a square parking lot of 250m on a side. the surface of the lot is planar, sloping to one of…

a square parking lot of 250m on a side. the surface of the lot is planar, sloping to one of its edges. along the downstream edge is a gutter, this gutter drains the entire lot and is sloped from both ends toward a sewer inlet at its center. the time of concentration of the lot is estimated to be 20 min, of which 18 min accounts for overland over the lot surface and 2 min accounts for travel down each half of the gutter.assuming the rational formula is applicable with a runoff coeeficient of 0.75 which of the following storms will yield the highest peak runoff? what will be the peak runoff rate in each case?
a)100mm/h for a duration of 10min
b) 25mm/h for a duration of 40min
c)15mm/h for a duration of 66.7 min

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
Still stressed from student homework?
Get quality assistance from academic writers!

Order your essay today and save 25% with the discount code LAVENDER