In the last activity, you practiced communicating professionally by writing an informative email to your customer(s). Now it’s time to practice using spreadsheet software and take a closer look at the resources, goods, and services necessary to complete your project and estimate the associated costs.
Use the template attached to help navigate through this assignment. The Project that i’ve chosen is kitchen remodel renovations.
Week 4 Activity – Project Resources and Budget
Student Name
BUS375: Project Management
Professor Name
Month Date Year
Instructions:
Carefully look through the “Sample” tab. Pay close attention to the amount of detail included, and the
formatting and organization of the list. You will use this sample list as a guide to create your own list of
resources.
Navigate to the third tab titled, “Blank Template – Fill This In” and complete the following:
1. In the “Resources” column, outline a plausible list of resources, goods, and services needed to
complete your chosen project. Include at least five resources in your list.
2. In the “Type” column, assign each resource a type. Include at least two different types in your list. You
may categorize each resource using the same types as in the Sample tab or utilize your own.
3. In the “Cost” column, estimate appropriate costs for each resource. Though these figures are
hypothetical estimates, they should relate to each other and be proportional. .
Then, in the fourth tab titled, “Sources,” list your resources in proper SWS style.
Project Resources and Budget
Developed by John Smith
August 2022
Resource
Type
Cost
Foundation Contractor
Labor
$10.000,00
Framing Contractor
Labor
$10.000,00
Roofing Contractor
Labor
$5.000,00
Windows Contractor
Labor
$2.500,00
Doors Contractor
Labor
$2.500,00
Bricks Contractor
Labor
$5.000,00
Siding Contractor
Labor
$5.000,00
Insulation Contractor
Labor
$5.000,00
Drywall Contractor
Labor
$5.000,00
Plumbing Contractor
Labor
$5.000,00
Electrical Contractor
Labor
$10.000,00
HVAC Contractor
Labor
$5.000,00
Cabinet Contractor
Labor
$2.500,00
Flooring Contractor
Labor
$2.500,00
Appliances Contractor
Labor
$2.500,00
Driveway/Sidewalk Contractor
Labor
$2.500,00
Fencing Contractor
Labor
$2.500,00
Deck Contractor
Labor
$2.500,00
Landscaping Contractor
Labor
$2.500,00
Government Inspector
Labor
$500,00
Inspection Resolvers
Labor
$500,00
Cleaning Service
Labor
$500,00
Lumber
Materials
$100.000,00
Bricks
Materials
$50.000,00
Windows
Materials
$10.000,00
HVAC
Equipment
$10.000,00
Appliances
Equipment
$20.000,00
Fence
Equipment
$10.000,00
Deck
Equipment
$10.000,00
Flooring
Materials
$10.000,00
Bathroom / Kitchen Fixtures
Equipment
$10.000,00
Cabinets
Equipment
$5.000,00
$324.000,00
Project Resources and Budget
Name
Date
Resource
Type
Cost
$
–
Sources