Physical Networking

Project Part 1 is already finsihed, you just need to finish the rest. See attached files for all the needed info.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

NT1310:Project

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Page 1

PRO JECT D ESC RIPT ION

As the project manager for the Cable Planning team, you will manage the creation of the cable plan for

the new building that will be built, with construction set to begin in six weeks.

The deliverables for the entire Cable Plan will consist of an Executive Summary, a

PowerPoint

Presentation and an Excel Spreadsheet. You will develop different parts of each of these in three parts.

The final organization should contain these elements:

The Executive Summary:

o Project Introduction

o Standards and

Codes

 Cable Standards and Codes

 Building Standards and Codes

o Project Materials

o Copper Cable, Tools, and Test Equipment

o Fiber-Optic Cable, Tools, and Test Equipment

o Fiber-Optic Design Considerations

o Basement Server Complex

Design

o First Floor Design

o Security and Safety

o Component Cost, Picture, and

source

The Excel Spreadsheet:

Component Names

Component Descriptions

Component Costs

Total Project Costs

The PowerPoint Presentation:

Introductory Slide

Component Slides with Component Name, Quantity Needed, Description, Price, Picture, and

Reference (where

to buy the component)

Description of the Basement Telecommunications and Network

Server Space

Network Equipment Required for the

Server

Farm

Cable Plant Design for the Basement

NT1310:

Project

Page 2

Standard Floor Design for Computers

and Network Equipment

Cable Plant for the

Standard Floor

Course Objectives Tested:

1. Distinguish between bandwidth, frequency, and data rate in a data network

2. Explain the importance of codes, standards, and specifications.

3. Compare and contrast network topologies

4. Describe the characteristics of different copper cables

5. Explain the purpose of network tools

6. Compare and contrast fiber-optic and copper transmission

7. Differentiate between twisted-pair cable connectors, coaxial cable connectors, and fiber-optic

cable connectors

8. Construct a network based on specifications using repeaters, hubs, bridges, switches, servers,

and routers

9. Demonstrate how to test copper and fiber-optic networks

10. Explain how fiber-optic transmission utilizes the basic principles of light for transmission

11. Evaluate the optical fiber characteristics that affect data rates, including dispersion, attenuation,

and bending

12. Compare different fiber-optic light sources

13. Explain the passive components used in fiber-optic networking, including couplers, optical

switches, optical attenuators, optical isolators, optical amplifiers, and optical filters

14. Explain how to install, test and repair fiber-optic cables and networks.

NT1310: Project

Page 3

PRO JECT SUBM ISSIO N P L AN

Project

Part

Description/Requirements of Project Part Evaluation Criteria

Part 1 Project Part 1: Design a Cable Network for a Large

Company

Your first task in creating the Cabling Plan is to develop an

Executive Summary that will contain the Project

Introduction and Infrastructure Cable Specifications and

Standards.

Your manager gives you the overall project plan that

includes:

A detailed description of the new

building.

The total number of computers for all of

the employees of the company.

The server and network topology

hardware that is required to put the

system together.

You can access documents for the project plan through

the Unit 2 Study Lesson.

This week, you will develop the template for

the Executive

Summary format (include headings for all sections.) You

will also fill in the content for the following sections and

subsections in the Executive Summary:

o Project Introduction

o Standards and Codes

 Cable Standards and Codes

 Building Standards and

Codes

Create the

template for the

Spreadsheet and the

Your instructor will use

the following points for

evaluating your

performance in this

assessment:

Did you create

an Executive

Summary

Document with

the sections

indicated

completed?

Did you use a

minimum of 2

pages: single-

spaced?

Did you include

all pertinent

standards and

codes for your

project?

Did you create

the headings for

all sections in

the Executive

Summary?

Did you create a

template

for the

spreadsheet?

Did you create a
template for the

NT1310: Project

Page 4

Project
Part
Description/Requirements of Project Part Evaluation Criteria

PowerPoint presentation. Complete the Introductory slide

for the PowerPoint

Presentation

Submission Requirements:

Microsoft Word Document

Size: 12-pt.

Font: Times New Roman

Length: Minimum of 2 pages

Line Spacing: Single-Spaced

Executive Summary containing the following

Sections:

o Project Introduction
o Standards and Codes
 Cable Standards and Codes
 Building Standards and
Codes

Due: Week 2

Grading Weight: 5%

PowerPoint

presentation?

Did you create

the first

introductory slide

for the
PowerPoint
presentation?

Did you use

proper

formatting,

grammar, and

spelling?

Part 2 Project Part 2 Cable Infrastructure and Procedures

Submission Requirements:

Using the Project Plan provided by your supervisor

(accessed from the Unit 2 Study Lesson), the Executive

Summary sections that were created for the Part 1 of the

Project, and templates you created in Part 1 of the Project,

you will design the cable infrastructure

for the basement

where the Telecommunications equipment, Network

equipment, and cable reside. Parameters for the design

such as the size of the building, Computer and Servers,

Cable, and Network Equipment requirements are provided

in the Overall Project Plan provided by your supervisor.

You will also designate the cable Equipment, and fiber

segments for installation in the basement where the

Telecommunications equipment, the Network equipment

Your instructor will use
the following points for
evaluating your
performance in this
assessment:

Did you add to

the Executive
Summary

Document?

Did you describe

the components

required for the

Installation of the

basement cable

structure and the

NT1310: Project

Page 5

Project
Part
Description/Requirements of Project Part Evaluation Criteria

and cable reside and one of the four upper floors in the

building. The basic designs of the upper floors (all have

the same design) are based on the size of the building,

the number of Computer Workstations, Cable, and

Network Equipment requirements. The parameters are

provided by the Overall Project Plan to assist you in

completing the tasks.

The first task will be to define the infrastructure and

network component requirements within

an Excel

Spreadsheet. Research each device and cable and fill in

information including the description, price, and source, in

the spreadsheet.

Define the Power Budget provided by the fiber-optic cable

and determine if the backbone design is adequate to keep

within the Power Budget. Research each type of Fiber-

Optic Cable to determine the best type to use for the

company’s backbone.

Continue the Executive Summary, Spreadsheet, and

presentation and add the following Topics/Items to the

Project Materials:

o Fiber-Optic Design Considerations
o Basement Server Complex Design

o Standard Floor Design

o Fiber-Optic Characteristics:

o Bandwidth

o Attenuation

o Electromagnetic Immunity

o Size and Weight

o Security and Safety

o Link Performance Analysis

o Cable Transmission Performance

Standard Floor

cable structure?

Did you create a

Spreadsheet

with all

components,

tools,

and testing

equipment with

required

information?

Did you create a
PowerPoint
Presentation
with all
components,

cabling, tools,

and testing

equipment?

Did you use
proper
formatting,
grammar, and
spelling?

NT1310: Project

Page 6

Project
Part
Description/Requirements of Project Part Evaluation Criteria

o Splice and Connector Performance

o Power Budget

In the Cost Analysis spreadsheet, fill in the

following information:

o Components Needed

o Quantity of Additional

Components

o Description of Additional Components

o Cost of Additional Components

In the PowerPoint Presentation, fill in the slides

for:

o

Component Slides with Component

Name, Quantity Needed, Description,

Price, Picture, and Reference (where

to buy the component)

o Description of the Basement

Telecommunications and Network

Server Space

o Network Equipment Required for the

Server Farm

o Cable Plant Design for the Basement

o Standard Floor Design for Computers

and Network Equipment

o Cable Plant for the Standard Floor

Submission Requirements:
Microsoft Word Document

Microsoft Word Document: Continue

Executive Summary from Part 1;

Size: 12-pt;

Font: Times New Roman

Length: 4-6 pages (Added to previous

NT1310: Project

Page 7

Project
Part
Description/Requirements of Project Part Evaluation Criteria

Work)

Microsoft Excel Spreadsheet

1 worksheet: Continue Spreadsheet

from Part 1.

PowerPoint Presentation

Introductory Slide: From Executive

Summary.

Component Slides with Component

Name, Description, Price, Picture, and

Source of Purchase

5-6 additional slides with information as

described above

Due: Week 4

Grading Weight: 5%

Part 3 Project Part 3: Completing the Cable Plant and

Network Component Design for the New Building

This week the you will finalize the project including

formatting the entire project document that includes the

Executive Summary, an Excel spreadsheet with the

component description, pricing, and source, and a

PowerPoint presentation that contains the cable

Infrastructure design for the basement and the Standard

Floor, a slide for each component of the network design

with a description, price and source, and a picture of the

Excel Spreadsheet with the component list and total cost

of the project.

Complete and Edit for format and

grammar, the Executive Summary

Document began in Part 1 and continued

in Part 2

Complete a Cost Analysis which will

contain the following:

Your instructor will use
the following points for
evaluating your
performance in this
assessment:

Did you edit and

submit a

professional

project?

Did you submit

an Executive
Summary

detailing the

design of the

building, Server

Farm Complex

and at least one

standard floor?

Did you submit

NT1310: Project

Page 8

Project
Part
Description/Requirements of Project Part Evaluation Criteria

o Quantity of Additional

Components

o Description of Additional

Components
o Cost of Additional Components

o Total Cost of the project

Complete the PowerPoint Presentation

o Edit the Design the Basement

Telecommunications and Network

Server Space in the basement

o Edit the Design of the Network

Equipment required for the Server

Farm

o Edit the Design the Cable Plant

for the basement
o Edit the Design the Cable Plant

for standard floor

Edit all deliverables for:

o Building Design

o Basement Server Complex

Design
o Standard Floor Design

o Component cost, picture, and

source

Submission Requirements:

Submit your completed Microsoft Work

Executive Summary.

Submit your completed Excel

Spreadsheet.

Submit your completed PowerPoint

Presentation

Due: Week 5

an Excel

spreadsheet

detailing

component

selection, price

and source?

Did you submit a

PowerPoint

presentation

describing the

design and

component

selection?

NT1310: Project

Page 9

Project
Part
Description/Requirements of Project Part Evaluation Criteria
Grading Weight: 5%

(End of Project Description)

 

DesignFactors

 Notes

CIO’s Office

5 People

IT Chief’s Office

5 People

LAN/WAN Maint.

20 People

Reception

4 People

Telecommunications

20 People

LAN Management

50 People

Server Room A

2 Person

Server Room B

4 Person

Equipment:

 

Patch Cable

Computer to Wall

Patch Cable

LAN Room

Cable Trays/Runs

Horizontal Runs

Cisco Border Router

Research: Attached to 5 Floor Switches

Server Room A

10 Servers

Server Room B

10 Servers

Computers

One Per Person

Standard floor (first floor) Lesson 2 Project Plan info

 Notes

CIO’s Office

5 People

IT Chief’s Office

5 People

LAN/WAN Maint.

20 People

Reception

4 People

Telecommunications

20 People

LAN Management

50 People

Server Room A

2 Person

Server Room B

4 Person

Equipment:

 

Patch Cable

Computer to Wall

Patch Cable

LAN Room

Cable Trays/Runs

Horizontal Runs

Cisco Border Router

Research: Attached to 5 Floor Switches

Server Room A

10 Servers

Server Room B

10 Servers

Computers

One Per Person

Design Factors

Basement floor

 Notes

Horizontal Runs

 Design Factors

Vertical Riser Run

On Outside Wall of LAN Room on Each Floor.

Fiber-Optic Multimode

Riser Runs: Backbone

SC Connectors

Fiber-Optic Cable

Cisco Catalyst: Switch: WS-C3750G-24PS-S: 24 Ports

Leave a Minimum of four ports free on each switch

Color Laser Printer

Minimum of One per Room or One per 20 people

Vertical Riser Run

On Outside Wall of LAN Room on Each Floor and Server RM B on this floor.

Fiber-Optic Multimode Riser Runs: Backbone
SC Connectors Fiber-Optic Cable
Cable Trays/Runs Horizontal Runs

Leave a Minimum of four ports free on each switch

Applicataion

U.S. Minimum Requirement Ranges

Space per Employee – 1997

Two people, such as a supervisor and an employee, can meet in an office with a table or desk between them

60″ to 72″ x 90″ to 126:/5.78m2 to 11.7m2

280Sq. Ft./26.0m2

Worker has a primary desk plus a return

60″ to 72″x60″to 84″/5.78 to 7.8m2

193Sq. Ft./17.9m2

Executive office – three to four people can meet around a desk

105 to 130″x96 to 123″/9.75 to 11.4 m2

142Sq. Ft./13.2m2

Basic workstation such as a call center

42″ to 52″ x 60″ to 72″/3.9 to 6.7 m2

114Sq. Ft./10.6 m2

Still stressed with your coursework?
Get quality coursework help from an expert!