BSOP326 -Total Quality Management -Check Point -Week 6

 

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

(TCO 11) The component of statistical methodology that includes the collection, organization, and summarization of data is called _____.

 

descriptive

statistics

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

 

analytical statistics

 

inferential statistics

 

predictive statistics

 

 2.        Question :         (TCO 11) Characteristics of the population are called _____.

 

point estimates

 

random variables

 statistics  

parameters

  

 3.        Question :         (TCO 11) Which of the following constitutes an operational approach to reducing sampling error?

 

Cross-checking research designs with knowledgeable analysts

 

Questioning the assumption that tomorrow’s and today’s population are comparable

 

Taking a larger sample from the population

 

Reducing conditions that contribute to dissimilar population segments

 

 4.        Question :         (TCO 11) Calculating the average value of five sample measurements of door width is an example of which of the following?

 

Descriptive statistics

 

Statistical inference

 

Predictive statistics

 

Analytical statistics

  

 5.        Question :         (TCO 11) Acting on every result as if it were a special cause of variation is known as which of the following?

 

Stabilizing

 

Bullwhipping

  

Tampering

 

Monitoring

 

 6.        Question :         (TCO 12) A statistical technique that is useful for interpreting scatter diagrams is which of the following?

 

The average

 

Correlation analysis

 

The standard deviation

 

Nominal group technique

  

 7.        Question :         (TCO 12) Another name for a cause-and-effect diagram is which of the following?

 

Histogram

 

Run chart

 

Check sheet

 

Fishbone diagram

  

 8.        Question :         (TCO 12) To enable a service process to be mistake-proof, unlike manufacturing processes, the _____ must be considered.

 

process owner

 

customer

 

environment

 

manager

  

 9.        Question :         (TCO 12) Which of the following pairs of charts are used together?

 

X-Bar chart and p-chart

 

R-chart and p-chart

 

R-chart and s-chart

 

X-Bar chart and R-chart

 

 10.      Question :         (TCO 12) A p-chart is also called a _____.

pre-control chart

 

probability chart

 

fraction defective chart

 

process capability chart

  

 11.      Question :         (TCO 12) Determine the sample standard deviation(s) for the following data: 7, 8, 2, 1, 3, and 5.

           

 

s = 2.805

 

s = 3.266

 

s = 2.927

 

s = 3.578

  

 12.      Question :         (TCO 12) Six samples of subgroup size 6 (n=6) were collected. Determine the upper control limit (UCL) for an X-Bar chart if the mean of the sample averages is 4.7 and the mean of the sample ranges is 0.35.

CHART

 

UCL = 4.86905

 

UCL = 4.90195

 

UCL = 4.72250

 

UCL = 5.05805

 

 13.      Question :         (TCO 12) Twenty samples of subgroup size 6 (n=6) were collected for a variable measurement. Determine the upper control limit (UCL) for an R-chart if the mean of the sample ranges equals 4.4.

Factors for calculating control limits:

n          A2       D3       D4

2          1.880   0          3.267

3          1.023   0          2.575

4          0.729   0          2.282

5          0.577   0          2.115

6          0.483   0          2.004

  

UCL = 9.3016

 

UCL = 1.4696

 

UCL = 11.3256

 

UCL = 8.8176

  

(TCO 11) What are the advantages of studying a sample from the population instead of studying the entire population though a census?

 

 2.        Question :         (TCO 11) Define standard error of the mean.

  

 3.        Question :         (TCO 11) Differentiate between an enumerative study and an analytic study. Which type of study is more appropriate for descriptive statistics, hypothesis testing on the population mean, and time-series analysis?

 

 4.        Question :         (TCO 12) Explain the difference between Type I and Type II errors in the context of a control chart.

  

 5.        Question :         (TCO 12) Define the term statistical process control.

Still stressed with your coursework?
Get quality coursework help from an expert!