I will need this completed by 11/21/2013 please
SS3150
Project
1
P ROJECT: WRITING A S OCIAL RESEARC H REP OR T
Project Introduction:
This project will require you to complete a research report in two parts. In the first part, you will prepare a
rough draft of your research report, which will include your research question, methodology, and literature
review.
In the second part, you will incorporate your instructor’s feedback and create a report with more details on
your research design and information about your data collection methods. You will provide the APA citation
for all the sources that you will use in the project.
Course Learning Objectives Covered:
1. Define the systematic process of scientific inquiry and social research.
2. Describe different types of research terms and methodologies and their purposes.
3. Compare and contrast the methods and specific uses of quantitative and qualitative research.
4. Evaluate the methodology, evidence, and conclusions of others’ qualitative research.
5. Gather research data from indirect data sources.
6. Analyze the challenges and ethical issues involved with social research.
7. Write an original qualitative research question to draw valid conclusions about a socially relevant
topic.
8. Define types of data sources used in social research.
9. Analyze and develop an appropriate method for collecting data for qualitative research.
10. Synthesize data, research findings, and potential ethical considerations by designing and working on
a qualitative research project.
11. Make a presentation of research design and data collection methods.
SS3150
Project
2
P ROJECT SUBM ISS ION P L AN
Project
Part
Description/Requirements of Project Part Evaluation Criteria
Project
Part 1
Assessment Preparation Checklist:
Read Chapters 2, 3, and 7 from your textbook,
Research Methods and Society: Foundations of
Social Inquiry. These readings focus on the
strategies and ethics involved in research. In
addition to this, it also focuses on the indirect and
scientific methods of data collection.
Review the Module 4 online lesson, which discusses
guidelines to prepare the rough draft of a research
paper.
Title: Draft Social Research Report
In Project Part 1, you will prepare a rough draft of your
research report, which will include your research question,
methodology, and literature review.
To complete this project part:
Add details about your research question. Why do
you think it will add to existing knowledge in that
field?
Add details about the research methodology that
you used in this research and your rationale for
selecting the research methodology.
Add details about the literature review that you
conducted in this research.
The Project Part 1
rubric will be used to
evaluate this
assessment.
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/Project%20Part%201%20Rubric.xlsx
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/Project%20Part%201%20Rubric.xlsx
SS3150
Project
3
Project
Part
Description/Requirements of Project Part Evaluation Criteria
Submission Requirements:
Submit your responses in a Microsoft Word
document of the following specifications:
o Font: Arial; 12-Point
o Line Spacing: Double
o Length: 3–5 pages, excluding cover page and
references
Include an APA title page. Refer to the sample APA
title page given in the handout titled “APA Title Page
Format” at the end of the study guide.
Cite three sources in APA format in-text and on the
References List page.
Due: Module 4
Grading Weight: 15%
Project
Part 2
Assessment Preparation Checklist:
Read Chapters 5, 10, 11, and 12 from your textbook,
Research Methods and Society: Foundations of
Social Inquiry. These readings focus on designing
social experiments, analyzing data analysis, and
preparing the final research report.
Review the Module 6 online lesson, which discusses
ways to incorporate the instructor’s feedback in the
draft research and prepare the final research report.
Title: Final Social Research Report
Now, it is time to revise and expand your Project Part 1:
Draft Social Research Report based on the feedback you
have got from your instructor. To help you expand your
The Project Part 2
rubric will be used to
evaluate this
assessment.
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/APA_Title_Page_Format
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/APA_Title_Page_Format
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/Project%20Part%202%20Rubric.xlsx
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/Project%20Part%202%20Rubric.xlsx
SS3150
Project
4
Project
Part
Description/Requirements of Project Part Evaluation Criteria
report, use the additional research you have done to
support your view.
To complete this project part:
Add details about the research design that you used
for this research report.
Add details about the data collections methods that
you used in this research report.
Submission Requirements:
Submit your responses in a Microsoft Word
document of the following specifications:
o Font: Arial; 12-Point
o Line Spacing: Double
o Length: 5–7 pages, excluding cover page and
references
Include an APA title page. Refer to the sample APA
title page given in the handout titled “APA Title Page
Format” at the end of the study guide.
Cite three sources in APA format in-text and on the
References List page.
Due: Module 6
Grading Weight: 15%
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/APA_Title_Page_Format
http://www.content.distance-education.itt-tech.edu/cliksdmrroot/content_directory/mount1/507393/SS3150/APA_Title_Page_Format
>Problem 1
00
800 Description Amount Requirements: 35,000 3,500 Allocation Base 700 Requirements:1
Bluebird Manufacturing makes carrying cases for portable electronic devices. Its costing records yield the following information:
Job
No.
Date
Total Cost of Job
at October
3
Total Manufacturing Costs
Added in November
Started
Finished
Sold
1
10/3
10/12
10/13
$1,900
2 10/3
10/30
11/1
1,
800
3
10/17
11/2
4
11/27
400
$1,
5
4
10/29
11/29
12/3
1,200
5
11/8
11/12
11/14
550
6
11/23
12/6
12/9
700
Requirements:
1. Which type of costing system is Bluebird using? What piece of data did you base your answer on?
2. Use the data in the table to identify the status of each job. Compute Bluebird’s account balance at October 31 for Work in process inventory, Finished goods inventory, and Cost of goods
sold. Compute, by job, account balances at November 30 for Work in process inventory, Finished goods inventory, and Cost of goods sold.
3. Prepare journal entries to record the transfer of completed units from Work in process to Finished goods for October and November.
4. Record the sale of Job 3 for $2,100.
5. What is the gross profit for Job 3? What other costs must this gross profit cover?
Problem 2
Lu Technology, Co., manufactures CDs and DVDs for computer software and entertainment companies. Lu uses job order costing and has a perpetual inventory system.
On April 2, Lu began production of 5,900 DVDs, Job 423, for Stick People Pictures for $1.30 sales price per DVD. Lu promised to deliver the DVDs to Stick People by April 5. Lu incurred the following costs: Date
Labor Time Record No.
Description
Amount
4/2
655
10 hours @ $14
$140
4/3
656
20 hours @ $13
260
Date
Material Requisition No.
4/2
63
31 lbs. polycarbonate plastic @ $11
$341
4/2
64
25 lbs. acrylic plastic @ $27
675
4/3
74
3 lbs. refined aluminum @ $42
126
Stick People provides the movie file for Lu burn onto the DVDs at a cost of $0.50 per DVD. Lu Technology allocated manufacturing overhead to jobs based on the relation between
estimated overhead of $540,000 and estimated direct labor costs of $432,000. Job 423 was completed and shipped on April 3.
1. Prepare a job cost record for Job 423. Calculate the predetermined overhead rate; then allocate manufacturing overhead to the job.
2. Journalize in summary form the requisition of direct materials (including the movie files) and the assignment of direct labor and manufacturing overhead to Job 423.
3. Journalize completion of the job and the sale of the 5,900 DVDs.
Problem 1
Prescott, Inc., manufactures bookcases and uses an activity-based costing system. Prescott’s activity areas and related data follows:
Activity
Budgeted Cost
of Activity
Allocation Base
Cost Allocation
Rate
Materials handling
$230,000
Number of parts
$0.50
Assembly
3,200,000
Direct labor hours
16.00
Finishing
180,000
Number of finished
units4.50
Prescott produced two styles of bookcases in October: the standard bookcase and an unfinished bookcase, which has fewer parts and requires no finishing. The totals for quantities, direct
materials costs, and other data follow:
Product
Total Units
ProducedTotal Direct
Materials CostsTotal Direct
Labor CostsTotal Number
of PartsTotal Assembling
Direct Labor Hours
Standard bookcase
3,000
$36,000
$45,000
9,000
4,500
Unfinished bookcase
3,500
35,000
7,000
Requirements:
1. Compute the manufacturing product cost per unit of each type of bookcase.
2. Suppose that pre-manufacturing activities, such as product design, were assigned to the standard bookcases at $7 each, and to the unfinished bookcases at $2 each. Similar analyses
were conducted of post-manufacturing activities such as distribution, marketing, and customer service. The post-manufacturing costs were $22 per standard bookcase and $14 per
unfinished bookcase. Compute the full product costs per unit.
3. Which product costs are reported in the external financial statements? Which costs are used for management decision making? Explain the difference.
4. What price should Prescott’s managers set for unfinished bookcases to earn $15 per bookcase?
Problem 2
Corbertt Pharmaceuticals manufactures an over-the-counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health-care facilities
and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system
would be beneficial: Activity
Estimated Indirect Activity
CostsEstimated Quantity of
Allocation Base Materials handling
$95,000
Kilos
19,000 kilos
Packaging
219,000
Machine hours
5,475 hours
Quality assurance
124,500
Samples
2,075 samples
Total indirect costs
$438,500
Other production information includes the following:
Commercial Containers
Travel Packs
Units produced
3,500 containers
57,000 packs
Weight in kilos
14,000
5,
700
Machine hours
2,625
570
Number of samples
855
1. Compute the cost allocation rate for each activity.
2. Use the activity-based cost allocation rates to compute the activity costs per unit of the commercial containers and the travel packs. (Hint: First compute the total activity
cost allocated to each product line, and then compute the cost per unit.)
3. Corbertt’s original single-allocation-base costing system allocated indirect costs to produce at $157 per machine hour. Compute the total indirect costs allocated to the
commercial containers and to the travel packs under the original system. Then compute the indirect cost per unit for each product.
4. Compare the indirect activity-based costs per unit to the indirect costs per unit from the single-allocation-base system. How have the unit costs changed? Explain why the
costs changed.