mat540 – Quiz – 5: Week – 9 ( Graded 40/40 )

Question 1

1.                               

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

 

In a problem involving capital budgeting applications, the 0-1 variables designate the acceptance or rejection of the different projects.   

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Answer

[removed]

 True  [removed] False

 

Question 2

1.                                 

In a 0-1 integer programming problem involving a capital budgeting application (where xj = 1, if project j is selected, xj = 0, otherwise) the constraint x1 – x2 ≤ 0 implies that if project 2 is selected, project 1 can not be selected.  

Answer[removed]

 True  [removed] False 

Question 3

1.                                 

The solution to the LP relaxation of a maximization integer linear program provides an upper bound for the value of the objective function.   

Answer[removed] True  [removed] False

 

Question 4

1.                                 

If we are solving a 0-1 integer programming problem with three decision variables, the constraint x1 + x2 ≤ 1 is a

mutually exclusive

constraint.   

Answer[removed] True  [removed] False 

Question 5

1.                                 

If we are solving a 0-1 integer programming problem, the constraint x1 ≤ x2 is a

conditional

constraint.   

Answer[removed] True  [removed] False 

Question 6

1.                                 

A conditional constraint specifies the conditions under which variables are integers or real variables.   

Answer[removed] True  [removed] False 

Question 7

1.                                 

If the solution values of a linear program are rounded in order to obtain an integer solution, the solution is

Answer

[removed] 

[removed] 

[removed] 

[removed] 

always optimal and feasible

sometimes optimal and feasible

always optimal but not necessarily feasible

never optimal and feasible

 

Question 8

1.                                 

If we are solving a 0-1 integer programming problem, the constraint x1 = x2 is a __________ constraint.

Answer

[removed] 

[removed] mutually exclusive[removed] conditional[removed] 

multiple choice

corequisite

 

Question 9

1.                                 

You have been asked to select at least 3 out of 7 possible sites for oil exploration. Designate each site as S1, S2, S3, S4, S5, S6, and S7. The restrictions are:        Restriction 1. Evaluating sites S1 and S3 will prevent you from exploring site S7.        Restriction 2. Evaluating sites S2 or S4 will prevent you from assessing site S5.        Restriction 3. Of all the sites, at least 3 should be assessed.  Assuming that Si is a binary variable, write the constraint(s) for the second restriction

Answer

[removed] 

[removed] 

[removed] 

[removed] 

S2 +S5 ≤ 1

S4 +S5 ≤ 1

S2 +S5 + S4 +S5 ≤ 2

S2 +S5 ≤ 1,  S4 +S5 ≤ 1

 

Question 10

1.                                 

The solution to the linear programming relaxation of a minimization problem will always be __________ the value of the integer programming minimization problem.

Answer

[removed] 

[removed] 

[removed] equal to[removed] 

greater than or

equal to

less than or equal to

different than   

 

Question 11

1.                                 

The Wiethoff Company has a contract to produce 10000 garden hoses for a customer. Wiethoff has 4 different machines that can produce this kind of hose. Because these machines are from different manufacturers and use differing technologies, their specifications are not the same.          Write the constraint that indicates they can purchase no more than 3 machines.

Answer

[removed] 

[removed] 

[removed] 

[removed] 

Y1 + Y2 + Y3+ Y4 ≤ 3

Y1 + Y2 + Y3+ Y4 = 3

Y1 + Y2 + Y3+ Y4 ≥3

none of the above   

 

Question 12

1.                                 

In a capital budgeting problem, if either project 1 or project 2 is selected, then project 5 cannot be selected. Which of the alternatives listed below correctly models this situation?

Answer

[removed] 

[removed] 

[removed] 

[removed] 

x1 + x2 + x5 ≤ 1

x1 + x2 + x5 ≥1

x1 + x5 ≤ 1,  x2 + x5 ≤ 1

x1 – x5 ≤ 1,  x2 – x5 ≤ 1

 

Question 13

1.                                 

The Wiethoff Company has a contract to produce 10000 garden hoses for a customer. Wiethoff has 4 different machines that can produce this kind of hose. Because these machines are from different manufacturers and use differing technologies, their specifications are not the same.        Write a constraint to ensure that if machine 4 is used, machine 1 will not be used.

Answer

[removed] 

[removed] 

[removed] 

[removed] 

Y1 + Y4 ≤ 0

Y1 + Y4 = 0

Y1 + Y4 ≤ 1

Y1 + Y4 ≥ 0

 

Question 14

1.                                 

Max Z = 5×1 + 6×2  Subject to: 17×1 + 8×2 ≤ 136                    3×1 + 4×2 ≤ 36                    x1, x2 ≥ 0 and integer  What is the optimal solution?

Answer

[removed] 

[removed] 

[removed] 

[removed] 

x1 = 6, x2 = 4, Z = 54

x1 = 3, x2 = 6, Z = 51

x1 = 2, x2 = 6, Z = 46

x1 = 4, x2 = 6, Z = 56

 

Question 15

1.                                 

In a 0-1 integer programming model, if the constraint x1-x2 = 0, it means when project 1 is selected, project 2 __________ be selected.

Answer

[removed] 

[removed] 

[removed] 

[removed] 

can also

can sometimes

can never

must also

 

Question 16

1.                                 

Binary variables are

Answer

[removed] 

[removed] 

[removed] 

[removed] 

0 or 1 only

any integer value

any continuous value

any negative integer value

 

Question 17

1.                                 

You have been asked to select at least 3 out of 7 possible sites for oil exploration. Designate each site as S1, S2, S3, S4, S5, S6, and S7. The restrictions are:        Restriction 1. Evaluating sites S1 and S3 will prevent you from exploring site S7.        Restriction 2. Evaluating sites S2 or S4 will prevent you from assessing site S5.       Restriction 3. Of all the sites, at least 3 should be assessed.  Assuming that Si is a binary variable, the constraint for the first restriction is

Answer

[removed] 

[removed] 

[removed] 

[removed] 

S1 + S3 + S7 ≥ 1

S1 + S3 + S7 ≤1

S1 + S3 + S7 = 2

S1 + S3 + S7 ≤ 2

 

Question 18

1.                                 

If we are solving a 0-1 integer programming problem, the constraint x1 ≤ x2 is a __________  constraint.

Answer[removed] multiple choice[removed] mutually exclusive[removed] conditional[removed] corequisite 

Question 19

1.                                 

Consider the following integer linear programming problem    Max Z =      3x

1 + 2x

2  Subject to:   3x

1 + 5x

2 ≤ 30                      4x
1 + 2×2 ≤ 28                      x

1 ≤ 8                      x

1 , x
2 ≥ 0 and integer 
Find the optimal solution.

 What is the value of the objective function at the optimal solution.

 Note: The answer will be an integer. Please give your answer as an integer without any decimal point. For example, 25.0 (twenty-five) would be written 25  

Answer[removed] 

Question 20

1.                                 

Consider the following integer linear programming problem    Max Z =      3×1 + 2×2  Subject to:   3×1 + 5×2 ≤ 30                      5x
1 + 2×2 ≤ 28                      x1 ≤ 8                      x1 ,x
2 ≥ 0 and integer   
Find the optimal solution. What is the value of the objective function at the optimal solution. Note: The answer will be an integer. Please give your answer as an integer without any decimal point. For example, 25.0 (twenty-five) would be written 25

 