Evaluate the Earned Value Management (EVM) Case Study Scanner Project below:

Case Study: Scanner Project:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

You have been serving as Electroscan’s project manager and are now well along in the project.

Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date and at completion. Be as specific as you can using numbers given and those you might develop. 

Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status

Calculate:

EVM information from the data provided using the Electroscan Student (Table Attachment) spreadsheet and then draw conclusions regarding the status of the project in the case study.

Draw:

 conclusions regarding project health from the Earned Value analysis. 

Analyze :

the effects of given schedule variances as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable.

Write your findings in a 350- to 700-word memorandum.

2

>Sheet

1

In-Store

Alcorn Street, Suite 5

Scanner Project

5

1

8

20 20 15 0 5 20 15

30 25 0 5 30 25

6 5 -4 1 10 8

2 2 2 0 0

40

0 0 0 0 0 30 30

30 30 25 0 5 30 25

0 0 0 0 0

100

20 20 15 0 5 20 15

45 55

10

25 30 45 5

40 60

20 25

5

30

30 20 40

0

100

45 30 25 -15 5 50

55 25 40 -30 -15 60 96

0 0 0 0 0 30 30

21

200

20 20 15 0 5 20 15

20 20

0 -15 20 35

30 60

30 -30 100

8 8

0 20 20

0 0 0 0 0 40 40

46

60 3

9 9 7 0 2 10 8

25 30 45 5 -15 50 75

0 0 0 0 0 20 20

12 10 8 -2 2 15 12

0 0 0 0 0 30 30

Electroscan, Inc. 2

0 Scanner Project
5 55 (thousands of dollars)
Boston, Massachusetts Actual Progress a/o January 1
NAME PV EV AC SV CV BAC EAC
4

20 3 9 4

7 6

25

8 9

15 1

12
H 1.0 Hardware 92 88 72 -4 16 2

60 243
H 1.1 Hardware Specifications (DS)
H 1.2 Hardware Design (DS) 30
H 1.3 Hardware Documentation (DOC) 10
H 1.4 Prototype (PD) 40
H 1.5 Test Prototypes (T)
H 1.6 Order Circuit Boards (PD)
H 1.7 Preproduction Models (PD) 100
OP 1.0 Operating System 195 1

50 1

96

45

46 330 480
OP 1.1 Kernel Specifications (DS)
OP 1.2 Drivers 76

21 70 97
OP 1.2.1 Disk Drivers (DEV) -15
OP 1.2.2 I/O Drivers (DEV) 31 -6 37
OP 1.3 Code Software 130 75 105 -55 -30 240 368
OP 1.3.1 Code Software ( C ) -10 -2 200
OP 1.3.2 Document Software (DOC) 42
OP 1.3.3 Code Interfaces ( C )
OP 1.3.4 Beta-Test Software (T)
U 1.0 Utilities 87 108 148 -40 260
U 1.1 Utilities Specifications (DS)
U 1.2 Routine Utilities (DEV) 35
U 1.3 Complex Utilities (DEV) 90 150
U 1.4 Utilities Documentation (DOC) 17 -9
U 1.5 Beta-Test Utilities (T)
S 1.0 System Integration 49 -11 125 145
S 1.1 Architecture Decisions (DS)
S 1.2 Integration Hard/Soft (DEV)
S 1.3 System Hardware/Software Test (T)
S 1.4 Project Documentation (D)C
S 1.5 Integration Acceptance Testing (T)
Note: There are minor errors in the Larson & Gray (2013) table. These appear to be found only in the EAC column. They are corrected here.
You have been serving as Electroscan’s project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date and at completion. Be as specific as you can using numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recommended changes (if any).

Earned Value Analysis

2

>Grading Guide

PM/598 Version 6

2

Earned Value Analysis Grading Guide

Individual Assignment: Earned Value Analysis

Purpose of Assignment

The students will engage with an Earned Value Management (EVM) case study found in Chapter 13 of the Project Management: The Managerial Process course textbook. Students calculate EVM information from the data provided and then draw conclusions regarding the status of the project in the case study. The relevance of this assignment is to assure the learner can manipulate EVM data and draw conclusions regarding project health from the Earned Value analysis. Students should analyze the effects of given schedule variances as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable.

Resources Required

Ch. 13 of Project Management: The Managerial Process

Electroscan, Inc. Student Table spreadsheet

Grading Guide

Content

Met

Partially Met

Not Met

Comments:

The student evaluates the Earned Value Management (EVM) Scanner Project Case Study.

 

The student calculates EVM information from the data provided and then draws conclusions regarding the status of the project in the case study.

The student draws conclusions regarding project health from the Earned Value analysis.

The student analyzes the effects of given schedule variances as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable.

The memorandum is 350 to 700 words in length.

Total Available

Total Earned

10

#/10

Met

Partially Met

Not Met

Comments:

Total Available

Total Earned

 

Writing Guidelines

The paper—including tables and graphs, headings, title page, and reference page—is consistent with APA formatting guidelines and meets course-level requirements.

Intellectual property is recognized with in-text citations and a reference page.

Paragraph and sentence transitions are present, logical, and maintain the flow throughout the paper.

Sentences are complete, clear, and concise.

4

#/4

Assignment Total

#

14

#/14

Additional comments: