Hi,
I have the attached stats assignment that needs to be complete in next 4 hours. Let me know if anyone can take it.
Question/1.xlsx
Anova Results
SUMMARY OUTPUT
Regression Statistics
Multiple R
0.9773822473
R Square
0.9552760573
Adjusted R Square
0.9463312687
Standard Error
355813.814640011
Observations
25
ANOVA
df
SS
MS
F
Significance F
Regression
4
54083453731574.5
13520863432893.6
106.7969413425
0
Residual
20
2532069413773.53
126603470688.676
Total
24
56615523145348
Coefficients
Standard Error
t Stat
P-value
Lower 95%
Upper 95%
Lower 95.0%
Upper 95.0%
Intercept
-5044576.80915197
7437899.36290137
-0.6782260102
0.50540053
-20559762.9601996
10470609.3418957
-20559762.9601996
10470609.3418957
System Downtime
380542.723631156
81284.7699495857
4.6815993189
0.0001434149
210985.665182202
550099.782080111
210985.665182202
550099.782080111
Employees
215342.339211447
46648.6263339963
4.6162632458
0.000166914
118035.010092074
312649.668330819
118035.010092074
312649.668330819
Data Quality
-826052.485389115
7303552.87097784
-0.1131028282
0.9110766274
-16060996.765818
14408891.7950397
-16060996.765818
14408891.7950397
Transactions
2.759530004
2.9426583909
0.9377677044
0.359551285
-3.3787478196
8.8978078276
-3.3787478196
8.8978078276
RESIDUAL OUTPUT
PROBABILITY OUTPUT
Observation
Predicted Losses
Residuals
Percentile
Losses
1
748240.904018606
-513828.904018606
2
0
2
285460.218251674
-194226.218251674
6
0
3
3079152.60926184
-345143.609261839
10
122
4
1060225.90729582
-714564.907295818
14
545
5
-174493.243879396
175038.243879396
18
918
6
392451.464016624
-276539.464016624
22
1200
7
10461.4951115575
-9227.4951115575
26
1234
8
387256.776997224
-296023.776997224
30
1456
9
348010.74127973
-292102.74127973
34
2891
10
-26610.0309627512
38612.0309627512
38
9871
11
-676105.777812173
699561.777812173
42
12002
12
1736087.2400232
51546.7599767996
46
17654
13
6689589.87019547
544114.129804531
50
23456
14
14767.6134696555
-11876.6134696555
54
55908
15
-158242.371685589
158364.371685589
58
91233
16
-217027.131383497
217027.131383497
62
91234
17
-223887.322973547
223887.322973547
66
115912
18
331705.673611212
-130919.673611212
70
200786
19
-125391.674965674
126847.674965674
74
234412
20
-157621.47743468
158539.47743468
78
345661
21
1580791.40777382
-346696.407773823
82
1095033
22
-10097.2598449811
27751.2598449811
86
1234095
23
-26636.3747110002
36507.3747110002
90
1787634
24
781129.239033207
313903.760966793
94
2734009
25
-358248.494686358
359448.494686358
98
7233704
System Downtime Line Fit Plot
Losses 3.0 1.0 10.0 3.0 0.0 1.0 0.0 1.0 1.0 0.0 0.0 8.0 16.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 5.0 0.0 0.0 3.0 0.0 234412.0 91234.0 2.734009E6 345661.0 545.0 115912.0 1234.0 91233.0 55908.0 12002.0 23456.0 1.787634E6 7.233704E6 2891.0 122.0 0.0 0.0 200786.0 1456.0 918.0 1.234095E6 17654.0 9871.0 1.095033E6 1200.0 Predicted Losses 3.0 1.0 10.0 3.0 0.0 1.0 0.0 1.0 1.0 0.0 0.0 8.0 16.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 5.0 0.0 0.0 3.0 0.0 748240.9040186057 285460.2182516743 3.07915260926184E6 1.06022590729582E6 -174493.2438793964 392451.464016624 10461.49511155754 387256.7769972243 348010.7412797297 -26610.03096275125 -676105.7778121727 1.7360872400232E6 6.68958987019547E6 14767.61346965551 -158242.3716855893 -217027.1313834973 -223887.3229735473 331705.6736112124 -125391.6749656742 -157621.4774346797 1.58079140777382E6 -10097.25984498113 -26636.37471100024 781129.239033207 -358248.4946863581
System Downtime
Losses
Employees Line Fit Plot
Losses 22.0 24.0 19.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 21.0 17.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 22.0 24.0 24.0 22.0 23.0 234412.0 91234.0 2.734009E6 345661.0 545.0 115912.0 1234.0 91233.0 55908.0 12002.0 23456.0 1.787634E6 7.233704E6 2891.0 122.0 0.0 0.0 200786.0 1456.0 918.0 1.234095E6 17654.0 9871.0 1.095033E6 1200.0 Predicted Losses 22.0 24.0 19.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 21.0 17.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 22.0 24.0 24.0 22.0 23.0 748240.9040186057 285460.2182516743 3.07915260926184E6 1.06022590729582E6 -174493.2438793964 392451.464016624 10461.49511155754 387256.7769972243 348010.7412797297 -26610.03096275125 -676105.7778121727 1.7360872400232E6 6.68958987019547E6 14767.61346965551 -158242.3716855893 -217027.1313834973 -223887.3229735473 331705.6736112124 -125391.6749656742 -157621.4774346797 1.58079140777382E6 -10097.25984498113 -26636.37471100024 781129.239033207 -358248.4946863581
Employees
Losses
Data Quality Line Fit Plot
Losses 0.94 0.96 0.88 0.95 0.98 0.97 0.98 0.98 0.98 0.98 0.98 0.89 0.81 0.97 0.98 0.99 0.99 0.95 0.97 0.98 0.95 0.96 0.97 0.96 0.99 234412.0 91234.0 2.734009E6 345661.0 545.0 115912.0 1234.0 91233.0 55908.0 12002.0 23456.0 1.787634E6 7.233704E6 2891.0 122.0 0.0 0.0 200786.0 1456.0 918.0 1.234095E6 17654.0 9871.0 1.095033E6 1200.0 Predicted Losses 0.94 0.96 0.88 0.95 0.98 0.97 0.98 0.98 0.98 0.98 0.98 0.89 0.81 0.97 0.98 0.99 0.99 0.95 0.97 0.98 0.95 0.96 0.97 0.96 0.99 748240.9040186057 285460.2182516743 3.07915260926184E6 1.06022590729582E6 -174493.2438793964 392451.464016624 10461.49511155754 387256.7769972243 348010.7412797297 -26610.03096275125 -676105.7778121727 1.7360872400232E6 6.68958987019547E6 14767.61346965551 -158242.3716855893 -217027.1313834973 -223887.3229735473 331705.6736112124 -125391.6749656742 -157621.4774346797 1.58079140777382E6 -10097.25984498113 -26636.37471100024 781129.239033207 -358248.4946863581
Data Quality
Losses
Transactions Line Fit Plot
Losses 250096.0 208111.0 345611.0 210075.0 185321.0 249876.0 252345.0 250987.0 236765.0 238911.0 237654.0 293778.0 415422.0 250912.0 191210.0 172901.0 170415.0 221876.0 200121.0 191435.0 278987.0 238908.0 235908.0 268001.0 199761.0 234412.0 91234.0 2.734009E6 345661.0 545.0 115912.0 1234.0 91233.0 55908.0 12002.0 23456.0 1.787634E6 7.233704E6 2891.0 122.0 0.0 0.0 200786.0 1456.0 918.0 1.234095E6 17654.0 9871.0 1.095033E6 1200.0 Predicted Losses 250096.0 208111.0 345611.0 210075.0 185321.0 249876.0 252345.0 250987.0 236765.0 238911.0 237654.0 293778.0 415422.0 250912.0 191210.0 172901.0 170415.0 221876.0 200121.0 191435.0 278987.0 238908.0 235908.0 268001.0 199761.0 748240.9040186057 285460.2182516743 3.07915260926184E6 1.06022590729582E6 -174493.2438793964 392451.464016624 10461.49511155754 387256.7769972243 348010.7412797297 -26610.03096275125 -676105.7778121727 1.7360872400232E6 6.68958987019547E6 14767.61346965551 -158242.3716855893 -217027.1313834973 -223887.3229735473 331705.6736112124 -125391.6749656742 -157621.4774346797 1.58079140777382E6 -10097.25984498113 -26636.37471100024 781129.239033207 -358248.4946863581
Transactions
Losses
Normal Probability Plot
2.0 6.0 10.0 14.0 18.0 22.0 26.0 30.0 34.0 38.0 42.0 46.0 50.0 54.0 58.0 62.0 66.0 70.0 74.0 78.0 82.0 86.0 90.0 94.0 98.0 0.0 0.0 122.0 545.0 918.0 1200.0 1234.0 1456.0 2891.0 9871.0 12002.0 17654.0 23456.0 55908.0 91233.0 91234.0 115912.0 200786.0 234412.0 345661.0 1.095033E6 1.234095E6 1.787634E6 2.734009E6 7.233704E6
Sample Percentile
Losses
Sheet1
Date
Losses
Number of Losses
System Downtime
Employees
Data Quality
Transactions
1-Jul
$234,412.00
10004
3
22
94%
250096
2-Jul
$91,234.00
7284
1
24
96%
208111
3-Jul
$2,734,009.00
17972
10
19
88%
345611
4-Jul
$345,661.00
8613
3
24
95%
210075
5-Jul
$545.00
5745
0
24
98%
185321
8-Jul
$115,912.00
9745
1
24
97%
249876
9-Jul
$1,234.00
8075
0
24
98%
252345
10-Jul
$91,233.00
9287
1
24
98%
250987
11-Jul
$55,908.00
8879
1
24
98%
236765
12-Jul
$12,002.00
9079
0
24
98%
238911
15-Jul
$23,456.00
9078
0
21
98%
237654
16-Jul
$1,787,634.00
13514
8
17
89%
293778
17-Jul
$7,233,704.00
24510
16
24
81%
415422
18-Jul
$2,891.00
8054
0
24
97%
250912
21-Jul
$122.00
6061
0
24
98%
191210
22-Jul
$0.00
5360
0
24
99%
172901
23-Jul
$0.00
5283
0
24
99%
170415
24-Jul
$200,786.00
8387
1
24
95%
221876
25-Jul
$1,456.00
6604
0
24
97%
200121
26-Jul
$918.00
5934
0
24
98%
191435
29-Jul
$1,234,095.00
11438
5
22
95%
278987
30-Jul
$17,654.00
7287
0
24
96%
238908
31-Jul
$9,871.00
7549
0
24
97%
235908
1-Aug
$1,095,033.00
10988
3
22
96%
268001
2-Aug
$1,200.00
1200
0
23
99%
199761
Assignment 2:
a.) Using Excel (or some other data analysis software), come up with a statistical model to predict Losses as a function of System Downtime, Employees, Data Quality and the Number of Transactions.
b.) Which composite factors would you think of using?
c.) What type of nonlinearity would you build in your function?
d.) Give an estimate for the probability that you will lose $1200 on any given day?
e.) In a year you expect the average number of daily trades to double. However, you do not want the expected losses on any give day to go up. How many new employees do you think you should you hire by next year?
Question/2
8 March 2007
TARGET2-SECURITIES
THE BLUEPRINT
Table of contents
Introduction 2
1. Project Objectives 2
2. Perimeter of TARGET2-Securities 8
3. Functional Architecture 12
4. TARGET2-Securities Project Time frame 19
Address: Kaiserstrasse 29, 60311 Frankfurt am Main, Germany
Postal address: Postfach 16 03 19, 60066 Frankfurt am Main, Germany
Telephone: +49 69 1344 0
Fax: +49 69 1344 6000
Website: http://www.ecb.int
All rights reserved.
Reproduction for educational and non-commercial purpose is permitted provided that the source is acknowledged.
© European Central Bank, 2007
Page 2 of 20
Introduction
At its meeting on 6 July 2006 the Governing Council of the European Central Bank (ECB) decided to
explore, in cooperation with central securities depositories (CSDs) and other market participants, the
possibility of setting up a new service for securities settlement in the euro area, called TARGET2-
Securities (T2S). Since then, the Eurosystem has been actively soliciting the views of CSDs and market
participants. It is also carrying out an internal Operational Feasibility Study on the project. A high-level
presentation on the methodology, the principles and the preliminary findings of this study has already
been shared with the market via industry-wide meetings held in the ECB, including representatives from
the European public authorities.
This paper presents a first blueprint of the T2S design that can be used for the formal market consultation,
following the Governing Council’s decision in March 2007 to initiate the project.
It should be clarified at the outset that only the high-level principles of the project are presented here. For
a thorough understanding of the legal, operational, technical and economic aspects of the project,
reference should be made to the T2S Feasibility Study document(s) which will be published in parallel.
Section 1 describes the background to the proposal and the benefits that T2S would bring. Section 2
describes the perimeter of T2S and the scope of services it would provide. Section 3 presents how T2S
would work. Finally, Section 4 presents the project’s time frame.
1. Project Objectives
Contributing to integration in EU securities settlement
Over the past decade, two trends have been apparent in the development of the European securities
settlement infrastructure:
• There has been considerable progress in integrating settlement systems at the national level, with
the result that in most EU countries, there is now just one settlement platform for all types of
securities.
• At the EU level, some cross-border company mergers have resulted in bringing CSDs in different
countries under common ownership (e.g. Clearstream and Euroclear Group). Although these
mergers have the objective of integrating settlement platforms progress has to date been slow.
Consequently, while efficiency at the national level has improved, there is widespread consensus that
more needs to be done at a cross-border level. It is particularly striking that, almost eight years after the
introduction of the euro, the euro area still lacks an efficient, integrated securities infrastructure that
would support the operation of a single financial market. This illustrates the difficulty faced by
Page 3 of 20
independent and competing organisations in coordinating solutions across multiple countries and
involving many different participants.
The result of this fragmented infrastructure is that the cost of clearing and settlement is considerably
higher in the EU compared to the US. Various studies (by CEPS, Giovannini, LSE/OXERA) have
concluded that the price per cross-border transaction in Europe is between 2.5 and 5 times higher than in
the US, with the cost per cross-border transaction between 1.5 and 4 times higher.
Increasing efficiency of settlement of securities transactions in euro
The implementation of TARGET2 presents an opportunity for the European securities industry to take a
major step forward. TARGET2 will, for the first time, provide a single technical infrastructure that
enables market participants to pool their euro liquidity across different countries. This will make it
possible to bring together the payments associated with securities settlement across multiple CSDs.
However, the benefits to banks of pooling liquidity are limited if TARGET2 has to maintain separate
interfaces to multiple securities settlement engines in the various CSDs.
To maximise the settlement efficiency of securities transactions, two conditions need to be satisfied:
• a single cash account (that will allow for liquidity pooling) must be operated; and
• it should be possible to deliver in real time, simultaneously settling cash and securities on a single
platform via common procedures.
The concept of T2S has emerged out of these requirements.
The most innovative element in this concept is that the securities accounts of multiple CSDs will be
maintained on a single technical platform together with central bank cash accounts, while all other
functions – notably, the relationship with intermediaries, investors and issuers and the management of
corporate actions – remain with the CSDs, as is the case today. However, while this split is a radical one,
it is also logical. Settlement is the most standardised process among CSDs activities. The relationships
with intermediaries, investors and issuers, on the other hand, are much more heterogeneous, with
numerous local variations. It is therefore possible to integrate the settlement process relatively rapidly,
while allowing the eventual harmonisation of local market practices to take place at a later stage.
The Eurosystem is in a unique position in Europe, given that the euro area level is a truly operative
decision-making framework that is just as efficient as any national level scheme. In addition, in seeking to
overcome sectoral or national barriers that stand in the way of a more efficient market structure, is
reassuming a traditional role for central banks in many countries*. This is entirely consistent with the
mandates of the ECB and the national central banks (NCBs) of the Eurosystem. The provision of T2S is
possibly the only solution that will allow existing national CSDs to continue to operate in a decentralised
framework. In doing so, it provides the same service and functionality to all financial market users as a
minimum in the euro area (and potentially in the whole EU/European Economic Area as well).
By maintaining CSDs’ current role in relation to intermediaries, investors and issuers, the project ensures
that there will continue to be choice and competition in the provision of services; if anything, T2S will
Page 4 of 20
provide greater possibilities for choice and competition. Participants may choose among multiple CSDs to
access securities through a single entry point based on a common Settlement Engine. This would be also
true for other infrastructures (e.g. central counterparties (CCPs) and trading platforms) in respect of the
Code of Conduct recently signed under the auspices of the European Commission. Issuers can also
improve the liquidity and issuance cost of their securities by making them directly available to a wider
range of participants via a single, potentially local CSD.
The ability of any bank (including international CSDs (ICSDs)) to offer securities settlement in
commercial bank money will not be affected. The parallel provision of securities settlement services in
central bank money and commercial bank money represents a stimulus for central banks to provide
efficient services. This is as true for T2S as it is for TARGET2.
T2S shares the same objectives as other public initiatives in this field, most notably the European
Commission’s Code of Conduct. The common objective is to improve efficiency and reduce costs
through ensuring greater competition. The Code of Conduct pursues this objective through CSDs’ self-
commitment to provide price transparency, to facilitate access and interoperability, to unbundle services
and to separate accounts. T2S, on the other hand, approaches this issue from an operational angle. The
two initiatives naturally reinforce one another, and for this reason the European Commission has stated its
support for T2S right from the start. The European Parliament has also concluded that “until such time as
an [integrated settlement] infrastructure may have been introduced, an ECB governance must be put in
place”.1
The potential benefits for TARGET2-Securities users
Although the initial impulse for the T2S concept was the opportunity created by the TARGET2 payment
system, the potential benefits go much further and affect a wide range of users.
• The settlement of cross-border securities transactions can be as efficient as domestic settlement,
eliminating the cost disadvantages that have hitherto impeded the development of a single financial
market especially when compared with the US one (see Chart 1). This will be achieved by bringing
together the securities accounts of multiple CSDs (as well as dedicated sub-cash accounts of NCBs)
on a single platform. The bookings for the transfer of securities between participants of different
CSDs can all be made simultaneously, together with the cash movements. This eliminates the
current highly complex and costly processes of interactions between various platforms, which are
costly often not synchronised, entailing delays and could pose a risk in terms of failing to achieve
1 European Parliament Resolution on the ECB’s Annual Report 2005:
“15. Welcomes the publication of the ECB’s first report on financial integration in the euro zone, since this is vital both for
putting across information concerning monetary policy and for financial stability; notes that, according to the ECB, financial
integration calls for the integration of market infrastructures, in particular settlement-delivery systems; notes the intention of the
ECB to create a settlement infrastructure; notes that, until such time as an infrastructure may have been introduced, an ECB
governance must be put in place”.
Page 5 of 20
settlement finality. These shortcomings are responsible for the current unattractiveness of CSD
links. T2S will also automate the realignment process between CSDs on a real-time basis without
needing to use additional, often costly, procedures.
• T2S will propose the same pricing for domestic and cross-border settlements. All markets may
operate in real time under the same settlement engine, thus allowing a faster reuse of securities and
central bank money
• Competition would be fostered by pooling all securities that settle in central bank money in a single
settlement engine accessible via multiple CSDs. At the same time, a decentralised structure is
maintained whereby each CSD is responsible for maintaining its relationships with intermediaries,
investors and issuers, as well as asset-servicing.
• As the European securities settlement industry could still achieve significant economies of scale, a
single settlement engine with the volume scale of T2S could potentially lead to a substantial
decrease in settlement costs on average. This is particularly the case for cross-CSD settlement. The
economic feasibility of the project shows that this is possible despite the conservative working
assumptions currently used in the calculations.
• A reduction in the number of settlement engines will decrease the CSDs’ infrastructure costs on the
one hand, and the number of interfaces needed by market participants on the other. This is an
additional factor which is reasonably expected to benefit infrastructures and users’ back office
development and running costs.
• T2S will encourage CSDs to offer their participants the opportunity, if they choose, to centralise
their securities holdings in one place. This will depend on the readiness of CSDs to hold securities
issued in other CSDs, although it should be noted that CSDs will have an incentive to do so in
order to improve their competitive position vis-à-vis their participants.
• Issuers may potentially reach a much wider set of participants while continuing to use the same
CSD they are using today (and with the same procedures as today under their local legal and tax
regimes). This effectively makes the euro financial market a domestic market that does not entail
any additional costs. In addition, this will increase the attractiveness of securities, which are
currently marginalised because of their national nature, by making them available throughout the
euro market.
• Investors will obtain cheaper access to non-local securities, which today requires prohibitive cross-
border settlement procedures, and will therefore benefit from greater opportunities to diversify their
portfolio. In addition, institutional investors will probably also benefit from lower fees to access the
domestic market, while the share of infrastructure costs represents a significant part of the fees they
pay to their custodians.
• The Eurosystem and its counterparties will also benefit from this efficiency in terms of using
collateral in its credit operations. With cross-border deliveries becoming as efficient as domestic
ones, a new generation of Eurosystem collateral handling procedures could be implemented.
Page 6 of 20
Improved Eurosystem collateral management could rationalise and harmonise Eurosystem
practices in this field, in particular replacing the current correspondent central banking model
(CCBM) procedures and multiple domestic procedures when securities are used for collateral
purposes.
• Finally, by de facto introducing standardised euro area-wide settlement, T2S will significantly
contribute to the momentum for further harmonisation in the financial markets. The successful
introduction of T2S will further facilitate, even during its development phase, the current industry
cooperation towards elimination of the remaining barriers identified by the Giovannini Report.
Although TARGET2 is a euro payment system, the problems of fragmentation and inefficiency are wider
than in the euro area. T2S will therefore be designed in such a way (an open architecture) that it could
later on provide settlement against other EU currencies, where there is market demand, and provided that
the relevant NCB is prepared to enable settlement in its currency.
As far as the Eurosystem is concerned, this is a project unlike any undertaken before, as it reaches out
beyond banks and payments systems into securities markets. The Governing Council has indicated that
the Eurosystem is willing to finance and operate T2S, but it also recognises that it will need the
cooperation and commitment of CSDs and securities market participants in order to deliver the service
successfully. It is therefore looking at mechanisms to enable its project partners to participate fully in its
design and development, in a way that appropriately links the degree of commitment with the level of
involvement in decision-making.
Chart 1: Domestic and Cross border settlement costs in EU
0
5
10
15
20
25
30
35
United
States
EU
domestic
EU cross-
border
Min Max Avg.
– EU dom estic costs range from
0.35 to 3.43 �€ ;
– �… and are higher than US
(+ 0.10 to 2.90 �€);
– Cross-border costs higher than
dom estic ones (19.5 to 35.0 �€).
Source: O xera, LSE, CEPS
Conclusion
By providing a single platform for the settlement of the cash and securities legs of all the transactions
today effected in the various CSDs, T2S will significantly contribute to increasing the efficiency of
Page 7 of 20
settlement and the integration of the EU capital markets infrastructure. A single platform will enable the
settlement of all domestic and cross-border securities transactions.
It will also allow the potential benefits stemming from TARGET2 (cash) to be fully exploited, since this
will complement the possibility of having a single pool of liquidity with that of a having a single entry
point for the settlement of securities, providing cash and securities settlement in the same platform.
Page 8 of 20
2. Perimeter of TARGET2-Securities
Functional specialisation: custody and settlement
Two dimensions can be distinguished with regard to the functional organisation of the securities market
infrastructure:
• the management of flows, including the trading, clearing and settlement functions as a result of the
movement of securities (against or not cash);
• the management of stocks, involving the custody or asset-servicing function as a result of the
relationship between issuers and investors (see Chart 1).
Chart 2: Two dimensions of CSD services today
INVESTOR
CSD
INVESTOR
CSD
SECURITIES
SETTLEMENT
SECURITIES
SETTLEMENT
TRADINGTRADING
ISSUER
CSD
ISSUER
CSDISSUERISSUER INVESTORINVESTOR
CCP
CLEARING
CCP
CLEARING
CeBM
SETTLEMENT
CeBM
SETTLEMENT
BANK &
BROKER
BANK &
BROKER
LISTINGLISTING
Management of Flows
Management of Stocks
Asset Services
Corporate actions
Investor information
A CSD today typically undertakes tasks related to both the settlement and custody functions. The
proposed model represents an opportunity for CSDs to perform their securities settlement function in
central bank money via T2S. The custody function (investor and issuer CSDs) will continue to be
performed by the CSDs as is currently the case, including the responsibility for the notary function of
issuance (see Chart 2). Other services such as settlement against commercial bank money and value-
added business are not part of the scope of T2S.
Chart 3: Perimeter of T2S
Page 9 of 20
INVESTOR
CSD
INVESTOR
CSD
SECURITIES
SETTLEMENT
SECURITIES
SETTLEMENT
TRADINGTRADING
ISSUER
CSD
ISSUER
CSDISSUERISSUER INVESTORINVESTOR
CCP
CLEARING
CCP
CLEARING
CeBM
SETTLEMENT
CeBM
SETTLEMENT
BANK &
BROKER
BANK &
BROKER
LISTINGLISTING
EXCHANGE
CSD
TARGET2-SECURITIES
CLEARING
HOUSE
A CSD has extensive relations to its home market stakeholders: the issuers, the investors directly or via
the brokers and the custodian banks, the CCPs, the tax authorities, the supervisory authorities and the
legislators. These relations require a range of asset-servicing activities that are typically adapted to local
market conditions, for which the local CSD has long-standing expertise. The settlement function, on the
other hand, only relates to the participants in the settlement process and to the cash clearing entity, the
central bank and its participating banks.
Participants in the settlement process are often active in several markets. As a consequence, they have to
build and maintain multiple connections to several systems, or have to route their transactions through
more expensive custodian networks. The introduction of TARGET2 for cash settlement within the euro
area has facilitated these connections for the cash side of settlement transactions. For the securities leg,
however, these complex and costly connections remain.
The proposed management of the settlement and custody functions in separate platforms (T2S and asset-
servicing platforms of CSDs) is motivated by the fact that settlement services are already highly
standardised and easier to harmonise than the custody business. The latter is typically more complex and
may take more time to harmonise owing to the national differences that exist with regard to custody,
corporate actions and beneficial ownership (e.g. owing to different legal and tax regimes). The feasibility
of this separation will be presented in detail in the operational and business analysis chapter of the T2S
Feasibility Study.
To avoid parallel settlement and to allow CSDs to decommission their settlement platforms and systems,
T2S needs to offer the same level of settlement services for the assets that CSDs settle in euro today.
Page 10 of 20
T2S scope of services
Within the context of the functionality described above, T2S will cover the following aspects in the
services provided:
Scope of assets
T2S will provide settlement services for all securities (with International Security Identification Number
(ISIN) codes) held through the participating CSDs’ accounts. These include debt instruments, equities,
investment funds and warrants.2 Securities that are denominated in foreign currency but settled in euro
will also be covered by T2S, provided they are held through a T2S-connected CSD. This implies that
securities issued outside T2S could be settled through T2S, provided that a T2S-connected CSD has a link
with the external issuer CSD.
Settlement type
T2S will offer an “optimised delivery versus payment (DvP)” settlement model. It will be based on real-
time gross settlement (RTGS) procedures combined with self-collateralisation and continuous
optimisation (including technical netting and other algorithms), as well as recycling mechanisms.3 Such
mechanisms will compensate for situations where participants lack liquidity (e.g. self-collateralisation) or
for complex transactions (specific algorithms for back-to-back transactions or chains of trades, for
example). This innovative optimised DvP settlement model will maximise settlement efficiency in terms
of liquidity, speed and safety.
In addition, free of payment (FOP) settlement and other types of securities settlement needed for CSDs to
function effectively will be offered as well.
Scope of services
T2S will manage the entire settlement process by offering the following services:
• receiving settlement instructions4 and checking their technical validity against a static reference
database (updated and controlled by the CSDs – the information checked will be defined with the
CSDs);
• providing matching services, mainly for transactions conducted between participants of different
markets;
• verifying the availability of and reserving securities and central bank money;
• managing queues;
2 This list of assets may not be exhaustive.
3 The details of the self-collateralisation procedure, e.g. the application of haircuts, assets and counterparties, are to be performed
in accordance with the rules defined by the Eurosystem and the relevant NCB providing the credit. Further analysis on the
exact rules and procedures will be described in the next phase of the project.
4 T2S will accept unmatched or matched settlement instructions from CSDs, CCPs, stock exchanges or other organised markets,
and possibly also market participants (users).
Page 11 of 20
• providing settlement optimisation mechanisms;
• offering self-collateralisation;
• executing debits and credits on securities accounts;
• performing automated real-time realignment of inter-CSD accounts where applicable; and
• reporting to CSDs and other participants on the status of each settlement instruction5 and the
account balance.
Operating hours
T2S will offer daylight and night-time settlement in order to cover the range of services already provided
by some CSDs. The daylight operating hours of T2S will be in line with the timetable of TARGET2.
Similarly, T2S will perform night-time settlement during the same night-time period when TARGET2
supports the settlement of ancillary systems.
Currency
In principle, T2S will cover securities transactions settling in euro central bank money. This service will
also be available to CSDs outside the euro area settling in euro central bank money. The design of T2S
will also allow for the provision of securities settlement in other EU currencies, provided that there is
market demand, and assuming that the relevant NCB is prepared to enable settlement in its currency.
Non-compulsory participation
T2S is a project that seeks to offer safe, efficient and competitive settlement services across all connected
markets. Market participants largely support the project. However, the benefits for the market will only
materialise if all CSDs, or at least a critical mass of them, join the project because of the greater
competition it will introduce, even if this may run counter to their corporate interests in the short term.
At this stage, the Eurosystem believes that the pressure of the market and the quality of the solution
proposed are sufficiently strong to convince all CSDs to follow the European integration approach. In this
context, participation in T2S should not be made mandatory.
5 In case of direct user access (see footnote 1), T2S would also provide settlement-related information directly to the user as well
as to the CSD.
Page 12 of 20
3. Functional Architecture
A high-level overview of T2S
This high-level description, in combination with the more detailed Operational Feasibility Study, presents
the T2S functionalities necessary to provide CSDs with efficient securities settlement services. The
custody and value-added services which are processed and initiated at the CSD level have an impact on
T2S operations insofar as they can result in changes in the securities accounts balances maintained via
T2S (see Boxes 1 and 2).
As a consequence, the CSDs will instruct T2S to perform related settlement activities. T2S will provide
via its interfaces specific instruction types for this purpose which would be restricted to the CSDs.
Within the proposed T2S business model, three main building blocks can be distinguished under the high-
level overview:
o the T2S Settlement Engine and Transactions Database (including the Lifecycle
Management);
o the dedicated sub-cash accounts in TARGET2;
o the Securities Accounts Database(s) and interactions with CSDs.
The first refers to the core functionality of the system, the platform responsible for checking the
availability of cash and securities and eventually executing final settlement in the securities accounts and
the Cash Accounts Database. The second is a database of the dedicated cash sub cash accounts to be used
during the DvP processes and how this database interacts with the RTGS accounts. The third is the set of
all securities accounts opened with the participating CSDs.
Chart 4: An overview of T2S
CSD ACSD A
CSD BCSD B
CSD CCSD C
T2S
SETTLEMENT
ENGINE
T2S
SETTLEMENT
ENGINE
SECURITIES
ACCOUNTS
TARGET2
CASH ACCOUNTS
CSD A SECURITIES
ACCOUNTS
NCB C ACCOUNTS
T2S
SETTLEMENT INSTRUCTIONS
ParticipantParticipant
NCB B ACCOUNTS
NCB A ACCOUNTS
CSD B SECURITIES
ACCOUNTS
CSD C SECURITIES
ACCOUNTS
Page 13 of 20
The dedicated cash sub-accounts (Chart 4) are part of the RTGS accounts opened in TARGET2 with the
NCBs, technically dedicated to T2S. They function independently; i.e. the T2S Settlement Engine can
only debit and credit these dedicated sub-accounts. The CSDs’ participants can choose to move liquidity
in and out of these sub-accounts at any time using the TARGET2 functionality (ICM and payment
functionality) At the end of the day, all liquidity is pooled back into the main TARGET2 RTGS account
in order to process end-of-day cash balances.
Chart 5: TARGET2 Dedicated Sub-account
Functional description
If we analyse T2S in more detail, two main functional blocks can be distinguished: Lifecycle
Management and the core Settlement Engine (see Box 1). The T2S Static Data constitutes a third rather
static functional block that supports the operations of the other two, and includes the CSD-specific rules
for settlement. The current version of the Operational Feasibility Study also covers in some detail the
level of functionality described below.
Lifecycle Management
The Lifecycle Management covers the lifecycle of an instruction, the different processes it can take
within the system, and the related lifecycle status attached to these processes (e.g. validated, matched,
unmatched, settled, etc.). Depending on the current lifecycle status and on the underlying market rules, an
instruction will be processed within the following functional modules:
• Validation – This checks that the instructions of incoming messages are correct. The rules against
which instructions are validated are the ones maintained by the CSDs in the T2S Static Data
databases.
• Matching – This matches instructions (if not already matched at CSD level).
• Settlement eligibility – This module distinguishes between eligible and non-eligible instructions. It
verifies whether an instruction is eligible for settlement (depending on settlement date, deadlines,
market closing, etc.) and then either hands it over for settlement, or returns instructions that are no
longer eligible (e.g. due to expired deadlines) by assigning them a non-eligible status.
Dedicated cash
Sub-accounts
RTGS account
Managed via T2S functionality
Page 14 of 20
• Instructions maintenance – This updates the parameters of instructions (e.g. prioritisation,
enrichment, etc.).
• Purging – This removes settled instructions from the system at the end of the day.
Settlement Engine
The following modules apply exclusively to instructions that are eligible for settlement and form the core
of the Settlement Engine:
• Sequencing – This creates queues of instructions that are eligible for settlement in a way that
optimises settlement results while also taking into account different levels of priority.
• Booking – This is the heart of the Settlement Engine, where the final bookings of the movements
related to the instructions regarding the securities and cash accounts are performed. This is the only
place where account balances can be changed.
• Optimisation – This identifies linked sets of (failed) instructions which could be settled if certain
technical netting procedures are performed. Optimisation will propose these instructions as linked
sets for processing in the Sequencing Module.
• Recycling – This determines when instructions that failed in their first attempt will be put forward
again for settlement. Recycling will propose these instructions for processing in the Sequencing
Module.
The T2S Static Data functional block can only be accessed by CSDs via the authorisations interface (see
next section). The block purely includes stocks of data relevant for the processing of settlement in T2S.
These data include updated information on valid participants’ accounts, active ISINs, and access and
rights for CSDs’ participants.
Interfaces
Three kinds of data groups to be stored and processed in T2S can be differentiated: settlement
instructions, balances stored on the securities and cash accounts, and authorisations (i.e. the information
on which kind of securities are admitted for which kind of settlement, as well as the account set-up
information plus the connectivity set-up of each customer).
Box 1 provides an overview of how the relevant data (on instructions, balances/holdings and
authorisations) relate to each other. Four different interfaces are required for the interaction between T2S,
CSDs and the users6:
6 Users are defined as CSDs’ participants.
Page 15 of 20
An instructions interface, which can be accessed by CSDs as well as some users. This will provide a bi-
directional functionality in order to instruct settlement, to receive settlement status and feedback, to
query the status of instructions, and to maintain and manage instructions.
An authorisation interface, which can only be accessed by CSDs. This provides the latter with the
functionality to authorise securities and participants relevant for settlement.
An accounts balance interface, which can be uni-directionally accessed by CSDs as well as some users to
query balance information and to monitor accounts.
A payment system Interface, which allows CSDs’ participants to transfer liquidity between dedicated sub-
cash accounts located in T2S and the main RTGS account located in TARGET2 (cash), if and when
required.
These interfaces are primarily for the use of the CSDs, although CSDs can give their participants limited
access to the instructions and accounts balance interfaces.
Box 1: A High-level Functional Description of T2S
TARGET2-Securities
Lifecycle Management and
Matching
T2S Static data
C
us
to
m
er
s
/ E
xc
ha
ng
es
/
CC
Ps
C
SD
P
ar
tic
ip
an
ts
Account
Balances
Interface
•
Query•
Monitor
Instructions
Interface
• Instruct
• Query Status
• Maintain
Instruction
CSD A
CSD A
ISINS
SECURITIES
ISINs and data
PARTICIPANTS
Customers data
CSD B
CSD A
CSD B
CSD A
CSD A
RULES
CSD A
CSD B
CSD A
CSD B
CSD A
CSD A
CSD A
CSD A
RULES
CSD A
CSD B
CSD A
CSD A
SECURITIES
CSD A
CSD B
CSD A
CSD B
CSD A
CSD A
CSD A
CSD A
SECURITIES
Information
on status
Instruction ready
for settlement
CSD A
ACCOUNTS
SECURITIES
ACCOUNTS
CSD B
ACCOUNTS
CSD…
CSD A
ACCOUNTS
SECURITIES
ACCOUNTS
CSD B
ACCOUNTS
CSD…
CASH
ACCOUNTS
NCB C
ACCOUNTS
NCB…
TARGET2
CASH
ACCOUNTS
NCB…
NCB A
ACCOUNTS
NCB B
ACCOUNTS
TARGET2
CASH
ACCOUNTS
NCB…
NCB A
ACCOUNTS
NCB B
ACCOUNTS
Optimization
procedures
Se
ttl
em
en
t
En
gi
ne
Optimization
procedures
Se
ttl
em
en
t
En
gi
ne
N
C
Bs
CSD
AUTHORIZA-
TION
INTERFACE
CSD A
NCB B
CSD A
NCB B
CSD A
NCB A
SETTLEMENT
AGENTS
•Set up / change /
maintain
• Participants
• Securities
• Rules CSD A
CSD B
CSD A
CSD A
CSD A
CSD B
CSD A
CSD B
CSD A
CSD A
CSD A
CSD A
CSD
PARTICIPANTS
A typical settlement transaction (e.g. a “plain vanilla” DvP over-the-counter trade) could follow this lifecycle:
instructions will enter the T2S system via the instructions interface. If not already validated and matched at the CSD
level, these functions will be performed at the T2S level. The T2S Static Data will provide reference information for
the validation of instructions. The Lifecycle Management and Matching will provide the functionalities required for
the lifecycle of a settlement transaction (validation, matching, settlement prioritisation, etc.). “Ready to settle”
transactions will be forwarded to the Settlement Engine where the availability of securities and cash balances will
be checked. If enough balances are available, final and irrevocable transfers of cash and securities will be executed
in an RTGS mode. If there are not enough balances (either owing to a lack of cash or securities), pending
Page 16 of 20
transactions will be re-entered for settlement via pre-specified optimisation and self-collateralisation procedures.
Instructing parties (CSDs and users) will be notified accordingly via the instructions interface.
The account balances interface will report on the securities holdings. The authorisations interface will provide
CSDs with the functionality of updating the static data necessary for the settlement process (e.g. authorised CSD
participants, valid ISINs, market-specific rules for Lifecycle Management, etc.).
TARGET2 will allow users to add central bank liquidity to and withdraw it from the dedicated cash sub accounts.
The interaction of functional modules in T2S
The picture below shows how the different functional blocks and modules interact with each other. A few
explanations need to be added:
• Real-time interfaces to the Static Data databases are required, to accommodate any change in
securities reference data, in customer authorisations, or in schedules and deadlines. Changes in static
data eventually have to be applied to all modules, but during settlement processing, they mainly affect
the Lifecycle Management.
• In the flow process example described below, instructions are split between eligible and non-eligible
ones.
• Instructions maintenance can also be performed for eligible instructions*, but with a subset of
potential activities.
Box 2: An Overview of the Interaction of the Main Functional Blocks in T2S
Page 17 of 20
Settlement Engine
Matching & Lifecycle
Management Engine
Lifecycle
Management
Instructions
Validation
Matching
Instruction
Maintenance
Purge &
Archive
Regulatory
Reporting
Static Data
Manager
Optimization Sequencing Recycling
Settlement
Eligibility
Instructions
not yet/ no
longer
eligible
Eligible
instructions
Booking
Feed back
Propose for settlement
Securities
accounts
Cash
accounts
1
2
3
4
5
6
7
8
9 10
11
A typical data flow in a straight “plain vanilla” over-the-counter trade would be as follows: settlement
instructions “captured” via the instructions interface are processed in the Validation Module (1)
according to the rules and restrictions stored in the T2S Static Data Module via the Static Data Manager
(3). Once validated, instructions are matched in the Matching Module (2). Whatever the outcome of the
matching process, instructions may be affected by the Instructions Maintenance Module (4). Successfully
matched transactions are moved to the Settlement Eligibility Module (5), where they are checked for their
settlement eligibility (e.g. checking the settlement date, blocked instructions, etc.). Once they have been
assessed as eligible for settlement, instructions are prioritised in the Sequencing Module (6) and
processed, in RTGS mode, for the final settlement (cash and securities) in the Booking Module (7).
Assuming successful settlement in both securities and cash accounts (optimised DvP model), transactions
reach the final stage of their lifecycle management and are eventually purged and archived via the
relevant module (8). In the case of failed settlement, transactions are moved to the Optimisation Module
in order to be optimised according to the T2S optimisation rules (9). In case of successful optimisation,
the instructions are then immediately put into the settlement queue via the Sequencing Modules. In case
optimisation was not successful, instructions are stored and eventually recycled (10) and re-entered in the
Sequencing and Booking Modules, according to the T2S recycling rules.
Page 18 of 20
For reasons of simplicity, instruction reporting is not covered here. In some transaction lifecycle stages,
immediate reporting to the instructing entities is required. This is not to be confused with the regulatory
reporting facility for the CSDs (11).
Annex 1 of the Operational Feasibility Study provides more detail on the functionalities and interactions
of the T2S functional blocks and modules.
Connectivity
CSDs will be directly connected to and will communicate with T2S. Users (CSDs’ participants)7 will
normally connect to T2S via their own CSD, i.e. the CSD with which they legally hold their accounts.
This is particularly relevant for smaller local participants, especially within the first period of live
operation of T2S. Users can also continue to send instructions in their proprietary formats. Their CSDs
will be responsible for converting these instructions into the T2S harmonised standards (message formats,
codification of securities accounts, etc.).
However, some users may see the need to have direct technical connectivity to T2S. In particular, some
major European custodians have already expressed their willingness to explore right from the start of T2S
the possibility of ensuring direct connectivity to the centralised infrastructure.8 Whatever the strategy
chosen by the market participants, the nature of their connectivity should be agreed and established in
cooperation with their local CSD, i.e. the system with which they legally hold their securities accounts.
Within this scenario, directly connected entities must be able to instruct T2S according to the harmonised
messages and standards, since T2S will not offer converting and mapping services.
All stakeholders along the settlement chain are expected to cooperate on the basis of their mutual interest
and should not abuse their controlling positions. Any “restrictive” policies that are against the interests of
the local settlement community will be counterbalanced by the open architecture of the T2S system and
the expected improved competition in the depository market (i.e. there will be more opportunities for
CSD participants to open securities accounts in any CSD connected to T2S). The Code of Conduct has a
similar incentivation effect.
In principle, the T2S architecture should be sufficiently open to accommodate both direct and indirect
connectivity options for market participants. As Box 1 shows, whatever the connectivity model,
settlement instructions will only be managed and processed in the T2S environment by a single entry
point: the T2S Settlement Engine.
7 CCPs, despite being part of the post-trading infrastructure, are also considered CSD participants for the purpose of securities
settlement. However, the functionality available in the T2S Settlement Engine will take into account the specific settlement
requirements stemming from central counterparty netting.
8 Here connectivity is meant only in technical terms. Legally, market participants will only remain direct participants in their
CSDs.
Page 19 of 20
T2S will use a standard communication protocol based on the ISO 15022/20022 standard for messages.
(For more information on the standards to be adopted in T2S, see the Operational Feasibility Study.)
Cross-CSD transactions
It is generally accepted that an issuer CSD cannot refuse to open an inter-CSD account for an investor
CSD (unilateral outbound account). This point has recently been reinforced by the Code of Conduct.
In order to achieve full coverage for all actors within T2S, all investor CSDs should be ready to open
inter-CSD accounts in all issuer CSDs.
However, it is also recognised that some links may lack an underlying business case, or that an investor
CSD may not be adequately prepared to provide its participants with custody services for all kinds of
securities, at least not right from the start of T2S production. Therefore, each investor CSD will have to
specify which securities of a remote issuer CSD it is ready to accept in its participants’ accounts. This
implies accepting handling these securities and the related corporate actions as proposed in the standard
agreement of the European Central Securities Depositories Association (ECSDA).
Participants may hold their securities in the CSD in which they have been issued (“issuer CSD”) or with
any other CSD (“investor CSD”) that is not the issuer CSD, provided that the investor CSD accepts these
securities. From a technical point of view, transfer of securities across national borders will take place as
a change of holdings in a single database (Annex 2 of the Operational Feasibility Study provides concrete
examples of how these transactions will be handled in T2S).
The transmission of a security from one participant in an investor CSD to another participant in another
investor CSD would necessarily imply a realignment at the level of the issuer CSD. In other words, the
issuer CSD should always know in which investor CSD the security is held. Realignment between
securities accounts at the issuer CSD level will take place in real time. This functionality will exceed the
minimum requirements set by the ECSDA standards (at least regarding end-of-day realignment).
T2S should also enable participants to settle securities issued in CSDs not directly connected to T2S
(external CSDs). (This issue is also covered in some detail in the Operational Feasibility Study.)
4. TARGET2-Securities Project Timeframe
Due to its complexity and wide range of specifications, it is foreseen that the T2S project will take
between four to six years to materialise.
A tentative project timetable is presented, based on a six-year project.. A detailed and thoroughly
documented time frame will be developed following the initiation decision alongside the preparation of
the User Requirements.
Page 20 of 20
– Phase 1: User Requirements and Design (approximately 40% of the project workload;
estimated to take place between Q2 2007 – Q3 2009). This phase will start with the Governing
Council’s final decision to initiate the project. It includes the definition of the User
Requirements and, as a next step, the first draft of the Detailed Functional Specifications (DFS)
of the T2S functionalities. An extended engagement with CSDs and market participants is
foreseen for this phase in order to ensure that services offered by T2S will enable, on the one
hand, the design of an efficient pan-European infrastructure, and on the other the smooth
functioning of the CSDs’ operations. Synergies with TARGET2 could help reduce the time
needed for this phase. The definition of the non-functional requirements is also to be developed
here.
– Phase 2: Development and Implementation (approximately 30% of the project workload;
estimated to take place between Q4 2009 – Q3 2011). In this phase, the development and
finalisation of the DFS would occur. This phase includes the application development of T2S
and implementation steps, and the various units and modules testing at the project team level.
Fine-tuning to the DFS could also take place at this stage.
– Phase 3: Testing and Deployment (approximately 30% of project workload; estimated to take
place between Q4 2010 – Q1 2013). This final phase includes testing on module integration,
interfaces, performance and back-up facilities. The supporting documentation (manuals,
procedures, etc.) will be finalised during this phase, and user training will be conducted. The
final user acceptance tests should be performed at the start of this phase.
Migration options
The various options and details relating to the gradual migration to the T2S environment, namely the
move of the CSDs’ settlement function to the central system, should be discussed with the market. This
migration could be based on the different jurisdictions (as in TARGET2) or on different assets (debt
instrument vs. equities markets). This may be particularly relevant for new Eurosystem members that join
the Eurosystem by the time that T2S goes into production.
Chart 6: Provisional T2S Project Phases and Timeframe
Phase 1 Phase 2 Phase 3
• Public Consultation
• User Requirements
• Detailed Functional Specifications
(DFS)
• Architectural Specifications
• Decision on Migration Policy
March 2007
• T2S Development &
Implementation
• Units and Modules
Testing
• Fine Tuning (DFS)
• UAT Testing
• Integration,
performance,
interface & back up
testing
• Migration Options
• Final Deployment
T2S
March
2013
Governing
Council
TARGET2-SECURITIES – THE BLUEPRINT
Table of contents
Introduction
1. Project Objectives
2. Perimeter of TARGET2-Securities
3. Functional Architecture
4. TARGET2-Securities Project Timeframe
Question/Question
Maximum 5 pages (1.5 spaced); figures and/or tables are allowed on additional pages.
1. (60 points – maximum 3 pages)
Do the problem that is described in the attached Excel spreadsheet. When you do this problem, you are allowed to ask for help within your organization of a person, who is very well versed in Excel (or any other appropriate data analysis software). However, the person who would help you with the use of Excel should not assist you with regard to the design of your expressions or formulas or with the interpretation of the results.
When you experiment with your regression analysis, you have to decide on a trade-off between a relatively simple expression and an acceptable R-Squared. (Any one of the five KRIs may appear only in at most two of the (composite) factors in your expression.)
2. (40 Points – maximum 2 pages)
See the attached document that describes a trade settlement system and answer following questions:
a) Identify the potential points of failure in the trade settlement system described in the document.
b) Describe the types of events that can result in Operational Risk losses. Can you say anything about the frequencies and severities of losses? You may want to provide a qualitative discussion about the frequencies and severities, possibly as a function of total number of trades, the types of trades, or other system or environment characteristics.
c) Describe KRIs that would be useful for the tracking or monitoring of the ops risk.
d) Recommend risk controls for this organization (on a tactical level as well as on a more strategic level).