As a senior coder and experienced test engineer, you have been given a new software testing future key project where you were asked to develop and conduct test cases that would occur throughout the software development life cycle. Your project first was to choose between the following three possible key project software implementations:
Now that you have selected your software project, it is time to plan the testing process.
Each week you will be working on a key assignment. You will create a proposal to be used at a Test Planning Milestone Meeting (TPMM) meeting. To begin your key assignment, create the following sections in your proposal:
Test planning approach Approach taken for your test project Outline of the test plan Scope (identification, system overview) System description and operation (name of test sites, test configuration) Test identification & test levels Planned tests & test schedules Requirement traceability
For this assignment, you will research the factors that contribute to an ideal test environment for your software and prepare a requirements traceability matrix (RTM). Locate a RTM template on the Internet to use as your starting point. RTM should have at least 3 columns: ID, Requirements, and Component. ID should be the unique ID of the requirement. Requirements should be the actual testable “shall” requirement. Component should be the component(s) of the software or system that has been allocated for this functionality (i.e., user interface, security, etc.).
In your key assignment document, provide the following: