EXCEL CHARTS/GRAPHS

Looking for options on how to chart information using the attached spreadsheet.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

 

I would like to chart with percentage of crews are checking in per month.

 

notes

, Tripping, lifting

8/6/13

,

and

no one under load

C105

trench

, 3″ depth

,

Tool inspections, hydration and rest

inic

8/7/13

8/7/13

Bebault, Dave 8/7/13

ing,

8/7/13

8/7/13

from

, Heat, RF, noise

8/7/13

, make sure ladder is on sure footing.

8/7/13

, inspect capstan, rigging and ropes, wear hard hats, use team lifting

8/7/13

p in

communication, PPE

8/8/13

8/8/13

Downtown

Bereiter, Blaise 8/8/13

Vindedahl, Erik 8/8/13 Ewing Park Dressing in DC Cable

8/8/13 Welch Ski Village

8/8/13

and trips

, Brad

8/8/13

heads

8/8/13

inic

8/8/13

Kohler, Shane 8/8/13
Sabin, Wayne

SCSU rooftop

Vindedahl, Erik 8/9/13 Ewing Park

8/9/13

installing radio Pedestrians, noise, lifting objects

, no safety

, Heat

Vindedahl, Erik

Hill, Joe

Ewing Park

Bistodeau, Brad

, underground

from crane

Bereiter, Blaise

Moorhead Installing Cabinets crane hazards, falling object, pedestrians, slips, fall from height use correct signals or radios, cones and barricades around crane, SRL’s and fall protection.

Anderson, Paul

, pulling wire

terminate.

Bistodeau, Brad

Fargo Water Tank Install antenna and radios Falls, lifting, climbing, traffic

Hill, Joe

Millage, Cody

Conway, Josh

Warden, Dominic

State Fair

hazard

, overhead power, lifting

, ladder hazards

Morelli, Chris

Vindedahl, Erik

Taconite Harbor Installing radios and ac in shelter

Meyer, Zach

Mink, Cyrus

Washburne HS

Bereiter, Blaise

swapping radio heads

Bistodeau, Brad

Fargo Water Tank installing radio heads and antenna

, fatigue

Kostreba, Mitch

Lanesboro

Hill, Joe

Grimes Upgrade antenna and radio

Millage, Cody

MS72XC004

Vindedahl, Erik

Taconite Harbor

Meyer, Zach

Annandale 1900

, hard hats and gloves. Stable ladders, capstan inspection rigging inspection

Conway, Josh

Bebault, Dave

i

Morelli, Chris

, underground utilities.

Mink, Cyrus

Bistodeau, Brad

Fargo Water Tank

finish wiring radios,

, complete shelter

Hill, Joe

Grimes

, grounding,

s

hiviz vests.

Kostreba, Mitch

Lanesboro

s, running jumpers

Meyer, Zach

Annandale 1900

and communications

Millage, Cody

Morelli, Chris 8/16/13

Bereiter, Blaise

falls

Mink, Cyrus 8/19/13

Kaiser, Scott

Hill, Joe

Carlson, Mike 8/19/13

Morelli, Chris 8/19/13

in cool place.

White, Corey

s

water tank

, battery spills, heat

Carlson, Mike

Millage, Cody

Isanti Water Tank

Meyer, Zach

with Belland, Nate

S

h

Swanson

cut

.

8/20/13

, inspect tools wear gloves, tieoff outside warning lines.

Bistodeau, Brad

Detroit Lakes water tank

(

)

Farmington

with Kacey Swirtz

, heat, sharp objects

Champlin WT

fiber and sweeping

Mink, Cyrus

MSP0411

Bebault, Dave

Power tools, Heat, Slipps and trips

Conway, Josh

Hill, Joe 8/20/13

Bereiter, Blaise 8/20/2013 9:10am

Givens, Rick

MS03MR213

Champlin WT

, pre inspection of JLG and tie off in basket as well as assurance of suitable ground condition, good technique and two person lift.

Blaise, Berieter

Bistodeau, Brad

Detroit Lakes water tank

Meyer, Zach

7:00

Van Meter water tank Pulling fiber on tower

, crane

Hill, Joe

Heartland Grain

8/21/13

Morelli, Chris 8/21/13

Sabin, Wayne

Detroit Lakes water tank

Detroit Lakes water tank

Carlson, Mike

MS73XC112

Synnott, Dominic 8/21/13

overhead hazards

Montgomery, Trent(MK Telecom) 8/21/13

RF from broadcast,heat wasp

Anderson, Paul with Kacey Swirtz

Mountain Lake

Kostreba, Mitch

Conway, Josh

MS03np211

MSP0313

pinch points, heat

Van Meter water tank

Detroit Lakes Setting cabinets, pulling wire

Fiber test

Jordan Miller

Cyrus Mink

,

jumpers

Blaise, Berieter

Prep.

Boys and Girls of Souix City

,

and two person lift, use of GFCI’s.

Sabin, Wayne

picture

,

,

Detroit Lakes

Loija, Pat

8/23/13

Travis, MCI 8/23/13

8/23/13 Anoka MS73XC112

Climbing

Mink, Cyrus 8/23/13

Inspect all rigging and hoist, wear cut gloves.

Bistodeau, Brad 8/23/13 Detroit Lakes Touch up, pictures

Bereiter, Blaise 8/23/13

Morelli, Chris 8/23/13 ML15AL204

, grounding

Miller, Jordan 8/23/13 MSP0507

, terminate

Meyer, Zach 8/23/13

Kostreba, Mitch 8/23/13 Elliston

Crane

8/23/13

Koehler, Shane

Bereiter, Blaise

Leaf Phil

Carlson, Mike Diamond Tower

WT

installing antenna and cable

Miller, Jordan

Bistodeau, Brad

Sabin, Wayne 8/26/13 Discussed JSA, in transit unable to write down information

8/26/13 vehicle traffic, hand and power tools

Bistodeau, Brad

Detroit Lakes WT

Kostreba, Mitch

White, Corey

Detroit Lake

, falls

Sabin, Wayne

, burrs, power tools

Bebault, Dave

Kohler, Shane

Carlson, Mike

Coon Rapids WT

cable on WT

8/27/13

Vindendahl, Erik

Swirtz, Kacey

face shield glovevs

Mink, Cyrus

heat, climbing

Bereiter, Blaise 8/27/13

Clearwire Prep.

Mace, Ryan

Nazarene

Miller, Jordan 8/27/13

Hill, Joe

Iowa crane

Meyer, Zach

Givens, Rick

Traveling Heat

Bebault, Dave

Blue Earth

Pelican Rapids

Mace, Ryan

7:49

Wolf, Mike

trips, and falls, cuts

Grand Forks

Lanesboro

Miller, Jordan

Lynn Street

, horizontal restraint.

Bereiter, Blaise

Edina

Millage, Cody

Swirtz, Kacey 8/28/13

of ladders, wear hiviz vest.

New Richland

Bistodeau, Brad

Water Tank

Sabin, Wayne

Bistodeau, Brad

Detroit Lakes WT

Sabin, Wayne

Givens, Rick

Bebault, Dave

trenching

Swirtz, Kacey

Springfield WT HVAC install, install metal siding

Bereiter, Blaise

Edina Pulling fiber on tower

Vindedahl, Erik

Fargo DT

Kohler, Shane

Grimes WT

Hill, Joe

Grimes WT

Wolf, Mike

Virginia DT Rooftop

Temple, Jake

Lanesboro

Leaf Phil

Pelican Rapids

Synnott, Dominic

Miller, Jordan 8/29/2013 9:40am

Bistodeau, Brad

Detroit Lakes WT

Sabin, Wayne

heat, bugs

Vindedahl, Erik

Fargo DT

Leaf Phil

Givens, Rick

Aims Iowa

lonnee, Mitch, Vogen, Forrest 8/30/13 Dundas

Hill, Joe 8/30/13 Birchwood

Millage, Cody

N. St. Paul

Kohler, Shane

Grimes WT

Bereiter, Blaise

Clearwire

Anderson, Paul

Running Conduit, pulling wire

Mace, Ryan

Nazarene

Carlson, Mike

Coon Rapids WT

, crane, working outside of guardrails

Bereiter, Blaise

Kohler, Shane

Traveling

Miller, Jordan

Millage, Cody 9/3/13

Relo

Kostreba, Mitch

utilities

Meyer, Zach

Mounting Radio heads and antenna

Givens, Rick

Traveling Traveling Driving hazard

Temple, Jake

Aberdeen Traveling

Mace, Ryan

Grand Forks

, slips and falls

Mink, Cyrus

and plugging into radio

Vindedahl, Erik 9/4/13

driving

Carlson, Mike Diamond Tower

Coon Rapids WT

Swirtz, Kacey

Lanesboro

Bereiter, Blaise

Millage, Cody 9/4/13 Traveling
Wolf, Mike

Heartland Grain

Morelli, Chris

Kohler, Shane

Miller, Jordan

MSP0226

Hill, Joe

ground prep

Miller, Jordan

Bereiter, Blaise 9/5/13

Givens, Rick 9/5/13

Meyer, Zach 9/5/13

Conway, Josh 9/5/13

Millage, Cody 9/5/13

Temple, Jake 9/5/13

Mace, Ryan

with Skipp

Swirtz, Kacey

White, Corey 9/5/13

ing

then crush and heavy lifting.

Vindedahl, Erik 9/5/13

wear gloves

Wolf, Mike 9/5/13

Anderson, Paul 9/5/13

Kohler, Shane 9/5/13 night cut
Hill, Joe 9/5/13 Jefferson Lake

Kostreba, Mitch 9/5/2013 7:15am

Morelli, Chris

Bebault, Dave

Equipment use, skidloader and trencher attachment, electrical shock,  high humidity, heat related injuries Wearing high vis vests, using hand motions in and out of the machine, making sure to stay away from trencher while in use 5’ rule, wearing leather gloves & clear safety glasses.  Having operator aware of possible obstacles and hazards, having cool water available and to take ½ water breaks

9/5/13 Coon Rapids WT

9/5/13

9/5/13

9/5/13

9/5/13

nate belland 9/5/13

Vindendahl, Erik

Aberdeen

Kostreba, Mitch

Chetek

Givens, Rick

7:54

Traveling Trouble shooting

rs, wear PPE

Hill, Joe

Jefferson Lake

Warden, Dominic

Miller, Jordan

MSP0053

Bebault, Dave

Blue Earth Trenching

9/6/13

Aberdeen

Bereiter, Blaise

Mink, Cyrus

in existing conduit

, people

Conway, Josh

Elk River

Millage, Cody

Hill, Joe

Jefferson Lake

White, Corey

Miller, Jordan 9/9/13 Call taken by Josh Hamre
Warden, Dominic

Fargo

Hill, Joe

Jefferson Lake

Swirtz, Kacey

Anderson, Paul

New Richmond 1900 LTE upgrade

Sabin, Wayne

Water Tank

Moe, Brian 9/10/13 Heartland Grain

, run liquidtight

Crump, Jaimie 9/10/13 Schleswig

Leaf Phil

Wolf, Mike 9/10/13

City

9/10/13

trenching trenching

Bereiter, Blaise

St. Paul

Millage, Cody 9/10/13 Traveling
Conway, Josh

Elk River Hanging antenna

Mink, Cyrus 9/10/13

on Vandalia

MK Telecom

9/10/13

Givens, Rick 9/10/13 Traveling
Miller, Jordan

take down old radios

Bistodeau, Brad

Swirtz, Kacey

East Grand Forks

Wolf, Mike

Nebraska City

Givens, Rick

Omaha

heat water and rest

don with MK

Bebault, Dave
Crump, Jaimie

Schleswig

Vindedahl, Erik

, Cadwelding

Kostreba, Mitch

Anderson, Paul

Sabin, Wayne

Park Rapids

Conway, Josh

Elk River

, train

Mace, Ryan

Traveling

Lonnee, Mitch

Morelli, Chris

Bistodeau, Brad

Wayne Sabin

Park Rapids

Kostreba, Mitch

Sarona

Leaf Phil

Park Rapids Shelter Work

Warden, Dominic

South Dakota Trouble shooting

rest and breaks

Swirtz, Kacey

White, Corey

Temple, Jake

Miller, Jordan

Conway, Josh

Elk River

Millage, Cody

Iowa

falls

Givens, Rick

Omaha

Vindedahl, Erik

Shelter Work

Crump, Jaimie

Schleswig

Swartztrauber

Bereiter, Blaise

Morelli, Chris

Mace, Ryan

Moe, Brian

Lynn Street

Wolf, Mike

Nebraska City wiring up shelter heat ladders, crowded work space, power tools cuts water, proper use,GFI outlets, cut gloves

Bistodeau, Brad

Sabeka

Warden, Dominic

Givens, Rick 9/13/13

Testing T-1’s

9/13/13 Park Rapids

Swirtz, Kacey

East Grand Forks

, hiviz and communication

Mink, Cyrus

Morelli, Chris 9/13/13 South Dakota

9/13/13 Crookston

hand and power tools inspect tools, heat and water, wear good boots, watch footing

Temple, Jake

Aberdeen

Estelinne

Anderson, Paul 9/13/13

Bereiter, Blaise 9/13/13 Discussed JSA, in transit unable to write down information
Conway, Josh

Kohler, Shane

Bereiter, Blaise

Dom, MK

Morelli, Chris

SD Digging trench in rock

Vindedahl, Erik

White, Corey

PPE, proper usage, housekeeping

Warden, Dominic

Kostreba, Mitch

Austin Relo

Mace, Ryan

Park Rapids Pull Lines

Conway, Josh

St. Peter

Bistodeau, Brad

Bereiter, Blaise

Buffalo

Temple, Jake

Driving

Moe, Brian

Swirtz, Kacey 9/17/13 Grand Island NE

Anderson, Paul

Leaf, Phil

Mike, Diamond Tower

Barnsville

rigging

Mink, Cyrus

Sabin, Wayne

Coon Rapids WT

Kohler, Shane

Millage, Cody

, Bryce

Wolf, Mike

Swanson, Skipp 9/17/13 Mankato

Givens, Rick

Driving Driving all day

Grand Island NE

Crookston

Mace, Ryan

Lifting, pinch points, slits and trips

Day Cut

of ladder, housekeeping

Coon Rapids WT

Koehler, Shane

Moline WT Hooking up cabinets

Kostreba, Mitch

Schleswig

cad welding

Swirtz, Kacey

Grand Island NE

Rick Givens

Mike, Diamond Tower

Barnesville

Vindedahl, Erik

Weather

9/19/2013 7:34AM

9/19/2013 7:34AM

9/19/2013 7:34AM

Bistodeau, Brad

Battle Lake

Warden, Dominic

Souix City

Driving

Kostreba, Mitch

Schleswig

Crump, Jaimie 9/20/13 Luxemburg

weather

Center City

Moe, Brian

Grand Island

Mike Diamond Tower 9/20/13 Barnsville

Mike Diamond Tower

Barnesville

Warden, Dominic

Electrical

Mink, Cyrus

climb 100% tie off

Conway, Justin

site

Bereiter, Blaise

Vindedahl, Erik

Schleswig

, gloves, cardboard

Conway, Josh

Bebault, Dave

Trenching

Swanson, Skipp

Mankato

Warden, Dominic

Ladders proper usage

Vindedahl, Erik

Schleswig

Swirtz, Kacey

electrical, hand tools

Mink, Cyrus

St. Paul

slips, trips, power tools

Osakis

ladders proper usage, ppe

Koehler, Shane

Skyline

lte upgrade

Mace, Ryan,

Mankato

ladders proper use

Vindedahl, Erik

Schleswig

Bebault, Dave

Swirtz, Kacey

Lincoln

Bjorjan, Bob

Honeywell

ladders proper usage

Donovan, MK Electric

Osakis

North Buford

Lonnee, Mitch

cut over

Kostreba, Mitch

Warden, Dominic

prep

Honeywell

Vindedahl, Erik

East Grand Forks

Conway, Justin

Conway, Josh

Meyer, Zack

, ND

Koehler, Shane

Austin

ladders, cutting proper usage, ppe

Mace, Ryan

Mankato

ladders, cutting proper usage, ppe

Synnott, Dominic

various

Moe, Brian

Warden, Dominic

Iowa City

Schwartztrauber

Trenching

Kostreba, Mitch

Vindedahl, Erik

E. Grand Forks Shelter work

, electrical

Givens, Rick

various troubleshooting

Meyer, Zack

Morelli, Chris

Sabin, Wayne

, WI

Millage, Cody

various troubleshooting

Crump, Jaimie

man basket, wind

Swirtz, Kacey

running hybrid

Mace, Ryan

installing antenna

Conway, Justin 10/2/13

Conway, Josh

Shamrock

Mink, Cyrus

SAC Wireless

Perham

various troubleshooting driving

Temple, Jake

Crookston

Kostreba, Mitch

Ruskin

Warden, Dominic

Iowa

Meyer, Zack

Manvel

Vindedahl, Erik

East Grand Forks

Sabin, Wayne

Madison

Climbing tie-off

Conway, Justin

Fiber test mount juntion box

Kohler, Shane

Millage, Cody

troubleshooting

Schwartztrauber

Grand Portage

Minke, Erik

2:12

Bistodeau, Brad

Perham

Meyer, Zack

Manvel

Kostreba, Mitch

slips trips, lifting

Givens, Rick

Mobile

Synnott, Dominic

Mobile

ing

Driving

Mink, Cyrus

Conway, Justin

Sabin, Wayne

Mobile

Vindedahl, Erik

E. Grand Forks

Driving

Morelli, Chris

Minke, Erik

Temple, Jake 10/4/2013 8:25am Crookston

rigging,

, radio communication,

White, Corey

Austin

Boerjam, Bob

proper use, PPE

Mace, Ryan

Grand Portage

Boerjam, Bob

ladders, slips-trips, power tools

Conway, Josh

Jaynesville

Vindedahl, Erik

Givens, Rick

Driving testing ladder proper usage

Kostreba, Mitch & Schwartztrauber, Bryce

Grand Portage

team lift, ppe

Crump, Jaime

DECC

Jaynesville

Givens, Rick

Driving

Conway, Justin

, lifting, slips-trips

Mace, Ryan

rooftop

Mink, Cyrus

MSP0158

Koehler, Shane

DECC running conduit

Kostreba, Mitch & Schwartztrauber, Bryce

Grand Portage

Mink, Cyrus

Conway, Justin

Jaynesville

cutting, ladders

48th and Vine Pulling lines

Montgomery, Trent

Grand Forks

Givens, Rick

cutting, ladders

Millage, Cody

Meyer, Zach

Fiber Test

ppe, proper usage

Koehler, Shane

Cavriole Pulling wire

Conway, Justin

Mace, Ryan

Crump, Jaime

Aberdeen

Rained Out

Temple, Jake

East Grand Forks

Bereiter, Blaise

48th and Vine

St. Paul cut over

, ladder

Conway, Justin

Pulling lines

Millage, Cody

photos

ppe

Conway, Josh

Cavriole

slips, RF

Morelli, Chris

heavy equipment, lifting

White, Cory

Des Moines

Kostreba, Mitch

north relo

Meyer, Zach

Morelli, Chris

, gfi, team lift

Givens, Rick

driving

Mink Cyrus

St. Paul

slippery conditions

Conway, Justin

pinch points, rf, traffic, slips

Millage, Cody

Conway, Josh

Cavriole

Kostreba, Mitch

waseca north relo

Givens, Rick

Driving testing T-1’s

St. Paul

slips, RF housekeeping, rf monitors

Morelli, Chris

power tools, slips,

Conway, Justin

Anderson, Paul

South Dakota

trip hazards awareness

Conway, Josh

Cavriole

housekeeping, rf monitors

Bereiter, Blaise

Kostreba, Mitch

waseca

Anderson, Paul

South Dakota Audits trip hazards housekeeping

St. Paul

White, Cory

Meyer, Zach

business office

Givens, Rick

driving testing T-1’s

Crump, Jaime

Rushkin

Millage, Cody

Conway, Justin

Conway, Josh

Bereiter, Blaise

digging proper technique

Belland, Greg

Bistodeau, Brad

Ground work

White, Corey 10/22/2013 7:12am

Swirtz, Kacey

Omaha

Bereiter, Blaise

Cut-over

Conway, Justin

Cut-over

Synnott, Dominic

Temple, Jake

Grand Portage

Mace, Ryan

proper usage, ppe

St. Cloud

Anderson, Paul

Crump, Jaime

Givens, Rick

testing

Millage, Cody

Ames

Wolf, Mike

White, Corey

Clarksfield

Belland, Greg

Business Park

Bistodeau, Brad

6:54

Milwaukee

Kostreba, Mitch

Sabin, Wayne

Man basket crane, traffic

Morelli, Chris

proper technique, ppe

Synnott, Dominic

Swirtz, Kacey

Omaha

power tools, ladder ppe, proper usage

Bereiter, Blaise

cutover Climbing/working at heights, cutting, power tools 100% tie off, ppe

Boerjan, Bob

South Dakota

awareness

Millage, Cody

Ames South

Warden, Dominic

ladder, cutting proper usage, ppe

Kostreba, Mitch

St. Cloud

Wolf, Mike

Givens, Rick

slips awareness

Moe, Brian

Millage, Cody

Ames

Bereiter, Blaise

cutover

Bistodeau, Brad

Milwaukee final photos

Belland, Greg

ice

White, Corey

Temple, Jake

Grand Portage

Omaha

Crump, Jaimie

Ruskin

100% tie-off, rigging inspection

Bereiter, Blaise

Conway, Josh

Pull Lines,

Mink, Cyrus

Conway, Justin

Millage, Cody

Givens, Rick

Mace, Ryan

Burnsville

Mink, Cyrus

St. Cloud

White, Corey

Warden, Dom

pull lines, crane, ppe high viz, ppe

Vindedahl, Erik

Swirtz, Kacey

Omaha

Conway, Josh

pulling lines

Anderson, Paul

Austin

Digging, lifting, ppe, team lift

Conway, Justin

Anoka

Mink, Cyrus

slips, cuts

& Mace, Ryan

Village Point

Givens, Rick

testing

Bereiter, Blaise

cutover

Swirtz, Kacey

backfill

Anderson, Paul

Schwerzler, Tom

7:41

cutting, ladder, ppe, proper usage

White, Corey

Cumberland trenching digging trench

Warden, Dom

connecting ppe

Conway, Josh

Brooklyn Park

capstan, pinch points inspection, ppe

Weaver, Jason

Burnsville

Temple, Jake

housekeeping, ppe

Givens, Rick

troubleshooting

Bistodeau, Brad

Bloomington

Bereiter, Blaise

crane, lifting radios pedestrians, slips, pinch points ppe, barricade

Synnott, Dom

lfiting team lift

Kostreba, Mitch

White, Corey

Nebraska City

Kostreba, Mitch

Waseca

Vindedahl, Erik

Omaha drilling

Mink, Cyrus

cutover

Waseca

Synnott, Dominic

for Brad

Rail yard central ave

Morelli, Chris

Mace, Ryan

power tools, ladders

Crump, Jaimie

Nebraska City

Minke, Erik

Worthington

Weaver, Jason

Givens, Rick

Federal Building

Anderson, Paul

running conduit drilling holes

Coon Rapids

Conway, Justin

Conway, Josh

Dundas Troubleshoot

Morelli, Chris

Conway, Justin

8:35

St. Paul

Bereiter, Blaise

Bistodeau

, crane

Belland, Greg

Bistodeau, Brad

slips trips, cold

Morelli, Chris

Mink Mercy

Crump, Jaimie

Nebraska City

Mink, Cyrus

Kostreba, Mitch

Swirtz, Kacey

Bereiter, Blaise

Vindedahl, Erik

Moe, Brian

Omaha

Anderson, Paul

Omaha wiring shelter

installing antenna

Weaver, Jason

Waseca

Wolf, Mike

Conway, Justin

St. Paul

Minke, Erik

Millage, Cody

Audits Driving

Crump, Jaimie Nebraska City

Falls from heights, tie-off,

Mink, Cyrus

Kostreba, Mitch

Swirtz, Kacey

Belland, Greg

Burnsville

Swirtz, Kacey

Bistodeau, Brad

tie-off

Mace, Ryan

Weaver, Jason

hand tools

Bereiter, Blaise

Water tower

Givens, Rick

Galena

cutting PPE,

, Cole

driving

Anderson, Paul

running lines

Wolf, Mike

Traveling

Airport Executive center

Temple, Jake

Swirtz, Kacey

Winthrop

Mink, Cyrus

Moe, Brian & Mace, Ryan

power plant swap,

Airport Executive center

Nebraska

Bereiter, Blaise

St. Paul

Schwerzler, Tom

11/20/13 Per Jerry

Anderson, Paul 11/20/13 Per Jerry
Moe, Brian 11/20/13

11/20/13 Per Jerry

11/20/13

Trenching

11/20/13 Per Jerry

Synnott, Dominic 11/20/13 Per Jerry
Bistodeau, Brad 11/20/13 Per Jerry

11/20/13 Per Jerry

Kostreba, Mitch 11/20/13 Per Jerry
Millage, Cody 11/20/13 Per Jerry
Minke, Erik 11/20/13 Per Jerry
Temple, Jake 11/20/13 Per Jerry
Wolf, Mike / Andy

Airport Executive center Airport Executive center Airport roof top

PPE, housekeeping.

Swirtz, Kacey

Winthrop

Kostreba, Mitch

Moe, Brian

7:37am

Village Point, NE

Mink, Cyrus

Main, Cole

Minke, Erik 11/21/13 Per Jerry
Conway, Josh 11/21/13 Per Jerry

11/21/13 Per Jerry

Vindendahl, Eric 11/21/13 Per Jerry
Carlson, Mike

Vindendahl, Eric 11/22/13 Omaha, NE

Synnott, Dominic 11/22/13 Per Jerry
White, Cory 11/22/13 Per Jerry
Main, Cole 11/22/13

Kostreba, Mitch 11/22/13 Indianola, IA

11/22/13 WI

Swirtz, Kacey 11/22/13 Winthrop

Weaver, Jason 11/22/13

Traffic PPE

Bereiter, Blaise 11/22/13 Per Jerry

11/22/13

PPE

11/22/13 Dayton

PPE

PPE

Minke, Erik 11/25/13

Bereiter, Blaise 11/25/13 Per Phone
Synnott, Dominic 11/25/13 Per Phone
Becker, Erik 11/25/13 Per Phone
Bistodeau, Brad 11/25/13 Per Phone
Moe, Brian 11/25/13 Per Phone

11/25/13 Per Phone

Mace, Ryan

Running Conduit ladders, slips trips

11/26/13

Weaver, Jason 11/26/13

11/26/13

11/26/13 Mapleton

Main, Cole

Synnott, Dominic / Schwerzler, Tom 11/27/13

Moe, Brian 11/27/13

Anderson, Paul

Moe, Brian 12/2/13
Bereiter, Blaise 12/2/13
Schwerzler, Tom 12/2/13
Synnott, Dominic / Schwerzler, Tom

Kostreba, Mitch 12/3/13

12/3/13

Main, Cole 12/3/13

12/3/13

12/3/13
12/3/13
12/3/13
12/3/13
12/3/13

Foreman Date/time Location Scope of Work JSA Abatement Comments
Bebault, Dave 8/6/13 401 Sibley Fall protection,

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
heat Warning lines, rest water, clean jobsite, use dolley, 2 people lift. Warning lines set, Painters on roof
Conway,

Josh Fall hazards,

Heat crane rigging PFAS, hydration, inspect

rigging,
Morelli, Chris 8/7/13 MS03

X Hand

digging Power tools, Heat, Proper

PPE
Warden, Dom BIR Colt Setting temporary tower at BIR Fall from tripping, pinch points keep worksite clean, communicate with crew
Kostreba,

Mitch Aberdeen Pouring Concrete Concrete burns have a wash station and gloves and boots
120449 Laying paving stones on roof back strain, heat use big wheel dolley,

team lift
Kohler, Shane 130741 Installing Cabinets Back train, Heat, Bees Team lifting and moving, hydration and rest, Checked to ensure no one had allergies to bees.
Vindedahl,

Erik Ewing Park Dressing in DC Cable falls ladder Make sure ladder is on solid footing, rest and hydration, RF assessment done.
Swirtz, Kacey Welch Ski Village lay down power feed on ladder platform Slipps and falls, falls from

ladders Use good

housekeeping
Bereiter, Blaise MSP0245 Installing radio heads on Monopole Fall hazards, Falling objects,tripping and lifting 100%

tie-

off
Anderson, Paul DM13XC011 Power Plant Swap,

Day Cut Falling objects, pinch points, power tools Warning line around crane, PPE-hi-viz vest, hard hat. Gloves and face sheild while grinding, tool inspections.
Hill, Joe 8/8/13 Grand Island Stuff Lines, s

na falls, trips, pinch points, falling object Tie-off-inspect equipment, keep worksite clean,

awareness
Millage, Cody Chandler Road Toubleshooting RETS Falls, heat stress inspect fall protection and tie off points, take breaks drink water.
Meyer, Zach Fargo finish boom gates, falling objects, falls from heights, hard hats, keep away from base of tower, use fall
Roseville Install radio heads, fiber and grounds Pedestrians, noise, lifting objects barricade area, ear plugs, inspect capstan and load rope.
falls from ladder, Lifting hazards Make sure ladder is on solid footing, 2 person lifting
Moe, Brian Running cable in shelter Falls from ladders, heat stress ladder on solid footing, rest and water breaks.
Mink, Cyrus MSP0032 Installing radio heads, Lifting falls from elevation,

slips team lifting, PFAS use and inspection
Bistodeau MSP0411 installing radio falls from elevation, falling objects PFAS use and inspection, inspect rigging
Sabin, Wayne SCSU

rooftop installing radio heads and antenna Falls, traffic, falls from ladder PFAS use and inspection of rigging and tie-off points, hi-viz vests, tie off ladder.
Synnott, Dom
8/9/13 Low pitch rooftop, SCSU,

installing antenna falls from elevation, falling objects, heat fall protection has been set up,rest breaks and hydration.
Photos installing GPS falls from a ladder, electrical hazards make sure ladder is stable and tied off, de-energize parts
Bistodeau, Brad Burnsville barricade area, inspect capstan and load rope.
Cyrus, Mink 08/12/2013 9:08am Washburne HS Running cable on smokestack fall hazards, hanging man basket, crushing from crane fall protection, proper procedure, barricade area and blind spots, ensure communication.
Blaise, Berieter 8/12/2013 8:35:00AM MSP 0130 Self support tower. Traffic climb barricade area, installed rope grab
08/13/2013 7:06am Taconite Harbor Installing radios and ac in shelter falls from ladders, cuts, slips and trips ladders on solid footing, stay off top step, housekeeping
08/13/2013 6:56am Install horizontal wave guide, snap in hybrid cable vehicle and pedestrian traffic, heat falls from height, falling objects barricade area, cone off crane and work area, cut resistant gloves
08/13/2013 7:19am Fargo

Water Tank Install antenna and radios Falls, lifting, climbing, traffic utilities team lifting, use crane, barricade area, avoid parking crane on utilities.
08/13/2013 7:48am MSP0507 swapping radio heads Auto traffic, falls from heights cones and barricades provided by city, PFAS while in lift
Lindstrom, Garth 08/13/2013 8:08am Moorhead Installing radios, antenna and hybrid cable crane hazards, falling object, pedestrians, slips, fall from height use correct signals or radios, cones and barricades around crane, SRL’s and fall protection.
Leaf Phil 08/13/2013 8:16am
8/13/13 IA2023 Running Conduit falls from a ladder, bees, cuts from sharp edges Ladder fully open and on stable ground, gloves cut sharp edges off pipe, inspect for bees, then e

x
08/14/2013 7:01am team lifting, use crane, barricade area
08/14/2013 7:15am Grimes Upgrade antenna and radio crane hazards, falling object, pinch points, RF radiation, power tools Proper signalling, tie off panels and tools, work as a team to watch pinch points, RF monitors on site
08/14/2013 7:22am Silver Bay Jumper Cables-working in shelter ladder hazards, hitting head on ladder rack ladders stable, wear hard hats
8/14/2013 7:25am Nazarene Pulling AC cable and fiber optic insects, pinch points, capstan, tight area at top of tower. spray insects, watch hands, good commuinication, inspect hoist and rigging
8/14/13 7:29 SD Set up a colt Driving keep logbook, daily vehicle inspection, team lifting.
Lonnee, Mitch 8/14/13 7:36 Dundas Sit Walk climbing, lots of people PFAS, harness and lanyard inspect
White, Corey 08/14/2013 7:41am Isanti Water Tank Running Wire in shelter overhead hazards Wear hard hat, ladder on stable footing and tied off
Carlson, Mike 08/14/2013 7:47am MS72XC004 Runnig Hybrid, installing antenna and radio falls and

cutting inspect fall protection, wear PPE
8/14/13 7:53 130817 hand digging , installing conduit Heat stress, utilities water and breaks, hard hat and Gloves
08/14/2013 7:58am Ladder hazards, shock hazards ladders stable, circuits are shut off and tested.
Kostreba, Mitch 08/14/2013 8:34am Lanesboro New site build. Poured concrete, installing ground rebar/form bars, Concrete, moving equipment cap or cover rebar, wear hi-viz make eye contact with operator
Kaiser, Scott 08/14/2013 8:45am With Cyrus
8/14/2013 9:05am Annandale 1900 Mount antenna and radio on guyed tower. climbing, ladder, falling objects, cuts, heat, overhead hazards. 100% tie-off after 6 feet, secure ladder and on stable ground, inspect rope and rigging, hard hats
08/14/2013 9:25am running wire through conduit crane, pedestrian traffic, heavy lifting while pulling wire barricade area, tie-off and inspect equipment, Take turns pulling wire, pull in teams and lube wire.
08/14/2013 7:55am NE Minneapolis vehicle and pedestrian traffic, falls from height, falling and flying objects, pinch points barricades, fall protection, inspections, hard hat safety glasses cut gloce
08/15/2013 6:53am peddtrain and vehicle traffic,

Weather barricade area, watch for lightning, take breaks
8/15/13 7:21 Setting Shelter overhead hazards, ladder hazardspinch points, power lines wear hard hats, do not be under load, maintain distance from power lines.
8/15/2013 7:32am Vehicle and pedestrian traffic, over head from cranes and panels,

weather barricade are, hard hats stay clear of fall area, hiviz vests, tie off panels, watch weather.
8/15/2013 7:37am Grand Marais Installing jumpers in cabinets within shelter Overhead, ladders, power tools, flying objects Wear hard hat, ladder on stable footing and tied off, wear safety glasses
Carlson,

Mike Diamond Tower 08/15/2013 7:47am Hooking up Hybrids and DC power Fall hazards, DC Power, cut hazards use safety climb and inspect equipment, shut down power,

wear gloves
8/15/2013 8:14am Finalizing shelter, installing wires and hooking up power plant Lost Cell phone connection
8/15/2013 8:50am Intall antenna and radio heads, installing hybrid fall hazards, ladder hazards, lifting, capstan 100% tie off
8/15/2013 9:01am Birchwood Assembly on the ground, possible crane vehicle traffic,

hand and power tools where hiviz, secure load when lifting with crane, inspect hand and power tools
8/15/2013 9:47am WT #7

Farmington had digging 36″ deep trench with PVC conduit Utility strikes, back strain, cut hazards, power tools Ensure locates and complete trench form, use legs, inspect tools plug into GFCI
8/15/13 10:01 MS21XC972 Installing H frame, running ridgid conduit Power tools, Heat, Slipps and trips
8/15/13 10:19 MSP0057 Doing a

Cut-over lost connection
8/16/2013 6:45am Fiber test photos Pedestrians, Heat, falls Barricades, hydration and rest, inspect rigging and harness, 100% fall protection
8/16/2013 6:56am Fiber Test picture cuts scrapes, RF exposure, pedestrian traffic, fall protection, cranes Wear gloves, RF monitor (2 on tower), caution tape to warn pedestrians, 100%

tie-off,
8/16/2013 7:20am Install PVC pipe, build fence and road, landscape backstrain, cuts and scrapes, PVC glue, moving equipment 2 person lifting, cut resistant gloves, ventilation, hiviz vest and eye contact with operator
MCI 8/16/2013 8:11am Champlic WT Hanging antenna Heat stress,fall hazards, slips, trips, and falls, lifting water and breaks, 100% tie off, two person lifting, periodic housekeeping, pre-use aerial lift inspection.
08/16/2013 9:31am photos, install fiber Falls, RF, Ladder Safety,

Crane tie off to legs of tower, monitor exposure, ladders stable and used correctly, good communication with crane operator and ground crew.
8/16/13 Mora Warman Sector Swap, shut down 3 sectors, wiring in cabinets, climbing, RF exposure, cuts and scrapes Secure anchors, inspect PFAS, confirm sectors shut down, Wear gloves.
MS63XC316 Restoration, plant grass and landscape Heat, vehicle traffic, slips Water and breaks in shade, Hi viz vests, housekeeping
8/16/2013 10:10am Lakewood Cemetart site prep and pulling wire, installing conduit Heat, Lifting,

Rooftop water and breaks, 2 person lifts, warning lines set, Horizontal lifelines install for 100% tie off
Synnott, Dominic 8/19/13 MS03XC261 Installing batteries and conduit Lifting, tripping 2 person lifting, will make step to get on platform
St. Louis Park Radios and new lines on a monopole Bees, falls, pinching overhead hazards spray for bees, tie-off inspect equipment and anchors, wear hard hat
8/19/2013 9:10am Champlin WT Installing radio, touch up paint, jumpers Heat stress, Trip hazards, elevation, lifting breaks, hydration, 100% fall protection, 2 person lifting,
8/19/2013 7:48am Heartland Grain LTE upgrade Heat, RF radiation, overhead crane, power lines, vehicle traffic
MS72X2112 install antenna and

ground prep cut hazards, climbing,

pinch points, heat cut resistant gloves, harness insp., tied to structure,
ML15AL204 Digging into Conduit Heat, underground utilities, slips, power tools Water and breaks as needed, locates completes
Givens, Rick 8/20/2013 6:32am Des Moines Dropping tower mast on colt, setting up at another location Pinching hazards, cut hazards, Heat Wear gloves and communicate with each other, drink

water and rest
8/20/2013 6:34am Detroit Lake decomission old sprint cabinets, run liquid tight Lifting,

Electrical 2 person lifting, Electricity is shut down, spill kit on site, water and rest as needed
8/20/2013 7:47am MS73XC112 putting up antenna, building mounts on the ground climbing, crane, heat, power lines safety climb broken use double lanyard, use correct signals and radios, water and rest in cool area, 10 ft. clearance
8/20/2013 7:50am color code, falls RF radiation cutting, overhead hazards, Rf gloves, hardhats, heat and rest, RF monitor.
8/20/2013 7:30am Van Meter water tank Mount antenna and cable Cutting and grinding hazard, overhead power, lifting Wear gloves and hard hat, face shields when grinding, hiviz vests on the ground, barricade boom truck
Schwerzler, Tom 8/20/2013 7:33am Building radio heads and flying into place Overhead, Heat, crane. Ponch points wear hard hats, drink water and rest, inspect rigging
Kohler, Shane with Ryan Mace 8/20/2013 7:44am Ames out rooftop, install equipment pull wire run conduit Falls, heat,traffic and pedestrians, lifting guardrails installed, drink water and rest, barricades erected, 2 person lifting
Vindedahl, Erik with Skipp 8/20/13 Molene Water Tank Moving cabinets, prepping for

night lifting, Wether, pinch points 2 person lift, skid steer to help with lifting, Communicate, watch weather
Wolf, Mike Boys and Girls of

Souix City Prep for cabinet removal, run wires Heat, power tools rooftop falls, rocky roofing rest and breaks
8/20/13 7:53 will work with another crew
Montgomery, Trent MK Telecom 8/20/2013 7:59am MS03MR213 Flying mounts RF from broadcast,heat wasp Shut down broadcast antenna, water and rest, double tie-off, spray wasp
Synnott, Dominic with Phil Leaf 8/20/2013 8:02am securing pipe, pulling wire heat, liting batteries water and rest, 2 person lifting
Anderson, Paul 8/20/2013 8:05am Mountain Lake Installing and wiring for HVAC Ladders ladders solid footing water and rest, cut resistant gloves
Demann, Travis (MCI) 8/20/2013 8:26am Installing hybrid,

testing Heat, slips and trips, falls lifting water and rest, 2 person lifting, 100% tieoff.
8/20/2013 9:00am MSP0244 Building antenna Capstan, bolt cutting, heat stress, bees/wasps Inspected ropes, capstan, harness, wear face sheild and gloves, water and breaks, spray wasp
Miller, Jordan 8/20/2013 9:24am build 3 antenna and radio heads hoist and rigging,

heat, climbing Inspected ropes, capstan, harness, wear hard hats, water and rest, tieoff to monopole
Beaver Creek Install Gounding inspect tools, heat and water, wear good boots, watch footing
8/20/2013 9:10am was unable to answer phone
MK Standpipe left message falls lifting, ladder cuts and scrapes tieoff, 2 person lifting, secure ladder, use ladder properly
White Bear Lake Rooftop work, prepping antennas Rooftop Fall Protection, Heat, walking through construction area Set up proper Fall Protection, warning lines, periodic breaks, stay hydrated, communicate with construction workers to find best path, be aware of lanyards etc. when walking through machinery.
8/21/2013 8:05AM MSP0313 Pull Hybrid Heat, cuts Take Breaks, drink water, use cut gloves
Trent Montgomery MK Telcom 8/21/2013, 8:05AM Pulling hybrids, grounding Cuts, heat Cut Gloves and proper cutting technique, periodic breaks and drink water often.
Travis, MCI 8/21/2013 8:27AM Hooking up antennnas, painting Heat Stress, Slips, Trips, and Falls, Heavy Lifting, JLG Water and Breaks, awareness of

trip hazards
8/21/2013 8:28AM MSP0186 Antenna installation Heat stress, lifting Take breaks, drink plenty of water, proper lifting technique utilize two people.
Shane Koehler & Ryan Mace 8/21/2013 8:31AM Ames South Wiring Radioheads Heat Stress, RF Take breaks in the shade, drink lots of water. RF Assesment, discussed avoidance game plan for tailgate meeting.
Cyrus Mink 8/21/20213 8:35AM MSP 0053 Hanging radioheads, connection jumpers Heat, capstan, cutting Breaks and hydration, Inspect all rigging componets and fall protection, use cut gloves, address bee nests.
Jordan Miller 8/21/2013 8:45AM MSP 0032 Cut over no safety climb, heat. crab climb, water and breaks
Mitch Kostreba 8/21/2013 9:10AM Wlliston 13074 Pouring Concrete, framing, hand dig, heavy equipment impalment, hand abrasion, struck by, heat stress. Stay hydrated and take breaks, cap rebar, leather gloves, equipment inspection, hi-viz, eye contact.
8/21/2013 7:43am Pulling fiber on tower heat, falls, hoisting water and rest, PFAS, inspections and tie-off, inspect hoist and rigging and commumincation.
8/21/13 falls from tower and

ladders, cutting tie off on tower, ladder stable and tied, communication, inspect rigging.
Boerjam, Bob 8/21/2013 7:05am Larson Construction Telco extension, pulling in phone line tripping, cuts and pinch points Good housekeeping, wear gloves open doors
8/21/2013 7:13am installing antenna and cable ladders, heat, slips, falls ladders stable and tied, water and rest, housekeeping, fall protections
Vindedahl, Eric Skipp Swanson Moline Water Tank Ground work Heat, flying debris, lifting, load water/rest, safety glasses and face sheild, 2 person lifting
MS15AL292 Digging into Conduit, installing H-frame heat, utilities, slipps and trip, pinches and cuts water and rest, hand dig locates on site, housekeeping and PPE
8/21/2013 9:01am raising radio heads and antenna heat, lifting, hoisting falls, overhead hazards water rest, Wayne was told not to raise antenna without a hoist, 100 % tieoff, PPE
White, Corey Phil Leaf 8/21/2013 8:44am Setting cabinets, pulling wire Heat and lifting Water and rest, 2 person lifting
8/21/2013 8:50am Anoka build platform, raise antenna Falls, hoisting and rigging, Heat use retractables, and tie off, inspect rigging and hoist
Detroit Lakes, MS03MP483 work in shelter wear hard hat, stay clear of lifting areas
MS03MP213 Install radio heads, and antenna monitor on site, also turned down broadcast, water and rest
8/21/2013 10:37am Finish AC install moving equipment, pinch points, ladders, heat Hiviz vest, eyecontact with operator, communicate, tie off ladder on secure ground, water and rest.
8/21/2013 11:00am Estelinne pour concrete Heat, rebar, equipement water/rest, caps on rebar, hiViz and eye contact with operator.
8/21/2013 12:43pm Dundas

Water tower Antenna swap RF, weather, heat, hoisting monitors, watch sky and radar, water/rest, communicate, inspect rigging and hoist.
Wayne Sabin 8/22/2013 6:03AM Detroit Lakes WT Connecting radioheads Heat, slips, trips, falls, working from height, traffic Drinking water and breaks, housekeeping, full body harness and 100% tie-off, cones to barricade work area.
Rick Givens 8/22/2013 6:57AM Connecting and testing Wearing protective gloves, drink water and take breaks.
Brad Bistodeau 8/22/2013 7:03AM North Detroit Lakes Run lines into cabinet, terminate at bottom and take photos. Heat, Overhead,

Climbing Breaks and drink lots of water, utilize tool lanyards, always tied off.
Zach Meyer 8/22/2013 7:10AM Ice bridge, dressing lines, sweep and pim test, cad welding. Cuts, burns, heat stress. Wear cut gloves, use face shield and welding gloves.
Cory White 8/22/2013 7:16AM Cuts, Heavy Lifting Wear Cut gloves, proper lifting technique, two person lift and have spill kit available.
Joe Hill 8/22/2013 7:25AM Waukee Weather, slips, trips, and falls, pinch points. Weather awareness, housekeeping, protective gloves.
Mike- Diamond Tower Services 8/22/2013 7:30AM Hooking up AC and Hybrid Electrical DC, Cutting. Lockout Tagout, cut gloves.
Mitch kostreba 8/22/2013 7:38AM Elliston Install fence, install and hook up ground ring. Heavy Equipment, slips, trips, and falls, cad welding, glue application Wear Ppe, High-viz, eye contact with operator, equipment inspection, use of ventilated area.
8/22/2013 7:44AM MSP01007 Lower antennas, hook up jumpers, terminate radioheads. Heat stress, slips, trips and falls, local traffic RF. Breaks and water, housekeeping, barricade site, RF assement and use of monitors.
8/22/2013 7:51AM MSP0053 Pulling lines connecting Cathead, cuts. Inspect all rigging and hoist, wear cut gloves.
Josh Conway 8/22/2013 8:22AM Bundas Terminating radioheads Heat Stress, weather, dropping tools. Water and breaks, ckeck weather, tool lanyards.
8/22/2013 8:40AM MSP0138 Clearwire Cathead, foot traffic, overhead utilities. Inspect hoist, barricade site, maintain 10 feet from power lines.
Mike Wolf 8/22/2013 9:03AM Stacking batteries, bolting cabinets. Rooftop Fall Protection, terrain, power tools, heavy lifting, electrical cords. Warning lines 15 feet tie off beyond that, proper footwear, tool inspection and

ppe proper technique
Erik Vindedahl, Skipp Swanson, Pat Loija, Michael Perez 8/22/2013 9:14AM Moline, Illinois Hooking up cabinets Heat, heavy lifting, flying debris, loud noise, grinding Water and breaks, technique and two person lifts, hard hat and ppe, ear plugs, faceshield, housekeeping.
8/23/2013 6:25am Toad Mountain falls, bugs tie-off, use bug repellent.
Stone, Matt 8/23/2013 7:05AM Carol

Iowa Assembling Fence Slips, trips, falls, heavy lifting housekeeping and site awareness, proper technique and two persone lift, wear gloves
White, Cory Leaf, Phil Weaver, Jason 8/23/13 Wiring cabinets working on AC panel Insulated tools, gloves, and face shield
Vindendahl, Erik Moline WT pictures and closeouts ladders, lifting, wasps fully erect ladder no top rung, proper technique and two person, spray
Farmington WT Set up radios and antennas, finish cabinet heat, slips, trips,

heavy equipment, lifting drink water, breaks, site awareness and housekeeping, High-Viz, inspection, proper technique and two person lift.
Mike, Diamond Tower Touch up, pictures SRL on platform, inspection of fall protection
Osseo Build up radioheads cathead, cutting
climbing, pinch points 100% fall protection, protective gloves
MSP 0138 running jumpers, ground antennas, terminate power overhead util., traffic, slips, trips. maintain 10 ft. clearance, barricade, awareness and housekeeping
Trenching heat, util., power tools,

trenching breaks and hydration, locates and awareness, inspeciton and ppe, gloves
take down old radios rigging, JLG daily inspection, barricade lift, tie off in basket
unable to take information
Setting shelter Barricade, high-viz, gloves, awareness of fall zone
Koehler, Shane Lynn Street Demobing rooftop, pedestrian warning lines, awareness, cut gloves.
8/26/2013 8:42am On route to

Aims Iowa
8/26/2013 9:10am MSP0252 Prepping for radio heads and wiring. heat, traffic, crane water and rest, barricades and spotter, inspections
8/26/2013 10:06am On route to Detroit Lakes
8/26/2013 10:11am Coon Rapids heat, falls from height Water and breaks, 100% tie-off, inspect gear.
8?26/2013 8:28am MSP0149 lowering radio heads, heat, slips and trips, rigging, falls water and rest, housekeeping awarness, inspect rigging
8/26/2013 10:39am In transit to Detroit Lakes
Mace, Ryan 8/26/13 Discussed JSA, in transit unable to write down information
Vogen, Forest
8/27/2013 6:35am Mounting Radio heads and antenna Heat, falls, tripping water and rest, 100% tie off, be aware of hills
8/27/2013 6:58am Grimes WT Digging a 3 1/2″ pipe 3 feet deep Heat, back strain, trips water and rest, straight back,
8/27/2013 7:17am Wire and install sprint cabinets heat, spills, electrical water and rest, spill kit in area, electricity shut off
Vogen, Forrest 8/27/2013 7:20am East

Grand Forks LTE upgrade new wire, radio heads and antenna heat, lifting,

capstan, pinch points water and rest, team lifting, inspections, gloves and work practices, tieoff to tower not boom gates.
8/27/2013 7:05am Pelican Rapids Build boom gates on the ground heat, bugs water, rest, spray for bugs, inspect tools plug into GFCI
8/27/2013 7:43am Blue Earth Trenching, install equipment in shelter utility strikes, slips/trips, heat,

electrical,

hand tools locates on site, watch footing and housekeeping, water and rest, shut off power, inspect tools gfci
8/27/2013 8:00am Lindseed Aims Iowa rooftop falls, crane, heat safety lines and retractable used, water rest and ice
8/27/13 running hybrid heat stress, falls, crane water rest, tie off to suitable anchor, signalling and rigging
Rozek, Don MK Rush Lake Intall mounts and running hybrid cable overhead hazards, heat, electrical, falls hard hats, stay out of drop area, water rest, gfci and turn off power, tie off
8/27/2013 8:27am Fargo, ND eletrical install heat, ladders, slipps and trips water rest in cool area, stable ladder, watch footing housekeeping
8/27/2013 8:37am Dawson, MN replace 2 HVAC units heat, ladders, ginding water and rest, stable secure ladders,

PPE
8/27/2013 8:54am Crystal Air Port pulling new fiber water rest, fall protection, anchor to tower.
Edina rooftop, jlg heat and RF warning lines installed, inspected JLG, RF monitor on site
8/27/2013 9:45am Dropping in cabinets bees, heat, power tools, crane spray, water and rest, inspect GFCI, communicate.
MSP0130 Clearwire upgrade, install new radio heads cranes, climbing, heat, traffic inspected rigging, fall protection, water and rest, barricades
8/27/2013 12:27am crane on site was too small and had inexperienced operators.
8/27/2013 12:09am New Richland build radio heads and antenna on the ground heat, terrain ground cutting water and rest, boots gloves
8/28/2013 6:55AM Traveling Stay hydrated.
8/28/2013 7:30AM Trenching, fiber tray. Slips, trips, falls, heavy lifting, underground utilities, heat, heavy equipment Site awareness, equipment inspection, take breaks, two person lifts, locates.
White, Cory, Leaf, Phil, Weaver, Jason, Loija, Pat 8/28/2013 7:35AM Wiring Sprint cabinets for indoor sites. Batteries, heavy lifting, heat stress. Spill kit, insulated tools, two person lift, water and breaks.
8/28/13 IA 2007 Nazzerin Setting cabinets, running wire. Bee Hives, Heavy lifting, heat stress. Wasp spray, 2 person lift, shade and water.
8/28/13 7:59 Virginia DT Running snap ins/antennas JLG, Rooftop, heat,

power tools, slips, inspection, tie off, warning line, fall arresst, breaks and water, awareness, cut gloves.
lonnee, Mitch, Vogen, Forrest 8/28/2013 8:07AM Running Fiber, jumpers, fiber testing Heat Stress, pinch points, ladder safety, CAD welding Breaks, buddy system, gloves and awareness, anchor ladder and don’t use top rung.
Temple, Jake 8/28/2013 8:14AM Prepping site, digging holes JLG, Heavy Lifting, Heat Stress, CAD Welding, RF Inspection, awareness of slope, proper technique, breaks and hydration, faceshield/PPE, RF monitor
8/28/2013 8:39AM MSP0068 Decomission old radioheads, cut butyl Cutting, rigging and straps, heat, slips Gloves, inspection, water and breaks, housekeeping
Koehler, Shane, Hill Joe, 8/28/2013 9:00AM Antenna connecting, electrical connecting elevation, rf exposure, heat stress,

slips, trips, power tools 100% tie off, monitors, awareness, breaks and hydration,

inspection, ppe
Vindedahl, Erik Anderson, Paul,

Swanson, Skipp 8/28/2013 9:05AM Fargo DT Pipe installation heat stress, ladder, slips, pinch hydrate and breaks, not top rung use, housekeeping, protective gloves
8/28/2013 9:20AM Hanging Radios and

pulling lines Heat, JLG hydrate and breaks, barricade, inspection, tie off in basket
8/28/2013 12:08pm N.

St. Paul Trouble shooting Heat, slips/trips, RF, RR tracks, Falls water and rest, housekeeping and awareness, use fall protection if climbing.
Springfield WT HVAC install, install metal siding Sharp edges on sheet metal, noise, heat, ladders, equipment Wear gloves and ear plugs, water rest,

proper use
Belland,

Greg 8/28/2013 7:00am Raise antenna snap in cable heat, pulling line, falls, falling objects water and rest, tie off and use PFAS, wear gloves and hard hats, tie to tower not boom gate.
8/28/2013 6:48am mount radio head heat, falls, terrain water rest, use fall protection SRL
8/28/2013 6:44am Detroit lakes WT Dressing on top and hook up radio in cabinet Heat, capstan, climbing water and rest, inspect hoist and rigging, use fall protection
8/29/2013 6:38am Dressing in antenna hooking into cabinet lightning, heat falls, terrain leave if they see lightning, water rest, use fall protection
8/29/2013 6:45am Detroit Lakes 296 Hooking up radio in cabinet Heat, insects, cows water and rest, spray and repellent, milk and cattle prods
8/29/2013 7:02am Iowa State T-1 testing heat, slips/trips, traffic, noist Water and Breaks, awareness of trip hazards, barricade traffic, limit exposure
8/29/2013 7:36am Blue EArth slips, trips, heat, epuipment awareness, water and rest, hard hats, hiviz vest, eye contact with operator when approaching.
8/29/2013 7:59am heat, sharp metal, power tools water and rest, gloves and face shield, ear plugs
8/29/2013 8:06am aerial lift, heat inspect lift and area, document inspection
8/29/2013 821am Wiring shelter, ladder, JLG, heat stable ladder, tie off to JLG inspect, water and rest
8/29/2013 8:50am LTE upgrade, pulling wiers Heat, pulling wire small shelter water and rest, ice
8/29/2013 8:53am Swap antenna heat, RF, traffic, crane, slips and trips area barricaded, monitor on site, hiviz vest, water rest in shade
8/29/2013 8:48am
8/29/2013 8:58am Finish ice bridge, mount antenna overhead hazards, power lines, slips trips, cadwelding, climbing hard hats stay clear of loads, housekeeping, water and rest, PPE
8/29/2013 9:00am Hooking up batteries,

running conduit heat batteries, shock water and breaks, 2 person lift and spill kit, PPE
8/29/2013 9:40am Chestnut Hooking up batteries. Heat cutting, slips lifting water breaks, cut gloves, housekeeping, proper lifting technique
MSP00068 Decommision line heat slips, lifting, pinch points water breaks, housekeeping, 2 person lift, protective gloves.
8/30/2013 6:55am Fiber Test and Photos Heat, trip hazards on tank, falling objects, falls water and rest, wear fall protection at all times be aware of surroundings,
8/30/2013 7:11am Pelican Rapids 296 Install GPS water, rest, spray
8/30/2013 7:42am Heat, ladders, slips and trips, cuts, pinch points water rest, housekeeping, cut resistant gloves.
8/30/2013 7:46am NSP Chestnut wire cabinets, run conduit slips and falls, heat, lifting, cutting housekeeping, tie off outside warning line, cut resistant gloves.
8/30/13 install Colt Heat, RF, cuts and pinches water and rest, wear monitor do assessment, cut resistant gloves
heat, climbing, slips/trips water ac in shelter, tie off, watch footing
Rerouting and fiber test heat, man basket, cuts, traffic, rf water, rest, tie off and insect, barricade and monitor rf radiation
8/30/2013 8:50am Change TMA on a Monopole heat, RF, slips and falls water and rest, moitor radiation, fall protection and awareness.
8/30/2013 9:02am LTE upgrade, install GPS, dress fiber Heat, lifting water and rest, team lifting, use legs
8/30/2013 9:50am Prep clearwire, get stuff to roof Controlled descent, trip, weather, lifting Ensure anchors, watch footing and weather, team lift.
8/30/2013 10:24am MSP0226 pinch points, sharp edges cut resistant gloves, file edges of conduit.
8/30/2013 11:17am hooking up GPS heat, bees, power tools water rest, spray, PPE, gloves
9/3/2013 9:37am Installing antennas and radio heads Climbing,

Man basket tie-off to entry port, lift plan discussed with employees
9/3/2013 9:43am MSP0271 set up to install radio heads controlled descent, falls, heavy lifting, pedestrians tie off to cabinet platform or cable around penthouse, spotter below work,
9/3/13
9/3/2013 9:20am MSP0129 Slips, cuts, RF radiation Housekeeping, gloves, assessment and monitor
Austin
9/3/2013 2:54pm Chetck trenching 3K ft install pipe locate, inspect trench
9/4/2013 7:20am New Richland 1900
9/4/2013 7:34am No texting, seat belt
9/4/13
9/4/2013 7:47am Pre-cut prep power tools, ladder PPE and inspections, proper use of ladders, houskeeping
9/4/2013 8:03am St. Paul, Rice Street Pulling wire Rigging, Climbing
Driving to SD driving
9/4/2013 8:09am Mounting Antennas Climbing, controlled descent, RF radiation tieofff to entry port, identify anchors, monitor radiation.
9/4/2013 8:33AM Tie up FIF cabinet Ladder, Torch Proper usage, gloves, ppe
9/4/2013 8:47AM Front Street St. Paul Fiber Test and De-Rigg Slips, trips, repel Housekeeping, proper anchorage and securment
9/4/2013 10:00am Prep for cabinet moving, run conduit Heat Power tools, cuts water and rest inspect, wear gloves
9/4/2013 10:04am MS15AL238 Install backer on Hframe Slips trips, heat power tools Awareness, housekeeping, inspect tools and wear PPE
9/4/2013 10:06am Crookston Prep for power plant swap back strain, potential voltage, ladder team lifting and good technique,
9/4/2013 10:01am Taking out old line and hooking up new jumpers cutting, rooftop, RF gloves, warning lines and SRL’s. monitor
9/4/2013 1:11pm Jefferson Lake bolts missing from tower, falls, lifting, cuts, heat Engineer to determine safety of missing bolts, tie off, 2 person and proper lifting, water and rest
9/5/13 MN-MSP 0252 Hook up new RRH’s, decom the old RRH’s Crane signals, slips trips falls, basket pinch points, heat stress, cuts, Make sure crew knows their signals, has inspected the environment, check that arms and heads are in the basket before you signal the crane to move, wear gloves
MN-MSP 0551 Hot slide old RRH’s, Hook up new RRH’s, Pull DC and Fiber, RF from rooftop antennas, no parapet wall, bee’s, Heat stress, maneuvering through hotel lobby with heavy materials, slips trips and falls RF monitor/don’t stand in front of antennas, rooftop safety cones, flags, carts and horizontal lifeline, avoid bees/wait until times that they are sleeping, be aware of civillians in the lobby/ go slow, Be aware of conduits on the rooftop
Little Marais Hand cuts when stripping cable, RF, slips Keep a clean site, identify trip hazards, Wear PPE
New Richmond 1900 Climbing Tower, Testing, Ladder Safety, Capstan Safety 100% tie off to the tower and wearing proper PPE, use GFCI and check the power cords, No leaning of the ladders, tie off the extension ladder, use the ladders the proper way, fill out the forms and inspect before use, GFCI
Elk River Train Traffic, Hydration and weather, Lifting hazard while installing collar, RF and pinch points Barricade sit, drink water, take breaks inspect rigging, inspect rigging team lifting, monitor RF, wear gloves, watch hand placement.
Lynn Street Rooftop Traveling to site
Etelline Cadwelding, power tools, ladder safety, weather use ppe while cadwelding, use GFCI, proper use water and rest.
9/5/2013 7:15am ladder lifting, power tools, batteries
9/5/2013 7:42am ladder safety, cuts and hand safety with Moe
travel
ladder safety, battery safety, cuts
heat stress, slips and falls, batteries, crane safety Signalling
Ladders, Heat stress
fall hazard, lift, weather, terrain tie off, team lift, plenty of breaks, watch footing.
ETTCS

Chetek trenching 800′ with case, backfilling and tamping, Installing 4 circuits inside power plant machine use electrical shock, heat stress, tamper in operation. Using high vis vests on and off machine, using correct hand motions, leather gloves, using buddy system, clear safety glasses ANSI approved, cool water onsite, emergency action plan discussed
Slack, Justin 9/5/2013 8:12am Earlville Fence Repair extension Slip trip falls, step ladders, sharp edges on chain link fence Watch foot placement, making sure step ladder is secure in stable location under 4’, wear cut resistant gloves
9/5/2013 7:46am Alamosa Constructing H Frame, hand digging 2” pvc from meet point to h frame location Equipment use, skidloader and trencher attachment, electrical shock,  high humidity, heat related injuries Wearing high vis vests, using hand motions in and out of the machine, making sure to stay away from trencher while in use 5’ rule, wearing leather gloves & clear safety glasses.  Having operator aware of possible obstacles and hazards, having cool water available and to take ½ water breaks
9/5/2013 6:48am ETTCS Wells Backfilling and tamping installing 4 circuits from PP to FIF rack.  Installing smurf tubing
scot kaiser installing hybrids inside and on wt harness insp, load rope inspec, capstan hoist inspect where gloves to protect hands, use an extenion ladder vs a controlled descent.
nate belland 336 mercy hospital install steel beams under platform rooftop saftey gloves hard hats set up a perimeter 15′ away from roof edge to inclose the work area
phill ms03np190 continue installing indoor cabietns installing new dc wiring into locked out pp, stripping wires, cad welding face sheild, gloves, gfci outlets, denergize equipment
don with MK mso3np190 isntalling the hybrid and new boom gates gloves, harness inpection hoist, capstan hoist inspection, load rope inpection gloves, competent personael
mike with diamond Installing antennas and radio heads on top of water tank 100% tie off on tower, tie off ext. ladder to water tank, pulling hybrids in under ground conuit tie off ladder to wt, 100% tie off, harness insepctions
MS03XC261 farmington wt picking up removed asphalt and installing new grounds( cad weld) heavy lifting, cad welding where gloves to protect hands and face shield for cad welding
9/6/2013 7:35am Ground work in shelter, install remote radio head and DC leads ladders, glove, slips and trips, heat ladders on flat surface, cut resistant gloves, housekeeping, water rest ac in truck.
9/6/2013 7:39am trenching pipe and backfilling installing vault landing wires in cabinet stay away from equipemtn, bees, foot around tamper, heat eye contact hiviz vest, feet from under tamper, stay away from nest, water and rest
9/6/13 driving, slips and trips, possible grinding watch other

drive
9/6/2013 8:08am installing bolts power tools, cuts, heat, falls, missing bolts, falling object
9/6/2013 8:13am Cargill Running cords
9/6/2013 8:24am taking down old radio heads and removing old wire. heat, RF falls Water rest and buddy up, use monitor, tie off to 5000 pound anchor.
9/6/2013 8:43am
anderson, Paul Fargo DT RELO installing wire for Alarms Heat, ladder, eye injury, slips trips water and rest, level surface fully open, wear safety glasses, good housekeeping.
Vindendahl, Eric 9/9/2013 7:42am Clean up jobsite, voltage test slips and trips, driving housekeeping, switch drivers
9/9/2013 8:37am MSP0132 pulling wires heat, dropping stuff, climbing water and rest, tether tools and matierials when possible, tie off
9/9/2013 9:08am MSP0508 Pull Lines hanging

man basket, wind Fall protection and crane lift, watch wind speed, barricades and security guard.
9/9/2013 10:27am Monopole, swap antenna Slips trips falls, ey injury, drop zone, backstrain housekeeping, tie off chokers, safety glasses and face sheild, inspect rigging wear hard hats, team lift, use legs
9/9/2013 10:49am Traveling to

Omaha
9/9/2013 11:55am Building frames, flying antenna wind, RF, Falls, Rigging, cuts scapes, slips and trips inspect rigging, eyes on load and communicate, gloves, aware of terrain
Crump, Jaimie 9/9/2013 12:57pm Schleswig Make Z Brackets, wind, Falls for work platform, heat, slips/trips, cuts work with crane operator, fall protection, water and rest in shade, PPE-gloves
9/9/13 Call taken by Josh Hamre
9/10/013 7:00am Install T1 slips trips, possible ladder, possible impact drill watch footing,

proper use, PPE
9/10/2013 7:05am Pull lines, dress ground, stuff shelter Weather, rigging, falls falling object, cuts watch radar, inspect rigging, tie tools to tower, tie off use PFAS
Heidman, Mitch 9/10/2013 7:15am Pull lines, rig tower heavy lifting, falling objects, falls, traffic, slips trips inspect rigging and capstan, tie off to tower, watch footing
9/10/2013 7:36am East Grand Forks Finish locates, pour concrete, digging Heavy equipment Hi-viz clothing, eye contact
9/10/13 heat, arc flash water rest, PPE, isolate conductors.
9/10/2013 7:41am Park Rapids fall hazards, traffic static rope to tie off, barricade area, HiViz clothing.
Shelter work heat, slips, electricity water and rest, awarness, de-energize.
Mount antenna, install ice bridge wind, heat, pinch points, falling objects stop if too windy, water and rest, inspect rigging
9/10/2013 8:06am MS03NP407 Setting up cabinets lifting and heat 2 person lift and proper technique
Nebraska wiring up shelter heat ladders, crowded work space, power tools cuts water, proper use,GFI outlets, cut gloves
Schartztrauber South Dakota Bryce did not have a job book. Book was with J. Bye
9/10/2013 9:58am Setting up rooftop fall hazards, lifting hazards set up warning lines and anchors
kohler, Shane 9/10/2013 8:52am MSP0235 Running conduit, connecting to bores rooftop, power tools Warning lines set, ppe
9/10/2013 8:21am drop zone, weather, train traffic aware of overhead loads, communication, water breaks, watch forecast, barricad site, 2 person lift
St. Paul pull radio heads and lines overhead utilities, bees proper rigging and awareness
MS03MP407 rigging and running hybrid moving, pinch points, cutting tie off, PPE
9/10/2013 8:58am 400 building off 169 Rigging, RF, heat stress, cutting inspect, water and rest, cut gloves
9/11/2013 6:38am Sebeka hang booms and side arms power lines, slips trips, falls 10 feet away watch rope if windy, watch footing, tie off use SLRs
9/11/2013 7:15am stripping forms, trench for conduit open trench, heavy equipment watch footing, wear hi viz vest, make eye contact with operator
9/11/2013 7:20am wiring shelter heat, ladders, crowded space, power tools, cuts water rest, poper use and inspection, housekeeping, inspect GFCI, Gloves on person
9/11/2013 7:17am Installing software in COW
9/11/2013 8:12am MS03NT407
9/11/2013 8:28am run lines heat, falls, crane water rest, tie off,
Swartztrauber 9/11/2013 8:24am Sheridan Lake Rd trenching, set up J-box utilities, lifting, heat, slips/trips locates, gloves, 2 person lift, water breaks, housekeeping, PPE
9/11/2013 8:36am Escelline Shelter Work ladders, flying debris, slips/trips gloves face sheild, jacket, housekeeping
9/11/2013 7:55am Sarona trenching, install SE-AD, install wire pinch points, eye contact Awareness at trench
9/11/2013 9:34am DT New Richmond Argus Cut Over arc hazards PPE , isolate circuits
9/11/2013 9:38am Hook up radio mount pipe climbing dry tube, lifting, hand tools use safety climb, use can
Langford, Larry 9/11/2013 9:40am 400 Lake Street
9/11/2013 9:45am LTE Swap heat,

slips, RF water, sunblock, monitors, housekeeping, caution tape
9/11/2013 9:49am
9/11/2013 10:08am Traveling/punch lit 3 sites
9/11/2013 11:06am went through JSA I was unable to take notes
9/12/2013 6:36am Sabeka Hanging arm and radio head falls, overhead power, weather tie off to anchor, maintain 10 feet distance, stop if too windy
9/12/13 Hooking up Cabinets Hand tools, climb, heat PPE, 100% tie off, water and breaks
9/12/2013 7:25am Low Voltage hook up, running wire cuts, low voltage power, ladders gloves, insulate tools, proper use
9/12/2013 7:33AM Lifting, cutting, ladder two man lift, cut gloves,

proper usage
9/12/2013 7:34am Driving and power tools
9/12/2013 7:44am E. Grand Forks Shelter Set Heavy Equipment, lifting Hi-Viz clothing, stay out of crane guys way, use mechanical lift
9/12/2013 7:47am Dairyland

WI Trenching, and shelter work utilities, power tools, electric locates, potholing, inspect and plug into GFCI, PPE and isolate
9/12/2013 7:56AM Aberdeen, SD Drilling holes heavy lifting, ladders two man lift and proper technique, proper usage
9/12/2013 7:59AM MSP0073 Remove radioheads, hook up new jumpers RF, Slips, Rigging. Monitors and assesment, housekeeping, inspection
9/12/2013 8:05AM Pictures, clean up Lifting, slips team lift, housekeeping
9/12/13 8:15 Prep site to sweep, run jumpers 100% tie off, ppe
9/12/2013 8:18AM Testing T-1’s Sun and heat Sun block, Hydration
9/12/2013 8:21AM Espeline Cad weld, ladders, flying debris, slips PPE, proper usage, housekeeping
9/12/2013 8:25AM Run ground leads, hook up top CAD welding, climbing, cutting, slips PPE, 100% tie off, housekeeping, cut gloves
9/12/2013 8:17am Hot Springs SD Digging trench in rock utilities ,fireRF, lifting Fire, slips/trips stay 10 feet from power lines, pothole and locates, housekeeping
9/12/2013 8:53am MSP0561 prep for

cut over fall, lifting, cars, tripping warning lines and fall protection, team lift, cones, awareness
9/12/2013 9:57am trenching and laying conduit Equipment, heat, power tools hi-viz vest, eye contact, water and rest, inspect and PPE
9/12/2013 12:28pm St. Peter Moving Batteries Lifting, spills heat tripping mechanical lift, spill kit on site, housekeeping.
9/12/2013 12:55pm Finish Roof falls, slips trips watning lines and PFAS
9/12/2013 1:05pm
9/13/2013 6:53am Final Photos, Fiber Test, anchor stiff arm falls, hoisting, slips/trips tie-off,inspect tie-off
9/13/13 various install software, testing driving, slips, trips rest switch drivers, awareness
Jack Trice Stadium cuts, trips, heat gloves, awarness, water rest housekeeping
Dom, MK Rigging tower, take down old antenna and installing new Heights, electric Capstan, overhead tie off to tower, PP3, GFI, tether tools
9/13/2013 7:55am stuff shelter put in fence lifting batteries hand tools heavy equipment proper technique, ppe
9/13/2013 8:06am Northstar Bdg. Hand antenna Repelling, slippery roof, weather/wind Ensure anchor points, inspect rigging stop if too windy.
hand trenching heat, tools, utilities, heave equip, slips water and rest, ppe and GFCI, locates, hi-viz communication, housekeeping
Minke, Erik Ground prep,
9/13/2013 8:19am Hang antenna, crane work in a man basket crane, bees, ladder PPE, RF Meters proper use of ladder, hydrate, team lift
Vindedahle, Erik 9/13/2013 8:34am Clean up, Cadweld, ladders, slips, lifting face shield, proper use housekeeping, lift gate and proper technique.
Mankato Skyline Day cut electircal, ladders, pinch points, cuts, heat PPE isolate, proper use, gloves water rest.
9/16/2013 10:06am St. Peter WT hanging antenna and wire boxes JLG, lifting, cold daily inspection, tie off, team lifting, dress appropriatly
9/16/13 Center City LTE Install Cuts, Trip, ladder gloves, awareness, proper use
9/16/2013 9:09am Driving to

Buffalo T

Mobile
9/16/2013 9:16am
9/16/2013 10:51am Heavy equipement, slips, power tools, utilities, heat housekeeping. Hi-Viz communication, PPE GFI, water and rest.
9/16/2013 11:02am AW Skyline setting cabinets with crane lifting, slips/trips, inspect crane and rigging, communicate, Hi-Viz vests, housekeeping
9/17/2013 7:06am Cumberland Finish Running pipe pinchpoints, ladder
9/17/2013 7:14am Galena Moving cabinet and driving pinch points, ladders, moving cabinet gloves awareness, steel toe shoes, 3 points of contact, use dolly and 2 people
9//17/2013 7:18am Put up fence, bolt down shelter pinch points, equipment,

slips trips, lifting awarness, gloves, Hi-Viz, team lift proper technique.
9/17/2013 7:23am ladder, heavy lifting, batteries, power tools, overhead proper use, fully open, team lift spill kit, GFI, leave area
9/17/2013 7:34am Wrap up, take photos falls, JLG, Fatigue tie off, inspect lift, buddy checks
9/17/2013 7:38am Battle Lake Start lifting booms rigging, pinch points, falls, falling objects inspect, awareness and communication, tie off tether tools Mitch Heimann called for Brad
9/17/2013 7:42am Finish Ground, Close out parking lot, cooler weather, climbing watch for nails, dress warm, tie off
9/17/2013 7:44am Shelter work and photos cuts climbing gloves and tie off to tower
9/17/13 Grand Island NE Stuff Shelter, wiring lifting and batteries team lift, spill kit
Installing Ground cadweld, equipment PPE, hi-viz and communication with driver
Lindblad, Jeff CC 9/17/2013 7:52am Barnsville Install battery, running cable overhead, lifting, slips/trips, clear area during lifting, housekeeping, team lift, lifting belt
9/17/2013 8:03am Grand Avenue Relo Adding fans, installing conduit, pulling wire. shock, rooftop, hammer drill, cuts, ladders, sawsall PPE and isolate live parts, set up lines and PFAS, eye protection and gloves, proper use of ladders.
9/17/2013 8:07am Fergus Falls Running Conduit, Installing batteries. Heavy lifting, cutting team lift, PPE
9/17/2013 8:09am Rig Tower, Assembly inspect rigging, tailgate meeting on rigging plan
9/17/2013 8:32am MSP0114 Clearwire Cut-over lifting, utilities, Roof edges team lift, keep safe distance, warning lines and PFAS
9/17/2013 8:56am Swapping Hybrids handrail around tank, electrical Tie off when outside guardrail, PPE
9/17/2013 9:12am Center City WT finsh up T Mobile work laddder, trip hazards, electrical work inspect and proper use, housekeeping and PPE
9/17/2013 9:50am Driving all day
Schwartztrauber 9/17/2013 11:38am Box Elder covering trench Heat, slope, slips/trips, strains, Lifting wind, watch footing, team lift, use lift
9/17/2013 12:18am With Jake Temple
GSM Cut-over lifting, RF, shock, bees, debris use skid steer, monitor, work on dead circuits, spray and alergies, housekeeping
9/18/2013 7:31AM Drive Drive Safe
Carlson, Mike(Diamond Tower) 9/18/2013 7:47AM Barnesville Rigging Gin Pole on tower Rigging, climbing Communication(radio and hand signals)
Kacey Swirtz and Brian Moe 9/18/2013 7:54AM Hand Digging 3 ft. trenches, Hand Digging Awareness, Gloves, Locates
Joe Hill and Eric Mincke 9/18/2013 8:14AM Fly booms & pull lines Elevation, rigging, wind, pinch points Manometer, inspection, wind, gloves
9/18/2013 8:19AM Driving to Fergus Falls Setting and bolting down cabinets, Lifting, pinch points, slits and trips Team lift, no running and housekeeping
Donovan, MK Electric 9/18/2013 8:28AM Wadena Assemble RRU, T Booms PPE, Team lift, housekeeping
Borjan, Bob, Warden, Dom 9/18/2013 8:37AM
Vindedahl, Eric, Wolf, Mike, Swanson, Skipp, Berg, Scott, Pomeroy, Andy 9/18/2013 8:50AM North Buford Fall Zone, Bee Sting, Slips, Ladder Bee Spray, Tailgate:Fall Zone awareness,

proper usage
Sabin, Wayne 8:58AM 9/18/2013 Re-Route Lines Rain Monitor Weather
9/18/2013 9AM Ladder, Slips and Trips, power tools Proper use, ppe, housekeeping
9/19/2013 7:34AM Relocate Hoffman Digging, lifting, Stretch,

team lift, ppe
9/19/2013 7:51AM Laying conduit, backfilling power tools, glue, excavator ppe, high viz, communication
9/19/2013 8:14AM Sterling, ND loading software, testing t-1 cutting, trips gloves, and housekeeping
9/19/2013 8:41AM Hanging mounts rigging, winch Inspection, retractable
9/19/2013 8:47AM Beron Center Day Cut, install GSM unit lifting, bobcat, electrical, slips, ladders ppe, high viz, housekeeping, proper usage
Crump, Jaime 9/19/2013 8:57AM Luxemburg Pull DC up tower and pics watch for weather
Several called while I was driving I could not take notes, JSA discussed
9/20/2013 6:38am Mount last radio tap into shelter,

final photos weather, falling objects, slips trips Watch weather stop is too windy, tether tools stay out from under tower hands, awareness tower is wet from rain.
9/20/13 Driving get material list switch drivers, Bob Boerjan called in
9/20/2013 7:12am Stuff shelter stubbing lines, landscaping Lifting digging, equipment 2 person, no twisting, PPE, communicate
Conway, Justin 9/20/2013 7:19am MSP0276 Full install with crane, weather proof and grounds crane basket, utilities, traffic, falling objects PPE, stay away, barricade, tether falling object zone.
waiting our rain storm watch wind speed, slippery tower.
Meyer, Zack 9/20/2013 7:48am Route Power and fiber, ground ring, mount GPS elevation, cutting,

power tools, ladders proper use of PPE and tie-off, Cut gloves tie-off to tower
9/20/2013 7:30am Pour Concrete, concrete, ladders PPE, gloves, ladder safety
Switching mounts Heavy lifting, workers on mounts, falls
9/24/2013 7:39AM Hooking up DC power elevation, electrical 100% tie off, LOTO
9/24/2013 7:45AM Vines Install 3 DC Breakers Disconnect, ppe
9/24/2013 7:50AM Cyrstal Cut-over, photos
9/24/2013 7:55AM MSP0590 Pulling Lines Hand Pull, Pinch Points Take breaks, identify anchor points,

ppe, barricade
9/24/2013 8:39AM Adams Connecting Rru’s busy site, volume, pinch points, elec High-viz, ear plugs, ppe
9/24/2013 8:42AM Connect cabinets Ladders, electrical, slips, trips proper usage, ppe
9/24/2013 8:52AM Grand Mall Running lines, crane Crane lift PPE, team lift, drop zone awareness
MK Electric, Donovan 9/24/2013 10:04AM Osakis Assemble T Boom Heavy Lifting Team Lift
9/25/2013 7:18AM Solon Spring Heavy Equipment, lifting, hand tools, jsa team lift, ppe, high-viz
Mace, Ryan, 9/25/2013 7:37AM Conduit runs lifting, power tools, ladders team lift,

ppe, proper usage
9/25/2013 7:41AM Morning Side Run jumpers
9/25/2013 7:44AM wiring radiohead ladders, slips, trips proper usage, ppe
9/25/2013 7:47AM Lincoln Excavate, pour concrete heavy equipment, power tools, slips ppe, hand placement, high-viz, awareness
White, Cory, Loija, Pat 9/25/2013 8:12AM Lake Nebagamon Hooking up Sci-Ad insulated tools, ppe
9/25/2013 8:25AM Pull new fiber, weatherproof jumpers, photos slips, trips, overhead power tools ppe, housekeeping, heel block
Pomeroy, Andy, Wolf, Mike 9/25/2013 8:29AM North Grand Mall DDU Install ppe, housekeeping, emer action plan
Mk Electric, Donovan 9/25/2013 8:46AM Remove and install new antenna pinch points, slips ppe, no man zone
Bjorjan, Bob 9/25/2013 8:56AM Honeywell Run coax to roof
9/25/2013 9:12AM power plant swap, ladder, slips, elec 3 points of contact, awareness, insulated tools
9/26/2013 7:15AM clean up, ground gps
9/26/2013 7:23AM interior shelter work ladder, slips, heat proper usage, housekeeping, hydrate
9/26/2013 7:33AM Solon Springs finish trenching lifting, slips, equipment team lift, housekeeping, high-viz
9/26/2013 7:55AM pourting concrete, ground ring heavy equipment, cad weld high-viz, communication, ppe
9/26/2013 8:11AM hook up power distribution, run cable
9/26/2013 8:14AM hook up antennas, install ground kits cutting and climbing gloves, 100% tie off
Swanson, Skipp, Koehler, Shane 9/26/2013 8:47AM prep site for lte lifting, wind, ladders, flying debris team lift, ppe, proper lifting, cut gloves
9/26/2013 9:05AM 132 Clearwire traffic, pinch points 100% tie off, awareness, barricade site
10/01/2013 7:28AM Rushkin pour concrete, rebar in fittings pinch points, lifting ppe, team lift
10/01/2013 7:36AM Iowa City UMTS

cutover traffic, lifting, trips awareness, team lift
Boarjan, Bob 10/1/2013 7:40AM hook up power lines clean up, trips housekeeping, awareness
10/1/2013 8:07AM new shelter hook up ladders, slips, trips,

lfiting proper usage, housekeeping, team lift.
10/01/2013 8:24AM McAlister pulling and terminating lines JLG, traffic, slips, rigging Inspection, barricade, housekeeping.
10/01/2013 9:12AM Shamrock running dc and fiber capstan, pinch points, lifting inspection, pinch points, team lift
10/01/2013 9:51AM Manvel Build out antennas wind,

cutting, ladders monitor weather, ppe, proper usage
10/01/2013 9:52AM core

drilling
10/01/2013 9:53AM installing cables
Bistodeau, Brian 10/2/2013 6:44am Perham Install hybrids, ground work weather, dropping objects watch, hang on to tools and parts, tie off to tower
10/2/2013 7:06am troubleshooting driving, Hemoroids Preparation H
10/2/2013 7:30am Crown Plaza Decommision Cabinets Crane power tools stay away from crane, PPE
10/2/2013 7:37am run coax cable ladders working in small area proper use, shut down power
10/2/2013 7:33am Grand Portage utilities, slips/trips, saws, noise, animals pothole/careful when digging, ppe, hiviz plugs safety glasses
10/2/2013 7:49am Ruskin digging ground ring cadwelding cadwelding, lifting PPE use legs, straight back
10/2/2013 7:50am ladders, slips trips proper use, watch footing, gloves watch polarity on batteries.
10/2/2013 7:52am cuts, driving gloves and PPE, awareness
10/2/2013 7:53am Manville ND move antenna, LTE antenna and radio install Men above, falls, heavy lifting, ladders PPE stay out of drop zone, tie off to tower, proper use.
10/2/2013 7:55am WI4938 Final grade heavy equipment, slips/trips PPE Hi Viz, watch footing
10/2/2013 8:12am Madison raise antenna, pull lines falls, lifting, bees tie off with SRL’s, inspect equipment, spray bees
10/2/2013 8:15am rf, slips, falls monitor, watch out for nest, tie off
10/2/2013 8:39am Van Meter Iowa Painting tie off inspect equipment, watch weather
10/2/2013 8:41am Spearfish, Deadwood Steep hill, rough terrain set up ropes, don’t loosen rocks on emps below
10/2/2013 8:42am Garden City Finish running conduit Power tools, ladder, trip hazard PPE, Proper use, watch step, housekeeping
Berieter, Blaise 10/2/13 ATT Marathon low parapet, ladders falling objects warning lines and fall protection, proper use, tie-off objects.
SAC Wireless Prep, fiber test, color code small area, noises lifting, watch each other, ensure communication, tie-off to tower
10/2/2013 9:14am LTE Wrap-up falling object, RF stay out of drop zone, monitor
10/2/2013 9:23am utilities, falls, ladder secure maintain distance, tie off, secure ladder
Bistodeau, brad 10/3/2013 6:38am Hang Booms with crane weather, falls, drop zone watch, tie off, hold on and tether tools
Givens, Rock 10/3/2013 7:12am
10/3/2013 7:24am Testing lowering/lifting material slips/trips, falls from elevation, weather, lifting inspect rigging and hoist, tie off, watch weather on phone, PPE,
10/3/2013 7:38am Run Pipe to vault weather, slips, equipment watch, footing, PPE and Hi Viz
10/3/2013 7:40am photos, driving slips/trips, low objects in shelter watch footing, wear hard hat
10/3/2013 7:42am Fiber test, test ground, dress in fiber cutting, men above, falling objects, ladders PPE, gloves, stay out of fall area, tether and hang on to tools, tie off ladders and use properly
10/3/2013 7:45am Shelter work, canweld ladder, slips/trips, cutting, cadweld proper use, houskeeping
10/3/2013 7:49am Hooking up radios
10/3/2013 7:57am P0287 Pull Lines, Weather, Pulling Lines, Slips monitor, breaks, barricade, housekeeping
10/3/2013 8:03am Austin E AAV Finish pipe run Ladder, power tools, Bender 3 pts. Contact, PPE, Keep fingers out of bender
10/3/2013 8:42am Sheldon Iowa climbing, weather, slips, RF tie-off, monitor watch for lightning, PPE monitor RF
10/3/2013 9:02am trenching, install vault Slips/trips, cutting awareness, hand digging, HiViz
10/3/13 Osacus tower, pictures climbing, falls, slips/trips, RF, weather tie off, housekeeping, monitor watch doppler
10/4/2013 7:05am Fly hybrids, Wind Climbing, cuts, potholes stop if too windy, tie off, wear gloves
10/4/2013 7:30am Change antenna bracket windy climbing 100% tie-off, monitor wind and weather, PPR
10/4/2013 7:33am Ruskin set shelter tag lines, housekeeping, clear of fall area
10/4/2013 7:36am Install T-1 Circuits trips cutting,
10/4/2013 7:42:00AM Troubleshoot
10/4/2013 8:19am NE Mpls., SAC wireless cutover Difficult to tie-off to Monopole, weather, cold use endless chokers, communicate, dress warm, monitor weather
10/4/2013 8:26am MSP0158 Pull fiber, hang lines on tower Pinch pts., weather, obstacles on tower when climbing monitor weather, 100% tie-off
10/4/2013 9:00am
10/4/2013 8:25am Pictures and driving
10/4/2013 7:42am WI4952 Equipment and hand digging pipe install power tools, heavy equipment, utilities, slips/trips, PPE Hi viz, locates, housekeeping, monitor weather
10/4/2013 8:15am Ossakas Weather, RF, Slips Monitor weather and RF, housekeeping
Final photos, taking down old sectors 100% tie-off, rigging inspection
10/4/2013 10:04am ladder work, drilling, weather proper use, 3 pts., PPE while drilling
10/4/2013 8:32am Duluth Ladders, cutting
Mink, Cryrus 10/7/2013 8:36am turkeys, proper rigging, hand pulling, climbing watch hands, inspect rigging, 100 tie off
10/8/2013 7:17AM Jaynesville Setting Cabinet, digging ground ring ladders, slips-trips, power tools proper usage,

housekeeping, ppe
Kostreba, Mitch & Schwartztrauber, Bryce 10/8/2013 7:23AM set shelter, install ground ring lifting, slips-trips fall zone awareness, ppe, housekeeping.
10/8/2013 7:30AM DECC Pulling power supply proper use, ppe, housekeeping
10/8/2013 7:36am raising antennas drop zones, wind, pinch points, capstan use. Awareness, monitor weather, tailgate topic-capstan use.
10/8/2013 7:50AM Fairbult Setting shelter, hammer drill, slips trips, ladder, hammer drill ppe, housekeeping, proper usage
10/8/2013 7:56AM
10/9/2013 7:10AM piping to H-Frame, setting ground ring. pouring concrete, heavy lifting.
10/9/2013 7: 32AM Fort Madison Installing beam clamp climbing, pinch points. 100% tie off, awareness, cut gloves
Boerjam, Bob & Warden, Dominic 10/9/2013 7:35AM Landing GPS Ladder Work Proper usage and PPE
Conway Josh 10/9/2013 7:46AM Flying a gate rigging, capstan inspection, proper awareness
Swirtz, Kacey, White, Cory, Moe, Brian 10/9/2013 7:50AM 48th and Vine Set the shelter Crane, traffic barricade drop zone, communication
10/9/2013 7:57AM Testing T-I’s Ladders, Driving Proper usage, defensive driving
10/9/2013 8:21AM MSO0169 flying antennas crane, traffic communication, team lift, 100% tie off
10/9/2013 8:39AM Waterville installing Raycap warning lines, ppe
10/9/2013 8:46AM Flying antennas up tower crane, rigging barricade, drop zone, communication
10/9/2013 8:58AM Cavriole vertical pipe pipe bender, rooftop, rooftop 3 points of contact, warning line, pinch points
Boerjan, Bob 10/10/2013 7:25AM sawzall, flying debris cut gloves, ppe
10/10/2013 7:32AM Cadweld, dig fence pole holes, install h-frame Cad Weld PPE, weld in ventilated area, ppe
Morelli, Chris, Vindedahl, Erik 10/10/2013 7:51AM MN3684 feeding conduit, grounding shelter cad weld, slips, underground utilities High-Viz, locates, housekeeping, ppe
10/10/2013 8:08AM MSP0173 Putting antennas on monopole aerial lift, wind tie-off in basket, monitor wind
10/10/2013 8:20AM MSP0110 Fly and move radioheads, ground work overhead utilities, traffic, slips Use caution, barricade, ppe, housekeeping
Mace, Ryan & Conway, Josh 10/10/2013 8:32AM Conduit Run gloves, gfi, ladders
Temple, Jake & Bereiter, Blaise 10/10/2013 8:29AM aerial lift, rooftop, heavy lifting Inspection, tie-off, high viz, team lift
10/10/2013 8:34AM handrail, antenna, and hybrid install Elec, slip, trips ppe, clear drop zone, RF Monitor
10/10/2013 8:50AM Sioux Falls Extending and

testing T-1’s gloves, proper usage
10/10/2013 9:02AM Sioux City Trouble shoot for TMA Wind, slips and trips ppe, housekeeping, monitor
10/10/2013 9:18AM Visions of Glory trip hazards, pedestrians, ladders
10/10/2013 9:20AM pulling wire, ladder ergonomics, proper usage
10/14/13
10/15/2013 8:25am Leanne Drive Run Conduit ladder, small shelter, power tools, cuts, proper use, housekeeping, GFI and PPE
10/15/2013 8:26am Rained out Rained Out
10/15/2013 8:50am Prepping Antennas Lift,

slips, cuts team lift, housekeeping, ppe
10/15/2013 8:55am flash antennas Rooftop, lifting, wind fall protection, lifting, monitor wind
Mink Cyrus 10/15/2013 9:01am slippery conditions awareness, ppe, proper ladder usage
10/15/2013 9:15am MSP0086 pinch points, rf, traffic, slips inspection, ppe, rf monitor, barricade
10/15/2013 9:20am Ashland NE general safety
10/15/2013 10:15am beta prep housekeeping, rf monitors
10/15/2013 1:05pm sp4848 restoation high viz, eye contact, gfi, team lift
10/16/2013 7:14am Installing Fencing ladder, cutting proper usage, cut gloves
10/16/2013 7:32am waseca footing, rebar, pour concrete cuts, lifting, conrete cut gloves, team lift, eye wash, ppe
10/16/2013 7:40am business

office flying and swapping antennas climb, work above, pedestrians, ladder 100% tie-off, ppe, cut gloves, barricade
10/16/2013 7:45am D4848 Laying rock down heavy equipment, lifting, power tools high viz, ppe
10/16/2013 7:50am checking T-1’s ladder, rf proper usage, rf monitors
10/16/2013 8:35am mounting radiohead, cut over work cautiously
10/16/2013 8:38am Bloomington move radiohead, routing lines, fiber test cut gloves, rf monitor, barricade, housekeeping
10/16/2013 8:54am Hartley, IA audit weather, rf, slips, height monitor weather, rf monitor, housekeeping, 100% tie off
10/16/2013 9:47am basket work power tools, rf, basket work 100% tie off, ppe, rf monitor
10/17/2013 7:25am pour concrete and install pipe pour concrete, heavy lifting ppe, eyewash, lift with legs
10/17/2013 7:41am Driving, ladders, rf awareness, proper usage, rf monitor
Lindstrom, Garth, Mink, Cyrus 10/17/2013 7:46am Switch antennas
10/17/2013 8:31am Maple Grove digging, install pipe housekeeping, ppe, gfi, call in locates
10/17/2013 8:40am St. paul replace antenna rooftop, pinch points, slips, RF Rooftop Fall Protection, awareness, housekeeping, rf monitors
10/17/2013 8:52am Audits
10/17/2013 9:23am photos and termintate Slips trips, rf
10/17/2013 9:50am Minnetristia changing rad center cathead, osprey inpection, proceed with caution
10/18/2013 7:30am Shelter set, install ground ring moving parts, cad weld, tamping ppe, awareness
10/18/2013 7:37am
Mack, Trent 10/18/2013 7:39am antenna swap and decom drop area, 100% tie off, rf monitors 100% tie off, rf monitor
10/18/2013 7:41am Alamosia backfill trench, install trench tools, tamping inspection, watc feet and tamping
Morelli,Chris 10/18/2013 7:49am maple grove installing conduit, digging power tools, util, slips ppe, gfi, locates, housekeeping
10/18/2013 7:52am cut over, gamma, drop zone lifting, cutting, grinding, pinch points gloves, ppe, barricade
10/18/2013 8:08am slips, RF, ladder awareness, rf monitor, proper usage
10/18/2013 8:41am Flying boom gates crane, wind, rigging, fall zone awareness, monitoring, inspection
10/18/2013 8:44am antenna installation slips, rf, lifting housekeeping, rf monitors, ergonomic
10/18/2013 8:57am Apple Valley mounting radioheads, hooking up jumpers. rf, mounting radioheads proper rigging, rf monitor
10/18/2013 9:47am Alegian install raycap in shelter, pictures cathead, pinch points, drop zone inspection, gloves, awareness
10/18/2013 10:16am Ministra digging trench
10/22/2013 6:51am St. Cloud Pulling and dropping lines, cut-over cutting, climbing, traffic wear all PPE, tie off to tower, barricade area. Greg called for Zack Meyer
10/22/2013 7:05am Milwaukee prep radios and antenna, work in man basket, JLG, public and vehicle traffic communicate, hand signals, tie off to basket, tether materials and tools, use PPE, don’t drop stuff
Schwertzler 10/22/2013 7:12am Wis Pinch points, lifting, crane and man basket wear gloves, communicate barricade area, tie-off to basket
Clarksfield 400 foot trench machinery, hand tools Hi-Viz, Gloves
10/22/2013 7:15am Stick frame storage unit for shelter Power tools, noise wear ppe, ear plugs
10/22/2013 7:53am S. Minneapolis cold, traffic, working on tower, lifting dress warm, cones for barricade, PPE including harnesses, team and proper lifting
10/22/2013 7:55am Little Canada power lines, vehicle traffic, pinch points, shock hazards, slips trips falls 10 feet from lines, barricade areas, power off radio heads, tie-off
10/22/2013 8:07am Maple Plaine installing batteries, wiring batteries Lifing, ladder, working with Dom Team lifting, proper use, don’t fall off, wear hard hat
10/.22/2013 prepping tower, getting concrete pinch points, tools, cold, wind, Muddy, Gloves, clothing, check tools
10/22/2013 8:36AM Minnetonka mounting radioheads, running conduit ladders, slips, power tools
Mink, Cyrus & Meyer, Zack 10/22/2013 8:38am pulling coax, installing radioheads pedetrians, falling objects barricade site, ppe, inspect equipment
10/22/2013 8:44am msp airport fiber optic pull ladder, traffic proper usage, site awareess
10/22/2013 8:57am rushkin mount antennas cold, hook up antennas dress warm, housekeeping, equipment inspection
10/22/2013 9:04AM honeywell falls, slips, power tools housekeeping, proper ladder usage, ppe
1022/2013 9:58am moving fiberglass for testing rootop, slips, falls, rf fall protection, housekeeping, rf monitors
10/22/2013 11:09am Camillus Court installing cabinets, wiring and antenna Slips/trips, electrical, falls, power tools proper footware and awareness, PPE and only trained employees, inspect
10/23/2013 6:24am trenching, laying pipe, backfilling, installing power plant heavy equipment, electrical, tamper Hi-Viz, PPE and insulated tools, watch feet
10/23/2013 6:52am St. Cloud Pulling lines, cut over to new lines, color coding Climbing/working at heights, cutting, power tools tie off to tower and safety climb, PPE
10/23/13 Hammer drilling for mounts, mount radios and antenna falls, weather, power tools, slips trips and falls SRL’s, tie off at all times, rf monitor, face shield,
10/23/2013 7:30am Pelumb Creek New Build, Dig footings, tie rebar
10/23/2013 8:16am Ace Ready Mix tie-off in man basket, barricade area, use spotters
10/23/2013 7:40am Kasson digging lines digging, lifting, cutting
10/23/2013 8:04am maple plain pulling wire, connecting, terminating working in electrtical face shield, ppe
10/23/2013 8:07am frame in storage unit
10/23/2013 8:11am Brooklyn Park
10/23/2013 8:26am testing audits slips, snakes
10/23/2013 8:37am install sector, drill holes mount antenna icy roof, liting, RF, falls watch footing, wait for sun
10/24/2013 7:12am Plymoth wiring equipment
10/24/2013 7:52am Install ground ring lifting, cad welding, heavy equipment eye contact, awareness, proper technique, ppe
10/24/2013 7:58am Camila’s Court finish sector and install gps rooftop, power tools, lifting, slips, rf inspections, 100% tie off, ppe, team lift, footwear, rf monitor and map
10/24/2013 8:22am Ames Testing
10/24/2013 8:27am Worthington pulling dc and installing raycap slips, ladders, cold stress housekeeping, proper usage, dress approptiately
10/24/2013 9:03am installing lines slips, rf, heavy ifting, cutting gfi, 100% tie off, awareness, rf monitor, proper technique, ppe
10/24/2013 9:13am Airport ladders, slips, vehicle traffic awareness, proper usage.
10/25/2013 7:05am driving falls tie off and drive defensively
10/25/2013 7:10am STTC Business

Off Pull a line, cut-over on gamma cathead, confined space, cutting, cold, public, climbing inspected, sign, gloves ppe, safety tie-off to chokers.
10/25/2013 7:12am Balsom Lake, WI installing kit, installing lines electricity low voltage, ladders, utilities PPE, qualified person, 3 pts contact, locates
10/25/2013 7:34am Flying wave guide, pulling lines lifting, rigging, pinch points proper technique, inspection of rigging, awareness, ppe.
Swirtz Kacey, Becker Eric 10/25/2013 7:43am Installing sheet rock ladder, cutting, power tools proper usage, cut gloves, gfi
10/25/2013 7:56am running lines falls, rigging
10/25/2013 7:59am Eden Prarie Cutover drop zone, pedestrians equipment inspection, site awareness, barricade site
10/25/2013 8:14am Plymouth Drop zone, capstan, pinch points, traffic, good communication, inspect, PPE,
10/25/2013 8:30am St. Paul WT install lines slips, controlled descent awareness, inspection, tailgate on descent
10/25/2013 8:34am msp0503 move radioheads, install jumpers pedestrians, slips, pinch points awareness, baricade, inspection
10/25/2013 8:47am Walton pim testing and sweeping slips, falls, rf, cutting ppe, 100% tie off, rf monitor
10/25/2013 8:55am Metro T-Mobile ladders, cuts, RF Fully open, PPE
10/25/2013 9:44am Dressing in cabinets, batteries on platform, lifting, ladders, power tools, batteries. communication, team lift, spill kit, PPE
10/29/2013 7:30am New connectors and jumpers ladders, pinch points, cuts, weather gloves, proper usage, awareness
10/29/2013 7:41am Wentworth Backfill, trenching digging, communication ppe, high-viz vest
10/29/2013 7:47am Hanson Blvd pull lines, crane, ppe
10/29/2013 7:53am Federal Building crane, lifting radios heavy lifting, slips, ladders, rigging radios, team lift, proper usage, spill kit, housekeeping
10/29/2013 8:01am mud drywall, and connect hvac ladder and power tools proper usage, ppe, hand placement
10/29/2013 8:05am Snelling capstan, pinch pints, power lines, falls from height. ppe, inspection, awarenss, 100% tie-off
10/29/2013 8:26am remove and rewire cabinet pinch points, ladders, heavy lifting ppe, proper usage, team lift
Ryan Mace & Brian Moe 10/29/2013 8:30am Village Point Digging Trenches
10/29/2013 8:48am connecting radioheads traffic, powerlines, lifting hazards, rf exposure, slips, trips awareness, 10 ft. rule, team lift, rf monitor, housekeeping
10/31/2013 7:15am Stagecoach Cutover, build sectors Srl’s, ppe, inspection
Moe, Brian 10/31/2013 7:20am working on shelter equipment Electric and Lifting Good technique and 3rd party elec. Contractor safety measures
10/31/2013 7:24am Red Lake Falls ladder, slips, and cutting ppe proper usage
10/31/2013 7:29am Msp0006 climbing, lifting, cutting 100% tie off, team lift, cut gloves
10/31/2013 7:32am ferberesh building site cutting, ladder, ppe, proper usage, proper technique
10/31/2013 7:37am fargo dt wiring ac units elec. Shock, ladders inspection, proper usage, ppe
10/31/13 coon rapids wt hooking up cables
10/31/2013 7:55am high viz, inspection,
10/31/2013 8:05am New Brighton move units for night cut
10/31/2013 8:12am pulling interduct, dc fiber
10/31/2013 8:03am running conduit and intall it cutting hazard, ladders proper use, cut gloves
10/31/2013 7:50am Kenyon Beef up site slips, cutting
11/1/2013 7:09am Driving and troubleshoot ladders, driving, cut proper use fully open, use gloves
11/1/2013 7:23am Pulling lines, sweeping Crane, fall hazard, fall zone, pedestrians, slips and trips hand signals, keep people and pedestrians away, watch footing. Proper PPE
11/1/2013 7:26am msp0169
11/1/2013 8:56am columbia heights deliv, batteries and cabinets
Crump, Jamie 11/5/2013 7:10am Nebraska City RELO Moving Antenna Weather, Lifting, falls, slips, trips fall watch, Proper PPE warm clothing, tie-off
11/5/2013 7:28am Waseca install fence and H frame Cadweld, back, tamping, PPE, Hi – Viz,
11/6/2013 6:49am dig trench install pipe Digging, PVC glue proper technique, well ventilated area
11/6/2013 7:25am installing pipe digging trench backfilling and tamping shoveling, lifting heavy objects, PVC glue stretch, 2 person lift good technique, well ventilated.
11/6/2013 7:31am Core drilling, heavy lifting, ladder flat surfavce, good housekeepin, 2 person lift. PPE gloves, GFI secure drill to wall.
11/6/2013 7:32am Slippery watch footing, hang on tie-off
Schille, Josh 11/6/2013 7:55am Traffic, No climbing hi viz, bend knees, back straight
11/6/2013 8:02am Rail yard central ave running pipe cutting, under tower gloves, gfci with tower crew
Tanner 11/6/2013 8:11am Crane lowering antenna pipe slips tripe and falls, ice on tower, overhead and vehicle hazards wattch footing wear hard hat, barricade
11/6/2013 8:13am Technology drive digging and installing conduit power tools, utilities and cold stress PPE, GFCI, housekeeping locates and plan
11/6/2013 8:31am St. Paul Park run GPS,install coaz PPE, gfce, Proper use of ladder and tie off ladder, watch footing
11/6/2013 8:33am running coax rigging, overhead, cold weather falls inspect, hard hats, warm up, tie off, take your time, pay attention
11/6/2013 8:42am pinch points, possible climbing, ice, watch, dress warm purchased salt, communication if flying booms
11/6/2013 8:44am Laverne running conduit drilling holes dust, power tools masks, use gfi
11/6/2013 8:50am To Omaha G1 extensions cutting, ladder, driving gloves, fully open, PPE
Pommeroy for wolf 11/6/2013 8:53am cobinet, prep for day cut ladders, slips trips, lifting 3 pts, fully open, warm clothes, go inside, buddy lift
11/6/2013 8:55am Wilmar sharp edges, sawsall, ladders, rooftop, pipe bender gloves, ppe, fully open proper use, warning lines and fall protection
Erik Becker for Kacy 11/6/2013 12:22pm Install footing, ladders, excavation, trip hazard, possible rebar fully open porper use, PPE, gloves, safety glasses, hard hats,
11/6/2013 12:24am Minneapolis, 0092 cutover dropping antenna traffic, slips trips, icy tower, power lines, small work space cone off work area, careful foot placement, 100% tie-off, wear PPE, 10 feet distance,
11/6/2013 12:32pm Heavy lifting, RF,

Falls from heights, Team lift, inspect ropes rigging and capstan, tie-off, RF monitor,
11/11/2013 8:15am Mink Mercy stripping forms and building new Slips trips fall, heavy equipemtn and lifting housekeeping HiViz communication, GFI, lift with legs and partnr.
11/11/13 Cut-over, new antenna, hook up jumpers RF, pinch points sloppery surface, sharp edges, cold slips trips Monitor, wear all ppe, watch step, rubber on sharp edges, 100% tie-off.
11/11/2013 8:37am MSP 02123 cut-over, pull lines vehicle traffic, cathead, cold weather, tower, fall hazard cat and harness inspections, dress warm, use fall protection, cones for truck
11/11/2013 8:40am Canadian Pacific banding on tower, pull lines, crane, slips trips fall, holes,

slips trips, cold watch step, dress warm, hand and radio signals
11/11/2013 10:13am Waite Park Audit jumpers cars, pedestrians, climbing, cold, cutting 100% tie-off to tower or safety climb, dress for weather, PPE, watch for pedestrians.
11/12/2013 7:10am Railroad yard final photos, travel proper PPE watch each other
11/12/2013 7:12am finish forms, pour concrete open trench, equipment, heavy lifting, cold PPE, hi-viz, communicate with operator, hated breaks
11/12/2013 7:21am Flying antenna, jumpers hook-up, snap in, ground leads, Photos and sweeps cold, wind, slips trips, falls from heights, rigging/lifiting PPE, dress proper, tie off, inspect rigging
11/12/2013 7:28am Bemidji pulling up hybrid cold, snow on ground, slippery Dress warm, tie-off, cinch hybrid
11/12/2013 7:33am Andalusia new build, digging footings, pour footing, cold weather, slippery, hiviz, eye contact, minimize exposure.
11/12/2013 7:50am Village point, Omaha Dig a trench, Dig foundation Utilities, rebar, power tools cuts scrapes Locates done, PPE, gfci
11/12/2013 7:56am MSP0500 Cut-over for Clearwire Cold, falls, lifting Dress warm, tie-off, inspect
11/12/2013 8:00AM Crow Valley New Shelter, ground all day, no power ladders, heavy lifting, cutting metal, snow, slippery proper use, don’t reach, gloves and face sheild, good housekeeping, cardboard on floor for traction
11/12/2013 8:08am Hanger ladder rack, battery cables, hanging tran ladder safety, PPE, pinch points, cold fully open, dress warm
11/12/2013 8:10am lifting, ladders, falls pinch points, cars, cuts power tools team lift, proper use, good housekeeping, PPE, file pieces
Swerzler, Tom 11/12/2013 8:14am Hanson Blvd. cutting hazards, falls, pinch points wear gloves, tie-off
11/12/2013 8:44am Ely Cabinets in shelter, running fiber and wire power tools, slippery, icy, heavy lifting PPE, warm clothes, use carts
Tempe, Jake 11/12/2013 8:46am pulling lines, stuff lines RF, rigging ropes, climbing on tower, pinch points, traffic, cold, cadweld tie-off, PPE, RF meter, put up cones, dress warm, inspect rope rigging
11/12/2013 8:50am Federal Bulding finishing slips trips, cold, power tools, pwer plant watch footing, housekeeping, 3 points contact on ladder.
11/12/2013 8:51am Cutover for clear wire, terminate DC in cabinet traffic, power lines, limited work area, slips trips falls caution tape, 10 feet from power lines, tie off to tower
11/12/2013 8:54am
11/12/2013 9:13am Driving Audits Stop and stretch
Hooking up Run lTE fiber and power to radios, snap in fiber, photos, de rig
11/18/2013 7:13am Sauk Center Get cutover done install new antenna Wind, cold weather, climbing ins difficult, lots of cable stay on cable grab, dress warm take,
11/18/2013 7:45am Indianola Grounding ring, dig in pipe, back fill slippery gournd, muddy, cadweld, Equipment, watch footing, feet out of tamper, dry off cadweld,
11/18/2013 8:15am travel iowa
11/18/2013 8:00am maple grove water tank finish wiring sectors final photos climbing tank and working on catwalk, 100 tieoff to safety cable, wear gloves, PPE,
Beriter, Blaze 11/18/2013 8:52AM Radio on top, not sure what’s going on bottom yet. Manifold, PPE, Cat head inspection. Warm , wear gloves
11/19/2013 7:10am Winthrop Wait for locates
Vendedahl , Eric 11/19/2013 7:20am Austin, MN Working, Mike Perez – Working on roof. Ladder, Low voltage, working in live power plant, slips trip and falls.
11/19/2013 8:01am New Hope Pulling lines in tank pedestrian traffic, falls,
11/19/2013 8:07am Slayton taking out old batteries and replaceing lifting, battery spills, trips, team lift, spill kit, and housekeeping
11/19/2013 8:11am Robinsdale install coax Gloves, Hard Hat,
11/19/2013 8:20am Learning Verizon with Zack Meyer, Fiber test de-rig and final photow falls, overhead hazards, lifting, 100% tie-off, wear all PPE, pay attention and work together
11/19/2013 8:30am T1 moving
Main 11/19/2013 8:33am team driving
11/19/2013 9:17am St. Cloud Hospital tall ladders, pinch point falls, pipe bender, sharp edges inspect, ladders, proper use, hands clear of pinch points, wear gloves, file edges
11/19/2013 9:56am Airport Executive center moving cabinets, setting and grounding, removing old batteries heavy lifting, falls proper form help, inspect harness and rigging, warm clothes, warm up inside, Inspect tools and PPE
Dominic, Synnott 11/19/2013 9:54am
Scherzler, Tom 11/19/2013 10:19am Pick up site, unloading and getting stuff on the roof. fall hazards, electrical hazards, fall hazards team lifting, use carts and stair climber, retractable lifeline
11/19/2013 10:43am Grand forks slips trips fall, pinch points hand tools, cadweld PPE, housekeeping, tie-off
11/20/2013 7:20am Whole dig, re-bars, concrete work. Cave ins,hole benched back. Footings. PPE, Wash basin for concrete.
11/20/2013 7:22am Sauk Centre Route and land Wind, tie off. Clean up site,
11/20/2013 7:25am Clayton & 3791 Ladders, slips, trips Tie off.
Wolf, Mike / Andy 11/20/2013 7:32am Airport roof top Heavy lefting, moving batteries, power tools, area clean, slips trips falls working with threader. PPE, housekeeping.
Givens, Rick/Steve Becker 11/20/2013 8:22am Galena, IL Meeting with AT&T cutting site over Ladder, RF monitor, hard hat. PPE, Safety, Housekeeping
Perez, Mike 11/20/2013 8:24am Shelter, DC power all inside work today. Slips, trips, falls, ladders, there traffic Housekeeping, PPE
11/20/2013 8:29am Verizon upgrade AWF Very small parking lot, work on tower, heavy lifting. Housekeeping, PPE,
11/20/13 Per Jerry
Conway, Josh
Village Point, NE Inside DC wiring ladder safety , PPE
Weaver, Jason
Becker, Erik Dayton Trip hazards, high vis vest Working with Josh King
Crumps, Jamie
Bjornan, Bob
11/21/2013 7:10am Heavy lefting, power tools, area clean, slips trips falls working with threader.
11/21/2013 7:15am Compacting and starting digging for the next power leg. Re- bar work High visible, spotter, pot hole, hand placement.
11/21/2013 7:35am Indianola, IA Cadwelding, running pipe, back fillling and housekeeping. Stay back while cadwelding, using glue, lifting heavy items, watch feet placement.
11/21/13 Inter shelter wiring. Ladder safety and PPE.
11/21/13 8:31am Sauk Centre, MN Supports, fiber test, photos, finsh landing. Wind, ladders, sharp tools, wires. Low voltage.
11/21/13 9:05 Shop Prepping for a night cut. Cagrill moving equipment. RG 400 PPE, Glove, trip hazards
White, Cory
11/22/13 Omaha, NE Mono Pole Cold stress, slipps trips and falls, ropes and rigging. Inspecting all rope, dress properly, watch footings. 100% tie off on towers, make sure things are tight.
Slips, ladders and heavy lifting PPE, snow on site. Using electric, not over extending, secured surface. 2 people to lift.
Cargill Tie- ins Ladder, and housekeeping , workng in

shop Forklift safety
Forming a pad, re-bar, installing pipe and pouring ocncrete. Slippery conditions, watch footings, concrete may splash. Have eye wash available.
Palmerroy, Andy Roof top- Housekeeping, and wrapping up. Snowing, cold stress, slips, trips and falls. PPE , checking ropes.
Set up shoring equipment, pour concrete and re-bar work. Cave ins, power tools, heavy equpiment. Gloves, eye wash base
Various Site Voltage readings and taking pictures
Givens, Rick Honeywell Wraping up job. Raised floor, footings
Becker, Eric Concrete work
Main, Cole 11/25/13 Duluth, MN Installing new antenna Traveling, weather
Per Phone
Anderson, Brian
11/26/13 Mapleton
Anderson, Paul / Moe , Brian Hawick Prep for powerplant heavy lifting, proper lifting, batteries, pinch points, poper tools , spill kit, keep hand and feet clear, electrical shock, PPE isolate electrical, slips and trips. Sharp tools when using sharp tools.
Driving Driving to 19 various site – Making
Synnott, Dominic / Schwerzler, Tom Eagan – Roof Top Working with Elecrical Crew Working with pipe, cutting, wear proper PPE, Signed in on the tower crew.
Vindendahl, Eric, Mike Pezer, Eric Bergstrom Getting site ready Slips, trips, falls, cutting, Cold stress, and ladders. Proper clothing, good house keeping, gloves, layers, hats. Ladders on flat surface, not over extending reach.
11/27/13 Rosedale Atena Work Ladders, Slips, trip, fall, Block door
NWA Term site, loading batteries Lifting hazards, wire
St. Cloud hospital Cleaning up site
12/2/13
12/3/13 Casade, MN Cable coming off tower to box Slips, footings, PPE, Cold weather gear.
Crump, Jaime/ Reynolds, Mark
Driving to NE

checklist

8/21/13

8/23/13 8/26/13 8/27/13 8/28/13

8/30/13 9/3/13 9/4/13 9/5/13 9/6/13 9/9/13 9/10/13

9/12/13 9/13/13 9/16/13 9/17/13

9/20/13

10/2/13 10/3/13

10/14/13

10/23/13

10/31/13

11/11/13

11/20/13 11/21/13 11/22/13 11/25/13 11/26/13 11/27/13

12/2/13 12/3/13

Anderson, Paul X X

x x x x x Traveling x x traveling x shop shop traveling x x x x

sick x x off travel x x x x

shop x x x x x x x x x travel x x travel x x x off x x x x X X X

X

Mace, Ryan X X x off off x x

Traveling traveling x x x x traveling traveling shop

x x x x x x x x x x x x x x x x x x x x x x x

X X X NA

Moe, Brian X X x x x x x x x x x missed x x x x x x x x x x x x x x x x x travel x x x x x

x x x x x x x x x x x x x night night night night x x x x x X X X X X NA X

X x x x x x x off off off training x off x x x sick Mitch x x x x x x x x x x x travel x x x x x x x x x x x x x off x x x x Tanner Mitch x x x x x X X NA

Synnott, Dominic x x x x x x shop x x x x x travel x x x x travel x office x drive night night night night X

X NA

Vindendahl, Eric X NA
Weaver, Jason X X out off off off off training

x x x x x x x x x x x x x x x travel x x x x x x x x x x x x x x x x x x x x x x x x X X X X NA

Wolf, Mike x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x X NA

X X out x x x Traveling x x off x x x x traveling traveling x x Main x shop x x x x x x x x travel x x x x x x x x travel x x x x x x x x X travel X

Becker, Eric X X x x off off x x x x traveling x x off traveling x x x x x x x x travel x x x x x x x x shop x x off x x x x x x x x x x x x X X X NA
Kostreba, Mitch X x x x x

x x x travel x

x x x traveling x x x x x x x shop travel x x x x x travel off x x x x x x x x x x x x shop travel x X X NA

Swirtz, Kacey X X X X NA
White, Corey X X X shop x off x x

Off off off off traveling x shop x x x x x x x x x x x x x x Greg

.

Greg B. x Greg B off off off off Greg B Greg B Greg B Greg B x x Greg B x X X NA

X out x shop x x traveling x x x traveling x x traveling traveling Traveling x x x x x x x

x x x x x x x x x x x x shop travel x x night night travel x x X X X

X X x x x training x x x shop shop x off x x x x x x Off x x x x x x

x x x x x x x x shop x x x x x x x x x x x x x X X NA

Givens, Rick x x x shop x

x x x x x x x x x x x travel x x x x x x x x x x X X X X NA

Main, Cole X X out x x x x travel na x x travel Traveling x x x x traveling x x x x x x travel x x x x shop travel x x travel x x x x x x

x x x travel x x x travel x X X X NA

s

x x x x x x x x x X X

Bereiter, Blaise X X traveling x x x travel x x x Traveling x x x x traveling x x x x x x x x x x x x x travel x

no service shop x x x x x x x x x Erik x x x x x x X X X X NA X

Bistodeau, Brad X X traveling x x x out

sick sick sick shop shop na na na shop na shop shop shop x x x x x x x x x x x x x x x x x x x sick x x x x x x x x travel X X X X X X NA

Conway, Josh X X x x x Traveling x traveling x x x shop x travel x x x travel x x x x x x x travel x x no service x x office drive x

x Josh S

x x x x X X X NA

Conway, Justin X x x x x x Traveling x x x x x x x x x x x x x x x x x x x x x x x x travel x no service no service travel

x x x x x x x x x x x x x x X X X NA

Crump, Jaimie x x x x x x x x travel x x shop x x X X X X NA
Meyer, Zach X X x x x x x Traveling x x Josh x travel x shop traveling x traveling x x x x x x x x travel x x x x travel x x x x shop x x Traveling x x x x x office travel x x x x X X NA
Millage, Cody X traveling x x x shop x x x x x x traveling traveling traveling x x x x

Wkacey off Off x off off shop travel off x x x x x x x x x x X X X NA

Mink, Cyrus NA

NA

Schwerzler, Tom X NA X
Temple, Jake NA
Electrical Crew 8?22/2013 8/29/13 9/11/13 9/18/13 9/19/13 9/24/13 9/25/13 9/26/13 9/30/13 10/1/13 10/4/13 10/7/13 10/8/13 10/9/13 10/10/13 10/11/13 10/15/13 10/16/13 10/17/13 10/18/13 10/21/13 10/22/13 10/24/13 10/25/13 10/28/13 10/29/13 10/30/13 11/1/13 11/4/13 11/5/13 11/6/13 11/7/13 11/8/13 11/12/13 11/13/13 11/14/13 11/18/13 11/19/13 Holiday 11/28/13
traveling sick N/A NA
missed weigh training
shop, travel
Palmeroy, Andy
nights
Training
Civil Crew
n cut pm cut x
Missed off all wk Greg B
Tech’s rain delay
Boejan, Bob DOT physical
x travel
w erik
Tower Crew
no service
Sick
Josh S josh S
W/Wolf
Wkacey
Mincke, Eric

Sheet3

Electrical Crew Tower Crew Tech’s Civil Crew
January
February
March
April
May
June
July
August
September
October
November
December

Sheet4

Still stressed from student homework?
Get quality assistance from academic writers!

Order your essay today and save 25% with the discount code LAVENDER