker Shane M. 3/29/13

4/10/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Single Outdoor

135H 135H n/a 1/4/13 1/4/13 4/18/13 Mary Tower Nick 3

Monopole 6 9 6 O

Steel Platform 5/1/13 5/1/13

N N Jacob Walker n/a 4/22/13

4/24/13 Lane 3/29/13 TAIC Yes 3/1/13 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor

H

225H

n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 6 9 6 OD S/O Steel Platform 4/24/13 4/24/13 200 A N Y Jacob Walker n/a

4/24/13 Lane 3/29/13 TAIC Yes

6/3/13 Approved n/a Yes 4/1/13 6/3/13 Approved n/a No

Nick Idaho Single Outdoor

180H 180H n/a 1/3/13 1/3/13 Mary Tower Nick 3

Monopole 6 9 6 O S/O Steel Platform

5/3/13 200 A N Y Jacob Walker Clay Schutzer

4/9/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No

Nick Idaho Single Outdoor 120H 120H 120H n/a 1/14/13 1/14/13 5/1/13 Mary Tower Nick 3 85′ Monopole 6 9 6 O S/O Steel Platform 5/1/13 5/1/13 200 A N Y Jacob Walker Shane M.

3/5/13 Lane 1/31/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 5/23/13 6/11/13 Approved

No MA is corrected and approved Nick Idaho Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/22/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N N Jacob Walker n/a 4/12/13

5/17/13 Lane TAIC Yes 4/9/13

Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Outdoor 180H 180H 180H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Monopole 6 9 6 O O Jacob Walker n/a

5/6/13 TAIC Yes 3/27/13

Rejected

Yes 4/1/13

Rejected

Yes No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor

H

330H 330H n/a 1/14/13 1/14/13 Mary Tower Nick 3 200′ Guyed 6 9 6 O S/O Steel Platform 5/3/13 5/3/13 Coax will need to be painted 200 A N Y Jacob Walker n/a

Lane 1/31/13 TAIC Yes n/a 5/8/13 Approved Hy-Cap Site Yes n/a 5/14/13 Rejected

Yes

Nick Idaho Single Outdoor

165H 165H n/a 1/4/13 1/4/13 4/17/13

– 2 MMMBS and 2 BBUs – Not enough room

Mary Nick 3

Monopole 6 9 6 O 2 – S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 6/7/13

3/19/13 Lane 2/8/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Single Outdoor 90 90 90 n/a 1/14/13 1/14/13 3/26/13 Mary Tower Nick 3 50′ Monopole 3 6 3 O S/O

3/26/13 3/26/13 200 A N N Jacob Walker n/a 4/9/13

Lane TAIC Yes 5/15/13 6/12/13 Rejected

Yes 5/15/13 6/12/13 Rejected Calculations need to be shown for high capacitiy and for stand off mounts. No n/a Emily Idaho

Jacob Walker n/a

6/19/13 Lane TAIC No n/a 6/12/13 n/a

.

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a

n/a Lane

Yes n/a 6/12/13 n/a

Yes n/a 6/12/13 n/a

No No owner approved CD uploaded to Siterra Emily Idaho Site Walk Needed n/a n/a

Lane TAIC No n/a 6/12/13 n/a

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a

Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a

6/17/13 Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time Yes 4/23/13 6/11/13 Rejected

Yes

Nick Idaho Jacob Walker n/a 5/14/13

Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No n/a Emily Idaho Jacob Walker n/a

3/30/13 Lane

TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Single Outdoor 120 120 120 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 70′ Self Support 3 6 4 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/9/13

3/28/13 Lane 2/4/13 TAIC Yes 1/24/13 6/13/13 Approved

Yes 3/26/13 6/13/13 Rejected Letter needed to show how many atennas and RRUs were used in the MA Yes

Emily Idaho Single Outdoor

n/a 345 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 2

Guyed 2 4 3 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/9/13

3/31/13 Lane 2/6/13 TAIC Yes

5/13/13 Approved n/a Yes

5/15/13 Approved n/a No n/a Nick Idaho Outdoor 345 345 345 n/a 1/14/13 1/14/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13

4/9/13 Lane 3/28/13 TAIC Yes 1/24/13 5/13/13 Approved n/a Yes

5/13/13 Approved n/a No n/a Nick Idaho Single Outdoor n/a 255 255 n/a 1/14/13 1/14/13 4/17/13 Given back to STA Mary Tower Nick 2 200′ Self Support 2 4 2 O S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 5/23/13

4/29/13 Lane WT Yes 3/4/13 5/14/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Idaho Outdoor 225H 225H 225H n/a 4/17/13 4/17/13 5/15/13 Mary Tower Nick 3

Self Support 6 9 6 O O Concrete Pad 5/15/13 5/15/13

200 A N N Jacob Walker n/a Need to remove existing dead lines to install new Hybrid cables

Lane WT Yes 1/23/13 6/14/13 Rejected

Yes 2/14/13

Approved n/a No n/a Emily Idaho Jacob Walker n/a

3/27/13 Lane 1/25/13 TAIC Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Idaho Single Outdoor 240H 240H 240H n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 200′ Self Support 6 9 6 O S/O Steel Platform 3/27/13 3/27/13

200 A N Y Jerry Tweden Jerry Tweden 4/30/13

5/6/13 Lane

Yes WT Yes 2/15/13 6/3/13 Approved n/a Yes

6/3/13 Approved n/a No n/a Nick Idaho Single Outdoor 180 180 180 n/a 1/3/13 1/3/13 6/15/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 6/15/13 6/16/13 200 A N Y Jacob Walker n/a

5/10/13 Lane WT Yes

6/14/13 Approved n/a Yes 2/13/13 6/14/13 Approved n/a No n/a Emily Idaho Single Outdoor 270 270 270 n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 3 6 3 O S/O Jacob Walker n/a

3/31/13 Lane 2/8/13 TAIC Yes 2/8/13 5/14/13 Approved n/a Yes 4/3/13 5/14/13 Approved n/a No n/a Nick Idaho Single Outdoor 240 n/a 240 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 2 200′ Self Support 2 4 2 O O Steel Platform 3/27/13 3/27/13 200 A N N Jerry Tweden Jerry Tweden 5/2/13

Lane 3/29/13 TAIC Yes

6/5/13 Approved SA has been corrected Yes 4/1/13 6/5/13 Approved n/a No n/a Nick Idaho Outdoor 180H

195H n/a 1/14/13 1/14/13 Mary Tower Nick 3 120′ Self Support 6 9 6 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a 5/1/13

3/1/13 Lane 1/29/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 255 255 255 n/a 1/14/13 1/14/13 3/22/13 Mary Tower Nick 3 200′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a

3/29/13 Lane

TAIC Yes

6/5/13 Approved

Yes 2/12/13 6/5/13 Approved

No n/a Nick Idaho Indoor 255 255 255 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 200′ Self Support 3 6 3 I I Shelter 3/27/13 3/27/13 200 A N N Jacob Walker n/a 4/22/13

Lane 2/15/13 Yes WT Yes 2/1/13 6/3/13 Approved

Yes 2/13/13 6/3/13 Approved n/a No n/a Nick Idaho Outdoor 255 255 n/a n/a 1/3/13 1/3/13 6/15/13 Mary Tower Nick 2

Self Support 2 4 2 O O Steel Platform 6/15/13 6/15/13 200 A N Y Jacob Walker Shane M.

5/4/13 Lane WT Yes 2/1/13 6/14/13 Approved

No n/a 6/14/13 n/a

No n/a Emily Idaho Mary Jacob Walker n/a

Lane 2/4/13 WT Yes 1/31/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a Emily Idaho Single Outdoor 255 255 255 n/a 1/3/13 1/3/13 4/24/13 Mary Tower Nick 3

Self Support 3 6 3 OD S/O Steel Platform 4/24/13 4/24/13 200 A N Y Jacob Walker n/a

5/10/13 Lane WT Yes 2/12/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a Emily Idaho Mary Jacob Walker n/a

6/7/13 Lane

Yes

5/6/13 Approved n/a Yes

6/14/13 Approved MA has been corrected and approved No

Nick Idaho Single Outdoor 150 150 150 n/a 1/14/13 1/14/13

Mary Tower Nick 3 110′ Monopole 3 6 3 O S/O

5/9/13 5/9/13 200 A N Y Jacob Walker n/a

Lane TAIC No n/a 6/14/13 n/a No SA has been provided at this time. Yes 3/5/13 6/14/13 Approved n/a No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a

4/22/13 Lane 3/28/13 TAIC No Yes 5/1/13 Rejected

No No 5/14/13 Rejected

Yes

Nick Idaho Single Outdoor 315 315 315 n/a 1/14/13 1/14/13

Mary Tower Nick 3

Self Support 3 6 4

S/O Shelter 5/9/13 5/9/13

200 A N N Jacob Walker n/a

3/31/13 Lane 1/11/13 Powder River Yes

5/6/13 Approved

will allow to build as long as the Interim will only be in place for 6 months.

Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No

Nick Idaho Outdoor 255 255 255 n/a 1/14/13 1/14/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N N Jacob Walker Shane M. 5/31/13

Lane Powder River Yes

5/6/13 Approved n/a Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No Everything has been cleared for Construction Nick Idaho Outdoor 135 135 135 n/a 1/14/13 1/14/13 Mary Tower Nick 3

Monopole 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Jacob Walker n/a

Lane 3/28/13 TAIC No n/a 5/14/13 n/a n/a Yes

5/8/13 Approved n/a No n/a Nick Idaho Outdoor 180 180 180 n/a 1/14/13 1/14/13 4/23/13 Mary Tower Nick 3 120′ Self Support 3 6 3 OD O Steel Platform 4/23/13 4/23/13 200 A N N Jacob Walker Clay Schutzer

Lane Powder River Yes 4/29/13 6/14/13 Approved n/a Yes 1/8/13 6/14/13 Approved n/a No n/a Emily Idaho Outdoor 210 210 210 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 3 O O Jacob Walker Shane M.

3/30/13 Lane 1/8/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a 1/14/13 1/14/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/24/13

5/14/13 Lane WT Yes 2/1/13 6/16/13 Rejected

No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a

Lane WT n/a n/a 6/16/13 n/a

No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a

5/16/13 Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a

Lane TAIC No n/a 6/6/13 n/a

Yes 6/3/13 6/6/13 Approved

No

Nick Idaho Single Outdoor 75 75 75 n/a 1/15/13 1/15/13 5/9/13 Mary Tower Nick 3 35′ Self Support 3 6 4 I S/O Shelter 5/9/13 5/9/13 Jacob Walker Shane M.

4/3/13 Lane TAIC No n/a 5/13/13 n/a

Yes 4/11/13 5/13/13 Approved

No n/a Nick

Outdoor 75 75 n/a n/a 1/15/13 1/15/13 Mary Tower Nick 2 Wooden Pole 2 4 3 Jacob Walker Shane M.

4/11/13 Lane

TAIC Yes

5/13/13 Approved n/a Yes

5/13/13 Approved n/a No n/a Nick Idaho Single Outdoor 165H 165H n/a n/a 1/14/13 1/14/13 4/17/13 Given back to STA Mary Tower Nick 2

Monopole 4 6 4 OD 2 – S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden

3/6/13 Lane 2/4/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 6/3/13 6/3/13 Approved

No

Nick Idaho Single Outdoor 150 150 150 n/a 1/14/13 1/14/13 3/22/13 Mary Tower Nick 3 110′ Monopole 3 6 3 O S/O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a 4/12/13

n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho n/a n/a

Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker Clay Schutzer

4/24/13 Lane 2/21/13 TAIC Yes 2/22/13 5/10/13 Approved

Yes 2/22/13 5/10/13 Approved

No n/a Nick Idaho Single Outdoor 150H 150H 150H n/a 1/4/13 1/4/13 Mary Tower Nick 2 70′ Wooden Pole 4 6 8 O S/O Steel Platform 6/15/13 6/15/13

200 A N Y Jacob Walker Clay Schutzer

6/23/13 Lane 3/29/13 Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected

Yes

Nick Idaho Single Outdoor 135 135 135 n/a 1/14/13 1/14/13 5/2/13 Daren Tower Nick 3 88′ Monopole 3 6 3 O S/O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a

5/2/13 Lane 3/28/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 225 225 225 n/a 1/14/13 1/14/13 5/2/13 Daren Tower Nick 3

Self Support 3 6 3 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a 4/11/13

Ubiquitel Kuna

5/19/13 Lane TAIC No n/a 5/24/13 n/a

Yes 4/26/13 5/24/13 Rejected

No n/a Nick Idaho Jacob Walker n/a

6/7/13 Lane WT Yes 2/1/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA provided at this time No n/a Emily Idaho Mary Jacob Walker n/a

6/5/13 Lane 2/15/13 Yes WT Yes

6/3/13 Approved See SA for Hybrid cable installment Yes 2/13/13 6/3/13 Approved

to

No n/a Nick Idaho Outdoor 240 240 240 n/a 1/15/13 1/15/13 Mary Tower Nick 3 175′ Self Support 3 6 3 O O Steel Platform 6/15/13 6/15/13 200 A N N Jacob Walker Shane M.

4/24/13 Lane 2/11/13 TAIC Yes 2/13/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor 150H 150H 150H n/a 1/4/13 1/4/13 4/17/13 Mary Tower Nick 3 80′ Monopole 6 9 6 O S/O Concrete Pad 5/3/13 5/3/13

200 A N N Jacob Walker n/a

Lane TAIC Yes 5/6/13 6/7/13 Rejected

Yes 5/6/13 6/7/13 Rejected SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed Yes

Nick Idaho Jacob Walker n/a

5/30/13 Lane TAIC Yes 4/11/13 5/10/13 Approved

Yes 4/11/13 5/10/13 Approved Wooden Pole, 2 mounts to be installed, with 3 collars No n/a Nick Idaho Outdoor 105 105 105 n/a 1/15/13 1/15/13 Mary Tower Nick 3

Wooden Pole 3 6 3 O O Steel Platform 5/10/13 5/10/13 200 A N Y Jacob Walker Shane M. 5/29/13

Lane TAIC Yes 3/9/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Mary Jacob Walker n/a

Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. Yes 2/11/13 6/16/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Utah Jacob Walker n/a

4/5/13 Lane 3/4/13 TAIC No n/a 4/30/13 n/a

No n/a 4/30/13 n/a No MA provided at this time n/a

Nick Idaho Single Outdoor 165H 165H 165H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Water Tank 6 9 6 Jacob Walker n/a 4/19/13

Lane WT Yes 2/11/13

Approved See SA for location to install Hybrid cables No n/a 6/17/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a

3/31/13 Lane 1/9/13 Fullerton Yes 3/13/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 Mary Tower Nick 3 50′ Monopole 3 6 4 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt n/a

4/17/13 Lane 2/11/13 TAIC Yes 3/12/13 5/10/13 Approved n/a Yes 4/30/13 5/10/13 Approved n/a No n/a Nick Idaho Outdoor 150H 150H 150H n/a 1/15/13 1/15/13 5/3/13 Mary Tower Nick 3 90′ Monopole 6 9 6 O O Steel Platform 5/3/13 5/3/13 Install 3 hand rails 200 A N N Jacob Walker Clay Schutzer

5/22/13 Lane

Yes WT Yes 1/30/13 6/3/13 Approved n/a Yes 2/14/13 6/3/13 Approved n/a No

Nick Idaho Single Outdoor 165 165 165 n/a 1/15/13 1/15/13 6/15/13 Mary Tower Nick 3

Monopole 3 6 6 O S/O Steel Platform 6/15/13 6/16/13

200 A N N Jacob Walker n/a Birds Nest

5/17/13 Lane Powder River Yes

5/13/13 Approved n/a Yes 1/24/13 5/13/13 Approved n/a No

Nick Idaho Outdoor 150 150 150 n/a 1/15/13 1/15/13 5/15/13 Mary Tower Nick 3

Self Support 3 6 3 O O Steel Platform 5/15/13 5/15/13 200 A N N Jacob Walker n/a

5/9/13 Lane WT Yes 1/31/13 6/17/13 Approved See SA for location to install Hybrid cables Yes 2/14/13 6/17/13 Rejected

Yes

Emily Idaho Jacob Walker n/a

5/29/13 Lane WT No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a

5/10/13 Lane WT Yes 2/6/13 5/10/13 Approved n/a Yes 6/3/13 6/7/13 Approved MA has been corrected and approved No n/a Nick Idaho Single Outdoor 180 180 180 n/a 1/15/13 1/15/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 5/10/13 5/10/13 200 A N N Jacob Walker Clay Schutzer

6/21/13 Lane 5/29/13 TAIC Yes 4/18/13 6/12/13 Approved n/a Yes Yes 6/12/13 Approved n/a No

Dez Idaho Single Outdoor 270 270 270 n/a 1/15/13 1/15/13 Mary Nick 3 Rooftop 3 6 3 O S/O Jacob Walker n/a

5/20/13 Lane TAIC No n/a 5/13/13 n/a

Yes 3/5/13 5/13/13 Rejected

Yes

Nick Idaho Jacob Walker n/a

3/21/13 Lane 2/8/13 TAIC Yes 6/11/13 6/11/13 Approved

Yes n/a 5/14/13 Rejected

Yes

Nick Idaho Outdoor 165 165 n/a n/a 1/15/13 1/15/13 3/26/13 Mary Tower Nick 2 120′ Self Support 2 4 2 O S/O Concrete Pad 3/26/13 3/26/13 200 A N Y Jacob Walker n/a 4/30/13

6/13/13 Lane 1/31/13 Powder River Yes 4/22/13 6/12/13 Approved

Yes Yes 6/12/13 Approved n/a No n/a Dez Idaho Single Outdoor 255 255 255 n/a 1/15/13 1/15/13 Mary Tower Nick 3

Self Support 3 6 3 O S/O Steel Platform 6/15/13 6/15/13 200 A N N Jacob Walker Shane M.

5/4/13 Lane Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Yes

Nick Idaho Single Outdoor 240 240 240 n/a 1/15/13 1/15/13 5/9/13 Mary Tower Nick 3 187′ Self Support 3 6 3 O S/O Steel Platform 5/9/13 5/9/13 200 A N Y Jacob Walker Clay Schutzer

Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Jacob Walker n/a

3/31/13 Lane 2/19/13 TAIC No n/a 5/13/13 n/a

No n/a 5/13/13 n/a No MA provided at this time No n/a Nick Wyoming Indoor 150 150 150 n/a 1/3/13 1/3/13 3/27/13 Mary Tower Nick 3 80′

3 6 5 I I Shelter 3/27/13 3/27/13

200 A N N Jacob Walker Shane M. 5/15/13

4/15/13 Lane 1/28/13 TAIC Yes n/a 5/7/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time Yes

Nick Idaho Single Outdoor 180 180 180 n/a 1/3/13 1/3/13 4/17/13 Given back to STA Mary Nick 3 94′ Rooftop 3 6 3 ID S/O

4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13

6/3/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Jacob Walker Shane M.

6/5/13 Lane Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/11/13 1/11/13 5/28/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N N Daren Holt n/a

2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved

No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13

Mary Tower Nick 3 98′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Steve Mann

2/27/13 Lane 2/18/13 Caltrop Yes

5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer

6/14/13 Lane Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 5/28/13 Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Jacob Walker Shane M.

4/15/13 Lane 2/28/13 Caltrop Yes

5/13/13 Approved n/a Yes 2/4/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a

1/11/13 3/29/13 Mary Tower Nick 3 98′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker n/a 5/14/13

4/23/13 Lane 3/4/13 Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 4/18/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 100 A N Y Jacob Walker Clay Schutzer

4/14/13 Lane 3/12/13 Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker Clay Schutzer

4/22/13 Lane

Caltrop Yes

5/13/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 3

Monopole 3 6 6 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker n/a

2/21/13 Lane 2/27/13 Caltrop Yes

5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No

Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13

Mary Tower Nick 3 100′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M.

6/13/13 Lane n/a TAIC Yes

6/12/13 Rejected

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

n/a Lane n/a

No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah n/a n/a

6/17/13 Lane Caltrop Yes 12/6/12 5/13/13 Approved n/a Yes 2/6/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 1/11/13 1/11/13 Mary Tower Nick 3 98′ Monopole 3 6 4 O S/O Steel Platform 5/15/13 5/15/13

100 A N Y Jacob Walker n/a

2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13

Mary Tower Nick 3 100′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A Y Y Jacob Walker Clay Schutzer

Lane n/a Caltrop Yes 11/30/12 6/12/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Mary Jacob Walker n/a

2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13 No possible dual install, small covered platform Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M.

3/31/13 Lane 3/5/13 TAIC No n/a 5/31/13 n/a No Structural Analysis at this time No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 180 165 255 n/a 1/11/13 1/11/13 Mary Tower Nick 3

3 6 5 O S/O Steel Platform

100 A N Y Jacob Walker n/a

2/20/13 Lane 2/25/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer

Lane n/a Caltrop No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

3/19/13 Lane 3/4/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/15/13 1/15/13 3/26/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Shane M.

2/15/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/15/13 1/15/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 80′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer

2/20/13 Lane 2/19/13 Caltrop Yes

5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/15/13 1/15/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3

Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N N Jacob Walker Shane M.

6/3/13 Lane 4/29/13 TAIC Yes 2/28/13 6/12/13 Approved n/a Yes n/a 6/12/13 Approved n/a No n/a Dez Utah Single Outdoor 210 210 210 n/a 1/15/13 1/15/13 Mary Tower Nick 3 75′ Self Support 3 6 3 O S/O Steel Platform 6/15/13 6/15/13 100 A N Y Jerry Tweden Jerry Tweden 5/24/13

7/11/13 Lane Caltrop Yes 12/4/12 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/15/13 1/15/13 5/30/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a

6/11/13 Lane Caltrop Yes

5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/15/13 1/15/13 5/30/13 Mary Tower Nick 3 79′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a

5/6/13 Lane Caltrop Yes 12/7/13 5/13/13 Approved

Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 Mary Tower Nick 3 97′ Monopole 3 6 5 O S/O Steel Platform 5/15/13 5/15/13 100 A N Y Jacob Walker Clay Schutzer

3/30/13 Lane 3/4/13 Caltrop Yes 12/6/12 5/20/13 Approved n/a Yes 1/28/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/25/13 1/25/13 3/28/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Clay Schutzer

Lane 2/28/13 Caltrop Yes 1/19/13 5/14/13 Approved n/a Yes 1/31/13 5/14/13 Approved n/a No Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/26/13 Mary Tower Nick 3 97′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Shane M.

5/7/13 Lane Caltrop Yes

5/20/13 Approved n/a Yes 1/31/13 6/17/13 Approved

No MA has been corrected. Nick Utah Single Outdoor 90 90 90 n/a 1/25/13 1/25/13 5/28/13 Mary Tower Nick 3 44′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann

2/15/13 Lane 2/27/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Steve Mann

3/6/13 Lane 1/23/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved

Yes 6/11/13 6/11/13 Approved

Yes

Nick Utah Single Outdoor 240 240 240 n/a 1/28/13 1/28/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary

Nick 3 55′ Rooftop 3 6 3 O S/O Steel Platform

in Steeple

100 A N Y Jacob Walker n/a

2/15/13 Lane 3/12/13 Caltrop Yes 12/6/12 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker n/a

Lane Caltrop Yes 12/10/12 5/20/13 Approved n/a No n/a 6/7/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/28/13 1/28/13 5/28/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Jacob Walker Clay Schutzer

3/20/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/28/13 1/28/13 3/26/13 Mary Tower Nick 3 98′ Monopole 3 6 3 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Clay Schutzer

4/10/13 Lane 3/15/13 Caltrop Yes

5/20/13 Approved n/a Yes 2/6/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 135 1/28/13 1/28/13 4/18/13

Mary Tower Nick 95′ Monopole 4 8 7 O S/O Steel Platform 4/18/13 4/18/13

100 A Y Y Jacob Walker Shane M.

5/1/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

3/9/13 Lane

Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/28/13 1/28/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 58′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M.

Lane 3/5/13 Caltrop Yes 12/6/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 225 225 225 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 187′ Self Support 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 Daren Holt Steve Mann

Lane 1/31/13 TAIC No n/a 6/12/13 n/a No Structural ran at this time Yes 6/3/13 6/12/13 Approved MA has been corrected and approved Yes

, we are using 3′ standoffs. SA still hasn’t been completed.

Nick Utah Single Outdoor 150 150 150 n/a 1/29/13 1/29/13 3/26/13 Mary Tower Nick 3 100′ Self Support 3 6 4 O S/O Steel Platform 3/27/13 3/27/13 100 A N Y Jacob Walker n/a 4/11/13

4/10/13 Lane 2/11/13 TAIC No n/a 5/8/13 n/a No Structural Yes n/a 5/8/13 Approved

No n/a Nick Utah Single Outdoor 120 120 120 120 1/29/13 1/29/13

Mary Tower Nick 4

Monopole 4 8 6 O S/O Steel Platform 3/29/13 3/29/13

100 A Y Y Jacob Walker n/a

2/15/13 Lane 2/20/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 1/29/13 1/29/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 117′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13

N Y Jacob Walker Shane M.

3/28/13 Lane 2/28/13 Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/28/13 Mary Tower Nick 3 99′ Monopole 3 6 3 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Jacob Walker Shane M.

5/22/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time n/a No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

2/15/13 Lane

Caltrop Yes

5/15/13 Approved n/a Yes 2/11/13 5/15/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/25/13 No possible dual install, small covered platform Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer

3/30/13 Lane 2/27/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/28/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Jacob Walker Clay Schutzer 6/5/13

4/6/13 Lane 3/6/13 Caltrop Yes

5/14/13 Approved

No n/a 5/14/13 n/a No MA provided at this time Yes

Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13

Mary Tower Nick 3

Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N N Jacob Walker n/a

4/30/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved n/a Yes 5/31/13 5/31/13 Approved

Yes

Nick Utah Single Indoor 150 150 180 n/a 1/29/13 1/29/13 5/28/13

Mary Tower Nick 3

/26′

Rooftop 3 6 5 I

5/28/13 5/28/13 200 A N N Daren Holt Steve Mann 4/26/13

5/23/13 Lane 4/1/13 Caltrop Yes

5/29/13 Approved n/a Yes 1/28/13 6/18/13 Rejected

No n/a

Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/31/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Steel Platform 5/31/13 5/31/13 100 A N Y Jacob Walker Shane M.

5/14/13 Lane

Smith Hyatt Yes 5/31/13 5/31/13 Approved

Yes 5/31/13 6/3/13 Approved

Yes

Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3 170′ Rooftop 3 6 3 O S/O

5/9/13 5/9/13 100 A N Y Jacob Walker Shane M.

4/27/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved

Yes 5/23/13 5/23/13 Approved

Yes

Nick Utah Single Outdoor 135 225 210 n/a 1/29/13 1/29/13 Mary Tower Nick 3 90′ Rooftop 3 6 4 O S/O Roof Platform 5/28/13 5/28/13 100 A N Y Jacob Walker n/a 5/24/13

5/23/13 Lane n/a TAIC Yes 4/3/13 6/13/13 Rejected

– If we are to use the sled mounts, they are nit identified in the SA for using on both sectors, and a specific sled mount was called out. Sled Mount is not in the Calculations page.,

Yes 4/3/13 6/13/13 Rejected RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.) No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

4/19/13 Lane 1/9/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 6/7/13 6/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135H 135H 135H n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 79′ Monopole 6 9 6 O S/O Steel Platform 4/18/13 4/18/13 100A Y Y Jacob Walker Clay Schutzer

4/15/13 Lane 1/16/13 Caltrop Yes 1/19/13 5/13/13

Yes 2/11/13 5/13/13 Need Letter

Yes

Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 68′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker Clay Schutzer

Lane Smith Hyatt Yes 5/31/13 6/3/13 Approved

Yes 5/31/13 6/3/13 Approved n/a Yes

Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 Mary Tower Nick 3

Rooftop 3 6 4 100 A N Y Jacob Walker Shane M.

4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 n/a No SA provided at this time. Yes 5/31/13 6/21/13 Approved n/a Yes

Nick Utah Single Outdoor 150 225 150 n/a 1/29/13 1/29/13 Mary Nick 3 95′ Rooftop 3 6 3 Jacob Walker n/a

5/16/13 Lane

Smith Hyatt Yes 4/13/13 6/13/13 Approved n/a Yes 2/25/13 6/13/13 Approved n/a No n/a Dez Utah Single Outdoor 90H 180H 150H

1/29/13 1/29/13 Mary Nick 4 Rooftop 8 12 10 O 2 – S/O Jacob Walker n/a

4/27/13 Lane Smith Hyatt Yes 2/27/13 5/29/13 Approved n/a Yes 2/27/13 5/29/13 Approved n/a No

Nick Utah Single Outdoor 210 240 240 n/a 2/1/13 2/1/13 Mary Tower Nick 3 45′ Rooftop 3 6 3 Jacob Walker n/a

5/29/13 Lane Caltrop Yes 12/11/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a

6/3/13 Lane n/a TAIC No n/a 6/13/13 n/a No SA provided at this time. No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Daren Holt n/a

4/27/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved

Yes n/a 5/7/13 Rejected

Yes

Nick Utah Outdoor 195 90 90 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3

Rooftop 3 6 3 O O Steel Platform 5/9/13 5/9/13 100 A N Y Jacob Walker Shane M.

7/1/13 Lane 4/12/13 Smith Hyatt Yes 4/17/13 6/13/13 Approved n/a Yes 4/17/13 6/13/13 Approved n/a No n/a Dez Utah Single Outdoor 195 285 165 165 1/25/13 1/25/13 Mary Nick 4 Rooftop 4 8 5 O S/O Jacob Walker n/a

Lane 3/5/13 Caltrop Yes 12/12/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 59′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100A N Y Daren Holt

6/3/13 Lane 2/26/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

5/25/13 Lane n/a TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a

Lane Caltrop Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No Hot Slide needed No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3

Monopole 3 6 4 O S/O Steel Platform 5/9/13 5/9/13 100 A N Y Daren Holt Chris E.

5/4/13 Lane Caltrop Yes 12/7/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O

5/30/13 5/30/13 200 A N N Daren Holt n/a

4/25/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/20/13 Approved n/a Yes 2/13/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 4/18/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 100A N Y Daren Holt Chris E.

5/29/13 Lane Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/28/13 Mary Tower Nick 3 61′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Chris E.

4/28/13 Lane 2/20/13 Yes Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/29/13 1/29/13 5/28/13 Mary Tower Nick 3

Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Chris E.

Lane Caltrop Yes

5/29/13 Approved n/a Yes 2/13/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 101′ Monopole 3 6 5 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a

5/27/13 Lane Caltrop Yes 1/16/13 5/29/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a

5/27/13 Lane Caltrop Yes 12/31/12 6/7/13 Approved n/a Yes 2/13/13 6/7/13 Approved n/a No n/a Nick Utah Single Outdoor 150H 150H 150H n/a 1/29/13 1/29/13 6/15/13 Mary Tower Nick 3 95′ Monopole 6 9 6 O S/O Concrete Pad w/ I-Beam 6/15/13 6/16/13 100 A Y N Daren Holt n/a

5/7/13 Lane Caltrop Yes

5/29/13 Approved n/a Yes 2/13/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a

6/17/13 Lane 3/19/13 Caltrop Yes 12/17/12 6/14/13 Approved n/a Yes 1/31/13 6/14/13 Approved n/a No n/a Dez Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 6/15/13 Mary Tower Nick 3

Monopole 3 6 3 O S/O Steel Platform 6/15/13 6/16/13 100 A N Y Daren Holt n/a

Lane

Smith Hyatt Yes 3/12/13 6/14/13 Approved n/a Yes 3/12/13 6/14/13 Approved

No n/a Dez Utah Single Outdoor 195 105 255 n/a 1/29/13 1/29/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt n/a

3/23/13 Lane 2/11/13 Smith Hyatt Yes 6/3/13 4/30/13 Approved

Yes 6/3/13 6/3/13 Approved

No

Nick Utah Single Outdoor 105 240 165 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 10′

3 6 6 O S/O Steel Platform 3/27/13 3/27/13 100 A N Y Daren Holt n/a 4/9/13

6/7/13 Lane n/a Smith Hyatt Yes 3/20/13 6/14/13

No n/a 6/14/13 Failed

Yes

Dez Utah Daren Holt n/a

3/20/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/2/13 1/2/13 3/26/13 Mary Tower Nick 3 100′ Self Support 3 6 4 O S/O Concrete Pad w/ I-Beam 3/26/13 3/26/13 200 A N N Jerry Tweden Jerry Tweden 4/24/13

4/22/13 Lane

Caltrop Yes 12/19/12 5/21/13 Approved n/a Yes 1/31/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 4/18/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 4/18/13 4/18/13 100A N Y Daren Holt Steve Mann

6/24/13 Lane 4/5/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 90 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 95′ Rooftop 3 6 3 I S/O Shelter 5/3/13 5/3/13

100 A N Y Daren Holt Steve Mann

6/10/13 Lane 2/28/13 Caltrop Yes 12/10/12 6/18/13 Approved N/A Yes 1/31/13 6/18/13 Approved

No n/a Dez Utah Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 6/19/13 6/19/13 100 A N Y Daren Holt n/a

5/30/13 Lane 3/15/13 Caltrop Yes

5/30/13 Rejected

Yes 1/31/13 5/30/13 Rejected

Yes

Nick Utah Single Outdoor 180 180 180 n/a 1/29/13 1/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O Daren Holt n/a

Lane 3/8/13 Caltrop Yes 1/11/13 5/8/13 Approved No Hot Slide needed Yes 2/6/13 5/31/13 Approved No Hot Slide needed No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 59′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt n/a

5/7/13 Lane Caltrop Yes 12/4/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 79′ Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann

4/16/13 Lane 2/26/13 Caltrop Yes 12/5/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N N Daren Holt Steve Mann 6/6/13

Beehive Storage

6/11/13 Lane Caltrop Yes 1/17/13 5/31/13 Approved n/a Yes 2/6/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 5/31/13 Mary Tower Nick 3 68′ Monopole 3 6 4 I S/O Concrete Pad w/ I-Beam 5/31/13 5/31/13 100 A N Y Daren Holt n/a

n/a Lane n/a ERROR:#N/A No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah n/a n/a

Lane Caltrop Yes 1/10/13 6/7/13 Approved

Yes 2/8/13 6/7/13 Approved n/a No

Nick Utah Single Outdoor 150 150 150 n/a

2/9/13 Mary Tower Nick 3 92′ Monopole 3 6 4 O S/O Steel Platform 6/15/13 6/16/13

100 A N N Daren Holt Steve Mann

5/7/13 Lane Caltrop Yes 12/6/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/28/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 6/5/13

Lane Caltrop Yes 12/5/12 5/24/13 Approved n/a Yes 2/6/13 5/24/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/8/13 2/8/13 Mary Tower Nick 3 60′ Monopole 3 6 5 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt n/a

9/9/13 Lane Caltrop Yes 12/7/13 6/7/13 Failed

Yes 2/6/13 6/7/13 Approved n/a Yes

Nick Utah Single Outdoor 255 255 255 n/a 2/8/13 2/8/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 6/15/13 6/16/13

of conduit, under concert, parking lot and through a park. Will need to band the tower.

100 A N Y Daren Holt n/a

Lane Caltrop Yes 1/11/13 5/24/13 Failed

No n/a 5/31/13 n/a No MA provided at this time Yes

Nick Utah Single Outdoor 330 330 330 n/a 2/9/13 2/9/13 Mary Tower Nick 3 98′ Monopole 3 6 3 Daren Holt n/a

Lane Caltrop Yes 1/3/13 6/7/13 Rejected

Yes 2/8/13 6/7/13 Rejected CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount No

Nick Utah Daren Holt n/a

Lane 3/9/13 Caltrop Yes 12/7/12 6/14/13 Failed

Yes 2/6/13 6/14/13 Approved n/a No n/a Dez Utah Single Outdoor 150 150 150 n/a 2/8/13 2/8/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a

5/30/13 Lane Caltrop Yes 12/7/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 Mary Tower Nick 3 90′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 6/5/13

4/24/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved

Yes 2/22/13 5/22/13 Approved

Yes

Nick Utah Single Outdoor 255 150 255 n/a 2/7/13 2/7/13 Mary Tower Nick 3 25′ Rooftop 3 6 4 O S/O Concrete Pad 5/3/13 5/3/13

100 A N Y Daren Holt Steve Mann 4/27/13

Lane Smith Hyatt Yes 4/25/13 6/14/13

N/A No N/A N/A N/A No MA provided at this time No

Dez Utah Daren Holt n/a

Lane Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 2/6/13 5/30/13 Approved n/a No No Hot Slide needed Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Concrete Pad 5/28/13 5/28/13 100 A N N Daren Holt n/a

5/28/13 Lane Caltrop Yes 12/7/12 5/31/13 Approved n/a Yes 2/8/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/31/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a

5/31/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/8/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 165 n/a 2/6/13 2/6/13 5/10/13 Mary Tower Nick 3

Monopole 3 6 5 O S/O Steel Platform 5/10/13 5/10/13 100 A N Y Daren Holt Chris E.

4/17/13 Lane 3/5/13 Caltrop Yes n/a 5/2/13 Approved n/a Yes n/a 5/2/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 95′ Monopole 3 6 6 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt n/a

4/2/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 3/28/13 Mary Tower Nick 3 94′ Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Chris E.

4/29/13 Lane Smith Hyatt Yes 3/13/13 6/16/13 Approved

Yes 3/13/13 6/16/13 Approved

No

Dez Utah Rooftop Jacob Walker n/a

5/17/13 Lane Caltrop Yes 12/5/12 5/29/13 Approved n/a Yes 2/8/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/30/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a

5/15/13 Lane Smith Hyatt Yes 3/1/13 6/16/13 Approved N/A Yes 3/1/13 6/16/13 Approved N/A No

Dez Utah Rooftop Daren Holt n/a

3/12/13 Lane 2/4/13 Smith Hyatt Yes 6/1/13 6/5/13 Approved

Yes 6/1/13 6/5/13 Approved

No n/a Nick Utah Single Outdoor 135 165 135 165 2/7/13 2/7/13 Mary Tower Nick 4 80′ Silo 4 8 4 O O Steel Platform sent to Mary to look at 100 A Y Y Daren Holt n/a 4/29/13

Lane Smith Hyatt No n/a 6/16/13 n/a No SA provided at this time. No n/a 6/16/13 n/a No MA provided at this time No N/A Dez Utah Daren Holt n/a

5/30/13 Lane TAIC Yes n/a 5/1/13 Rejected

, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction.  Equipment structural was ran for Hot Swap and not a 2 – Step.

Yes n/a 5/14/13 Rejected Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was ran for consolidation, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction.  Equipment structural was ran for Hot Swap and not a 2 – Step. Yes

Nick Utah Single Outdoor 240H 240H 240H n/a 2/6/13 2/6/13 Mary Tower Nick 3

6 9 6 Daren Holt n/a 4/23/13

4/24/13 Lane 3/13/13 Caltrop Yes 12/11/12 5/21/13 Approved n/a Yes 2/11/13 5/21/13 Approved n/a No n/a Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 4/18/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Concrete Pad 4/18/13 4/18/13 100A N Y Daren Holt Chris E.

5/5/13 Lane Caltrop Yes 12/10/12 5/31/13 Approved n/a Yes 2/11/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/7/13 2/7/13 5/31/13 Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a

4/15/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/31/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 97′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N N Daren Holt n/a

4/29/13 Lane Smith Hyatt Yes 6/3/13 6/3/13 Approved

Yes 6/3/13 6/3/13 Approved MA has been corrected and approved No

Nick Utah Single Outdoor 165 165 165 n/a 2/7/13 2/7/13 Mary Tower Nick 3

3 6 4 O S/O Daren Holt n/a 4/29/13

2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13

Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N N Daren Holt Steve Mann

6/4/13 Lane CD redlined on 6/13/13 Caltrop Yes 1/19/13 6/13/13 Approved

Yes 2/8/13 6/13/13 Approved N/A No n/a Dez Utah Single Outdoor 75 75 75 n/a 2/8/13 2/8/13 Mary Tower Nick 3

/18’/22′

Wooden Pole 3 6 5 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a

2/15/13 Lane 2/15/13 Caltrop Yes 12/17/12 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A Dez Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Steve Mann

2/15/13 Lane 2/19/13 Caltrop Yes

6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A Dez Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E.

4/29/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved

Yes n/a 5/6/13 Approved Approved w/ Consolidation No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 5/9/13 Mary Tower Nick 3 35′ Rooftop 3 6 3 O S/O Shelter 5/9/13 5/9/13 200 A N N Daren Holt Chris E. 4/30/13

2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E.

6/20/13 Lane Fullerton No n/a 6/12/13 n/a

No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Daren Holt n/a

5/30/13 Lane Caltrop Yes 12/11/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 5/29/13 5/29/13 100 A N Y Daren Holt Steve Mann

3/21/13 Lane 2/20/13 Caltrop Yes 12/14/12 5/14/13 Approved n/a Yes 2/11/13 5/14/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/26/13 Mary Tower Nick 3 98′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Daren Holt Chris E.

3/14/13 Lane 2/20/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 100′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Steve Mann

3/14/13 Lane 2/15/13 Caltrop Yes

5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 100′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E. 5/30/13

2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/8/13 2/8/13 3/26/13 Mary Tower Nick 3 96′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Daren Holt Chris E.

4/1/13 Lane 3/14/13 Caltrop Yes

5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved

No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/9/13 2/9/13 3/28/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Steve Mann 5/30/13

4/8/13 Lane 2/28/13 Caltrop Yes 12/15/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt Chris E.

4/8/13 Lane 3/5/13 Caltrop Yes 12/17/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt Steve Mann

5/7/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/7/13 2/7/13 5/10/13 Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 5/10/13 5/10/13 100 A N Y Daren Holt Chris E.

Lane Crown No n/a 6/12/13 n/a no SA available in Siterra Yes 2/11/13 6/12/13 Approved No Hot Slide needed No

Craig Utah Daren Holt n/a

5/25/13 Lane Smith Hyatt Yes 3/3/13 6/4/13 Approved n/a Yes 6/10/13 6/11/13 Approved MA has been corrected and approved No

Nick Utah Single Outdoor 105 120 90 n/a 2/8/13 2/8/13 Mary Nick 3 Rooftop 3 6 3 O S/O Daren Holt n/a

4/30/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved

Yes 6/1/13 6/3/13 Approved

Yes

Nick Utah Single Outdoor 240 315 240 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt n/a 4/29/13

6/8/13 Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a

Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Jacob Walker n/a

4/13/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved

Yes 6/1/13 6/3/13 Approved

Yes

Nick Utah Single Outdoor 315 75 135 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt Shane M. 5/15/13

n/a Lane ERROR:#N/A No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No

Craig Utah n/a n/a

3/13/13 Lane 1/16/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 2/4/13 2/4/13

Mary Non-Tower Nick 3 26′ Silo 3 6 6 I S/O Shelter 5/3/13 5/3/13 100 A N Y Daren Holt n/a 4/17/13

3/13/13 Lane 2/4/13 Smith Hyatt Yes 3/5/13 5/23/13 Approved

Yes 5/22/13 5/23/13 Approved

Yes

Nick Utah Single Outdoor 105 105 180 n/a 2/8/13 2/8/13 5/28/13

Mary Tower Nick 3 35′ Rooftop 3 6 4 I S/O

5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann

6/4/13 Lane Caltrop Yes 6/3/13 6/6/13 Approved SA has been corrected and approved Yes 6/3/13 6/6/13 Approved MA has been corrected and approved No n/a Nick Utah Single Indoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 65′ Monopole 3 6 3 I S/I Shelter 5/9/13 5/9/13

100 A N N Daren Holt Clay Schutzer

3/30/13 Lane 2/25/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved

Yes 5/23/13 5/23/13 Approved

No n/a Nick Utah Outdoor 105 105 105 n/a 12/31/12 12/31/12 3/28/13 Mary Tower Nick 3 60′ Rooftop 3 6 4 O O Steel Platform 5/28/13 5/28/13 200 A N Y Daren Holt Clay Schutzer 5/24/13

3/8/13 Lane 1/10/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved

Yes 5/22/13 5/23/13 Approved

No n/a Nick Utah Single Outdoor 255 240 255 n/a 2/6/13 2/6/13

Mary Non-Tower Nick 3 58′ Rooftop 3 6 3 I S/O Shelter 5/28/13 5/28/13 100 A N N Daren Holt n/a 4/15/13

3/21/13 Lane 2/18/13 Smith Hyatt Yes 5/23/13 5/24/13 Approved

Yes 5/23/13 5/24/13 Approved Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. No

Nick Utah Outdoor 195 105 150 n/a 12/31/12 12/31/12 Mary Non-Tower Nick 3

Rooftop 3 6 3 O S/O Steel Platform 3/26/13 3/26/13 100 A N N Daren Holt n/a 4/18/13

4/24/13 Lane 3/6/13 Caltrop Yes 12/19/12 6/12/13 Approved Yes 2/11/13 6/12/13 Approved

No n/a Craig Utah Single Outdoor 105 105 105 n/a 2/9/13 2/9/13 4/18/13 Mary Tower Nick 3 77′ Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 200A N N Daren Holt n/a

Ball Park

7/26/13 Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No

Craig Utah Daren Holt n/a

5/7/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved

Yes n/a 5/8/13 Approved

No

Nick Utah Single Outdoor 105 120 120 n/a 2/9/13 2/9/13 Mary Tower Nick 3 117′ Rooftop 3 6 5 O S/O

5/9/13 5/9/13 200A N Y Daren Holt Chris E.

5/14/13 Lane Fullerton No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Daren Holt n/a

Lane 3/6/13 3/6/13 Crown Yes 3/7/13 6/3/13 Approved n/a No n/a 6/3/13 n/a No MA provided at this time No n/a Nick Utah Mary Tower Nick 3 101′

3 6 3 Daren Holt n/a

n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13

n/a No n/a 4/30/13 Stop Work Site n/a No n/a Nick n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Jacob Walker n/a n/a n/a

n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 Stop Work Site n/a No n/a 4/30/13 Stop Work Site n/a No n/a Nick n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Jacob Walker n/a n/a n/a

3/9/13 Lane 2/11/13 TAIC Yes 1/23/13 5/13/13 Approved n/a Yes 3/31/13 5/13/13 Approved n/a No

Nick Utah Outdoor 120 120 120 n/a 1/31/13 1/31/13 3/25/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O O Steel Platform 3/25/13 3/25/13 100 A N N Jacob Walker Clay Schutzer 5/9/13

Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Jacob Walker n/a

3/30/13 Lane 1/24/13 TAIC Yes n/a 5/7/13 Approved ran for consolidation Yes n/a 5/7/13 Approved ran for consolidation No n/a Nick Utah Outdoor 120 75 75 n/a 2/7/13 2/7/13 3/28/13 Mary Non-Tower Nick 3 48′ Rooftop 3 6 4 I O

s

3/28/13 3/28/13 Need to order 3 additional NV antennas 200 A N N Jacob Walker n/a 5/1/13

5/22/13 Lane 3/21/13 Crown Yes 1/2/13 6/13/13 Approved n/a Yes 2/11/13 6/13/13 Approved n/a No n/a Craig Utah Outdoor 105 105 105 n/a 2/7/13 2/7/13 6/16/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O O Steel Platform 6/16/13 6/16/13 Jacob Walker n/a

5/4/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved n/a Yes 6/3/13 6/6/13 Approved MA was corrected and approved No MA was corrected and provided Nick Utah Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 78′ Monopole 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N Y Jerry Tweden Jerry Tweden

6/16/13 Lane 3/28/13 Crown Yes 12/15/12 6/13/13 Approved n/a No n/a 6/13/13 n/a No MA provided at this time No n/a Craig Utah Mary Daren Holt n/a

4/30/13 Lane Caltrop Yes 1/29/13 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved

No n/a Nick Utah Outdoor 105 105 105 n/a 2/7/13 2/7/13 Mary Tower Nick 3 55′ Monopole 3 6 3 O O Steel Platform 5/30/13 5/30/13 200 A N Y Daren Holt n/a

5/2/13 Lane

Yes 3/12/13 6/13/13 Approved

Yes 3/12/13 6/13/13 Approved rooftop No rooftop Craig Utah Single Outdoor 225 300 330 n/a 2/7/13 2/7/13 Mary Nick 3 Rooftop 3 6 3 O S/O Daren Holt n/a

6/11/13 Lane Crown Yes 12/11/12 6/12/13 Approved n/a Yes 2/11/13 6/12/13 Approved n/a No

Craig Utah Indoor 105 105 105 n/a 2/8/13 2/8/13 Mary Tower Nick 3

Monopole 3 6 3 I I Shelter 6/16/13 6/16/13 Daren Holt n/a

7/26/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a

5/4/13 Lane Smith Hyatt Yes n/a 4/29/13 Rejected

Yes 6/7/13 4/29/13 Rejected

No n/a Nick Utah Outdoor 180 180 180 n/a 2/6/13 2/6/13 Mary Tower Nick 3 100′ Guyed 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Jerry Tweden Jerry Tweden 4/30/13

5/11/13 Lane Caltrop Yes 1/16/13 5/23/13 Approved n/a Yes 2/13/13 5/23/13 Approved

No n/a Nick Utah Outdoor 150 150 150 n/a 2/8/13 2/8/13 5/29/13 Mary Tower Nick 3 103′ Monopole 3 6 5 O O Steel Platform 5/29/13 5/29/13 100 A N N Daren Holt Steve Mann Need to install a 12′ hand rail

4/29/13 Lane 3/9/13 Crown Yes 1/4/13 6/13/13 Rejected

Yes 2/11/13 6/13/13 Approved

Yes

Craig Utah Outdoor 120 120 120 n/a 2/8/13 2/8/13 6/16/13 Mary Tower Nick 3 77′ Wooden Pole 3 6 5 O O Steel Platform

200 A N Y Daren Holt n/a

Lane Caltrop Yes 12/11/12 5/13/13 Approved n/a Yes 2/13/13 6/18/13 Approved N/A No n/a Nick, Dez (MA) Utah Outdoor 120 120 120 n/a 2/8/13 2/8/13 Mary Tower Nick 3 58′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13 100 A N Y Daren Holt Chris E.

4/29/13 Lane 2/15/13 Rage Yes

6/13/13 Approved n/a Yes 3/20/13 6/13/13 Rejected

Yes

Craig Utah Single Outdoor 135 135 135 n/a 2/5/13 2/5/13 6/16/13 Mary Tower Nick 3 60′ Monopole 3 6 4 I S/O Shelter w/ I-Beam 6/16/13 6/16/13

200 A N Y Daren Holt n/a

Lane Caltrop Yes 12/15/12 5/13/13

Yes 2/13/13 6/14/13 Approved

No n/a Nick Utah Outdoor 135 135 135 n/a 2/8/13 2/8/13 5/29/13 Mary Tower Nick 3 60′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13

200 A N N Daren Holt n/a

8/3/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a

5/8/13 Lane Caltrop Yes 1/14/13 6/14/13 Approved n/a Yes 3/11/13 6/17/13 Approved n/a No n/a Craig Utah Mary Nick 3 Monopole 3 6 4 Daren Holt Steve Mann

4/30/13 Lane Caltrop Yes 12/13/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Outdoor 105 105 105 n/a 2/8/13 2/8/13 5/30/13 Mary Tower Nick 3 68′ Monopine 3 6 4 O O Steel Platform 5/30/13 5/30/13 200 A N N Daren Holt n/a

6/22/13 Lane 5/28/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

4/13/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved

Yes n/a 5/1/13 Rejected

Yes

Nick Utah Single Outdoor 90 180 135 n/a 2/5/13 2/5/13 Mary Tower Nick 3

/156’/162′

Rooftop 3 6 3 O S/O Steel Plaform 5/3/13 5/3/13

200 A N Y Jacob Walker n/a

6/24/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

5/11/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

3/29/13 Lane 2/11/13 TAIC Yes 4/18/13 5/14/13 Approved n/a Yes 4/18/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 120 90 120 n/a 2/4/13 2/4/13 3/28/13 Mary Tower Nick 3 27′ Rooftop 3 6 4 I S/I

3/28/13 3/28/13 200 A N Y Jacob Walker Shane M. 5/15/13

4/6/13 Lane 2/28/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 Mary Tower Nick 3 59′ Monopole 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N Y Jacob Walker n/a

5/7/13 Lane Smith Hyatt Yes 3/7/13 6/14/13 Rejected

from subject line.

Yes 3/7/13 6/14/13 Yes n/a No rooftop Craig Daren Holt n/a

2/20/13 Lane 2/26/13 Caltrop Yes n/a 5/6/13 Approved

Yes n/a 5/6/13 Approved

No n/a Nick Utah Outdoor 150 150 150 n/a 2/9/13 2/9/13 3/25/13 Mary Tower Nick 3 100′ Monopole 3 6 4 O O Steel Platform 3/25/13 3/25/13 200 A N N Jacob Walker n/a

Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. Yes 3/31/13 6/14/13 Approved n/a No n/a Craig Jacob Walker n/a

3/13/13 Lane 1/10/13 Smith Hyatt Yes 5/23/13 5/31/13 Approved

.

Yes 5/23/13 5/31/13 Approved New Structural and Mount analysis is approved, RF Approved Yes

Nick Utah Outdoor 105 105 210 n/a 2/9/13 2/9/13

Mary Tower Nick 3 13′ Wooden Pole 3 6 3 I O

5/28/13 5/28/13 Need a CS to walk and provide pictures 200 A N Y Jacob Walker n/a 4/24/13

5/7/13 Lane Smith Hyatt Yes 3/4/13 6/14/13 Rejected

No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

4/27/13 Lane Smith Hyatt Yes 1/18/13 5/28/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No n/a Nick Utah Outdoor 180 180 180 n/a 2/6/13 2/6/13 Mary Tower Nick 3 90′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13 200 A N N Jerry Tweden Jerry Tweden 5/21/13

4/29/13 Lane Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Outdoor 120 120 n/a n/a 2/6/13 2/6/13 5/2/13 Mary Tower Nick 2 85′ Monopole 2 4 4 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13

Lane

Caltrop Yes 1/10/13 6/14/13 Approved n/a Yes 2/15/13 6/14/13 Approved New antenna mounting system to replace cluster mount No n/a Craig Utah Outdoor 150 150 n/a n/a 1/29/13 1/29/13 Mary Tower Nick 2 22′ Monopole 2 4 3 O O Steel Platform 6/16/13 6/16/13

Daren Holt n/a

SL54XC030

4/27/13 Lane Smith Hyatt Yes 3/7/13 5/15/13 Approved n/a Yes 6/4/13 6/5/13 Approved MA has been corrected and approved No n/a Nick Utah Outdoor 90 165 225 n/a 2/8/13 2/8/13 Mary Tower Nick 3 Rooftop 3 6 4 O O Daren Holt n/a 5/21/13

3/30/13 Lane 2/6/13 Caltrop Yes 2/7/13 5/14/13 Fails

No n/a 5/14/13 n/a No MA provided at this time Yes

Nick Utah Outdoor 135 135 135 n/a 2/7/13 2/7/13 Mary Tower Nick 3 81′ Monopole 3 6 3 O O Steel Platform 3/28/13 3/28/13 200 A N N Daren Holt Steve Mann

4/30/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Utah Outdoor 270 180 180 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 70′ Rooftop 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Daren Holt Chris E. 4/26/13

7/1/13 Lane Caltrop Yes 12/11/12 5/29/13

Yes 2/15/13 5/29/13 Approved n/a Yes

Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 5/30/13 Mary Tower Nick 3 75′ Monopole 3 6 3 O O Steel Platform 5/30/13 5/30/13 200 A N Y Daren Holt n/a

3/14/13 Lane 1/18/13 Smith Hyatt Yes 6/4/13 6/5/13 Approved

Yes 6/4/13 6/5/13 Approved

No

Nick Utah Single Outdoor 210 210 210 n/a 2/9/13 2/9/13 Existing equipment is indoor/site is indoor Mary Non-Tower Nick 3 55′ Rooftop 3 6 3 I S/I Shelter w/ I-Beams

200 A N Y Daren Holt n/a

6/16/13 Lane Caltrop Yes 12/11/12 6/14/13 Approved

Yes 2/15/13 6/14/13 Approved

No n/a Craig Utah Outdoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 87′ Monopole 3 6 3 O O Steel Platform 6/16/13 6/16/13

200 A N N Daren Holt n/a

6/24/13 Lane Smith Hyatt Yes 3/21/13 6/14/13 Approved n/a No n/a 6/14/13 n/a

No n/a Craig Utah Mary Daren Holt n/a

Lane 1/28/13 TAIC No n/a 5/31/13 n/a

Yes 2/27/13 5/15/13 Approved n/a No n/a Nick Utah Outdoor 90 105 135 n/a 2/4/13 2/4/13 Mary Non-Tower Nick 3 48′ Rooftop 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N N Jacob Walker n/a

6/3/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

9/17/13 Lane Caltrop No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a

6/21/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Jacob Walker n/a

3/1/13 Lane

Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Indoor 225 135 135 n/a 3/5/13 3/5/13 3/25/13 Mary Non-Tower Nick 3 44′ Rooftop 3 6 4 I I Shelter w/ I-Beams 3/25/13 3/25/13

200 A N Y Daren Holt n/a 4/19/13

5/4/13 Lane Smith Hyatt Yes 3/11/13 5/13/13 Approved n/a Yes 6/5/13 6/5/13 Approved MA has been corrected and approved No n/a Nick Utah Single Outdoor 210 180 120 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 S/O Daren Holt n/a

5/17/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a Emily Jacob Walker n/a

3/26/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Outdoor 150 150 150 n/a 3/27/13 3/27/13 Mary Tower Nick 3

Self Support 3 6 5 O O Steel Platform 3/27/13 3/27/13 100 A N Y Jacob Walker n/a

6/1/13 Lane Caltrop No n/a 5/14/13 n/a No Structural at this time No n/a 5/14/13 n/a No MA provided at this time No n/a Nick Utah Outdoor 150 150 150 n/a 2/9/13 2/9/13 Mary Tower Nick 3 Monopole 3 6 4 Daren Holt n/a

5/2/13 Lane Fullerton

Emily Daren Holt n/a

5/27/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No No recent owner approved drawings or signed/stamped drawings in siterra Emily Jacob Walker n/a

3/9/13 Lane

Smith Hyatt Yes 6/5/13 6/5/13 Approved SA has been corrected and approved Yes 6/5/13 6/5/13 Approved

No

Nick Utah Indoor 75 75 75 n/a

2/10/13 3/26/13 Existing equipment is indoor/site is indoor Mary Non-Tower Nick 3 60′ Rooftop 3 6 3 I I Shelter 3/26/13 3/26/13 200 A N N Daren Holt n/a 5/7/13

6/11/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a Emily Daren Holt n/a

3/21/13 Lane 1/29/13 TAIC No n/a 5/7/13 n/a

Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 2/6/13 2/6/13 3/26/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O S/O Concrete Pad 3/26/13 3/26/13 100 A N N Jacob Walker n/a 5/24/13

6/3/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. Yes 2/28/13 6/18/13 Approved n/a No n/a Emily Jacob Walker n/a

5/25/13 Lane Smith Hyatt Yes 6/21/13 6/21/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No

Emily Daren Holt n/a

3/29/13 Lane 2/21/13 TAIC Emily Utah Single Outdoor 120 120 120 n/a 2/1/13 2/1/13 3/28/13

Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Concrete Pad 3/28/13 3/28/13 200 A N N Jacob Walker n/a

3/25/13 Lane 2/13/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Outdoor 75 165 45 n/a 2/10/13 2/10/13 5/3/13 Mary Tower Nick 3 45′ Rooftop 3 6 3 O O Steel Platform 5/3/13 5/3/13 200 A N N Daren Holt n/a 5/15/13

6/15/13 Lane Fullerton

Emily Daren Holt n/a

Lane Smith Hyatt Yes 5/1/13 6/18/13 Rejected

Yes 5/1/13 6/18/13 Rejected

Emily Daren Holt n/a

4/28/13 Lane Smith Hyatt Yes 4/24/13 6/18/13 Approved

Yes 4/24/13 6/18/13 Approved n/a No n/a Emily Nick 3 Monopole 3 6 3 S/O Daren Holt n/a

6/15/13 Lane Fullerton Yes 3/1/13 6/17/13 Yes

No n/a n/a n/a n/a n/a

Craig Daren Holt n/a

4/28/13 Lane Smith Hyatt Yes 3/6/13 6/17/13 Yes Yes 3/6/13 6/17/13 Yes n/a No n/a Craig Daren Holt Chris E. 5/12/13

4/30/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Daren Holt n/a

4/26/13 Lane TAIC No n/a 5/29/13 n/a No Structural Analysis at this time Yes 4/18/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 150 120 n/a 2/9/13 2/9/13 Mary Tower Nick 3

Water Tank 3 6 4 O S/O Concrete Pad

200 A N N Jacob Walker n/a Need to paint antennas, RRUs, Hybrid Cables & mounts, also will need to run 3 new conduits from the Equipment to the tower where they go up. Welding will need to be done on the side of the tank for the new mounts and coax brackets.

5/19/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Jacob Walker n/a

Lane Smith Hyatt Yes 4/12/13 6/17/13 Yes Yes 4/12/13 6/17/13 Yes No Craig Daren Holt n/a

4/30/13 Lane Smith Hyatt Yes 3/14/13 6/17/13 Yes No n/a 6/17/13 n/a n/a n/a Craig Daren Holt n/a

Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a

4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved

Yes n/a 5/8/13 Approved Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed No n/a Nick Utah Indoor 150 300 300 n/a 2/8/13 2/8/13 Mary Non-Tower Nick 3 40′ Rooftop 3 6 3 I I Shelter 5/9/13 5/9/13 200 A N N Jacob Walker Shane M. 5/14/13

3/12/13 Lane 2/1/13 Smith Hyatt Yes 6/5/13 6/5/13 Approved

Yes 6/5/13 6/5/13 Approved

No

Nick Utah Indoor 120 120 120 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3 70′ Guyed 3 6 4 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a

4/20/13 Lane 2/21/13 Smith Hyatt Yes 1/21/13 5/29/13 Approved n/a Yes 3/15/13 5/29/13 Approved n/a No n/a Nick Utah Single Indoor 210 210 210 n/a 2/6/13 2/6/13 3/29/13 Mary Tower Nick 3 150′ Monopole 3 6 3 I S/I Shelter 3/29/13 3/29/13 200 A N N Jerry Tweden Jerry Tweden

5/1/13 Lane TAIC No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Jacob Walker n/a

4/8/13 Lane Smith Hyatt Yes 6/5/13 6/6/13 Approved

Yes 6/5/13 6/6/13 Approved MA was corrected and approved No n/a Nick Utah Indoor 195H 195H 195H n/a 2/4/13 2/4/13 5/2/13 Mary Tower Nick 3

Self Support 6 9 6 I I Shelter 5/2/13 5/2/13 200 A N N Jerry Tweden Jerry Tweden

2/27/13 Lane 1/4/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/17/13 Approved

Yes

Nick Utah Indoor 195 195 195 n/a 2/6/13 2/6/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 110′ Monopole 3 6 3 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/24/13

3/23/13 Lane 2/25/13 Smith Hyatt Yes 1/25/13 5/1/13 Approved n/a Yes 6/5/13 6/6/13 Approved MA was corrected and approved No

Nick Utah Indoor 150 150 150 n/a 2/6/13 2/6/13 3/27/13 Mary Tower Nick 3 100′ Monopole 3 6 3 I I Shelter 3/27/13 3/27/13 200 A N N Daren Holt Chris E. 4/23/13

6/6/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a

5/24/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a

5/25/13 Lane Smith Hyatt Dez Jerry Tweden Jerry Tweden

4/26/13 Lane Caltrop 6/10/13

Failed

No n/a 06/18/13 n/a No MA provided at this time No n/a Dez Utah Jacob Walker n/a

4/6/13 Lane 2/25/13 Smith Hyatt Yes 3/26/13 6/18/13 Approved

Yes 3/26/13 6/18/13 Approved

No N/A Dez Utah Indoor 75 75 75 n/a 2/4/13 2/4/13 3/29/13 Mary Tower Nick 3

Guyed 3 6 3 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a

7/4/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time No N/A Dez Daren Holt n/a

3/4/13 Lane 2/1/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved

Yes 6/11/13 6/11/13 Approved

No

Nick Utah Indoor 105 105 n/a n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 2 35′ Self Support 2 4 2 I I Shelter 3/25/13 3/25/13 200 A N N Jerry Tweden Jerry Tweden 5/31/13

2/28/13 Lane 2/8/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No

Nick Utah Indoor 165 165 165 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3

Self Support 3 6 3 I I Shelter 3/25/13 3/25/13 200 A N N Jerry Tweden Jerry Tweden 5/31/13

5/5/13 Lane n/a Caltrop Yes 1/18/13 6/18/13 N/A

No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Daren Holt n/a

2/28/13 Lane 1/15/13 Smith Hyatt Yes 6/6/13 6/6/13 Rejected

Yes 6/6/13 6/7/13 Approved

No n/a Nick Utah Indoor 120 120 n/a n/a 2/4/13 2/4/13 3/25/13 Mary Tower Nick 2 73′ Monopole 2 4 2 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/23/13

Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Jacob Walker n/a

6/12/13 Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Jacob Walker n/a

3/31/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Rejected

Yes n/a 5/7/13 Approved n/a No n/a Nick Idaho Single Indoor 300 300 300 n/a 1/15/13 1/15/13 3/27/13 Mary Tower Nick 3

Self Support 3 6 3 ID S/I Shelter 3/27/13 3/27/13 200 A N N Jacob Walker Shane M.

4/14/13 Lane 2/20/13 n/a TAIC Yes 3/4/13 6/18/13 N/A No owner approved drawings to compare to. No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Idaho Indoor 135 135 135 n/a 1/15/13 1/15/13 4/23/13 Mary Tower Nick 3 80′ Self Support 3 6 3 ID I Shelter 4/23/13 4/23/13 200 A N Y Jacob Walker Shane M.

7/17/13 Lane Smith Hyatt Yes 6/6/13 6/6/13 Approved

Yes 6/6/13 6/6/13 Approved MA was corrected No

Nick Utah Single Indoor 240 60 165 n/a 5/8/13 5/8/13 5/9/13 Mary Tower Nick 3

Rooftop 3 6 4 I S/I Shelter 5/9/13 5/9/13 200 A N N Daren Holt Steve Mann

3/8/13 Lane 1/18/13 Smith Hyatt Yes 2/21/13 5/14/13 Approved n/a Yes 2/19/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 135 135 135 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3 110′ Monopole 3 6 5 I S/I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 5/7/13

Lane n/a Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Daren Holt n/a

3/26/13 Lane 2/20/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 2/27/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 165 165 165 n/a 2/6/13 2/6/13 3/27/13 Mary Tower Nick 3 120′ Monopole 3 6 4 I S/I Shelter 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 5/24/13

4/29/13 Lane Smith Hyatt Yes 3/28/13 6/14/13 Approved n/a Yes 6/19/13 6/21/13 Approved

No n/a Nick Utah Mary Daren Holt n/a

5/2/13 Lane Smith Hyatt Dez Daren Holt n/a

4/27/13 Lane 2/11/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Indoor 135 135 135 n/a 2/6/13 2/6/13 5/3/13 Mary Tower Nick 3 55′ Monopole 3 6 5 I I Shelter 5/3/13 5/3/13

200 A N N Daren Holt n/a 5/12/13 Remove 3 of the dead antennas on iDEN and there lines.

3/27/13 Lane 1/11/13 Fullerton Yes 1/17/13 5/14/13 Rejected

No n/a 5/14/13 n/a No MA provided at this time No n/a Nick Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3 60′ Monopole 3 6 5 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt n/a

4/2/13 Lane 3/1/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No n/a Nick Utah Indoor 165 165 135 n/a 2/9/13 2/9/13 Mary Tower Nick 3

Rooftop 3 6 5 I I Shelter Daren Holt Steve Mann 4/19/13

3/23/13 Lane 3/2/13 Smith Hyatt Yes n/a 4/29/13 Rejected

Yes n/a 4/29/13 Rejected CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole No

Nick Utah Indoor 90 90 90 n/a 1/31/13 1/31/13 3/27/13 Mary Tower Nick 3 56′ Monopole 3 6 3 I I Shelter 5/9/13 5/9/13

200 A N N Jacob Walker n/a 4/29/13

3/31/13 Lane 2/15/13 Fullerton Yes 1/16/13 5/10/13 Approved n/a Yes 2/6/13 5/10/13 Approved n/a No n/a Nick Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3 60′ Monopole 3 6 4 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt Clay Schutzer 5/28/13

4/13/13 Lane 2/11/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 4/4/13 6/6/13 Approved MA is corrected & approved. No

Nick Utah Indoor 105 105 105 n/a 1/31/13 1/31/13 3/29/13 Mary Tower Nick 3 60′ Monopole 3 6 5 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a 5/15/13

4/14/13 Lane 2/11/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No

Nick Utah Indoor 105 105 105 n/a 1/31/13 1/31/13 3/29/13 Mary Tower Nick 3 57′ Monopole 3 6 4 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a 5/13/13

n/a Lane TAIC n/a n/a n/a

n/a Lane TAIC n/a n/a n/a

n/a Lane Smith Hyatt n/a n/a n/a

n/a Lane TAIC n/a n/a n/a

n/a Lane Smith Hyatt n/a n/a n/a

n/a Lane Smith Hyatt n/a n/a n/a

n/a Lane Smith Hyatt n/a n/a n/a

Site

I CDs Structural Samsung B

O Scoping GD BOMs N AC Panel Construction
Cascade # Site Name Task # NTP Dates SAMs 9 CD Uploaded for Review AE Vendors Tower Structural Completed Date Reviewed Approved No Mount Structural Recv. Mount Analysis Completed Letter Approval Needed CM State Cabinet Type Alpha Beta Gamma Delta Completion Date Submitted Date Revised Date CM Name Review Date Site Type Submit Date Approved Date Sector Count Rad Center Tower Type Ant# RRU # RET Cable # Indoor Outdoor Eqpt Type Platform Style Complete Date Ordered Date Received Date Power Upgrade Need Sub Panel CS Site Walk Pre-Con Walk CNX Start 5 4 Special Notes
DE05AL522 Green River East H142 5/25/1

3 Lane 1/25/13 Fullerton Y 1/23/13 5/20/13 Letter is going to be provided to show everything will be cleared. Yes n/a Letter will be provided to show everything is cleared. Cleared Nick Utah 1

8 180 1/2/13 3/29/13 Mary 150 Monopole 6 Concrete Pad 200 A Daren Steve Mann 5/30/13
SL03UB

10 Ubiquitel-Dry Canyon H149 3/

12 2/12/13 TAIC 4/29/13 Rejected Structural was ran for the 2 existing mounts, not the third that we are adding. 5/14/13 MA was ran for installing the Hy-Cap site in a two step and we are putting all the antennas and RRUS up at one time. Also the MA doesn’t spec the mount that is to be used on the Lam pole, antenna weights are not correct b/c we have 2 different styles. MA also shows Monopole and

Self Support (Nick’s reply – I see it in the top notes two antennas and 3 RRUs, but in the calculations part, it states how many antennas per mount, and 1 was put in and the same with the RRUs. So the correct weight is not showing on this document. Total weight should be 34

7 75 1/10/13 30′ Wooden Pole Steel Platform Hy-Cap site and need to verify if tower will be able to hold the additional mount and weight. Jacob Walker 4/12/13
SL03UB104 Downtown Logan H150 4/6/13 2/7/13 Single Outdoor 150H 76′ S/O 3/28/13 Need to order 3 additional NV antennas Jerry Tweden 5/7/13
SL03UB106 Crow Mountain H151 7/10/13 2/14/13 5/29/13 No 4/15/13 Need Rad Center verification from RF Need SA approved and RF verify. 90 90H sent back to Mary, not showing additional 2 cabinets 40′ 50′ Sent Back to Mary.

Hy-Cap Site Clay Schutzer
SL03UB110 Ubiquitel Hyrum H152 3/30/13 5/1/13 Hot Slide not needed 105 Shelter 4/24/13
SL03UB111 Silage H010 3/6/13 3/13/13 Caltrop 12/5/12 Failed 2/4/13 120 3/22/13 103′
SL03UB113 Ubiquitel Brigham H153 5/25/13 2/20/13 WT 12/20/12 6/11/13 6/21/13 Group 135 100′
SL03UB116 Ubiquitel – Tremonton – UT H154 3/9/13 4/30/13 MA has been corrected and uploaded to Siterra. MA is corrected and approved 195 154′ 100 A 4/16/13
SL03UB120 Preston H156 2/8/13 No Structural 4/8/13 install standoff mount off the existing mount. 87′ Sent back to Mary to verify Install 3′ standoff mount.
SL03UB130 Ubiquitel S&S Fun Center H158 3/19/13 1/30/13 No Structural ran so far 5/10/13 4 Sector Mount to be installed 80′ Shelter inside Tower sent to Mary to look at
SL03UB131 Ubiquitel – Riverside Cornwall H159 3/21/13 “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.) Sent back this is a Wooden Pole, not a Monopole 47′ 4/17/13
SL03UB401 Mona H1

60 3/5/13 2/6/13 Smith Hyatt Tower Structural was ran correctly, no standoff mount for Gamma, install it on the leg of the tower and the other two sectors will be placed on the existing mounts. 5/24/13 Mount analysis was ran for installing 2 antennas and 4 RRUs on the two existing mounts and Gamma antenna and 2 RRUs will be mounted on the back of the antenna on the leg. 255 1

92′ 3/25/13 Daren Holt 4/10/13
SL03UB414 Ubiquitel UT003 Exit 112 H014 3/14/13 5/17/13 Fails remove exiting Pipe mounts 285 251′ 5/23/13
SL03UB419 Jones-Enoch H163 3/31/13 2/11/13 2/28/13 5/6/13 5/31/13 MA was corrected MA was corrected and provided 240 1/11/13 1

90′ 5/15/13
SL03UB420 Ceader City State Lands H164 2/27/13 75′
SL03UB421 Ubiquitel Kanarraville H

165 5/2/13 Needs Hand rails 120′
SL03UB425 Harrisburg Junction H167 2/21/13 4/9/13
SL03UB426 Ubiquitel Washington H168 5/28/13 4/22/13 No MA provided at this time
SL03UB427 Ubiquitel Rococo H169 6/3/13 SA has been corrected MA has been corrected and reflects what is shown in the CD. MA and SA are corrected and reflect the CD. 60H Rooftop 6/20/13 Coax will need to be painted
SL03UB428 Ubiquitel Santa Clara H170 6/1/13 6/7/13 SA has been corrected and approved MA has been corrected and approved 70′ 6/15/13 6/16/13 installing 12′ 6″ Mount, need to install conduit about

45
SL03UB429 Webb Hill H171 4/26/13 1/24/13 SA states mount is at 43′ and RAD Center is 50′. Plus it was ran for 6 hybrid cables instead of 3. 6/18/13 Provide 2″ std pipe with plates and ubolts to tie

the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Need to have the SA verify RAD Center and correct the MA. 120H 55′ 4/18/13
SL03UB430 Ubiquitel Santaquin H172 1/9/13 SA was ran for the existing mount, didn’t run for the new 12′ mount that is called out in the CD, MA specifiies new mount. 1/31/13 94′
SL03UB450 Ubiquitel-Nephi H173 3/7/13 1/14/13 12/31/12 No possible dual install, small platform 1

35′
SL03UB471 Ubiquitel Red Cliffs H174 4/23/13 No Structural Analysis at this time 105H
SL03UB472 Hurricane Rim H175 SA – Needs to specify weight and size of mount used in the calculations in the SA. – PE will be accepted PE letter stating for mount calculations used in SA
SL03UB474 Ubiquitel Rockville H176 5/16/13 3/27/13 6/17/13 Need verification on RAD Center, SA state 70′ and the CD states

77′ CD needs to be corrected to show the RAD Center at

73′ Emily
SL03UB480 Ubiquitel Ivins H178 2/24/13 Need letter. CD calls for powerwave attenna on Gamma. SA lists 3 KMW attennas. Need letter saying powerwave will not create any structural or mount analysis issues. PE letter stating powerwave will not create any structural or mount analysis issues. Dez
SL03UB481 Ubiquitel Fiddlers Canyon H179 6/4/13 6/19/13 Craig 85′
SL03UB500 Payette Bluff G019 2/18/13 Mount analysis was ran for more than what’s currently on the mount. Idaho 1/3/13 140′ Need to paint coax Red and White
SL03UB503 Ubiquitel Payette Co Sheriff G020 2/19/13 a Tower Mapping was uploaded as a Structural, nothing is mentioned of the new Equipment going on the Tower Mount analysis was ran at 87′ and our mount is at 100′. Need to be redone. – New mount analysis was ordered 5/14/13 OD Shane M.
SL03UB504 Ubiquitel Langley Gulch G021 1/19/13 300 1/4/13 250′ 5/8/13
SL03UB505 Ubiquitel – Parma ATC G022 Shelter has no Ventalation
SL03UB506 Rookstool Corner G023 1/18/13 5/13/13 3/26/13 Letter needs to be signed on the Stamp Stamp needs to be signed and dated 315 270
SL03UB508 Ubiquitel Emmett G024 5/21/13 Mount Analysis was ran on the wrong Mount. We are at

117′ 25′ Bird Nest on the Tower. Site on Hold
SL03UB510 Ubiquitel Christian Gulch G025 12/11/13 Structural says 1

88′ 200′ Mount analysis says everything is good, but it was ran off both CD and Structural and they both disagree. See notes in Mount and Structural Guyed
SL03UB511 Purple Sage G026 3/4/13 No microwave on CDs. Install lines beside existing cables No owner approved CD uploaded to Siterra 210
SL03UB512 Ubiquitel Sommers G027 7/1/13 3/11/13
SL03UB514 Ubiquitel – Van Slyke Farms G029 3/1/13 1/13/13
SL03UB515 Ubiquitel – Weitz G030 1/8/13
SL03UB516 Ubiquitel Main St. G031 135H 106′ 2 – S/O 200A
SL03UB517 Deer Flat G032 225 240H
SL03UB518 Ubiquitel Sugar Factory G033 4/1/13 Received letter on 6/03/13 stating the SA is completed and good. 180H 1

10′ 5/3/13
SL03UB519 Ubiquitel Town Square G034 CD not showing the correct mount that is on the tower.
SL03UB520 White Town G035 MA is corrected & approved. 187′
SL03UB521 Ubiquitel McRae G036 6/12/13
SL03UB522 Ubiquitel McMillian G037 6/13/13 SA does not match CD, SA needs to show calcualtions for 6 antenas instead of 3. 6/13/12 Letter needed to show how many atennas and RRUs were used in the MA 330
SL03UB523 Ubiquitel Glenwood G038 4/114/13 Mount analysis was ran off the CD and the CD was done for a regular 3 antennas and 6 RRHs. There are a total of 6 antennas and 9 RRUs going on the tower. Letter is not stamped or Signed – Approved – Rejected – new mount analysis ordered 5/14/13 Need mount analysis redone and have it signed and dated 165H Given back to STA 110′
SL03UB524 State & Dewey G039 Concrete Pad w/ Steal Platform
SL03UB526 Idaho Power Downtown G040 7/3/13 Calculations need to be shown for high capacitiy and for stand off mounts. Single Indoor Site Walk Needed
SL03UB527 Ubiquitel Choctaw G041 No SA has been provided at this time
SL03UB528 Ubiquitel Jack’s Tire & Oil G042 ERROR:#

N/A Need site photos to verify SA Site walk needed
SL03UB529 Black Creek G043 6/23/13 No SA has been provided at this time.
SL03UB531 Ubiquitel Ditto Creek G044 6/14/13
SL03UB533 Ubiquitel Shell Station G045 The MA doesn’t identify the interim dual position mount and it’s calculation, and than it doesn’t indetify the single mount that it will change to at final. Also the collar weight is never mention. This needs to be corrected and provided. MA needs to have the correct configuration.
SL03UB534 Ubiquitel Rocky Butte G046 7/5/13
SL03UB535 Mt. Home AFB G047 1/28/13
SL03UB536 Hammett ATC G048 Coax needs to be double stacked Letter is neeed to show the number of antennas and RRUs were used in the calculations. 345 290′
SL03UB538 Ubiquitel Rocky Trail G049 3/17/13 4/3/13 2

81′
SL03UB540 Ubiquitel Jerome West G050 4/2/13
SL03UB543 Ubiquitel Jerome 99 G051 177′ Need to remove existing dead lines to install new Hybrid cables
SL03UB545 Ubiquitel Magic Valley Mall G052 6/5/13 SA does not match CD, SA calls for the dragonwave CD does not 6/1413
SL03UB547 Ubiquitel Twin Falls G053 Hy-Cap site need more room for all the cabinets
SL03UB548 Ubiquitel Buhl G054 2/15/13 2/13/13 1

45′
SL03UB549 Ubiquitel Kimberly G055 2/1/13
SL03UB550 Ubiquitel Hazelton Butte G056
SL03UB552 Ubiquitel Burley Butte G057 4/19/13 1/29/13 195H
SL03UB553 Ubiquitel – Burley Highway G058 4/11/13
SL03UB554 Ubiquitel Rupert Junction G059 1/15/13 3/12/13 SA was corrected to show proper weight. MA was corrected to show it matches. CD and SA.
SL03UB556 Ubiquitel Boarder Site G060 5/4/13 See SA for Hybrid cable installment 1

98′
SL03UB559 Ubiquitel Lamar G061 See SA for location to install Hybrid cables No MA has been provided at this time.
SL03UB560 American Falls G062 4/25/13 1

95′
SL03UB562 Ubiquitel Frasure G063
SL03UB563 Ubiquitel Logan G010 Powder River 12/3/12 5/22/13 MA has been corrected. 5/9/13 Steel Plaform
SL03UB564 Ubiquitel Layman G064 5/5/13
SL03UB568 Blackfoot G065 Did Structural and CD on wrong site – Self Support Tower is Failing Did mount analysis on wrong site this is a self support not a monpole (Nick’s reply – Understand and agree fully on your comment, but there is an incorrect document uploaded.) Send back, rejected -Wet Stamp – Site is completely wrong 180′ ID Sent back, rejected
SL03UB572 Ubiquitel Jamestown G011 12/4/12 Structural fails at Interim at 114%, but passes at Final at 104.3%,

Crown Everything has been cleared for Construction 189′
SL03UB573 Ubiquitel Telecom G012 6/6/13 11/30/12 78′
SL03UB574 Ubiquitel Utah G066 4/14/13 2/22/13
SL03UB575 Ubiquitel Majestic G013 5/11/13
SL03UB576 Ubiquitel Rigby G067 176′
SL03UB578 Ubiquitel Rexburg G068 SA does not match the CD, SA lists 6 c2A, CD calls for 3.
SL03UB580 Ubiquitel St. Anthony G069 5/26/13 No SA provided at this time.
SL03UB586 Ubiquitel Snow King Mountain G071
SL03UB589 Ubiquitel Jackson Airport G072 5/19/13 No Structural has been ran MA was corrected and Approved there are two towers and to carriers at the samse RAD Center shooting right at each other. Safety issues and performance issues will be felt.
SL03UB590 Ubiquitel Lower Valley G073 No Structural ran at this time 2 – Collars being added Wyoming
SL03UB591 Ubiquitel Table Rock G074 2/25/13 1/17/13 4/5/13 99′
SL03UB592 Ubiquitel Cloverdale G075 MA has been corrected and states that interim load was taken into calculations. If they will provide a letter stating everything is good we can sign off. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.) – MA was corrected and everyting is approved.
SL03UB593 Boise

Water Tank G076
SL03UB594 Ubiguitel Vista G077 6/24/13
SL03UB595 Ubiquitel North Eagle G078 New mount to be installed on Wooden Pole new mount on wooden Pole Supplemental BOM Created
SL03UB596 Ubiquitel Watson G014 Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Verifing everything is good
SL03UB597 Ubiquitel Kuna G079 181′
SL03UB600 G081 MA was uploaded as a SA MA – MA doesn’t identify the three new mounts and the two different towers that the three are going to be installed on. It was ran for the mount that will be placed on Tower 1 at 18’ Nothing is showing for Tower 2. Also there is not mention of the weight of the existing antennas on the new mount. Please have these corrected and sent back to the AE Team. CD – CD is showing swapping out the only BBU on the site. There is not Batteries in the existing CDMA cabinet. There is a generator on site but it is labeled not installed on the AC panel. Please review this, b/c for what I see we are going to need to expand the pad 3’ x 3’ to install the MMBS.
SL03UB609 Ubiquitel Hampton G084
SL03UB610 Ubiquitel West Twin Falls G085 2/26/13 CD needs to have the RAD Center corrected from

175′ 170′
SL03UB611 Ubiquitel South Nampa G086 Install 3 hand rails
SL03UB613 Ubiquitel Broadway G087 6/8/13 SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed a letter needs to be provided stating everything is voorected.
SL03UB614 Ubiquitel Stone G088 Wooden Pole, 2 mounts to be installed, with 3 collars 65′
SL03UB615 Ubiquitel North Meridian G089 4/28/13
SL03UB617 Ubiquitel Eccles Theatre H180 8/13/13
SL03UB620 Ubiquitel East Nampa G090 Nothing received CD needs corrections
SL03UB622 Ubiquitel South Meridian G091 6/9/13 617/13
SL03UB623 Ubiquitel E. St. George H181
SL03UB624 Ubiquitel West Nampa G092
SL03UB627 Ubiquitel East Eagle G093 3/3/13 Bird Nest in the Tower 118′ Birds Nest
SL03UB633 Ubiquitel – North Rexburg G015 12/4/13 No Hot Slide needed 116′
SL03UB634 Ubiquitel East Twin Falls G095 MA does not match CD and SA, RAD center is 99′ MA states 199′ Letter needed to show that the statement of one hundred and ninety nine feet, on MA was a typed in error and that RAD center is ninety nine feet
SL03UB636 Ubiquitel Maple Grove G096
SL03UB637 Cassia G097 1

13′
SL03UB639 Ubiquitel Western Aircraft G098 Three Cantaliver mounts needed.
SL03UB642 View Point Buildiing G100 No Structural as of this time Mount analysis was ran for adding 2 new cantilever mount to the building. Not a Stand off mount as the CD shows. Need a letter approving this land owner.
SL03UB659 Ubiquitel – Williamson G101 SA was ran at the correct height. The CD and mA are being corrected. Mount analysis needs to be reran with correct information, It states in the letter that everything appears to be correct, from the Structural and CD, but we have conflicting information. Letter stating where the mount calculations were run and with what information. – New Structural and Mount analysis to be reran.
SL03UB660 Teton Mall G016 See SA for beef up. No tower work allowed till structure is beefed up. No hot slide needed. 173′
SL03UB665 Ubiquitel Shelley G017 verifing the calculations and everything is good.
SL03UB668 Ubiquitel Signal Mountain G102 8/30/13
SL03UB670 Ubiquitel Apre Vous G104 No Structural received at this time Monopine Need to run 2 Conduits for new coax.
SL03UB675 Ubiquitel Weiser G105 verifing everything is correct. Concrete Floor
SL03UB686 Ubiquitel Alameda G108
SL03XC010 Ernies Auto H018 58′
SL03XC102 North Ogden City H019 Hot slide not needed Cabinet will have to be turned, very small platform
SL03XC104 Plain City H020 12/7/13
SL03XC106 Doc Holiday & Frank Kuba H021
SL03XC108 Mt. Eyre City Park H022 12/6/12 1/111/13
SL03XC110 Norma Elliot H023 97′
SL03XC112 4th St.

Ball Park H024
SL03XC114 TCI H025 3/15/13 12/6/13 79′
SL03XC118 Clair Baur H027 1

2/5/13 No Hot Slide is needed No possible dual install, small covered platform
SL03XC120 Ogden City Municipal Building H182 4/4/13 No cantilever brackets called for in SA.
SL03XC122 Mt. Ogden Water Tank H183 ERROR:#N/A
SL03XC124 Carl Favero H028 Need to remove BBU to set MMBS
SL03XC126 Kenneth Baldwin H029 Will have to be a temporary install, no room until decomm.
SL03XC128 Ogden Municipal Airport H030 7/4/13
SL03XC130 Washington Heights Corp H031
SL03XC132 South Ogden Water Tank H184 42′ Water Tank/Wooden Pole Sent to Mary for Verification
SL03XC134 Dallas Green H032
SL03XC136 Kwik City Muffler H033 7/11/13
SL03XC138 Roy Water Conservacy H034 Birds Nest – sent to Lane
SL03XC140 Ron Nitler H035
SL03XC142 Ray’s Valley Service H036 12/1/13 96′
SL03XC144 Prime Communications H185
SL03XC146 Weber Basin Water H037
SL03XC148 Lovell H038 12/12/12
SL03XC150 Sunset City H039 Fails at Interim at 107.7%, Passes at Final 104.5%, new and existing equpt can’t be on tower longer than 6 months
SL03XC152 Peters H040
SL03XC154 Fire Station #2 H041 3/20/13
SL03XC156 Bates Canyon H042 12/10/12 MA wsa corrected to show

44′
SL03XC158 Nancy Gardner H043
SL03XC160 St. Ambrose Church H186 SA was corrected. Need a Mason to fix the brick and walls before antennas and RRUS can be installed. MA has been corrected. Consolidation on the Alpha Sector and Mason needs to be hired and fix the Bricks before wwe proceed with hanging the antennas and RRUs. Need a mason to fix brick work. MA & SA are corrected and approved. Non-Tower Need a CS to walk and provide pictures Must contact Church to scheule construction dates and times. ContactMirko at 801-560-3042
SL03XC162 JP’s Texaco H044
SL03XC164 Public Works H045 8/1/13
SL03XC166 Andy Adams Park H046
SL03XC168 Stoken’s Nursery H047 12/17/12 Need more Lease space to set all 4 cabinets Need to expand the Pad – 2 MMBS and 2 BBUs
SL03XC172 Kaysville H187
SL03XC174 Cherry Hill H048 12/21/13
SL03XC176 Burmester H049 4/27/13
SL03XC178 Davis County Sheriff H188 3/23/13 MA was corrected and approved
SL03XC180 Fruit Heights H189 New 4 sector mount Sent to Mary for Corrections 68′ Sent to Mary for corrections, – 4 Sector Site not enough room for the additional Cabinets. Need to paint to match and replace existing 7/8 snap-ins to make room.
SL03XC182 Bangeter Wood Warehouse H050 100A
SL03XC184 Bountiful Police Dept. H051
SL03XC186 Western Wireless Collocate H190
SL03XC188 Beehive Storage H052 12/19/12 12/7/12
SL03XC192 Kulmer & Schumacher H054
SL03XC194 Justice H055 1/16/13 CD shows stand off on the existing pipe, structural was ran for 10′ mount, GD BOM was ordered with a small dual stand-off arm (30″x19″) Need a Letter verifing we can use the smaller mount Need a letter approving the smaller mount. CD needs to be changed to show changing out the existing mount. 59′
SL03XC202 Sons of Pioneers H191 CD/ MA and SA match. Everything is approved Everything is approved and good to go. Need Site Walk 20’/

26′ S/I Storage Closet
SL03XC204 Robert Wolff H056 12/11/12 OA drawings call for 2 powerwaves and one KMW. MA calls for two powerwaves and two KMW attennas. MA needs to be adjusted. Nick, Dez (MA)
SL03XC206 Sunset Tower H192 3/2/13 2 – step only for Equipment – Do not sit both BBU Cabinets together MA has been corrected to install 3 Cantilever Mounts to the side of the building. MA matches the CD. SA & MA have been corrected and they match the CD. Roof Platform
SL03XC208 University Park H193 Structure is approved to with hold the new Eqipment Install 2 antennas on the 2 skids and install new antenna on new cantilever mount and remove the old antennas and mounts at Final Letter verifing the Blastard is good. – Letter confirmed everything is good – 5/23/13 consolidate the alpha CDMA antennas on one of the existing mass pipes and add 2 new mass pipes for the sleds for Beta and Gamma.
SL03XC210 Salt Lake City Airport H194 RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.)
SL03XC212 Robert Wallace H057
SL03XC214 North Temple Storage H058 Need Letter Need Letter, CD shows stand-off on the existing and new chain mount, Structural shows 10′ mount Need Letter, Mount analysis was done on a new 12′ 6″ mount and not Standoff or 6 position chain mount for RRUs. BOM was ordered with a single collar and dual standoff small 30″ x 19″ mount.
SL03XC216 Tribune H195 4/13/13 Structural was corrected Letter stating the Structure will be okay to with stand the RRUs and Cantilever mount on the inside of the wall. 1

48′
SL03XC218 St. Mark’s H196 Verifing that the current mount can with stand another 60 lbs.
SL03XC220 Charleston Apartments H197 CD redlined on 6/13/13 210H
SL03XC224 Freedom Mortgage H199 Need Site visit to order GD Materials
SL03XC228 Evans H059 61′
SL03XC230 Smith’s Credit Union H200
SL03XC232 SL County Housing Authority H201 ran for installing 3 new cantilever mounts, not a standoff RRUs were not calcuated ing the weigh and nothing is shown for mounting the antennas Letter verifing everything is good 230′
SL03XC234 Parkview Plaza (Mecham) H202
SL03XC236 Dan’s Grocery H060 4/20/13 Chris E.
SL03XC238 Eagel Point H203
SL03XC240 International Center H204
SL03XC242 Maverik H061 6/22/13 57′
SL03XC244 Sprint Spectrum H062 101′ Concrete Pad w/ I-Beam
SL03XC246 Flinders Trucking H063
SL03XC248 Lori Riddle H064
SL03XC250 Frampton H065 62′
SL03XC252 OMS Diesel H066 5/27/13 12/14/12
SL03XC254 All Steel FAB H067
SL03XC256 Anderson Truss H068
SL03XC258 B&B Auto Body H069 12/12/13
SL03XC260 Sunburst Auto H070 60′
SL03XC262 Cottonwood Corp. H205 7/29/13 6/10/13 New NV antennas to be placed on existing empty wall mounts.
SL03XC264 Ferguson Canyon H206 Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided, see SA and MA Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided please see the MA & SA. Mount is Failing – Corrective measures were given for this site. Please see the SA & MA. 3 Steel Poles
SL03XC268 Assembly of God H207 Rejected/Failed Interim failed at 176.2%. Final failed at 166.3%. Tower shaft failed from 0-65′. Base plate failed. Base foundation structural failed. Not identifing the 2 existing mounts and the third one that will be installed. Needs 6 position collar mount w/3 dual standoff mounts. Need a letter stating the mount can withstand the load.
SL03XC270 U.S. Satelite H208
SL03XC272 Kramer Construction H071 3/8/13
SL03XC274 Union Woods H209 Need to order consolidation antennas
SL03XC276 Flat Iron Mesa H072 No hot slide needed. Possible consolidation. Check drawings.
SL03XC278 Towne Storage H073 1/7/13 SA was done on a 10′ mount and we speced a 4′ mount. MA was done on a 10′ mount and we speced a 4′ mount. Need a letter approving the 4′ mount.
SL03XC280 Karen Poulsen H074 4/21/13
SL03XC282 Hand Cart Park H075
SL03XC284 Fire Station #26 H076
SL03XC286 H077
SL03XC288 Sand Lot H078
SL03XC290 Hand Tank H079 9/9/13 Interim Fails at 107.0%, Final passes at 103.4% Install a 10′ T-Boom 2/9/13 Installing dual poistion stand off mount
SL03XC292 Taylor Property H080
SL03XC294 Bonnoco H081 11/17/13
SL03XC296 Crescent Park H082 Fails at Interim at 126.1% and Fails at Final at 115.8% – Base plate needs to be modified. Upgrades are to be provided. Need specifics given for beefup to base plate and achors. Need to run over

150′
SL03XC298 Bell Canyon Park H083 7/30/13 Site Fails both Interim and Final. SA is ran for a 10′ T-Arm and the CD is showing a standoff coming off the existing mass pipe. We need to use a 30″ x 19″ dual position standoff mount. Need a proper break down on everything that needs to be done to upgrade the site
SL03XC300 Glenmoor Golf Course H084 8/5/13 CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount Need a L of C to approve the 40″ mount we are showing in the CD.
SL03XC302 Equestrian Park H085 7/7/13 Intirim failed at 119.9%. Final Failed at 108.5%. Further engineering and detailing is required to design the necessary modifications. Anchor rods at 0′ require modifications. Foundation is significant.
SL03XC304 Carolyn White H086
SL03XC306 Ron Raddon H210 Approved – received updated information Approved by Scott Giles Need a letter verifing everything is good. No Conduit available, must install new conduit across the parking lot, under asphalt – Signed off and approved. No available conduit, need to run 3 new conduits across the parking lot under the asphalt, need to order 3 consolidation antennas
SL03XC308 Taylorsville Collocate H211 8/8/13 Passed Owner approved drawings did not reflect correct RAD center. They’ve been redlined and approved by RF.
SL03XC310 Riverton Park H087 9/17/13
SL03XC312 Petersen Marine H088
SL03XC314 Shelby H089 1

27′
SL03XC402 Trans West Auto H090
SL03XC404 Highland Water H091
SL03XC406 Canyon Road Tower H212 Cool cell cabinet platform needs to be removed. The wall mount on sector A has a cosmetic issue. The flexing of the EFIS exterior finish is cracking in
the area of the mount plate. Over time the exterior finish will fail and spall. We recommend adding a
single Valmont slider bracket near the top of the mast to reduce the flexing.
Has a pipe mount planned in Sector Gamma.
SL03XC408 Waymon H092
SL03XC410 JJG Investments H213 Owner Approved drawings do not reflect 4 sectors. Plus they show a pipe mount. MA reflects four sectors.
SL03XC412 Smart

Silo H214 SA has passed and been uploaded to Siterra. MA is approved and uploaded
SL03XC414 Mangum H215 6/2/13
SL03XC416 Peck Sons H216 Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was

ran for consolidation If you can get a letter, stating everything is good, we can sign off. (Nick’s reply – First this is a Hy-Cap Site and there are 2 antennas and 3 RRUs per sector, calculations isn’t correct. Nothing is showing the weight of the standoff from the existing mass pipe or the weight of the existing antennas. This is need to provide clear and correct information. – Eqpt – Certified Letter stating everything is in good standing at the Interim, will need to be provided before Construction can begin.) Smokestack
SL03XC418 Tooele City Fire H093
SL03XC420 Thad Beal H094
SL03XC422 Lindon Park H095
SL03XC424 Seven Peaks H217 SA has been corrected and shows what needs to be done SA & MA are corrected and reflect what needs to be done. Water Slide/ RFT
SL03XC426 Cherrywood Sunstation H096 Could be a temporary DUAL, no room until decomm.
SL03XC428 Eagle Ridge H097 Interim fails at 114%. Final Passes at 101.8%. 22′
SL03XC430 Richard Gornichec H098
SL03XC432 Orem Firestation H099 12/14/13
SL03XC434 Fruit Stand H218 Approved w/ Consolidation
SL03XC436 Utah County EQ/Richard Gornichec H100
SL03XC438 David Gardner H219 no SA available in Siterra
SL03XC440 EXCEL Graphics H101
SL03XC442 Dr. Fullmer H102
SL03XC444 Evan Trucking H103
SL03XC446 Bird Storage H104 12/13/12
SL03XC448 Mapleton City Park H105
SL03XC450 Industrial Park H106 12/15/12 CD shows Hot Slide and the wrong Mount is shown on the Final. Hot Slide not needed
SL03XC452 East Bench H107
SL03XC454 G&W Investments H108
SL03XC456 Salem’s Lot H109
SL03XC458 Payson City H110 6/29/13 CDs redlined for A-2 platform corrections
SL13XC572 Brickyard H220 Antenna swap out due to LL not allowing any additional material on the site.
SL13XC574 Van Winkle H221 SA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″ MA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″ SA & MA is approved and everything is corrected.
SL13XC580 Bicycle City H222
SL13XC582 Eaglewood H111 7/26/13
SL13XC584 Unversity of Utah Hosptial H223 SA was corrected for the calculation of the 6 RRUs MA was corrected for the weight of the 6 RRUs. SA & MA were corrected and approved.
SL13XC588 Olympus Collocate H224 relocation site, no active site in Siterra, no data
SL13XC601 Parley’s Summit H226 Can be Dual Indoor, inside of an old silo/tank
SL13XC602 Kimball Junction H227 ran for a 2 – Step on the Equipment, nothing ran for the building – SA is approved. ran for colsolidation, MA states Skid Mount and it doesn’t call out removing all the existing CDMA antennas and consolidating them to 3 antennas. – Approved – received Certified. 05/23/13 verifing there was a structural ran on the building. – received letter – 5/23/13 Underground VAULT, NO ROOM, BBU will have to come out Bunker Shelter
SL13XC603 Quarry Mountain H112 Need to core drill 4 holes
SL13XC604 Yarrow Hotel H228 Equipment must be a 2 – Step, Tower – states standoffs can only be 12″ but doesn’t include the weight of standoffs and 12″ isn’t enough room – Hot Swap is palnned, cabinets will be set as a 2 – Step. Hot Swap on Alpha nad Gamma and consolidate the Beta antennas. All RRUs will be mounted on the inside of the tower on the roof. Beta will be consolidated on the back of the wall and Alpha and Gamma will be hot swaps. All RRUs will be mounted inside the tower.
SL13XC605 Caledonian H229 Platform Structural was ran for a Hot Swap only, No Interim config, Structural states one cabinet one cabinet off and one than can go on. Need to pull the existing BBU before setting MMBS – Mount analysis shows installing 3 new cantilever mounts to the side of the building, not standing pipes off the existing cantilever mount – Structural for equipment is good to go to set the cabinets. – Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Install 4″ boot on both sides of the wall behind the antennas and run the jumpers from the RRUs inside to the antennas mounted on the wall outside. Remove CDMA antennas and brackets at the end. Indoor Site Will need to core dril 7 holes and install 6 cantilever mounts, 3 inside and 3 out.
SL17XC651 Doctor Rooftop H235 Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. SA & MA match the BOM and CD. 63′
SL17XC652 Alley H116 Handrail 12.6″ required for twist and sway
SL17XC653 H117 no documents in Siterra
SL17XC654 Marriot H236 Ran for antennas and RRUs to mounted on the wall Mount analysis is ran for 3 new cantilever mounts to be installed and the new antennas and RRUs to be installed on the new Mounts. CD shows standoffs off the existing mass pipes. Penthouse on I-Beams
SL17XC655 Golf Course Orchard H237
SL25XC170 Keith Potter Relocation H238 8/3/13 Monpole
SL25XC288 Stop Work Site
SL25XC588
SL29XC106 Building 87 H239 No Hot Slide Needed
SL29XC107 Layton Hills Western Wireless H240 7/17/13
SL29XC111 Sahara Inc. H241 Shelter w/ I-Beam
SL29XC122 Utah LP Gas H118
SL29XC141 L&N Uniform H242
SL29XC149 City Property H119
SL29XC152 Johnson Trucking II H120 Need to install a 12′ Hand Rail Need to install a 12′ hand rail
SL29XC159 High School Auditorium H243 Rage rooftop
SL33XC022 Rogers Ranch H121 No hot slide required 38′
SL33XC078 Jordanelle Point H122
SL33XC132 US West @ SR111 – Site 162 H245 Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected. Need to add new mounts and consolidate the Beta sector for CDMA.
SL33XC133 Towers – Site 164 H123 Need to add a 12′ 6″ Handrail
SL35XC001 BYU/Park Plaza – Site 172 H124 Failed at Inerim at the base at 122.7%, but Passes at Final at 101.7% – SA was ran on a Monopole and not a telephone pole, also the SA was ran for a new 10′ mount and we are calling out a dual stand off mount 40″ x19″, the MA specs a small dual 40″ x 19″ mount. New antenna mounting system to replace cluster mount SO/CDs need redlined. Wooden pole. – Need a letter stating that a 40″ x 19″ dual standoff mount will be sufficent on the wooden pole istead of the 10′ mount the SA specs. New Dual Position standoff mount 10 1/2″ collar Wooden Pole sent a request to have a smaller mount added to the BOM.
SL35XC002 PAC Butler Substation – Site 137 H125 8/15/13
SL35XC003 Bulls Eye – Site 169 H246 3/18/13 The MA states it was ran for 1 antenna and 2 RRUs, instead of 3 antennas and 6 RRUs. PE Letter correcting the Verbiage will be sufficent. The Conduit should be sufficent to withhold 1 more cable per each of the 3 existing Conduit. Have CS verify to make sure.
SL36XC004 RLK Properties H126 8/18/13 Failed – Interim 109.8% and Final 109.8% Need to make base mods Need Namd rail for a 12′ 6″ mount Need to order a Hand rail
SL36XC005 Oak Canyon Jr High H127
SL36XC006 Hogi Yogi H128
SL36XC009 Beauty Bark Trucking H129
SL37XC002 E Center H247
SL37XC005 Multi-Ethnic – Senior Housing H249 Equipment structural is good Mount analysis was not ran to capture the whirligig that the CD is showing. Mount analysis was ran for a consolidation, but it doesn’t specify the type of mount that needs to be used on the building. Need to consolidate CDMA antennas Need a Letter stating everything is good. 1

56′ Need to order consolidation antennas for Beta and Gamma antennas on CDMA Updated BOM 6/5/13
SL40XC020 Provo High School H250
SL40XC029 PACX Businees Park H251
SL40XC034 Bridal Image H252 Shelter – Closet
SL40XC052 Magcorp H130
SL40XC053 Granger Medical H253 Need to calculate for weight of sled mounts. Need to remove

SL54XC030
SL40XC061 Chelemes H131 Add hand rails Add Hand rails to mount
SL41XC040 SL41XC040-C H254 9/19/13
SL54XC001 Elggren Property H255 New Structural and Mount analysis is approved, RF Approved Waiting on Approval from RF.RF Approved. Received Email. Existing equipment is indoor/site is indoor Shelter w/ I-Beams
SL54XC012 South Hills – Site 206 H256 Rad Center of structural at 68′ vs. Rad center of CDs at 62′. Need to verify which is corrected.
SL54XC013 Big Daddy – Site 195 H257 Need to remove 3 of the existing lines and snap-in the new hybrid cable and restack the existing lines.
SL54XC020 Provo Gun Club H258
SL54XC024 Shepard’s Hill H133 11/16/13 CD needs to be corrected to show Dual position Mount New Dual Position standoff mount, need to install new conduit form Eqpt to tower, 50′ through a retaining wall up the hill.
Oak Hallow Elementry H260
SL54XC031 Christensen Property H134 Tower Fails at Interim at 134.6% and Fails at Final at 122.5% – Tower needs the Base plate upgraded and the tower from 0 to 15′. Verifing exactly what needs to be done.
SL54XC060 Highland Springs H261
SL54XC061 Utah Medical Products II H136 Fails SA SA Fails at Interim at 134.3% and Fails at Final at 117% – Need to get information on beefing up from 0-38′ and the base plate. need a letter on what needs to be done for Beef up.
SL54XC062 Hampton Inn H262 SA has bee ncorrected SA has been corrected an approved Everything has been corrected and cleared. Need a CS to walk and provide pictures in Steeple
SL54XC063 T-B Improvement District H137 Interim at 106%, final passing at 97.5 proposed handrail to to support additional loading Need to install a handrail – 12′ 6″ – MA specs it Need to paint to match the tower.
SL54XC064 Keene Coatings H263 Mo MA provided at this time
SL54XC065 Centennial Building H264 4/7/13 No Structural at this time
SL54XC068 Huntsville H266
SL54XC094 Granite H138
SL54XC097 Northridge Heights H267
SL55XC101 Central Park West H268 1/21/13 Going to need to run Conduit
SL57XC001 Orchard Elementry H269
SL60XC001 Hale Bakery SLC068 Keebler H270
SL60XC017 Spectrasite Colocation H271 66′
SL60XC020 Nextel Collocation H139
SL60XC028 Saratoga H272 No recent owner approved drawings or signed/stamped drawings in siterra
SL62XC002 North Layton Jr. High – Site 220 H273
SL62XC012 Jordan Landing – Site 219 H274 1/22/13 MA has been coorected and approved Everything is orrected an Approved. 2/10/13
SL62XC022 Howland Building – Site 218 H275
SL63XC002 Newgate Mall – Site 221 H276 No Structural has been ran so far.
SL63XC006 Boyer-Madsen Building – Site 217 H277
SL63XC008 3900 South State – Site 211 H278 Existing mast will fail under the conditions purposed in the drawings. The new T-Arm supports will provide adequate support for the new antennas and the existing antennas over the interim period of time.
SL63XC020 Qwest Clearfield – Site 222 H279 no space to set MMBS Cabinet
SL63XC022 Riverton HS – Site 232 H280
SL63XC026 Boys Ranch – Site 230 H281 CD not signed/stamped-Preliminary not for construction
SL63XC028 Copper Hills – Site 231 H282 5/12/13 SA does not match CD, SA list 3 exisiting antennas CD lists 4 MA does not match CD, MA list 3 exisiting antennas CD lists 4
SL63XC030 Storage Plus – Site 226 H283 The top section of the pole shall be replaced with a 3″ std. pipe or better if the existing is less than the size
SL63XC032 Classic Trends – Site 227 H284 assumed. wrong CDs uploaded in 315.2
SL63XC034 Cottonwood Theaters – Site 225 H285
SL63XC036 I-215 Mini Storage – Site 228 H286
SL63XC038 Layton Water Tanks – Site 223 H287 36’/36’/40′ Need to paint antennas, RRUs, Hybrid Cables & mounts, also will need to run 3 new conduits from the Equipment to the tower where they go up. Welding will need to be done on the side of the tank for the new mounts and coax brackets.
SL63XC135 Qwest Main Building – Site 224 H288
SL63XC164 Jordan Commons – Site 229 H289 6/27/13
SL70XC003 RC Riley – T-Moblie Bennion Conservancy Collocate H290
SL70XC004 North Star Coatings – Site 234 H291 6/25/13
SL70XC007 RC Riley (foothill UT0095) H292 Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed
SL72XC002 West Mountain H293 SA was ran and we are to do a antenna swap out and mount the RRUs below the antennas. MA was corrected and it was stated that the tower could not withhold the weight, so we are doing an antenna swap and mounting the RRUs below the antennas. SA & MA were corrected.
SL72XC049 UT0049-Phase 1 B – Eagle Mountain H294
SL72XC069 UT0069 – Phase 1A – Morgan H296
SL72XC101 UT0101 – Phase 1A H299 SA was coorected and Approved 157′
SL72XC102 Roosevelt H300 Received letter verifing RAD Center Receieved Letter – Uploaded to Siterra
SL72XC103 UT0103 – Phase1 A – Duchesne H301 MA was corrected.
SL72XC105 UT0105 – Phase 1A H302
SL72XC106 UT0106 – Phase 1A H303
SL72XC113 UT0113 – Phase 1A – Loafer – Mtn H304
SL72XC117 UT0117 – Phase 1A – Bear Lake H306 01/29/13 06/18/13 Structure fails at interim (197.4%) AND at Final (179.9%). Engineer recommends 1) If the load differs from that described in Tables 1 and 2 of this report, “Appendix B – Base Level
Drawing” or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower does not have sufficient capacity to carry the existing, reserved, and proposed loads. Modifications will be required to bring the tower into compliance with the ANSI/TIA-222-G standard for the existing, reserved, and proposed loading. The following components require
modifications: a) Tower legs from 0’ to 140’ b) Tower diagonals from 0’ to 80’, 100’ to 120’ c) Tower diagonal bolts from 120’ to 160’ d) Anchor rods e) Foundation Further engineering and detailing is required to design the necessary modifications.
3) A Professional Engineer licensed in the state of Utah shall issue design drawings for the above
modifications. This analysis report is not a construction document.
SL72XC122 UT0122 – Phase 1A – Price H307 Need three standoff arms. Letter only received, nothing to verify what was measured. 28′
SL72XC123 UT0123 – Phase 1A – Helper H308
SL72XC127 Horn Mountain H312 SA was corrected and approved MA was corrrected and approved CD needs to be corrected for the mount we are installing.
SL72XC128 Four Mile Hill H313 Everything is matching 115′
SL72XC138 UT0138 – Phase 1A – Kamas H316 No owner approved drawings to compare to.
SL72XC143 Moab H319 No calculations were provided in the SA. MA corrected and approved
SL72XC255 UT0255 – Phase 1A – Powder Mountain H321 9/4/13
SL72XC413 UT0413 – Phase 1B (Devils Slide) H325
SL72XC703 ID034P- Phase 1B – Melba G110 Structural is ran for the wrong type of mount. Ran for a Side Arm Mount, not a Sector Frame 258′
SL72XC737 ID211P – Phase 1B – McCall G112
SL73XC004 UT0004 – Phase 1C – Brighton HS H330 Ran for installing NV antennas on cantilever mounts CD needs to show the iDEN antennas that are installed beside the CDMA and NV antennas. 42’/9’/35′
SL73XC011 North Orem H331
SL73XC052 UT0052 – Phase 1C – Dimple Dell H332 7/20/13
SL73XC085 UT0085 – Phase 1C – South Salt Lake H333
SL73XC114 UT0114 – Phase 1C – South Jordan H334 MA suggests adding bracing to prevent rotation of the horizontal pipe mounts
SL73XC173 UT0173 – Phase 1C – Bell Canyon H335
SL73XC188 UT0188 – Phase 1C – Century 16 H336 Remove 3 of the dead antennas on iDEN and there lines.
SL73XC198 UT0198 – Phase 1C – SLCC H337 Cd shows 12′ T-Arms to be installed and the Structural was ran for the new equipment to go on the existing mount. They are flushed mounted to the tower.
SL73XC304 UT0304 – Phase 1C – Jordan Commans H338 35’/45′
SL73XC341 UT0341 – Phase 1C – Franklin Covey Stadium H339 CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole Structural for Mount and Tower need to be redone. On Hold until we get proper Structurals and mount analysis
SL73XC364 UT0364 – Phase 1C – North Salt Lake H340
SL73XC373 UT0373 – Phase 1C – Interstate 15 & 1700 S H341 MA is coorected.
SL73XC381 UT0381 – Phase 1C – 33rd & Interstate 15 H342 CD showing pulling CDMA and iDEN off at Iterim and it is not needed . Please correct for construction
SL97XC002 BYU Rexburg G114
SL97XC003 BYU Rexburg BTS #2 G115
SL97XC004 CNSUT00055 Movie Set H343
SL97XC005 SL97XC005 BTS #2 (CNS DPT ENRGY) G116
SL98XC004
SL98XC007 LDS Headquarters – BTS H345
SL98XC008 CNSUT00058 (CNS Montage) H346

Sheet2

SL03UB511

SL03UB563

6/14/13

SL03UB572 Full NTP 4/19/13
SL03UB573 Full NTP 4/12/13
SL03UB596 Full NTP 4/23/13
SL03UB633 Full NTP 6/10/13
SL03UB665 Full NTP 3/29/13
SL03UB611

6/24/13

SL03UB512 Conditional NTP – waiting on MA emailed Jared 6/20/13

SL03UB517 Incomplete 6/24/13

180 180
Tower 150′ Monopole O O Concrete Pad 3/29/13 3/29/13 200 A N N
2/20/13 135 135 135 3/29/13 Tower 100′ Monopole O O Steel Platform 3/29/13 3/29/13 200 A N N
2/8/13 Tower 87′ Wooden Pole O S/O Steel Platform Sent back to Mary to verify 200 A N Y
2/14/13 sent back to Mary, not showing additional 2 cabinets Tower

Wooden Pole O S/O Steel Platform 200 A N Y

Conditional NTP – waiting on MA emailed Jared
Full NTP
Incomplete emailed taec for completion of lease tasks
waiting on MA, emailed taec
Missing MA, NTP, tasks 122, 190, 200 and 315.3
40’/50′

Sheet3

Sheet4

Sheet1

Information

tes

Date Reviewed Approved Notes

Notes

Yes

5/20/13 Approved

Yes

Lane

Yes n/a

Yes 2/12/13

Rejected

Yes

JS Utah

Lane

TAIC Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah

Lane

TAIC No n/a

n/a

Structural Analysis at this time

Yes

5/29/13 n/a

No

JS Utah

Lane 2/12/13 TAIC Yes n/a

n/a Yes n/a 5/1/13 Approved n/a No

JS Utah

Lane

Yes

5/14/13 Approved

at Inerim at the base at 150.9%, but Passes at Final at 100.8%

Yes

5/14/13 Approved n/a No n/a JS Utah

5/25/13 Lane

Yes

Approved n/a Yes

6/21/13 Approved n/a No n/a JS Utah

Lane 1/25/13 TAIC Yes n/a

n/a Yes

6/11/13 Approved

No

JS Utah

5/29/13 Lane

TAIC No n/a 5/29/13 n/a

Analysis at this time

Yes

5/29/13 Approved n/a No

JS Utah

Lane

TAIC No n/a 5/14/13 n/a

Yes 2/20/13

Approved

No n/a JS Utah

Lane TAIC Yes n/a 4/30/13 Rejected

Yes n/a 4/30/13 Rejected “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. Yes

JS Utah

Lane

Yes n/a 4/30/13 Approved

Yes

5/24/13 Approved

No n/a JS Utah

3/30/13 Lane

Caltrop Yes n/a

Approved

Yes n/a 5/17/13 Approved

No n/a JS Utah

Lane

Smith Hyatt Yes

Approved n/a Yes 5/30/13

Approved

and showing the 6 RRUs

Yes

JS Utah

4/6/13 Lane

Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Utah

Lane 2/8/13 Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved

No n/a JS Utah

Lane 1/30/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah

Lane Smith Hyatt Yes

6/11/13 n/a No n/a 6/11/13 n/a

No n/a JS Utah

Lane Smith Hyatt Yes 5/31/13

. Install 3 Cantilever mounts and have 3 existing antennas standing off the existing mount.

Yes 5/31/13 6/3/13 Approved

No

JS Utah

Lane Smith Hyatt Yes

6/11/13

Yes 6/7/13 6/11/13 Approved

No n/a JS Utah

Lane 2/21/13 Smith Hyatt Yes

6/7/13

Yes

6/21/13 Approved

Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace.

Yes

JS Utah

3/30/13 Lane

Fullerton Yes 1/23/13 6/11/13

Yes

6/11/13 Rejected the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. No n/a JS Utah

Lane

Smith Hyatt Yes n/a 4/30/13 n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah

Lane Smith Hyatt No n/a 5/29/13

No n/a 5/29/13 n/a No MA provided at this time No n/a JS Utah

5/2/13 Lane Smith Hyatt Yes

6/11/13

No n/a 6/11/13 n/a No MA provided at this time Yes

JS Utah

Lane Smith Hyatt Yes

Yes 3/27/13 6/11/13 Approved n/a Yes

JS Utah

4/29/13 Lane

Smith Hyatt Yes 4/24/13 6/11/13

Yes 6/21/13 6/21/13 Approved n/a Yes

JS Utah

Lane Smith Hyatt Yes 4/22/13 6/11/13 n/a Yes

6/19/13 Approved n/a No n/a JS Utah

3/30/13 Lane

TAIC Yes n/a 5/1/13 n/a Yes n/a 5/1/13 Approved

No n/a JS

Lane

TAIC Yes n/a

Yes n/a 5/14/13 Rejected

No n/a JS Idaho

3/30/13 Lane

TAIC Yes n/a 5/7/13 n/a Yes n/a 5/7/13 Approved n/a No n/a JS Idaho

3/30/13 Lane 2/18/13 TAIC Yes n/a 5/1/13 n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho

3/30/13 Lane 2/12/13 TAIC Yes

n/a Yes

5/13/13 Approved

Yes

JS Idaho

5/13/13 Lane 2/7/13 WT Yes n/a 5/7/13 Approved n/a Yes 2/14/13

Rejected

No n/a JS Idaho

3/27/13 Lane 2/21/13 TAIC Yes

5/13/13 Rejected

Yes 4/22/13 5/13/13 Rejected

Yes

JS Idaho

4/24/13 Lane

TAIC Yes

6/11/13 Approved

No n/a 6/11/13 n/a No MA provided at this time No

JS Idaho

Lane n/a TAIC Yes

6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

Lane 1/24/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

2/21/13 Lane

TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

4/10/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho

4/24/13 Lane 3/29/13 TAIC Yes 3/1/13 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

4/24/13 Lane 3/29/13 TAIC Yes

6/3/13 Approved n/a Yes 4/1/13 6/3/13 Approved n/a No

JS Idaho

Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No

JS Idaho

3/5/13 Lane 1/31/13 TAIC Yes n/a 4/30/13 Approved n/a Yes

6/11/13 Approved

No MA is corrected and approved JS Idaho

5/17/13 Lane TAIC Yes 4/9/13

Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

5/6/13 TAIC Yes 3/27/13

Rejected

Yes 4/1/13

Rejected

Yes No owner approved CD uploaded to Siterra JS Idaho

Lane 1/31/13 TAIC Yes n/a

Approved

Yes n/a 5/14/13 Rejected

Yes

JS Idaho

3/19/13 Lane 2/8/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

Lane TAIC Yes

6/12/13 Rejected

Yes 5/15/13 6/12/13 Rejected Calculations need to be shown for high capacitiy and for stand off mounts. No n/a JS Idaho

6/19/13 Lane TAIC No n/a 6/12/13 n/a

.

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

n/a Lane

Yes n/a 6/12/13 n/a

Yes n/a 6/12/13 n/a

No No owner approved CD uploaded to Siterra JS Idaho

Lane TAIC No n/a 6/12/13 n/a

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

6/17/13 Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time Yes 4/23/13 6/11/13 Rejected

Yes

JS Idaho

Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No n/a JS Idaho

3/30/13 Lane

TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

Lane 2/4/13 TAIC Yes 1/24/13 6/13/13 Approved

Yes 3/26/13 6/13/13 Rejected Letter needed to show how many atennas and RRUs were used in the MA Yes

JS Idaho

3/31/13 Lane 2/6/13 TAIC Yes

5/13/13 Approved n/a Yes

5/15/13 Approved n/a No n/a JS Idaho

4/9/13 Lane 3/28/13 TAIC Yes 1/24/13 5/13/13 Approved n/a Yes

5/13/13 Approved n/a No n/a JS Idaho

4/29/13 Lane WT Yes 3/4/13 5/14/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Idaho

Lane WT Yes 1/23/13 6/14/13 Rejected

Yes 2/14/13

Approved n/a No n/a JS Idaho

3/27/13 Lane 1/25/13 TAIC Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Idaho

5/6/13 Lane

Yes WT Yes 2/15/13 6/3/13 Approved n/a Yes

6/3/13 Approved n/a No n/a JS Idaho

5/10/13 Lane WT Yes

6/14/13 Approved n/a Yes 2/13/13 6/14/13 Approved n/a No n/a JS Idaho

3/31/13 Lane 2/8/13 TAIC Yes 2/8/13 5/14/13 Approved n/a Yes 4/3/13 5/14/13 Approved n/a No n/a JS Idaho

Lane 3/29/13 TAIC Yes

6/5/13 Approved SA has been corrected Yes 4/1/13 6/5/13 Approved n/a No n/a JS Idaho

3/1/13 Lane 1/29/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

3/29/13 Lane

TAIC Yes 3/12/13 6/5/13 Approved

Yes 2/12/13 6/5/13 Approved

No n/a JS Idaho

Lane 2/15/13 Yes WT Yes 2/1/13 6/3/13 Approved

Yes 2/13/13 6/3/13 Approved n/a No n/a JS Idaho

5/4/13 Lane WT Yes 2/1/13 6/14/13 Approved

No n/a 6/14/13 n/a

No n/a JS Idaho

Lane 2/4/13 WT Yes 1/31/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a JS Idaho

5/10/13 Lane WT Yes 2/12/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a JS Idaho

6/7/13 Lane

Yes

5/6/13 Approved n/a Yes

6/14/13 Approved MA has been corrected and approved No

JS Idaho

Lane TAIC No n/a 6/14/13 n/a No SA has been provided at this time. Yes 3/5/13 6/14/13 Approved n/a No No owner approved CD uploaded to Siterra JS Idaho

4/22/13 Lane 3/28/13 TAIC No Yes 5/1/13 Rejected

No No 5/14/13 Rejected

Yes

JS Idaho

3/31/13 Lane

Powder River Yes

5/6/13 Approved

will allow to build as long as the Interim will only be in place for 6 months.

Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No

JS Idaho

Lane Powder River Yes

5/6/13 Approved n/a Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No Everything has been cleared for Construction JS Idaho

Lane 3/28/13 TAIC No n/a 5/14/13 n/a n/a Yes

5/8/13 Approved n/a No n/a JS Idaho

Lane Powder River Yes 4/29/13 6/14/13 Approved n/a Yes 1/8/13 6/14/13 Approved n/a No n/a JS Idaho

3/30/13 Lane 1/8/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho

5/14/13 Lane WT Yes 2/1/13

Rejected

No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho

Lane WT n/a n/a 6/16/13 n/a

No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho

5/16/13 Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho

Lane TAIC No n/a 6/6/13 n/a

Yes 6/3/13 6/6/13 Approved

No

JS Idaho

4/3/13 Lane TAIC No n/a 5/13/13 n/a

Yes

5/13/13 Approved

No n/a JS

4/11/13 Lane

TAIC Yes

5/13/13 Approved n/a Yes

5/13/13 Approved n/a No n/a JS Idaho

3/6/13 Lane 2/4/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 6/3/13 6/3/13 Approved

No

JS Idaho

n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho

Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho

4/24/13 Lane 2/21/13 TAIC Yes 2/22/13 5/10/13 Approved

Yes 2/22/13 5/10/13 Approved

No n/a JS Idaho

6/23/13 Lane 3/29/13 Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected

Yes

JS Idaho

5/2/13 Lane 3/28/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho

Ubiquitel Kuna

5/19/13 Lane TAIC No n/a 5/24/13 n/a

Yes 4/26/13 5/24/13 Rejected

No n/a JS Idaho

6/7/13 Lane WT Yes 2/1/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA provided at this time No n/a JS Idaho

6/5/13 Lane 2/15/13 Yes WT Yes

6/3/13 Approved See SA for Hybrid cable installment Yes 2/13/13 6/3/13 Approved

No n/a JS Idaho

4/24/13 Lane 2/11/13 TAIC Yes 2/13/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho

Lane TAIC Yes 5/6/13 6/7/13 Rejected

Yes 5/6/13 6/7/13 Rejected SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed Yes

JS Idaho

5/30/13 Lane TAIC Yes 4/11/13 5/10/13 Approved

Yes 4/11/13 5/10/13 Approved Wooden Pole, 2 mounts to be installed, with 3 collars No n/a JS Idaho

Lane TAIC Yes 3/9/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho

Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. Yes 2/11/13 6/16/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

4/5/13 Lane 3/4/13 TAIC No n/a 4/30/13 n/a

No n/a 4/30/13 n/a No MA provided at this time n/a

JS Idaho

Lane WT Yes 2/11/13

Approved See SA for location to install Hybrid cables No n/a 6/17/13 n/a No MA has been provided at this time. No n/a JS Idaho

3/31/13 Lane 1/9/13 Fullerton Yes 3/13/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Utah

4/17/13 Lane 2/11/13 TAIC Yes 3/12/13 5/10/13 Approved n/a Yes 4/30/13 5/10/13 Approved n/a No n/a JS Idaho

5/22/13 Lane

Yes WT Yes 1/30/13 6/3/13 Approved n/a Yes 2/14/13 6/3/13 Approved n/a No

JS Idaho

5/17/13 Lane Powder River Yes

5/13/13 Approved n/a Yes 1/24/13 5/13/13 Approved n/a No

JS Idaho

Lane WT Yes 1/31/13 6/17/13 Approved See SA for location to install Hybrid cables Yes 2/14/13 6/17/13 Rejected

Yes

JS Idaho

5/29/13 Lane WT No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho

5/10/13 Lane WT Yes 2/6/13 5/10/13 Approved n/a Yes 6/3/13 6/7/13 Approved MA has been corrected and approved No n/a JS Idaho

6/21/13 Lane 5/29/13 TAIC Yes

6/12/13 Approved n/a Yes Yes 6/12/13 Approved n/a No

JS Idaho

5/20/13 Lane TAIC No n/a 5/13/13 n/a

Yes 3/5/13 5/13/13 Rejected

Yes

JS Idaho

3/21/13 Lane 2/8/13 TAIC Yes 6/11/13 6/11/13 Approved

Yes n/a 5/14/13 Rejected

Yes

JS Idaho

6/13/13 Lane 1/31/13 Powder River Yes 4/22/13 6/12/13 Approved

Yes Yes 6/12/13 Approved n/a No n/a JS Idaho

5/4/13 Lane Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Yes

JS Idaho

Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

3/31/13 Lane 2/19/13 TAIC No n/a 5/13/13 n/a

No n/a 5/13/13 n/a No MA provided at this time No n/a JS Wyoming

4/15/13 Lane 1/28/13 TAIC Yes n/a 5/7/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time Yes

JS Idaho

6/3/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho

6/5/13 Lane Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah

2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved

No n/a JS Utah

2/27/13 Lane 2/18/13 Caltrop Yes

5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah

6/14/13 Lane Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah

4/15/13 Lane 2/28/13 Caltrop Yes

5/13/13 Approved n/a Yes 2/4/13 5/13/13 Approved n/a No n/a JS Utah

4/23/13 Lane 3/4/13 Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah

4/14/13 Lane 3/12/13 Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah

4/22/13 Lane

Caltrop Yes

5/13/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

2/21/13 Lane 2/27/13 Caltrop Yes

5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No

JS Utah

6/13/13 Lane n/a TAIC Yes

6/12/13 Rejected

No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

n/a Lane n/a

No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

6/17/13 Lane Caltrop Yes 12/6/12 5/13/13 Approved n/a Yes 2/6/13 5/13/13 Approved n/a No n/a JS Utah

2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

Lane n/a Caltrop Yes 11/30/12 6/12/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

3/31/13 Lane 3/5/13 TAIC No n/a 5/31/13 n/a No Structural Analysis at this time No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

2/20/13 Lane 2/25/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

Lane n/a Caltrop No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

3/19/13 Lane 3/4/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

2/15/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

2/20/13 Lane 2/19/13 Caltrop Yes

5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah

6/3/13 Lane 4/29/13 TAIC Yes 2/28/13 6/12/13 Approved n/a Yes n/a 6/12/13 Approved n/a No n/a JS Utah

7/11/13 Lane Caltrop Yes 12/4/12 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a JS Utah

6/11/13 Lane Caltrop Yes

5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a JS Utah

5/6/13 Lane Caltrop Yes 12/7/13 5/13/13 Approved

Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah

3/30/13 Lane 3/4/13 Caltrop Yes 12/6/12 5/20/13 Approved n/a Yes 1/28/13 5/20/13 Approved n/a No n/a JS Utah

Lane 2/28/13 Caltrop Yes 1/19/13 5/14/13 Approved n/a Yes 1/31/13 5/14/13 Approved n/a No JS Utah

5/7/13 Lane Caltrop Yes

5/20/13 Approved n/a Yes 1/31/13 6/17/13 Approved

No MA has been corrected. JS Utah

2/15/13 Lane 2/27/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a JS Utah

3/6/13 Lane 1/23/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved

Yes 6/11/13 6/11/13 Approved

Yes

JS Utah

2/15/13 Lane 3/12/13 Caltrop Yes 12/6/12 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No n/a JS Utah

Lane Caltrop Yes 12/10/12 5/20/13 Approved n/a No n/a 6/7/13 n/a No MA provided at this time No n/a JS Utah

3/20/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

4/10/13 Lane 3/15/13 Caltrop Yes

5/20/13 Approved n/a Yes 2/6/13 5/20/13 Approved n/a No n/a JS Utah

5/1/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

3/9/13 Lane

Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

Lane 3/5/13 Caltrop Yes 12/6/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah

Lane 1/31/13 TAIC No n/a 6/12/13 n/a No Structural ran at this time Yes 6/3/13 6/12/13 Approved MA has been corrected and approved Yes

, we are using 3′ standoffs. SA still hasn’t been completed.

JS Utah

4/10/13 Lane 2/11/13 TAIC No n/a 5/8/13 n/a No Structural Yes n/a 5/8/13 Approved

No n/a JS Utah

2/15/13 Lane 2/20/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a JS Utah

3/28/13 Lane 2/28/13 Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah

5/22/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time n/a No owner approved CD uploaded to Siterra JS Utah

2/15/13 Lane

Caltrop Yes

5/15/13 Approved n/a Yes 2/11/13 5/15/13 Approved n/a No n/a JS Utah

3/30/13 Lane 2/27/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah

4/6/13 Lane 3/6/13 Caltrop Yes

5/14/13 Approved

No n/a 5/14/13 n/a No MA provided at this time Yes

JS Utah

4/30/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved n/a Yes 5/31/13 5/31/13 Approved

Yes

JS Utah

5/23/13 Lane 4/1/13 Caltrop Yes

5/29/13 Approved n/a Yes 1/28/13 6/18/13 Rejected

No n/a JS Utah

5/14/13 Lane

Smith Hyatt Yes 5/31/13 5/31/13 Approved

Yes 5/31/13 6/3/13 Approved

Yes

JS Utah

4/27/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved

Yes 5/23/13 5/23/13 Approved

Yes

JS Utah

5/23/13 Lane n/a TAIC Yes 4/3/13 6/13/13 Rejected

– If we are to use the sled mounts, they are nit identified in the SA for using on both sectors, and a specific sled mount was called out. Sled Mount is not in the Calculations page.,

Yes 4/3/13 6/13/13 Rejected RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.) No No owner approved CD uploaded to Siterra JS Utah

4/19/13 Lane 1/9/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 6/7/13 6/7/13 Approved n/a No n/a JS Utah

4/15/13 Lane 1/16/13 Caltrop Yes 1/19/13 5/13/13

Yes 2/11/13 5/13/13 Need Letter

Yes

JS Utah

Lane Smith Hyatt Yes 5/31/13 6/3/13 Approved

Yes 5/31/13 6/3/13 Approved n/a Yes

JS Utah

4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 n/a No SA provided at this time. Yes 5/31/13 6/21/13 Approved n/a Yes

JS Utah

5/16/13 Lane

Smith Hyatt Yes 4/13/13 6/13/13 Approved n/a Yes 2/25/13 6/13/13 Approved n/a No n/a JS Utah

4/27/13 Lane Smith Hyatt Yes 2/27/13 5/29/13 Approved n/a Yes 2/27/13 5/29/13 Approved n/a No

JS Utah

5/29/13 Lane Caltrop Yes 12/11/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah

6/3/13 Lane n/a TAIC No n/a 6/13/13 n/a No SA provided at this time. No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

4/27/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved

Yes n/a 5/7/13 Rejected

Yes

JS Utah

7/1/13 Lane

Smith Hyatt Yes 4/17/13 6/13/13 Approved n/a Yes 4/17/13 6/13/13 Approved n/a No n/a JS Utah

Lane 3/5/13 Caltrop Yes 12/12/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah

6/3/13 Lane 2/26/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

5/25/13 Lane n/a TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

Lane Caltrop Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No Hot Slide needed No n/a JS Utah

5/4/13 Lane Caltrop Yes 12/7/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah

4/25/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/20/13 Approved n/a Yes 2/13/13 5/20/13 Approved n/a No n/a JS Utah

5/29/13 Lane Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

4/28/13 Lane 2/20/13 Yes Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

Lane Caltrop Yes

5/29/13 Approved n/a Yes 2/13/13 5/31/13 Approved n/a No n/a JS Utah

5/27/13 Lane Caltrop Yes 1/16/13 5/29/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

5/27/13 Lane Caltrop Yes

6/7/13 Approved n/a Yes 2/13/13 6/7/13 Approved n/a No n/a JS Utah

5/7/13 Lane Caltrop Yes

5/29/13 Approved n/a Yes 2/13/13 5/29/13 Approved n/a No n/a JS Utah

6/17/13 Lane 3/19/13 Caltrop Yes 12/17/12 6/14/13 Approved n/a Yes 1/31/13 6/14/13 Approved n/a No n/a JS Utah

Lane

Smith Hyatt Yes 3/12/13 6/14/13 Approved n/a Yes 3/12/13 6/14/13 Approved

No n/a JS Utah

3/23/13 Lane 2/11/13 Smith Hyatt Yes 6/3/13 4/30/13 Approved

Yes 6/3/13 6/3/13 Approved

No

JS Utah

6/7/13 Lane n/a Smith Hyatt Yes 3/20/13 6/14/13

No n/a 6/14/13 Failed

Yes

JS Utah

3/20/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Utah

4/22/13 Lane

Caltrop Yes 12/19/12 5/21/13 Approved n/a Yes 1/31/13 5/21/13 Approved n/a No n/a JS Utah

6/24/13 Lane 4/5/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Utah

6/10/13 Lane 2/28/13 Caltrop Yes 12/10/12 6/18/13 Approved N/A Yes 1/31/13 6/18/13 Approved

No n/a JS Utah

5/30/13 Lane 3/15/13 Caltrop Yes

5/30/13 Rejected

Yes 1/31/13 5/30/13 Rejected

Yes

JS Utah

Lane 3/8/13 Caltrop Yes 1/11/13 5/8/13 Approved No Hot Slide needed Yes 2/6/13 5/31/13 Approved No Hot Slide needed No n/a JS Utah

5/7/13 Lane Caltrop Yes 12/4/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a JS Utah

Lane 2/26/13 Caltrop Yes 12/5/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a JS Utah

Beehive Storage

6/11/13 Lane Caltrop Yes 1/17/13 5/31/13 Approved n/a Yes 2/6/13 5/31/13 Approved n/a No n/a JS Utah

n/a Lane n/a ERROR:#N/A No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

Lane Caltrop Yes

6/7/13 Approved

Yes 2/8/13 6/7/13 Approved n/a No

JS Utah

5/7/13 Lane Caltrop Yes 12/6/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a JS Utah

Lane Caltrop Yes 12/5/12 5/24/13 Approved n/a Yes 2/6/13 5/24/13 Approved n/a No n/a JS Utah

9/9/13 Lane Caltrop Yes 12/7/13 6/7/13

Yes 2/6/13 6/7/13 Approved n/a Yes

JS Utah

Lane Caltrop Yes 1/11/13 5/24/13

No n/a 5/31/13 n/a No MA provided at this time Yes

JS Utah

Lane Caltrop Yes

6/7/13 Rejected

Yes 2/8/13 6/7/13 Rejected CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount No

JS Utah

Lane 3/9/13 Caltrop Yes 12/7/12 6/14/13

Yes 2/6/13 6/14/13 Approved n/a No n/a JS Utah

5/30/13 Lane Caltrop Yes 12/7/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a JS Utah

4/24/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved

Yes 2/22/13 5/22/13 Approved

Yes

JS Utah

Lane Smith Hyatt Yes 4/25/13 6/14/13 N/A No N/A N/A N/A No MA provided at this time No

JS Utah

Lane Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 2/6/13 5/30/13 Approved n/a No No Hot Slide needed JS Utah

5/28/13 Lane Caltrop Yes 12/7/12 5/31/13 Approved n/a Yes 2/8/13 5/31/13 Approved n/a No n/a JS Utah

5/31/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/8/13 5/10/13 Approved n/a No n/a JS Utah

4/17/13 Lane 3/5/13 Caltrop Yes n/a 5/2/13 Approved n/a Yes n/a 5/2/13 Approved n/a No n/a JS Utah

4/2/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

4/29/13 Lane Smith Hyatt Yes 3/13/13 6/16/13 Approved

Yes 3/13/13 6/16/13 Approved

No

JS Utah

5/17/13 Lane Caltrop Yes 12/5/12 5/29/13 Approved n/a Yes 2/8/13 5/29/13 Approved n/a No n/a JS Utah

5/15/13 Lane Smith Hyatt Yes 3/1/13 6/16/13 Approved N/A Yes 3/1/13 6/16/13 Approved N/A No

JS Utah

3/12/13 Lane 2/4/13 Smith Hyatt Yes 6/1/13 6/5/13 Approved

Yes 6/1/13 6/5/13 Approved

No n/a JS Utah

Lane Smith Hyatt No n/a 6/16/13 n/a No SA provided at this time. No n/a 6/16/13 n/a No MA provided at this time No N/A JS Utah

5/30/13 Lane TAIC Yes n/a 5/1/13 Rejected

, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction.  Equipment structural was ran for Hot Swap and not a 2 – Step.

Yes n/a 5/14/13 Rejected Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was ran for consolidation, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction.  Equipment structural was ran for Hot Swap and not a 2 – Step. Yes

JS Utah

4/24/13 Lane 3/13/13 Caltrop Yes 12/11/12 5/21/13 Approved n/a Yes 2/11/13 5/21/13 Approved n/a No n/a JS Utah

5/5/13 Lane Caltrop Yes 12/10/12 5/31/13 Approved n/a Yes 2/11/13 5/31/13 Approved n/a No n/a JS Utah

4/15/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/31/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah

4/29/13 Lane Smith Hyatt Yes 6/3/13 6/3/13 Approved

Yes 6/3/13 6/3/13 Approved MA has been corrected and approved No

JS Utah

2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a JS Utah

6/4/13 Lane CD redlined on 6/13/13 Caltrop Yes 1/19/13 6/13/13 Approved

Yes 2/8/13 6/13/13 Approved N/A No n/a JS Utah

2/15/13 Lane 2/15/13 Caltrop Yes 12/17/12 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A JS Utah

2/15/13 Lane 2/19/13 Caltrop Yes

6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A JS Utah

4/29/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved

Yes n/a 5/6/13 Approved Approved w/ Consolidation No n/a JS Utah

2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a JS Utah

Lane Fullerton No n/a 6/12/13 n/a

No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah

5/30/13 Lane Caltrop Yes 12/11/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah

3/21/13 Lane 2/20/13 Caltrop Yes 12/14/12 5/14/13 Approved n/a Yes 2/11/13 5/14/13 Approved n/a No n/a JS Utah

3/14/13 Lane 2/20/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

3/14/13 Lane 2/15/13 Caltrop Yes

5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah

2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

4/1/13 Lane 3/14/13 Caltrop Yes

5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved

No n/a JS Utah

4/8/13 Lane 2/28/13 Caltrop Yes 12/15/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah

4/8/13 Lane 3/5/13 Caltrop Yes 12/17/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah

5/7/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah

Lane Crown No n/a 6/12/13 n/a no SA available in Siterra Yes 2/11/13 6/12/13 Approved No Hot Slide needed No

JS Utah

5/25/13 Lane Smith Hyatt Yes 3/3/13 6/4/13 Approved n/a Yes 6/10/13 6/11/13 Approved MA has been corrected and approved No

JS Utah

4/30/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved

Yes 6/1/13 6/3/13 Approved

Yes

JS Utah

6/8/13 Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

4/13/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved

Yes 6/1/13 6/3/13 Approved

Yes

JS Utah

n/a Lane ERROR:#N/A No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No

JS Utah

3/13/13 Lane 1/16/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah

3/13/13 Lane 2/4/13 Smith Hyatt Yes 3/5/13 5/23/13 Approved

Yes 5/22/13 5/23/13 Approved

Yes

JS Utah

6/4/13 Lane Caltrop Yes 6/3/13 6/6/13 Approved SA has been corrected and approved Yes 6/3/13 6/6/13 Approved MA has been corrected and approved No n/a JS Utah

3/30/13 Lane 2/25/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved

Yes 5/23/13 5/23/13 Approved

No n/a JS Utah

3/8/13 Lane 1/10/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved

Yes 5/22/13 5/23/13 Approved

No n/a JS Utah

3/21/13 Lane 2/18/13 Smith Hyatt Yes 5/23/13 5/24/13 Approved

Yes 5/23/13 5/24/13 Approved Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. No

JS Utah

4/24/13 Lane 3/6/13 Caltrop Yes 12/19/12 6/12/13 Approved Yes 2/11/13 6/12/13 Approved

No n/a JS Utah

Ball Park

7/26/13 Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No

JS Utah

5/7/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved

Yes n/a 5/8/13 Approved

No

JS Utah

5/14/13 Lane Fullerton No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah

Lane 3/6/13 3/6/13 Crown Yes 3/7/13 6/3/13 Approved n/a No n/a 6/3/13 n/a No MA provided at this time No n/a JS Utah

n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13

n/a No n/a 4/30/13 Stop Work Site n/a No n/a JS n/a

n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 Stop Work Site n/a No n/a 4/30/13 Stop Work Site n/a No n/a JS n/a

3/9/13 Lane 2/11/13 TAIC Yes 1/23/13 5/13/13 Approved n/a Yes 3/31/13 5/13/13 Approved n/a No

JS Utah

Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah

3/30/13 Lane 1/24/13 TAIC Yes n/a 5/7/13 Approved ran for consolidation Yes n/a 5/7/13 Approved ran for consolidation No n/a JS Utah

5/22/13 Lane 3/21/13 Crown Yes

6/13/13 Approved n/a Yes 2/11/13 6/13/13 Approved n/a No n/a JS Utah

5/4/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved n/a Yes 6/3/13 6/6/13 Approved MA was corrected and approved No MA was corrected and provided JS Utah

6/16/13 Lane 3/28/13 Crown Yes 12/15/12 6/13/13 Approved n/a No n/a 6/13/13 n/a No MA provided at this time No n/a JS Utah

4/30/13 Lane Caltrop Yes 1/29/13 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved

No n/a JS Utah

5/2/13 Lane

Yes 3/12/13 6/13/13 Approved

Yes 3/12/13 6/13/13 Approved rooftop No rooftop JS Utah

6/11/13 Lane Crown Yes 12/11/12 6/12/13 Approved n/a Yes 2/11/13 6/12/13 Approved n/a No

JS Utah

7/26/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

5/4/13 Lane Smith Hyatt Yes n/a 4/29/13 Rejected

Yes 6/7/13 4/29/13 Rejected

No n/a JS Utah

5/11/13 Lane Caltrop Yes 1/16/13 5/23/13 Approved n/a Yes 2/13/13 5/23/13 Approved

No n/a JS Utah

4/29/13 Lane 3/9/13 Crown Yes

6/13/13 Rejected

Yes 2/11/13 6/13/13 Approved

Yes

JS Utah

Lane Caltrop Yes 12/11/12 5/13/13 Approved n/a Yes 2/13/13 6/18/13 Approved N/A No n/a JS Utah

4/29/13 Lane 2/15/13 Rage Yes

6/13/13 Approved n/a Yes 3/20/13 6/13/13 Rejected

Yes

JS Utah

Lane Caltrop Yes 12/15/12 5/13/13

Yes 2/13/13 6/14/13 Approved

No n/a JS Utah

8/3/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah

5/8/13 Lane Caltrop Yes 1/14/13 6/14/13 Approved n/a Yes 3/11/13 6/17/13 Approved n/a No n/a JS Utah

4/30/13 Lane Caltrop Yes 12/13/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah

6/22/13 Lane 5/28/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

4/13/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved

Yes n/a 5/1/13 Rejected

Yes

JS Utah

6/24/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

5/11/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

3/29/13 Lane 2/11/13 TAIC Yes 4/18/13 5/14/13 Approved n/a Yes 4/18/13 5/14/13 Approved n/a No n/a JS Utah

4/6/13 Lane 2/28/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

5/7/13 Lane Smith Hyatt Yes 3/7/13 6/14/13 Rejected

from subject line.

Yes 3/7/13 6/14/13 Yes n/a No rooftop JS

2/20/13 Lane 2/26/13 Caltrop Yes n/a 5/6/13 Approved

Yes n/a 5/6/13 Approved

No n/a JS Utah

Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. Yes 3/31/13 6/14/13 Approved n/a No n/a JS

3/13/13 Lane 1/10/13 Smith Hyatt Yes 5/23/13 5/31/13 Approved

.

Yes 5/23/13 5/31/13 Approved New Structural and Mount analysis is approved, RF Approved Yes

JS Utah

5/7/13 Lane Smith Hyatt Yes 3/4/13 6/14/13 Rejected

No n/a 6/14/13 n/a No MA provided at this time No n/a JS

4/27/13 Lane Smith Hyatt Yes 1/18/13 5/28/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No n/a JS Utah

4/29/13 Lane Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah

Lane

Caltrop Yes 1/10/13 6/14/13 Approved n/a Yes 2/15/13 6/14/13 Approved New antenna mounting system to replace cluster mount No n/a JS Utah

SL54XC030

4/27/13 Lane Smith Hyatt Yes 3/7/13 5/15/13 Approved n/a Yes 6/4/13 6/5/13 Approved MA has been corrected and approved No n/a JS Utah

3/30/13 Lane 2/6/13 Caltrop Yes 2/7/13 5/14/13

No n/a 5/14/13 n/a No MA provided at this time Yes

JS Utah

4/30/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Utah

7/1/13 Lane Caltrop Yes 12/11/12 5/29/13

Yes 2/15/13 5/29/13 Approved n/a Yes

JS Utah

3/14/13 Lane 1/18/13 Smith Hyatt Yes 6/4/13 6/5/13 Approved

Yes 6/4/13 6/5/13 Approved

No

JS Utah

6/16/13 Lane Caltrop Yes 12/11/12 6/14/13 Approved

Yes 2/15/13 6/14/13 Approved

No n/a JS Utah

6/24/13 Lane Smith Hyatt Yes 3/21/13 6/14/13 Approved n/a No n/a 6/14/13 n/a

No n/a JS Utah

Lane 1/28/13 TAIC No n/a 5/31/13 n/a

Yes 2/27/13 5/15/13 Approved n/a No n/a JS Utah

6/3/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

9/17/13 Lane Caltrop No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

6/21/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS

3/1/13 Lane

Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah

5/4/13 Lane Smith Hyatt Yes 3/11/13 5/13/13 Approved n/a Yes 6/5/13 6/5/13 Approved MA has been corrected and approved No n/a JS Utah

5/17/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a JS

3/26/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah

6/1/13 Lane Caltrop No n/a 5/14/13 n/a No Structural at this time No n/a 5/14/13 n/a No MA provided at this time No n/a JS Utah

5/2/13 Lane Fullerton

JS

5/27/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No No recent owner approved drawings or signed/stamped drawings in siterra JS

3/9/13 Lane

Smith Hyatt Yes 6/5/13 6/5/13 Approved SA has been corrected and approved Yes 6/5/13 6/5/13 Approved

No

JS Utah

6/11/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a JS

3/21/13 Lane 1/29/13 TAIC No n/a 5/7/13 n/a

Yes n/a 5/7/13 Approved n/a No n/a JS Utah

6/3/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. Yes 2/28/13 6/18/13 Approved n/a No n/a JS

5/25/13 Lane Smith Hyatt Yes 6/21/13 6/21/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No

JS

3/29/13 Lane 2/21/13 TAIC JS Utah

Lane 2/13/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah

Lane Fullerton

JS

Lane Smith Hyatt Yes 5/1/13 6/18/13 Rejected

Yes 5/1/13 6/18/13 Rejected

JS

4/28/13 Lane Smith Hyatt Yes 4/24/13 6/18/13 Approved

Yes 4/24/13 6/18/13 Approved n/a No n/a JS

6/15/13 Lane Fullerton Yes 3/1/13 6/17/13 Yes

No n/a n/a n/a n/a n/a

JS

4/28/13 Lane Smith Hyatt Yes 3/6/13 6/17/13 Yes Yes 3/6/13 6/17/13 Yes n/a No n/a JS

4/30/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS

4/26/13 Lane TAIC No n/a 5/29/13 n/a No Structural Analysis at this time Yes 4/18/13 5/29/13 Approved n/a No n/a JS Utah

5/19/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS

Lane Smith Hyatt Yes 4/12/13 6/17/13 Yes Yes 4/12/13 6/17/13 Yes No JS

4/30/13 Lane Smith Hyatt Yes 3/14/13 6/17/13 Yes No n/a 6/17/13 n/a n/a n/a JS

Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS

4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved

Yes n/a 5/8/13 Approved Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed No n/a JS Utah

3/12/13 Lane 2/1/13 Smith Hyatt Yes 6/5/13 6/5/13 Approved

Yes 6/5/13 6/5/13 Approved

No

JS Utah

4/20/13 Lane 2/21/13 Smith Hyatt Yes 1/21/13 5/29/13 Approved n/a Yes 3/15/13 5/29/13 Approved n/a No n/a JS Utah

5/1/13 Lane TAIC No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS

4/8/13 Lane Smith Hyatt Yes 6/5/13 6/6/13 Approved

Yes 6/5/13 6/6/13 Approved MA was corrected and approved No n/a JS Utah

2/27/13 Lane 1/4/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/17/13 Approved

Yes

JS Utah

3/23/13 Lane 2/25/13 Smith Hyatt Yes 1/25/13 5/1/13 Approved n/a Yes 6/5/13 6/6/13 Approved MA was corrected and approved No

JS Utah

6/6/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS

5/24/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS

5/25/13 Lane Smith Hyatt JS

4/26/13 Lane Caltrop 6/10/13

No n/a 06/18/13 n/a No MA provided at this time No n/a JS Utah

4/6/13 Lane 2/25/13 Smith Hyatt Yes 3/26/13 6/18/13 Approved

Yes 3/26/13 6/18/13 Approved

No N/A JS Utah

7/4/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time No N/A JS

3/4/13 Lane 2/1/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved

Yes 6/11/13 6/11/13 Approved

No

JS Utah

2/28/13 Lane 2/8/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No

JS Utah

5/5/13 Lane n/a Caltrop Yes 1/18/13 6/18/13 N/A

No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra JS

2/28/13 Lane 1/15/13 Smith Hyatt Yes 6/6/13 6/6/13 Rejected

Yes 6/6/13 6/7/13 Approved

No n/a JS Utah

Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS

6/12/13 Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS

3/31/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Rejected

Yes n/a 5/7/13 Approved n/a No n/a JS Idaho

4/14/13 Lane 2/20/13 n/a TAIC Yes 3/4/13 6/18/13 N/A No owner approved drawings to compare to. No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra JS Idaho

7/17/13 Lane Smith Hyatt Yes 6/6/13 6/6/13 Approved

Yes 6/6/13 6/6/13 Approved MA was corrected No

JS Utah

3/8/13 Lane 1/18/13 Smith Hyatt Yes 2/21/13 5/14/13 Approved n/a Yes 2/19/13 5/14/13 Approved n/a No n/a JS Utah

Lane n/a Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS

3/26/13 Lane 2/20/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 2/27/13 5/14/13 Approved n/a No n/a JS Utah

4/29/13 Lane Smith Hyatt Yes 3/28/13 6/14/13 Approved n/a Yes 6/19/13 6/21/13 Approved

No n/a JS Utah

5/2/13 Lane Smith Hyatt JS

4/27/13 Lane 2/11/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah

3/27/13 Lane 1/11/13 Fullerton Yes 1/17/13 5/14/13 Rejected

No n/a 5/14/13 n/a No MA provided at this time No n/a JS Utah

4/2/13 Lane 3/1/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No n/a JS Utah

3/23/13 Lane 3/2/13 Smith Hyatt Yes n/a 4/29/13 Rejected

Yes n/a 4/29/13 Rejected CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole No

JS Utah

3/31/13 Lane 2/15/13 Fullerton Yes 1/16/13 5/10/13 Approved n/a Yes 2/6/13 5/10/13 Approved n/a No n/a JS Utah

4/13/13 Lane 2/11/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 4/4/13 6/6/13 Approved MA is corrected & approved. No

JS Utah

4/14/13 Lane 2/11/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No

JS Utah

n/a Lane TAIC JS

n/a Lane TAIC JS

n/a Lane Smith Hyatt JS

n/a Lane TAIC JS

n/a Lane Smith Hyatt JS

n/a Lane Smith Hyatt JS

n/a Lane Smith Hyatt JS

Site

CDs Structural
Cascade # Site Name Task # NTP Dates SAMs 90% Review Completed CD Uploaded for Review AE Vendors Tower & Equipment Structural Recv. Structural Completed Date Reviewed Approved No Mount Structural Recv. Mount Analysis Completed Letter Approval Needed CM review State
DE05AL522 Green River East H142 5/25/13 Lane 1/25/13 Fullerton Yes 1/23/13 5/20/13 Letter is going to be provided to show everything will be cleared. n/a Letter will be provided to show everything is cleared. Cleared JS Utah
SL03UB103 Ubiquitel-Dry Canyon H149 3/12/13 2/12/13 TAIC 4/29/13 Rejected Structural was ran for the 2 existing mounts, not the third that we are adding. 5/14/13 MA was ran for installing the Hy-Cap site in a two step and we are putting all the antennas and RRUS up at one time. Also the MA doesn’t spec the mount that is to be used on the Lam pole, antenna weights are not correct b/c we have 2 different styles. MA also shows Monopole and Self Support tower and this is a Lam (Nick’s reply – I see it in the top notes two antennas and 3 RRUs, but in the calculations part, it states how many antennas per mount, and 1 was put in and the same with the RRUs. So the correct weight is not showing on this document. Total weight should be 347 lbs. not 201 lbs. as it shows.)
SL03UB104 Downtown Logan H150 4/6/13 2/7/13
SL03UB106 Crow Mountain H151 7/10/13 2/14/13 5/29/13 No 4/15/13 Need Rad Center verification from RF Need SA approved and RF verify.
SL03UB110 Ubiquitel Hyrum H152 3/30/13 5/1/13 Hot Slide not needed
SL03UB111 Silage H010 3/6/13 3/13/13 Caltrop 12/5/12 Failed 2/4/13
SL03UB113 Ubiquitel Brigham H153 2/20/13 WT 12/20/12 6/11/13 6/21/13
SL03UB116 Ubiquitel – Tremonton – UT H154 3/9/13 4/30/13 5/30/13 MA has been corrected and uploaded to Siterra. MA is corrected and approved
SL03UB120 Preston H156 2/8/13 No Structural 4/8/13 install standoff mount off the existing mount.
SL03UB130 Ubiquitel S&S Fun Center H158 3/19/13 1/30/13 No Structural ran so far 5/10/13 4 Sector Mount to be installed
SL03UB131 Ubiquitel – Riverside Cornwall H159 3/21/13 “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.)
SL03UB401 Mona H160 3/5/13 2/6/13 Smith Hyatt Tower Structural was ran correctly, no standoff mount for Gamma, install it on the leg of the tower and the other two sectors will be placed on the existing mounts. 5/24/13 Mount analysis was ran for installing 2 antennas and 4 RRUs on the two existing mounts and Gamma antenna and 2 RRUs will be mounted on the back of the antenna on the leg.
SL03UB414 Ubiquitel UT003 Exit 112 H014 3/14/13 5/17/13 Fails Structural at Interim at 133%, but passes at Final at 100.6% – need to remove the existing pipe mounts. remove exiting Pipe mounts
SL03UB419 Jones-Enoch H163 3/31/13 2/11/13 2/28/13 5/6/13 5/31/13 MA was corrected MA was corrected and provided
SL03UB420 Ceader City State Lands H164 2/27/13
SL03UB421 Ubiquitel Kanarraville H165 5/2/13 Needs Hand rails
SL03UB425 Harrisburg Junction H167 2/21/13
SL03UB426 Ubiquitel Washington H168 5/28/13 4/22/13 No MA provided at this time
SL03UB427 Ubiquitel Rococo H169 4/10/13 6/3/13 SA has been corrected MA has been corrected and reflects what is shown in the CD. MA and SA are corrected and reflect the CD.
SL03UB428 Ubiquitel Santa Clara H170 6/1/13 6/7/13 SA has been corrected and approved MA has been corrected and approved
SL03UB429 Webb Hill H171 4/26/13 1/24/13 SA states mount is at 43′ and RAD Center is 50′. Plus it was ran for 6 hybrid cables instead of 3. 6/18/13 Provide 2″ std pipe with plates and ubolts to tie

the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Need to have the SA verify RAD Center and correct the MA.
SL03UB430 Ubiquitel Santaquin H172 1/9/13 SA was ran for the existing mount, didn’t run for the new 12′ mount that is called out in the CD, MA specifiies new mount. 1/31/13
SL03UB450 Ubiquitel-Nephi H173 3/7/13 1/14/13
SL03UB471 Ubiquitel Red Cliffs H174 4/23/13 No Structural Analysis at this time
SL03UB472 Hurricane Rim H175 4/24/13 SA – Needs to specify weight and size of mount used in the calculations in the SA. – PE will be accepted PE letter stating for mount calculations used in SA
SL03UB474 Ubiquitel Rockville H176 5/16/13 3/27/13 6/17/13 Need verification on RAD Center, SA state 70′ and the CD states 77′ – Verified and approved. CD needs to be corrected to show the RAD Center at 73”
SL03UB480 Ubiquitel Ivins H178 2/24/13 Need letter. CD calls for powerwave attenna on Gamma. SA lists 3 KMW attennas. Need letter saying powerwave will not create any structural or mount analysis issues. PE letter stating powerwave will not create any structural or mount analysis issues.
SL03UB481 Ubiquitel Fiddlers Canyon H179 6/4/13 6/19/13
SL03UB500 Payette Bluff G019 2/18/13 Mount analysis was ran for more than what’s currently on the mount. Idaho
SL03UB503 Ubiquitel Payette Co Sheriff G020 4/17/13 2/19/13 5/7/13 a Tower Mapping was uploaded as a Structural, nothing is mentioned of the new Equipment going on the Tower Mount analysis was ran at 87′ and our mount is at 100′. Need to be redone. – New mount analysis was ordered 5/14/13
SL03UB504 Ubiquitel Langley Gulch G021 1/19/13
SL03UB505 Ubiquitel – Parma ATC G022
SL03UB506 Rookstool Corner G023 1/18/13 5/13/13 3/26/13 Letter needs to be signed on the Stamp Stamp needs to be signed and dated
SL03UB508 Ubiquitel Emmett G024 5/21/13 Mount Analysis was ran on the wrong Mount. We are at 117′ not at 125′ that the mount was ran at.
SL03UB510 Ubiquitel Christian Gulch G025 12/11/13 Structural says 188′ CD shows 200′ Need verifications Mount analysis says everything is good, but it was ran off both CD and Structural and they both disagree. See notes in Mount and Structural
SL03UB511 Purple Sage G026 3/29/13 3/4/13 No microwave on CDs. Install lines beside existing cables No owner approved CD uploaded to Siterra
SL03UB512 Ubiquitel Sommers G027 7/1/13 3/11/13
SL03UB514 Ubiquitel – Van Slyke Farms G029 3/1/13
SL03UB515 Ubiquitel – Weitz G030 1/8/13
SL03UB516 Ubiquitel Main St. G031
SL03UB517 Deer Flat G032
SL03UB518 Ubiquitel Sugar Factory G033 4/1/13 Received letter on 6/03/13 stating the SA is completed and good.
SL03UB519 Ubiquitel Town Square G034 4/9/13 CD not showing the correct mount that is on the tower.
SL03UB520 White Town G035 5/23/13 MA is corrected & approved.
SL03UB521 Ubiquitel McRae G036 6/12/13
SL03UB522 Ubiquitel McMillian G037 6/13/13 SA does not match CD, SA needs to show calcualtions for 6 antenas instead of 3. 6/13/12 Letter needed to show how many atennas and RRUs were used in the MA
SL03UB523 Ubiquitel Glenwood G038 4/114/13 5/8/13 Hy-Cap Site Mount analysis was ran off the CD and the CD was done for a regular 3 antennas and 6 RRHs. There are a total of 6 antennas and 9 RRUs going on the tower. Letter is not stamped or Signed – Approved – Rejected – new mount analysis ordered 5/14/13 Need mount analysis redone and have it signed and dated
SL03UB524 State & Dewey G039
SL03UB526 Idaho Power Downtown G040 7/3/13 5/15/13 Calculations need to be shown for high capacitiy and for stand off mounts.
SL03UB527 Ubiquitel Choctaw G041 No SA has been provided at this time
SL03UB528 Ubiquitel Jack’s Tire & Oil G042 ERROR:#

N/A Need site photos to verify SA Site walk needed
SL03UB529 Black Creek G043 6/23/13 No SA has been provided at this time.
SL03UB531 Ubiquitel Ditto Creek G044 6/14/13
SL03UB533 Ubiquitel Shell Station G045 The MA doesn’t identify the interim dual position mount and it’s calculation, and than it doesn’t indetify the single mount that it will change to at final. Also the collar weight is never mention. This needs to be corrected and provided. MA needs to have the correct configuration.
SL03UB534 Ubiquitel Rocky Butte G046 7/5/13
SL03UB535 Mt. Home AFB G047 1/28/13
SL03UB536 Hammett ATC G048 3/28/13 Coax needs to be double stacked Letter is neeed to show the number of antennas and RRUs were used in the calculations.
SL03UB538 Ubiquitel Rocky Trail G049 3/17/13 4/3/13
SL03UB540 Ubiquitel Jerome West G050 4/2/13
SL03UB543 Ubiquitel Jerome 99 G051
SL03UB545 Ubiquitel Magic Valley Mall G052 6/5/13 SA does not match CD, SA calls for the dragonwave CD does not 6/1413
SL03UB547 Ubiquitel Twin Falls G053
SL03UB548 Ubiquitel Buhl G054 2/15/13 2/13/13
SL03UB549 Ubiquitel Kimberly G055 2/1/13
SL03UB550 Ubiquitel Hazelton Butte G056
SL03UB552 Ubiquitel Burley Butte G057 4/19/13 1/29/13
SL03UB553 Ubiquitel – Burley Highway G058
SL03UB554 Ubiquitel Rupert Junction G059 1/15/13 SA was corrected to show proper weight. MA was corrected to show it matches. CD and SA.
SL03UB556 Ubiquitel Boarder Site G060 5/4/13 See SA for Hybrid cable installment
SL03UB559 Ubiquitel Lamar G061 See SA for location to install Hybrid cables No MA has been provided at this time.
SL03UB560 American Falls G062 4/25/13
SL03UB562 Ubiquitel Frasure G063
SL03UB563 Ubiquitel Logan G010 Powder River 12/3/12 5/22/13 MA has been corrected.
SL03UB564 Ubiquitel Layman G064 5/5/13
SL03UB568 Blackfoot G065 Did Structural and CD on wrong site – Self Support Tower is Failing Did mount analysis on wrong site this is a self support not a monpole (Nick’s reply – Understand and agree fully on your comment, but there is an incorrect document uploaded.)
SL03UB572 Ubiquitel Jamestown G011 1/11/13 12/4/12 Structural fails at Interim at 114%, but passes at Final at 104.3%,

Crown Everything has been cleared for Construction
SL03UB573 Ubiquitel Telecom G012 6/6/13 11/30/12
SL03UB574 Ubiquitel Utah G066 4/14/13 2/22/13
SL03UB575 Ubiquitel Majestic G013 5/11/13
SL03UB576 Ubiquitel Rigby G067
SL03UB578 Ubiquitel Rexburg G068 6/16/13 SA does not match the CD, SA lists 6 c2A, CD calls for 3.
SL03UB580 Ubiquitel St. Anthony G069 5/26/13 No SA provided at this time.
SL03UB586 Ubiquitel Snow King Mountain G071
SL03UB589 Ubiquitel Jackson Airport G072 5/19/13 No Structural has been ran MA was corrected and Approved there are two towers and to carriers at the samse RAD Center shooting right at each other. Safety issues and performance issues will be felt.
SL03UB590 Ubiquitel Lower Valley G073 No Structural ran at this time 4/11/13 2 – Collars being added Wyoming
SL03UB591 Ubiquitel Table Rock G074 2/25/13 1/17/13 4/5/13
SL03UB592 Ubiquitel Cloverdale G075 MA has been corrected and states that interim load was taken into calculations. If they will provide a letter stating everything is good we can sign off. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.) – MA was corrected and everyting is approved.
SL03UB593 Boise Water Tank G076
SL03UB594 Ubiguitel Vista G077 6/24/13
SL03UB595 Ubiquitel North Eagle G078 New mount to be installed on Wooden Pole new mount on wooden Pole
SL03UB596 Ubiquitel Watson G014 Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Verifing everything is good
SL03UB597 Ubiquitel Kuna G079
SL03UB600 G081 MA was uploaded as a SA MA – MA doesn’t identify the three new mounts and the two different towers that the three are going to be installed on. It was ran for the mount that will be placed on Tower 1 at 18’ Nothing is showing for Tower 2. Also there is not mention of the weight of the existing antennas on the new mount. Please have these corrected and sent back to the AE Team. CD – CD is showing swapping out the only BBU on the site. There is not Batteries in the existing CDMA cabinet. There is a generator on site but it is labeled not installed on the AC panel. Please review this, b/c for what I see we are going to need to expand the pad 3’ x 3’ to install the MMBS.
SL03UB609 Ubiquitel Hampton G084
SL03UB610 Ubiquitel West Twin Falls G085 2/26/13 CD needs to have the RAD Center corrected from 175′ to 170′
SL03UB611 Ubiquitel South Nampa G086
SL03UB613 Ubiquitel Broadway G087 6/8/13 SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed a letter needs to be provided stating everything is voorected.
SL03UB614 Ubiquitel Stone G088 Wooden Pole, 2 mounts to be installed, with 3 collars
SL03UB615 Ubiquitel North Meridian G089 4/28/13
SL03UB617 Ubiquitel Eccles Theatre H180 8/13/13
SL03UB620 Ubiquitel East Nampa G090 Nothing received CD needs corrections
SL03UB622 Ubiquitel South Meridian G091 6/9/13 617/13
SL03UB623 Ubiquitel E. St. George H181
SL03UB624 Ubiquitel West Nampa G092
SL03UB627 Ubiquitel East Eagle G093 3/3/13 Bird Nest in the Tower
SL03UB633 Ubiquitel – North Rexburg G015 12/4/13 No Hot Slide needed
SL03UB634 Ubiquitel East Twin Falls G095 5/9/13 MA does not match CD and SA, RAD center is 99′ MA states 199′ Letter needed to show that the statement of one hundred and ninety nine feet, on MA was a typed in error and that RAD center is ninety nine feet
SL03UB636 Ubiquitel Maple Grove G096
SL03UB637 Cassia G097
SL03UB639 Ubiquitel Western Aircraft G098 4/18/13 Three Cantaliver mounts needed.
SL03UB642 View Point Buildiing G100 No Structural as of this time Mount analysis was ran for adding 2 new cantilever mount to the building. Not a Stand off mount as the CD shows. Need a letter approving this land owner.
SL03UB659 Ubiquitel – Williamson G101 SA was ran at the correct height. The CD and mA are being corrected. Mount analysis needs to be reran with correct information, It states in the letter that everything appears to be correct, from the Structural and CD, but we have conflicting information. Letter stating where the mount calculations were run and with what information. – New Structural and Mount analysis to be reran.
SL03UB660 Teton Mall G016 See SA for beef up. No tower work allowed till structure is beefed up. No hot slide needed.
SL03UB665 Ubiquitel Shelley G017 verifing the calculations and everything is good.
SL03UB668 Ubiquitel Signal Mountain G102 8/30/13
SL03UB670 Ubiquitel Apre Vous G104 No Structural received at this time
SL03UB675 Ubiquitel Weiser G105 verifing everything is correct.
SL03UB686 Ubiquitel Alameda G108
SL03XC010 Ernies Auto H018
SL03XC102 North Ogden City H019 Hot slide not needed
SL03XC104 Plain City H020 12/7/13
SL03XC106 Doc Holiday & Frank Kuba H021
SL03XC108 Mt. Eyre City Park H022 12/6/12
SL03XC110 Norma Elliot H023
SL03XC112 4th St.

Ball Park H024
SL03XC114 TCI H025 3/15/13 12/6/13
SL03XC118 Clair Baur H027 12/5/13 No Hot Slide is needed
SL03XC120 Ogden City Municipal Building H182 4/4/13 No cantilever brackets called for in SA.
SL03XC122 Mt. Ogden Water Tank H183 ERROR:#N/A
SL03XC124 Carl Favero H028
SL03XC126 Kenneth Baldwin H029
SL03XC128 Ogden Municipal Airport H030 7/4/13
SL03XC130 Washington Heights Corp H031
SL03XC132 South Ogden Water Tank H184
SL03XC134 Dallas Green H032
SL03XC136 Kwik City Muffler H033 7/11/13
SL03XC138 Roy Water Conservacy H034
SL03XC140 Ron Nitler H035
SL03XC142 Ray’s Valley Service H036 12/1/13
SL03XC144 Prime Communications H185
SL03XC146 Weber Basin Water H037
SL03XC148 Lovell H038 12/12/12
SL03XC150 Sunset City H039 Fails at Interim at 107.7%, Passes at Final 104.5%, new and existing equpt can’t be on tower longer than 6 months
SL03XC152 Peters H040
SL03XC154 Fire Station #2 H041 3/20/13
SL03XC156 Bates Canyon H042 12/10/12 MA wsa corrected to show 44′
SL03XC158 Nancy Gardner H043
SL03XC160 St. Ambrose Church H186 SA was corrected. Need a Mason to fix the brick and walls before antennas and RRUS can be installed. MA has been corrected. Consolidation on the Alpha Sector and Mason needs to be hired and fix the Bricks before wwe proceed with hanging the antennas and RRUs. Need a mason to fix brick work. MA & SA are corrected and approved.
SL03XC162 JP’s Texaco H044
SL03XC164 Public Works H045 8/1/13
SL03XC166 Andy Adams Park H046
SL03XC168 Stoken’s Nursery H047 12/17/12
SL03XC172 Kaysville H187
SL03XC174 Cherry Hill H048 12/21/13
SL03XC176 Burmester H049 4/27/13
SL03XC178 Davis County Sheriff H188 3/23/13 MA was corrected and approved
SL03XC180 Fruit Heights H189 New 4 sector mount
SL03XC182 Bangeter Wood Warehouse H050
SL03XC184 Bountiful Police Dept. H051
SL03XC186 Western Wireless Collocate H190
SL03XC188 Beehive Storage H052 12/19/12 12/7/12
SL03XC192 Kulmer & Schumacher H054
SL03XC194 Justice H055 1/16/13 CD shows stand off on the existing pipe, structural was ran for 10′ mount, GD BOM was ordered with a small dual stand-off arm (30″x19″) Need a Letter verifing we can use the smaller mount Need a letter approving the smaller mount.
SL03XC202 Sons of Pioneers H191 CD/ MA and SA match. Everything is approved Everything is approved and good to go.
SL03XC204 Robert Wolff H056 12/11/12 OA drawings call for 2 powerwaves and one KMW. MA calls for two powerwaves and two KMW attennas. MA needs to be adjusted.
SL03XC206 Sunset Tower H192 3/2/13 2 – step only for Equipment – Do not sit both BBU Cabinets together MA has been corrected to install 3 Cantilever Mounts to the side of the building. MA matches the CD. SA & MA have been corrected and they match the CD.
SL03XC208 University Park H193 Structure is approved to with hold the new Eqipment Install 2 antennas on the 2 skids and install new antenna on new cantilever mount and remove the old antennas and mounts at Final Letter verifing the Blastard is good. – Letter confirmed everything is good – 5/23/13
SL03XC210 Salt Lake City Airport H194 RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.)
SL03XC212 Robert Wallace H057
SL03XC214 North Temple Storage H058 Need Letter Need Letter, CD shows stand-off on the existing and new chain mount, Structural shows 10′ mount Need Letter, Mount analysis was done on a new 12′ 6″ mount and not Standoff or 6 position chain mount for RRUs. BOM was ordered with a single collar and dual standoff small 30″ x 19″ mount.
SL03XC216 Tribune H195 4/13/13 Structural was corrected Letter stating the Structure will be okay to with stand the RRUs and Cantilever mount on the inside of the wall.
SL03XC218 St. Mark’s H196 Verifing that the current mount can with stand another 60 lbs.
SL03XC220 Charleston Apartments H197 CD redlined on 6/13/13
SL03XC224 Freedom Mortgage H199 Need Site visit to order GD Materials
SL03XC228 Evans H059
SL03XC230 Smith’s Credit Union H200
SL03XC232 SL County Housing Authority H201 ran for installing 3 new cantilever mounts, not a standoff RRUs were not calcuated ing the weigh and nothing is shown for mounting the antennas Letter verifing everything is good
SL03XC234 Parkview Plaza (Mecham) H202 4/12/13
SL03XC236 Dan’s Grocery H060 4/20/13
SL03XC238 Eagel Point H203
SL03XC240 International Center H204
SL03XC242 Maverik H061 6/22/13
SL03XC244 Sprint Spectrum H062
SL03XC246 Flinders Trucking H063
SL03XC248 Lori Riddle H064
SL03XC250 Frampton H065
SL03XC252 OMS Diesel H066 5/27/13 12/14/12
SL03XC254 All Steel FAB H067
SL03XC256 Anderson Truss H068 12/31/12
SL03XC258 B&B Auto Body H069 12/12/13
SL03XC260 Sunburst Auto H070
SL03XC262 Cottonwood Corp. H205 7/29/13 6/10/13 New NV antennas to be placed on existing empty wall mounts.
SL03XC264 Ferguson Canyon H206 Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided, see SA and MA Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided please see the MA & SA. Mount is Failing – Corrective measures were given for this site. Please see the SA & MA.
SL03XC268 Assembly of God H207 Rejected/Failed Interim failed at 176.2%. Final failed at 166.3%. Tower shaft failed from 0-65′. Base plate failed. Base foundation structural failed. Not identifing the 2 existing mounts and the third one that will be installed. Needs 6 position collar mount w/3 dual standoff mounts. Need a letter stating the mount can withstand the load.
SL03XC270 U.S. Satelite H208
SL03XC272 Kramer Construction H071 3/8/13
SL03XC274 Union Woods H209
SL03XC276 Flat Iron Mesa H072 No hot slide needed. Possible consolidation. Check drawings.
SL03XC278 Towne Storage H073 1/7/13 SA was done on a 10′ mount and we speced a 4′ mount. MA was done on a 10′ mount and we speced a 4′ mount. Need a letter approving the 4′ mount.
SL03XC280 Karen Poulsen H074 4/21/13
SL03XC282 Hand Cart Park H075
SL03XC284 Fire Station #26 H076 4/16/13
SL03XC286 H077
SL03XC288 Sand Lot H078
SL03XC290 Hand Tank H079 9/9/13 1/10/13 Interim Fails at 107.0%, Final passes at 103.4% Install a 10′ T-Boom
SL03XC292 Taylor Property H080
SL03XC294 Bonnoco H081 11/17/13
SL03XC296 Crescent Park H082 Fails at Interim at 126.1% and Fails at Final at 115.8% – Base plate needs to be modified. Upgrades are to be provided. Need specifics given for beefup to base plate and achors.
SL03XC298 Bell Canyon Park H083 7/30/13 Site Fails both Interim and Final. SA is ran for a 10′ T-Arm and the CD is showing a standoff coming off the existing mass pipe. We need to use a 30″ x 19″ dual position standoff mount. Need a proper break down on everything that needs to be done to upgrade the site
SL03XC300 Glenmoor Golf Course H084 8/5/13 1/3/13 CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount Need a L of C to approve the 40″ mount we are showing in the CD.
SL03XC302 Equestrian Park H085 7/7/13 Intirim failed at 119.9%. Final Failed at 108.5%. Further engineering and detailing is required to design the necessary modifications. Anchor rods at 0′ require modifications. Foundation is significant.
SL03XC304 Carolyn White H086
SL03XC306 Ron Raddon H210 Approved – received updated information Approved by Scott Giles Need a letter verifing everything is good. No Conduit available, must install new conduit across the parking lot, under asphalt – Signed off and approved.
SL03XC308 Taylorsville Collocate H211 8/8/13 Owner approved drawings did not reflect correct RAD center. They’ve been redlined and approved by RF.
SL03XC310 Riverton Park H087 9/17/13
SL03XC312 Petersen Marine H088
SL03XC314 Shelby H089
SL03XC402 Trans West Auto H090
SL03XC404 Highland Water H091
SL03XC406 Canyon Road Tower H212 Cool cell cabinet platform needs to be removed. The wall mount on sector A has a cosmetic issue. The flexing of the EFIS exterior finish is cracking in
the area of the mount plate. Over time the exterior finish will fail and spall. We recommend adding a
single Valmont slider bracket near the top of the mast to reduce the flexing.
Has a pipe mount planned in Sector Gamma.
SL03XC408 Waymon H092
SL03XC410 JJG Investments H213 Owner Approved drawings do not reflect 4 sectors. Plus they show a pipe mount. MA reflects four sectors.
SL03XC412 Smart Silo H214 SA has passed and been uploaded to Siterra. MA is approved and uploaded
SL03XC414 Mangum H215 6/2/13
SL03XC416 Peck Sons H216 Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was

ran for consolidation If you can get a letter, stating everything is good, we can sign off. (Nick’s reply – First this is a Hy-Cap Site and there are 2 antennas and 3 RRUs per sector, calculations isn’t correct. Nothing is showing the weight of the standoff from the existing mass pipe or the weight of the existing antennas. This is need to provide clear and correct information. – Eqpt – Certified Letter stating everything is in good standing at the Interim, will need to be provided before Construction can begin.)
SL03XC418 Tooele City Fire H093
SL03XC420 Thad Beal H094
SL03XC422 Lindon Park H095
SL03XC424 Seven Peaks H217 SA has been corrected and shows what needs to be done SA & MA are corrected and reflect what needs to be done.
SL03XC426 Cherrywood Sunstation H096
SL03XC428 Eagle Ridge H097 Interim fails at 114%. Final Passes at 101.8%.
SL03XC430 Richard Gornichec H098
SL03XC432 Orem Firestation H099 12/14/13
SL03XC434 Fruit Stand H218 Approved w/ Consolidation
SL03XC436 Utah County EQ/Richard Gornichec H100
SL03XC438 David Gardner H219 6/20/13 no SA available in Siterra
SL03XC440 EXCEL Graphics H101
SL03XC442 Dr. Fullmer H102
SL03XC444 Evan Trucking H103
SL03XC446 Bird Storage H104 12/13/12
SL03XC448 Mapleton City Park H105
SL03XC450 Industrial Park H106 12/15/12 CD shows Hot Slide and the wrong Mount is shown on the Final. Hot Slide not needed
SL03XC452 East Bench H107
SL03XC454 G&W Investments H108
SL03XC456 Salem’s Lot H109
SL03XC458 Payson City H110 6/29/13 CDs redlined for A-2 platform corrections
SL13XC572 Brickyard H220 Antenna swap out due to LL not allowing any additional material on the site.
SL13XC574 Van Winkle H221 SA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″ MA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″ SA & MA is approved and everything is corrected.
SL13XC580 Bicycle City H222
SL13XC582 Eaglewood H111 7/26/13
SL13XC584 Unversity of Utah Hosptial H223 SA was corrected for the calculation of the 6 RRUs MA was corrected for the weight of the 6 RRUs. SA & MA were corrected and approved.
SL13XC588 Olympus Collocate H224 relocation site, no active site in Siterra, no data
SL13XC601 Parley’s Summit H226
SL13XC602 Kimball Junction H227 ran for a 2 – Step on the Equipment, nothing ran for the building – SA is approved. ran for colsolidation, MA states Skid Mount and it doesn’t call out removing all the existing CDMA antennas and consolidating them to 3 antennas. – Approved – received Certified. 05/23/13 verifing there was a structural ran on the building. – received letter – 5/23/13
SL13XC603 Quarry Mountain H112
SL13XC604 Yarrow Hotel H228 Equipment must be a 2 – Step, Tower – states standoffs can only be 12″ but doesn’t include the weight of standoffs and 12″ isn’t enough room – Hot Swap is palnned, cabinets will be set as a 2 – Step. Hot Swap on Alpha nad Gamma and consolidate the Beta antennas. All RRUs will be mounted on the inside of the tower on the roof.
SL13XC605 Caledonian H229 Platform Structural was ran for a Hot Swap only, No Interim config, Structural states one cabinet one cabinet off and one than can go on. Need to pull the existing BBU before setting MMBS – Mount analysis shows installing 3 new cantilever mounts to the side of the building, not standing pipes off the existing cantilever mount – Structural for equipment is good to go to set the cabinets. – Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Install 4″ boot on both sides of the wall behind the antennas and run the jumpers from the RRUs inside to the antennas mounted on the wall outside. Remove CDMA antennas and brackets at the end.
SL17XC651 Doctor Rooftop H235 Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. SA & MA match the BOM and CD.
SL17XC652 Alley H116 Handrail 12.6″ required for twist and sway
SL17XC653 H117 no documents in Siterra
SL17XC654 Marriot H236 Ran for antennas and RRUs to mounted on the wall Mount analysis is ran for 3 new cantilever mounts to be installed and the new antennas and RRUs to be installed on the new Mounts. CD shows standoffs off the existing mass pipes.
SL17XC655 Golf Course Orchard H237
SL25XC170 Keith Potter Relocation H238 8/3/13
SL25XC288 Stop Work Site
SL25XC588
SL29XC106 Building 87 H239 No Hot Slide Needed
SL29XC107 Layton Hills Western Wireless H240 7/17/13
SL29XC111 Sahara Inc. H241
SL29XC122 Utah LP Gas H118 1/2/13
SL29XC141 L&N Uniform H242
SL29XC149 City Property H119
SL29XC152 Johnson Trucking II H120 Need to install a 12′ Hand Rail
SL29XC159 High School Auditorium H243 Rage rooftop
SL33XC022 Rogers Ranch H121 No hot slide required
SL33XC078 Jordanelle Point H122
SL33XC132 US West @ SR111 – Site 162 H245 Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected. Need to add new mounts and consolidate the Beta sector for CDMA.
SL33XC133 Towers – Site 164 H123 Need to add a 12′ 6″ Handrail
SL35XC001 BYU/Park Plaza – Site 172 H124 1/4/13 Failed at Inerim at the base at 122.7%, but Passes at Final at 101.7% – SA was ran on a Monopole and not a telephone pole, also the SA was ran for a new 10′ mount and we are calling out a dual stand off mount 40″ x19″, the MA specs a small dual 40″ x 19″ mount. New antenna mounting system to replace cluster mount SO/CDs need redlined. Wooden pole. – Need a letter stating that a 40″ x 19″ dual standoff mount will be sufficent on the wooden pole istead of the 10′ mount the SA specs.
SL35XC002 PAC Butler Substation – Site 137 H125 8/15/13
SL35XC003 Bulls Eye – Site 169 H246 3/18/13 The MA states it was ran for 1 antenna and 2 RRUs, instead of 3 antennas and 6 RRUs. PE Letter correcting the Verbiage will be sufficent.
SL36XC004 RLK Properties H126 8/18/13 Need to make base mods Need Namd rail for a 12′ 6″ mount
SL36XC005 Oak Canyon Jr High H127
SL36XC006 Hogi Yogi H128
SL36XC009 Beauty Bark Trucking H129
SL37XC002 E Center H247
SL37XC005 Multi-Ethnic – Senior Housing H249 Equipment structural is good Mount analysis was not ran to capture the whirligig that the CD is showing. Mount analysis was ran for a consolidation, but it doesn’t specify the type of mount that needs to be used on the building. Need to consolidate CDMA antennas Need a Letter stating everything is good.
SL40XC020 Provo High School H250
SL40XC029 PACX Businees Park H251
SL40XC034 Bridal Image H252
SL40XC052 Magcorp H130
SL40XC053 Granger Medical H253 Need to calculate for weight of sled mounts. Need to remove

SL54XC030
SL40XC061 Chelemes H131 Add hand rails Add Hand rails to mount
SL41XC040 SL41XC040-C H254 9/19/13
SL54XC001 Elggren Property H255 New Structural and Mount analysis is approved, RF Approved Waiting on Approval from RF.RF Approved. Received Email.
SL54XC012 South Hills – Site 206 H256 Rad Center of structural at 68′ vs. Rad center of CDs at 62′. Need to verify which is corrected.
SL54XC013 Big Daddy – Site 195 H257
SL54XC020 Provo Gun Club H258
SL54XC024 Shepard’s Hill H133 11/16/13 CD needs to be corrected to show Dual position Mount
Oak Hallow Elementry H260
SL54XC031 Christensen Property H134 Tower Fails at Interim at 134.6% and Fails at Final at 122.5% – Tower needs the Base plate upgraded and the tower from 0 to 15′. Verifing exactly what needs to be done.
SL54XC060 Highland Springs H261
SL54XC061 Utah Medical Products II H136 SA Fails at Interim at 134.3% and Fails at Final at 117% – Need to get information on beefing up from 0-38′ and the base plate. need a letter on what needs to be done for Beef up.
SL54XC062 Hampton Inn H262 SA has bee ncorrected SA has been corrected an approved Everything has been corrected and cleared.
SL54XC063 T-B Improvement District H137 Interim at 106%, final passing at 97.5 proposed handrail to to support additional loading
SL54XC064 Keene Coatings H263 Mo MA provided at this time
SL54XC065 Centennial Building H264 4/7/13 No Structural at this time
SL54XC068 Huntsville H266
SL54XC094 Granite H138
SL54XC097 Northridge Heights H267
SL55XC101 Central Park West H268 1/21/13
SL57XC001 Orchard Elementry H269
SL60XC001 Hale Bakery SLC068 Keebler H270
SL60XC017 Spectrasite Colocation H271
SL60XC020 Nextel Collocation H139
SL60XC028 Saratoga H272 No recent owner approved drawings or signed/stamped drawings in siterra
SL62XC002 North Layton Jr. High – Site 220 H273
SL62XC012 Jordan Landing – Site 219 H274 1/22/13 MA has been coorected and approved Everything is orrected an Approved.
SL62XC022 Howland Building – Site 218 H275
SL63XC002 Newgate Mall – Site 221 H276 No Structural has been ran so far.
SL63XC006 Boyer-Madsen Building – Site 217 H277
SL63XC008 3900 South State – Site 211 H278 Existing mast will fail under the conditions purposed in the drawings. The new T-Arm supports will provide adequate support for the new antennas and the existing antennas over the interim period of time.
SL63XC020 Qwest Clearfield – Site 222 H279
SL63XC022 Riverton HS – Site 232 H280 3/25/13
SL63XC026 Boys Ranch – Site 230 H281 6/15/13 CD not signed/stamped-Preliminary not for construction
SL63XC028 Copper Hills – Site 231 H282 5/12/13 SA does not match CD, SA list 3 exisiting antennas CD lists 4 MA does not match CD, MA list 3 exisiting antennas CD lists 4
SL63XC030 Storage Plus – Site 226 H283 The top section of the pole shall be replaced with a 3″ std. pipe or better if the existing is less than the size
SL63XC032 Classic Trends – Site 227 H284 assumed. wrong CDs uploaded in 315.2
SL63XC034 Cottonwood Theaters – Site 225 H285
SL63XC036 I-215 Mini Storage – Site 228 H286
SL63XC038 Layton Water Tanks – Site 223 H287
SL63XC135 Qwest Main Building – Site 224 H288
SL63XC164 Jordan Commons – Site 229 H289 6/27/13
SL70XC003 RC Riley – T-Moblie Bennion Conservancy Collocate H290
SL70XC004 North Star Coatings – Site 234 H291 6/25/13
SL70XC007 RC Riley (foothill UT0095) H292 Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed
SL72XC002 West Mountain H293 SA was ran and we are to do a antenna swap out and mount the RRUs below the antennas. MA was corrected and it was stated that the tower could not withhold the weight, so we are doing an antenna swap and mounting the RRUs below the antennas. SA & MA were corrected.
SL72XC049 UT0049-Phase 1 B – Eagle Mountain H294
SL72XC069 UT0069 – Phase 1A – Morgan H296
SL72XC101 UT0101 – Phase 1A H299 SA was coorected and Approved
SL72XC102 Roosevelt H300 Received letter verifing RAD Center Receieved Letter – Uploaded to Siterra
SL72XC103 UT0103 – Phase1 A – Duchesne H301 MA was corrected.
SL72XC105 UT0105 – Phase 1A H302
SL72XC106 UT0106 – Phase 1A H303
SL72XC113 UT0113 – Phase 1A – Loafer – Mtn H304
SL72XC117 UT0117 – Phase 1A – Bear Lake H306 01/29/13 06/18/13 Structure fails at interim (197.4%) AND at Final (179.9%). Engineer recommends 1) If the load differs from that described in Tables 1 and 2 of this report, “Appendix B – Base Level
Drawing” or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower does not have sufficient capacity to carry the existing, reserved, and proposed loads. Modifications will be required to bring the tower into compliance with the ANSI/TIA-222-G standard for the existing, reserved, and proposed loading. The following components require
modifications: a) Tower legs from 0’ to 140’ b) Tower diagonals from 0’ to 80’, 100’ to 120’ c) Tower diagonal bolts from 120’ to 160’ d) Anchor rods e) Foundation Further engineering and detailing is required to design the necessary modifications.
3) A Professional Engineer licensed in the state of Utah shall issue design drawings for the above
modifications. This analysis report is not a construction document.
SL72XC122 UT0122 – Phase 1A – Price H307 Need three standoff arms. Letter only received, nothing to verify what was measured.
SL72XC123 UT0123 – Phase 1A – Helper H308
SL72XC127 Horn Mountain H312 SA was corrected and approved MA was corrrected and approved CD needs to be corrected for the mount we are installing.
SL72XC128 Four Mile Hill H313 Everything is matching
SL72XC138 UT0138 – Phase 1A – Kamas H316 No owner approved drawings to compare to.
SL72XC143 Moab H319 No calculations were provided in the SA. MA corrected and approved
SL72XC255 UT0255 – Phase 1A – Powder Mountain H321 9/4/13
SL72XC413 UT0413 – Phase 1B (Devils Slide) H325
SL72XC703 ID034P- Phase 1B – Melba G110 Structural is ran for the wrong type of mount. Ran for a Side Arm Mount, not a Sector Frame
SL72XC737 ID211P – Phase 1B – McCall G112
SL73XC004 UT0004 – Phase 1C – Brighton HS H330 Ran for installing NV antennas on cantilever mounts CD needs to show the iDEN antennas that are installed beside the CDMA and NV antennas.
SL73XC011 North Orem H331
SL73XC052 UT0052 – Phase 1C – Dimple Dell H332 7/20/13
SL73XC085 UT0085 – Phase 1C – South Salt Lake H333
SL73XC114 UT0114 – Phase 1C – South Jordan H334 MA suggests adding bracing to prevent rotation of the horizontal pipe mounts
SL73XC173 UT0173 – Phase 1C – Bell Canyon H335
SL73XC188 UT0188 – Phase 1C – Century 16 H336
SL73XC198 UT0198 – Phase 1C – SLCC H337 Cd shows 12′ T-Arms to be installed and the Structural was ran for the new equipment to go on the existing mount. They are flushed mounted to the tower.
SL73XC304 UT0304 – Phase 1C – Jordan Commans H338
SL73XC341 UT0341 – Phase 1C – Franklin Covey Stadium H339 CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole Structural for Mount and Tower need to be redone.
SL73XC364 UT0364 – Phase 1C – North Salt Lake H340
SL73XC373 UT0373 – Phase 1C – Interstate 15 & 1700 S H341 MA is coorected.
SL73XC381 UT0381 – Phase 1C – 33rd & Interstate 15 H342 CD showing pulling CDMA and iDEN off at Iterim and it is not needed . Please correct for construction
SL97XC002 BYU Rexburg G114
SL97XC003 BYU Rexburg BTS #2 G115
SL97XC004 CNSUT00055 Movie Set H343
SL97XC005 SL97XC005 BTS #2 (CNS DPT ENRGY) G116
SL98XC004
SL98XC007 LDS Headquarters – BTS H345
SL98XC008 CNSUT00058 (CNS Montage) H346

Sheet3

Sheet4

Still stressed from student homework?
Get quality assistance from academic writers!

Order your essay today and save 25% with the discount code LAVENDER