I have a spreadsheet that holds my primary info, daily I receive a similar spreadsheet with some changes to the sites. What I need help with is either a formula or macro that I can use to automatically update only changed data to my spreadsheet from the daily tracker I receive. I’ve attached an older spreadsheet and a newer spreadsheet dated 7/24/2013 that I would like to be able to transfer only changed data from the June Spreadsheet to the July spreadsheet
>Sheet1
nformation
M
otes
s
0% Review Completed
& Equipment Structural Recv.
tes Date Reviewed Approved Notes Notes review
Notes CM Name / Submit Date Approved Date Notes AC Panel CM 9 Complete
es
Approved 5/20/13 Approved Yes Outdoor 0
180 n/a 1/2/13 Tower Nick 3 ‘
3 3 O O 3/29/13 3/29/13 N N Holt
3
/13
Lane Yes n/a Yes 2/12/13 Rejected tower and this is a Lam
Yes lbs. not 201 lbs. as it shows.)
Nick Utah Outdoor H
75H 75H n/a 1/10/13 Mary Tower Nick 3 6 9 8 O O 200 A N N n/a Lane TAIC Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah 150H 150H n/a 1/10/13 1/10/13 Mary Tower Nick 3 Self Support 6 9 6 O Steel Platform 3/28/13 200 A N Y Jerry Tweden Lane TAIC No n/a n/a Structural Analysis at this time
Yes 5/29/13 n/a No Nick Utah Outdoor H
90H n/a 1/10/13 1/10/13 Mary Tower Nick 3 / Wooden Pole 6 9 6 O S/O Steel Platform is not going to work for what is shown.
200 A N Y Jacob Walker Lane 2/12/13 TAIC Yes n/a Approved n/a Yes n/a 5/1/13 Approved n/a No Nick Utah Outdoor 180 180 180 n/a 1/10/13 1/10/13 Mary Tower Nick 3 ‘
Monopole 3 6 3 I O w/ Concrete floor
3/28/13 3/28/13 200 A N N Jerry Tweden Jerry Tweden Lane Yes 5/14/13 Approved at Inerim at the base at 150.9%, but Passes at Final at 100.8%
Yes 5/14/13 Approved n/a No n/a Nick Utah Outdoor 120 120 n/a 1/10/13 1/10/13 Mary Tower Nick 3 Monopole 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N N Jacob Walker Clay Schutzer Lane Yes Approved n/a Yes 6/21/13 Approved n/a No n/a Utah Single Outdoor 135 135 n/a 1/2/13 1/2/13 6/11/13 Mary Tower Nick 3 Monopole 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N N Jacob Walker n/a Lane 1/25/13 TAIC Yes n/a Approved n/a Yes 5/30/13 6/11/13 Approved No Nick Utah Outdoor 195 195 n/a 1/10/13 1/10/13 3/22/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 N N Jacob Walker n/a 5/29/13 Lane TAIC No n/a 5/29/13 n/a Analysis at this time
Yes 5/29/13 Approved n/a No Nick Utah Single Outdoor 135 135 135 n/a 1/10/13 1/10/13 Mary Tower Nick 3 Wooden Pole 3 6 3 O S/O Steel Platform 200 A N Y Jacob Walker n/a Lane TAIC No n/a 5/14/13 n/a Yes 2/20/13 Approved No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/10/13 1/10/13 Mary Tower Nick 3 Wooden Pole 3 6 3 O S/O 100 A N Y Jacob Walker n/a Lane TAIC Yes n/a 4/30/13 Rejected Yes n/a 4/30/13 Rejected “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. Yes Nick Utah Outdoor 90 90 90 n/a 1/10/13 1/10/13 Mary Tower Nick 3 Wooden Pole 3 6 3 O S/O Steel Platform sent to Mary to look at 100 A N N Jacob Walker n/a Lane Yes n/a 4/30/13 Approved Yes 5/24/13 Approved No n/a Nick Utah Outdoor 255 255 n/a 1/10/13 1/10/13 Mary Tower Nick 3 Self Support 3 6 5 O O Steel Platform 3/25/13 200 A N N n/a 3/30/13 Lane Caltrop Yes n/a Approved Structural at Interim at 133%, but passes at Final at 100.6% – need to remove the existing pipe mounts.
Yes n/a 5/17/13 Approved No n/a Nick Utah Outdoor 285 n/a n/a 1/10/13 1/10/13 3/28/13 Mary Tower Nick 2 Self Support 2 4 4 O O Steel Platform 3/28/13 3/28/13 200 A N N Daren Holt n/a Lane Smith Hyatt Yes Approved n/a Yes 5/30/13 Approved and showing the 6 RRUs
Yes Nick Utah Outdoor 240 240 n/a 1/11/13 3/28/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/28/13 3/28/13 200 A N N Jerry Tweden Jerry Tweden 4/6/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Utah Single Outdoor 135 150 135 n/a 1/11/13 1/11/13 3/28/13 Mary Tower Nick 3 Self Support 3 6 4 O O Steel Platform 3/28/13 3/28/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 Lane 2/8/13 Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No n/a Nick Utah Single Outdoor 180 180 n/a n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 2 Self Support 2 4 4 O S/O Steel Platform 3/29/13 3/29/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 Lane 1/30/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Outdoor 240 240 240 n/a 1/11/13 1/11/13 3/25/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/25/13 3/25/13 200 A N Y Daren Holt n/a Lane Smith Hyatt Yes 6/11/13 Approved n/a No n/a 6/11/13 n/a No n/a Group Utah Mary Jerry Tweden Jerry Tweden 4/10/13 Lane Smith Hyatt Yes 5/31/13 Approved . Install 3 Cantilever mounts and have 3 existing antennas standing off the existing mount.
Yes 5/31/13 6/3/13 Approved No Nick Utah Single Outdoor 60H 90H n/a 1/11/13 1/11/13 Mary Tower Nick 3 6 9 6 O S/O Steel Platform 6/20/13 200 A N Y Daren Holt Steve Mann Lane Smith Hyatt Yes 6/11/13 Approved Yes 6/7/13 6/11/13 Approved No n/a Nick Utah Single Outdoor 150H 150H 150H n/a 1/11/13 1/11/13 Mary Tower Nick 3 Monopole 6 9 6 O S/O Steel Platform ‘
, also need to paint mounts, hybrid cables, and antennas.
200 A N Y Daren Holt n/a Lane 2/21/13 Smith Hyatt Yes 6/7/13 Rejected Yes 6/21/13 Approved Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace.
Yes Nick Utah Single Outdoor 120H 120H n/a 1/11/13 1/11/13 Provide 2″ std pipe with plates and ubolts to tie the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace. Mary Tower Nick 3 Self Support 6 9 6 O S/O Steel Platform 4/18/13 200 A N Y Jerry Tweden Jerry Tweden 5/15/13 Provide 2″ std pipe with plates and ubolts to tie the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace. 3/30/13 Lane Fullerton Yes 1/23/13 6/11/13 Rejected Yes 6/11/13 Rejected the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. No n/a Group Utah Single Outdoor 135 135 135 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Concrete Pad 3/28/13 3/28/13 200 A N N Daren Holt n/a Lane Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 165 n/a 12/31/12 3/25/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/29/13 Lane Smith Hyatt No n/a 5/29/13 n/a No n/a 5/29/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 105H 105H n/a 1/11/13 1/11/13 Mary Tower Nick 3 Wooden Pole 6 9 6 Daren Holt n/a 5/2/13 Lane Smith Hyatt Yes 4/24/13 6/11/13 Rejected No n/a 6/11/13 n/a No MA provided at this time Yes Group Utah Jerry Tweden Jerry Tweden Lane Smith Hyatt Yes Approved – Verified and approved.
Yes 3/27/13 6/11/13 Approved n/a Yes ‘
Utah Nick 2 Self Support 4 4 4 Daren Holt n/a 4/29/13 Lane Smith Hyatt Yes 4/24/13 6/11/13 Rejected Yes 6/21/13 6/21/13 Approved n/a Yes Utah Single Outdoor Daren Holt n/a Lane Smith Hyatt Yes 4/22/13 6/11/13 Approved n/a Yes 6/19/13 Approved n/a No n/a Utah Mary Self Support Jerry Tweden Jerry Tweden 3/30/13 Lane TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved No n/a Nick Single Outdoor 195 195 195 n/a 1/3/13 3/27/13 Mary Tower Nick 3 Self Support 3 6 3 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 4/29/13 4/17/13 Lane TAIC Yes n/a 5/7/13 Rejected Yes n/a 5/14/13 Rejected No n/a Nick Idaho Single Outdoor 165 165 165 n/a 1/3/13 1/3/13 4/23/13 Mary Tower Nick 3 100′ Self Support 3 6 3 S/O Steel Platform 4/23/13 4/23/13 200 A N Y Jacob Walker 3/30/13 Lane TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Idaho Single Outdoor 300 300 n/a 1/4/13 3/27/13 Mary Tower Nick 3 Self Support 3 6 3 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 3/30/13 Lane 2/18/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Outdoor n/a 135 135 n/a 1/4/13 1/4/13 3/27/13 Mary Tower Nick 2 50′ Self Support 2 4 2 I O Shelter 3/27/13 3/27/13 200 A N N Jacob Walker n/a 4/23/13 3/30/13 Lane 2/12/13 TAIC Yes Approved n/a Yes 5/13/13 Approved Yes Nick Idaho Outdoor 315 315 n/a 1/4/13 1/4/13 3/27/13 Mary Tower Nick 3 ‘
Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 5/15/13 5/13/13 Lane 2/7/13 WT Yes n/a 5/7/13 Approved n/a Yes 2/14/13 Rejected not at 1 that the mount was ran at.
No n/a Nick Idaho Single Outdoor 165 165 165 n/a 1/3/13 1/3/13 5/2/13 Daren Tower Nick 3 117′ Monopole 3 6 3 O S/O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker Shane M. 3/27/13 Lane 2/21/13 TAIC Yes 5/13/13 Rejected CD shows Need verifications
Yes 4/22/13 5/13/13 Rejected Yes Nick Idaho Single Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/26/13 Mary Tower Nick 3 200′ 3 6 3 O S/O Steel Platform 3/27/13 3/27/13 Need to paint coax Red and White 200 A N N Jerry Tweden Jerry Tweden 4/30/13 4/24/13 Lane 3/29/13 TAIC Yes 6/11/13 Approved No n/a 6/11/13 n/a No MA provided at this time No Craig Idaho Outdoor 285 285 285 n/a 1/3/13 1/3/13 Mary Tower Nick 3 ‘
Self Support 3 6 3 OD O Steel Platform 4/23/13 4/23/13 200 A N Y Jacob Walker Shane M. Lane n/a TAIC Yes 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Outdoor 255 270 270 n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 3 6 3 O O Jacob Walker Shane M. Lane 1/24/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a 1/3/13 3/22/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a 3/29/13 2/21/13 Lane TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/22/13 Mary Tower Nick 3 190′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker Shane M. 3/29/13 4/10/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Single Outdoor 135H 135H n/a 1/4/13 1/4/13 4/18/13 Mary Tower Nick 3 Monopole 6 9 6 O Steel Platform 5/1/13 5/1/13 N N Jacob Walker n/a 4/22/13 4/24/13 Lane 3/29/13 TAIC Yes 3/1/13 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor H
225H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 6 9 6 OD S/O Steel Platform 4/24/13 4/24/13 200 A N Y Jacob Walker n/a 4/24/13 Lane 3/29/13 TAIC Yes 6/3/13 Approved n/a Yes 4/1/13 6/3/13 Approved n/a No Nick Idaho Single Outdoor 180H 180H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Monopole 6 9 6 O S/O Steel Platform 5/3/13 200 A N Y Jacob Walker Clay Schutzer 4/9/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No Nick Idaho Single Outdoor 120H 120H 120H n/a 1/14/13 1/14/13 5/1/13 Mary Tower Nick 3 85′ Monopole 6 9 6 O S/O Steel Platform 5/1/13 5/1/13 200 A N Y Jacob Walker Shane M. 3/5/13 Lane 1/31/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 5/23/13 6/11/13 Approved No MA is corrected and approved Nick Idaho Outdoor 240 240 240 n/a 1/4/13 1/4/13 3/22/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N N Jacob Walker n/a 4/12/13 5/17/13 Lane TAIC Yes 4/9/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Outdoor 180H 180H 180H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Monopole 6 9 6 O O Jacob Walker n/a 5/6/13 TAIC Yes 3/27/13 Rejected Yes 4/1/13 Rejected Yes No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor H
330H 330H n/a 1/14/13 1/14/13 Mary Tower Nick 3 200′ Guyed 6 9 6 O S/O Steel Platform 5/3/13 5/3/13 Coax will need to be painted 200 A N Y Jacob Walker n/a Lane 1/31/13 TAIC Yes n/a 5/8/13 Approved Hy-Cap Site Yes n/a 5/14/13 Rejected Yes Nick Idaho Single Outdoor 165H 165H n/a 1/4/13 1/4/13 4/17/13 – 2 MMMBS and 2 BBUs – Not enough room
Mary Nick 3 Monopole 6 9 6 O 2 – S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 6/7/13 3/19/13 Lane 2/8/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Single Outdoor 90 90 90 n/a 1/14/13 1/14/13 3/26/13 Mary Tower Nick 3 50′ Monopole 3 6 3 O S/O 3/26/13 3/26/13 200 A N N Jacob Walker n/a 4/9/13 Lane TAIC Yes 5/15/13 6/12/13 Rejected Yes 5/15/13 6/12/13 Rejected Calculations need to be shown for high capacitiy and for stand off mounts. No n/a Emily Idaho Jacob Walker n/a 6/19/13 Lane TAIC No n/a 6/12/13 n/a .
No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a n/a Lane Yes n/a 6/12/13 n/a Yes n/a 6/12/13 n/a No No owner approved CD uploaded to Siterra Emily Idaho Site Walk Needed n/a n/a Lane TAIC No n/a 6/12/13 n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a 6/17/13 Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time Yes 4/23/13 6/11/13 Rejected Yes Nick Idaho Jacob Walker n/a 5/14/13 Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No n/a Emily Idaho Jacob Walker n/a 3/30/13 Lane TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Single Outdoor 120 120 120 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 70′ Self Support 3 6 4 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/9/13 3/28/13 Lane 2/4/13 TAIC Yes 1/24/13 6/13/13 Approved Yes 3/26/13 6/13/13 Rejected Letter needed to show how many atennas and RRUs were used in the MA Yes Emily Idaho Single Outdoor n/a 345 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 2 Guyed 2 4 3 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/9/13 3/31/13 Lane 2/6/13 TAIC Yes 5/13/13 Approved n/a Yes 5/15/13 Approved n/a No n/a Nick Idaho Outdoor 345 345 345 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 4/9/13 Lane 3/28/13 TAIC Yes 1/24/13 5/13/13 Approved n/a Yes 5/13/13 Approved n/a No n/a Nick Idaho Single Outdoor n/a 255 255 n/a 1/14/13 1/14/13 4/17/13 Given back to STA Mary Tower Nick 2 200′ Self Support 2 4 2 O S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 5/23/13 4/29/13 Lane WT Yes 3/4/13 5/14/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Idaho Outdoor 225H 225H 225H n/a 4/17/13 4/17/13 5/15/13 Mary Tower Nick 3 Self Support 6 9 6 O O Concrete Pad 5/15/13 5/15/13 200 A N N Jacob Walker n/a Need to remove existing dead lines to install new Hybrid cables Lane WT Yes 1/23/13 6/14/13 Rejected Yes 2/14/13 Approved n/a No n/a Emily Idaho Jacob Walker n/a 3/27/13 Lane 1/25/13 TAIC Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Idaho Single Outdoor 240H 240H 240H n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 200′ Self Support 6 9 6 O S/O Steel Platform 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 5/6/13 Lane Yes WT Yes 2/15/13 6/3/13 Approved n/a Yes 6/3/13 Approved n/a No n/a Nick Idaho Single Outdoor 180 180 180 n/a 1/3/13 1/3/13 6/15/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 6/15/13 6/16/13 200 A N Y Jacob Walker n/a 5/10/13 Lane WT Yes 6/14/13 Approved n/a Yes 2/13/13 6/14/13 Approved n/a No n/a Emily Idaho Single Outdoor 270 270 270 n/a 1/3/13 1/3/13 Mary Tower Nick 3 Self Support 3 6 3 O S/O Jacob Walker n/a 3/31/13 Lane 2/8/13 TAIC Yes 2/8/13 5/14/13 Approved n/a Yes 4/3/13 5/14/13 Approved n/a No n/a Nick Idaho Single Outdoor 240 n/a 240 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 2 200′ Self Support 2 4 2 O O Steel Platform 3/27/13 3/27/13 200 A N N Jerry Tweden Jerry Tweden 5/2/13 Lane 3/29/13 TAIC Yes 6/5/13 Approved SA has been corrected Yes 4/1/13 6/5/13 Approved n/a No n/a Nick Idaho Outdoor 180H 195H n/a 1/14/13 1/14/13 Mary Tower Nick 3 120′ Self Support 6 9 6 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a 5/1/13 3/1/13 Lane 1/29/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 255 255 255 n/a 1/14/13 1/14/13 3/22/13 Mary Tower Nick 3 200′ Self Support 3 6 3 O O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a 3/29/13 Lane TAIC Yes 6/5/13 Approved Yes 2/12/13 6/5/13 Approved No n/a Nick Idaho Indoor 255 255 255 n/a 1/14/13 1/14/13 3/27/13 Mary Tower Nick 3 200′ Self Support 3 6 3 I I Shelter 3/27/13 3/27/13 200 A N N Jacob Walker n/a 4/22/13 Lane 2/15/13 Yes WT Yes 2/1/13 6/3/13 Approved Yes 2/13/13 6/3/13 Approved n/a No n/a Nick Idaho Outdoor 255 255 n/a n/a 1/3/13 1/3/13 6/15/13 Mary Tower Nick 2 Self Support 2 4 2 O O Steel Platform 6/15/13 6/15/13 200 A N Y Jacob Walker Shane M. 5/4/13 Lane WT Yes 2/1/13 6/14/13 Approved No n/a 6/14/13 n/a No n/a Emily Idaho Mary Jacob Walker n/a Lane 2/4/13 WT Yes 1/31/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a Emily Idaho Single Outdoor 255 255 255 n/a 1/3/13 1/3/13 4/24/13 Mary Tower Nick 3 Self Support 3 6 3 OD S/O Steel Platform 4/24/13 4/24/13 200 A N Y Jacob Walker n/a 5/10/13 Lane WT Yes 2/12/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a Emily Idaho Mary Jacob Walker n/a 6/7/13 Lane Yes 5/6/13 Approved n/a Yes 6/14/13 Approved MA has been corrected and approved No Nick Idaho Single Outdoor 150 150 150 n/a 1/14/13 1/14/13 Mary Tower Nick 3 110′ Monopole 3 6 3 O S/O 5/9/13 5/9/13 200 A N Y Jacob Walker n/a Lane TAIC No n/a 6/14/13 n/a No SA has been provided at this time. Yes 3/5/13 6/14/13 Approved n/a No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a 4/22/13 Lane 3/28/13 TAIC No Yes 5/1/13 Rejected No No 5/14/13 Rejected Yes Nick Idaho Single Outdoor 315 315 315 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 4 S/O Shelter 5/9/13 5/9/13 200 A N N Jacob Walker n/a 3/31/13 Lane 1/11/13 Powder River Yes 5/6/13 Approved will allow to build as long as the Interim will only be in place for 6 months.
Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No Nick Idaho Outdoor 255 255 255 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N N Jacob Walker Shane M. 5/31/13 Lane Powder River Yes 5/6/13 Approved n/a Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No Everything has been cleared for Construction Nick Idaho Outdoor 135 135 135 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Monopole 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Jacob Walker n/a Lane 3/28/13 TAIC No n/a 5/14/13 n/a n/a Yes 5/8/13 Approved n/a No n/a Nick Idaho Outdoor 180 180 180 n/a 1/14/13 1/14/13 4/23/13 Mary Tower Nick 3 120′ Self Support 3 6 3 OD O Steel Platform 4/23/13 4/23/13 200 A N N Jacob Walker Clay Schutzer Lane Powder River Yes 4/29/13 6/14/13 Approved n/a Yes 1/8/13 6/14/13 Approved n/a No n/a Emily Idaho Outdoor 210 210 210 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 3 O O Jacob Walker Shane M. 3/30/13 Lane 1/8/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Idaho Outdoor 240 240 240 n/a 1/14/13 1/14/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 3/27/13 3/27/13 200 A N Y Jacob Walker n/a 4/24/13 5/14/13 Lane WT Yes 2/1/13 6/16/13 Rejected No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho Jacob Walker n/a Lane WT n/a n/a 6/16/13 n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a 5/16/13 Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a Lane TAIC No n/a 6/6/13 n/a Yes 6/3/13 6/6/13 Approved No Nick Idaho Single Outdoor 75 75 75 n/a 1/15/13 1/15/13 5/9/13 Mary Tower Nick 3 35′ Self Support 3 6 4 I S/O Shelter 5/9/13 5/9/13 Jacob Walker Shane M. 4/3/13 Lane TAIC No n/a 5/13/13 n/a Yes 4/11/13 5/13/13 Approved No n/a Nick Outdoor 75 75 n/a n/a 1/15/13 1/15/13 Mary Tower Nick 2 Wooden Pole 2 4 3 Jacob Walker Shane M. 4/11/13 Lane TAIC Yes 5/13/13 Approved n/a Yes 5/13/13 Approved n/a No n/a Nick Idaho Single Outdoor 165H 165H n/a n/a 1/14/13 1/14/13 4/17/13 Given back to STA Mary Tower Nick 2 Monopole 4 6 4 OD 2 – S/O Steel Platform 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 3/6/13 Lane 2/4/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 6/3/13 6/3/13 Approved No Nick Idaho Single Outdoor 150 150 150 n/a 1/14/13 1/14/13 3/22/13 Mary Tower Nick 3 110′ Monopole 3 6 3 O S/O Steel Platform 3/22/13 3/22/13 200 A N Y Jacob Walker n/a 4/12/13 n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho n/a n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker Clay Schutzer 4/24/13 Lane 2/21/13 TAIC Yes 2/22/13 5/10/13 Approved Yes 2/22/13 5/10/13 Approved No n/a Nick Idaho Single Outdoor 150H 150H 150H n/a 1/4/13 1/4/13 Mary Tower Nick 2 70′ Wooden Pole 4 6 8 O S/O Steel Platform 6/15/13 6/15/13 200 A N Y Jacob Walker Clay Schutzer 6/23/13 Lane 3/29/13 Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Yes Nick Idaho Single Outdoor 135 135 135 n/a 1/14/13 1/14/13 5/2/13 Daren Tower Nick 3 88′ Monopole 3 6 3 O S/O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a 5/2/13 Lane 3/28/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Idaho Outdoor 225 225 225 n/a 1/14/13 1/14/13 5/2/13 Daren Tower Nick 3 Self Support 3 6 3 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jacob Walker n/a 4/11/13 Ubiquitel Kuna 5/19/13 Lane TAIC No n/a 5/24/13 n/a Yes 4/26/13 5/24/13 Rejected No n/a Nick Idaho Jacob Walker n/a 6/7/13 Lane WT Yes 2/1/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA provided at this time No n/a Emily Idaho Mary Jacob Walker n/a 6/5/13 Lane 2/15/13 Yes WT Yes 6/3/13 Approved See SA for Hybrid cable installment Yes 2/13/13 6/3/13 Approved to No n/a Nick Idaho Outdoor 240 240 240 n/a 1/15/13 1/15/13 Mary Tower Nick 3 175′ Self Support 3 6 3 O O Steel Platform 6/15/13 6/15/13 200 A N N Jacob Walker Shane M. 4/24/13 Lane 2/11/13 TAIC Yes 2/13/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra Emily Idaho Single Outdoor 150H 150H 150H n/a 1/4/13 1/4/13 4/17/13 Mary Tower Nick 3 80′ Monopole 6 9 6 O S/O Concrete Pad 5/3/13 5/3/13 200 A N N Jacob Walker n/a Lane TAIC Yes 5/6/13 6/7/13 Rejected Yes 5/6/13 6/7/13 Rejected SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed Yes Nick Idaho Jacob Walker n/a 5/30/13 Lane TAIC Yes 4/11/13 5/10/13 Approved Yes 4/11/13 5/10/13 Approved Wooden Pole, 2 mounts to be installed, with 3 collars No n/a Nick Idaho Outdoor 105 105 105 n/a 1/15/13 1/15/13 Mary Tower Nick 3 Wooden Pole 3 6 3 O O Steel Platform 5/10/13 5/10/13 200 A N Y Jacob Walker Shane M. 5/29/13 Lane TAIC Yes 3/9/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Mary Jacob Walker n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. Yes 2/11/13 6/16/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Emily Utah Jacob Walker n/a 4/5/13 Lane 3/4/13 TAIC No n/a 4/30/13 n/a No n/a 4/30/13 n/a No MA provided at this time n/a Nick Idaho Single Outdoor 165H 165H 165H n/a 1/3/13 1/3/13 Mary Tower Nick 3 Water Tank 6 9 6 Jacob Walker n/a 4/19/13 Lane WT Yes 2/11/13 Approved See SA for location to install Hybrid cables No n/a 6/17/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a 3/31/13 Lane 1/9/13 Fullerton Yes 3/13/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 Mary Tower Nick 3 50′ Monopole 3 6 4 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt n/a 4/17/13 Lane 2/11/13 TAIC Yes 3/12/13 5/10/13 Approved n/a Yes 4/30/13 5/10/13 Approved n/a No n/a Nick Idaho Outdoor 150H 150H 150H n/a 1/15/13 1/15/13 5/3/13 Mary Tower Nick 3 90′ Monopole 6 9 6 O O Steel Platform 5/3/13 5/3/13 Install 3 hand rails 200 A N N Jacob Walker Clay Schutzer 5/22/13 Lane Yes WT Yes 1/30/13 6/3/13 Approved n/a Yes 2/14/13 6/3/13 Approved n/a No Nick Idaho Single Outdoor 165 165 165 n/a 1/15/13 1/15/13 6/15/13 Mary Tower Nick 3 Monopole 3 6 6 O S/O Steel Platform 6/15/13 6/16/13 200 A N N Jacob Walker n/a Birds Nest 5/17/13 Lane Powder River Yes 5/13/13 Approved n/a Yes 1/24/13 5/13/13 Approved n/a No Nick Idaho Outdoor 150 150 150 n/a 1/15/13 1/15/13 5/15/13 Mary Tower Nick 3 Self Support 3 6 3 O O Steel Platform 5/15/13 5/15/13 200 A N N Jacob Walker n/a 5/9/13 Lane WT Yes 1/31/13 6/17/13 Approved See SA for location to install Hybrid cables Yes 2/14/13 6/17/13 Rejected Yes Emily Idaho Jacob Walker n/a 5/29/13 Lane WT No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a Emily Idaho Jacob Walker n/a 5/10/13 Lane WT Yes 2/6/13 5/10/13 Approved n/a Yes 6/3/13 6/7/13 Approved MA has been corrected and approved No n/a Nick Idaho Single Outdoor 180 180 180 n/a 1/15/13 1/15/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 5/10/13 5/10/13 200 A N N Jacob Walker Clay Schutzer 6/21/13 Lane 5/29/13 TAIC Yes 4/18/13 6/12/13 Approved n/a Yes Yes 6/12/13 Approved n/a No Dez Idaho Single Outdoor 270 270 270 n/a 1/15/13 1/15/13 Mary Nick 3 Rooftop 3 6 3 O S/O Jacob Walker n/a 5/20/13 Lane TAIC No n/a 5/13/13 n/a Yes 3/5/13 5/13/13 Rejected Yes Nick Idaho Jacob Walker n/a 3/21/13 Lane 2/8/13 TAIC Yes 6/11/13 6/11/13 Approved Yes n/a 5/14/13 Rejected Yes Nick Idaho Outdoor 165 165 n/a n/a 1/15/13 1/15/13 3/26/13 Mary Tower Nick 2 120′ Self Support 2 4 2 O S/O Concrete Pad 3/26/13 3/26/13 200 A N Y Jacob Walker n/a 4/30/13 6/13/13 Lane 1/31/13 Powder River Yes 4/22/13 6/12/13 Approved Yes Yes 6/12/13 Approved n/a No n/a Dez Idaho Single Outdoor 255 255 255 n/a 1/15/13 1/15/13 Mary Tower Nick 3 Self Support 3 6 3 O S/O Steel Platform 6/15/13 6/15/13 200 A N N Jacob Walker Shane M. 5/4/13 Lane Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Yes Nick Idaho Single Outdoor 240 240 240 n/a 1/15/13 1/15/13 5/9/13 Mary Tower Nick 3 187′ Self Support 3 6 3 O S/O Steel Platform 5/9/13 5/9/13 200 A N Y Jacob Walker Clay Schutzer Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Jacob Walker n/a 3/31/13 Lane 2/19/13 TAIC No n/a 5/13/13 n/a No n/a 5/13/13 n/a No MA provided at this time No n/a Nick Wyoming Indoor 150 150 150 n/a 1/3/13 1/3/13 3/27/13 Mary Tower Nick 3 80′ 3 6 5 I I Shelter 3/27/13 3/27/13 200 A N N Jacob Walker Shane M. 5/15/13 4/15/13 Lane 1/28/13 TAIC Yes n/a 5/7/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time Yes Nick Idaho Single Outdoor 180 180 180 n/a 1/3/13 1/3/13 4/17/13 Given back to STA Mary Nick 3 94′ Rooftop 3 6 3 ID S/O 4/17/13 4/17/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 6/3/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Idaho Jacob Walker Shane M. 6/5/13 Lane Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/11/13 1/11/13 5/28/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N N Daren Holt n/a 2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13 Mary Tower Nick 3 98′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Steve Mann 2/27/13 Lane 2/18/13 Caltrop Yes 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer 6/14/13 Lane Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 5/28/13 Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Jacob Walker Shane M. 4/15/13 Lane 2/28/13 Caltrop Yes 5/13/13 Approved n/a Yes 2/4/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 3/29/13 Mary Tower Nick 3 98′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker n/a 5/14/13 4/23/13 Lane 3/4/13 Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 4/18/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 100 A N Y Jacob Walker Clay Schutzer 4/14/13 Lane 3/12/13 Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker Clay Schutzer 4/22/13 Lane Caltrop Yes 5/13/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/29/13 Mary Tower Nick 3 Monopole 3 6 6 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker n/a 2/21/13 Lane 2/27/13 Caltrop Yes 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13 Mary Tower Nick 3 100′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M. 6/13/13 Lane n/a TAIC Yes 6/12/13 Rejected No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a n/a Lane n/a No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah n/a n/a 6/17/13 Lane Caltrop Yes 12/6/12 5/13/13 Approved n/a Yes 2/6/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 1/11/13 1/11/13 Mary Tower Nick 3 98′ Monopole 3 6 4 O S/O Steel Platform 5/15/13 5/15/13 100 A N Y Jacob Walker n/a 2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13 Mary Tower Nick 3 100′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A Y Y Jacob Walker Clay Schutzer Lane n/a Caltrop Yes 11/30/12 6/12/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Mary Jacob Walker n/a 2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/11/13 1/11/13 3/25/13 No possible dual install, small covered platform Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M. 3/31/13 Lane 3/5/13 TAIC No n/a 5/31/13 n/a No Structural Analysis at this time No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 180 165 255 n/a 1/11/13 1/11/13 Mary Tower Nick 3 3 6 5 O S/O Steel Platform 100 A N Y Jacob Walker n/a 2/20/13 Lane 2/25/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/11/13 1/11/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer Lane n/a Caltrop No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a 3/19/13 Lane 3/4/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/15/13 1/15/13 3/26/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Shane M. 2/15/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/15/13 1/15/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 80′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer 2/20/13 Lane 2/19/13 Caltrop Yes 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/15/13 1/15/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N N Jacob Walker Shane M. 6/3/13 Lane 4/29/13 TAIC Yes 2/28/13 6/12/13 Approved n/a Yes n/a 6/12/13 Approved n/a No n/a Dez Utah Single Outdoor 210 210 210 n/a 1/15/13 1/15/13 Mary Tower Nick 3 75′ Self Support 3 6 3 O S/O Steel Platform 6/15/13 6/15/13 100 A N Y Jerry Tweden Jerry Tweden 5/24/13 7/11/13 Lane Caltrop Yes 12/4/12 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/15/13 1/15/13 5/30/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a 6/11/13 Lane Caltrop Yes 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/15/13 1/15/13 5/30/13 Mary Tower Nick 3 79′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a 5/6/13 Lane Caltrop Yes 12/7/13 5/13/13 Approved Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 Mary Tower Nick 3 97′ Monopole 3 6 5 O S/O Steel Platform 5/15/13 5/15/13 100 A N Y Jacob Walker Clay Schutzer 3/30/13 Lane 3/4/13 Caltrop Yes 12/6/12 5/20/13 Approved n/a Yes 1/28/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/25/13 1/25/13 3/28/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Clay Schutzer Lane 2/28/13 Caltrop Yes 1/19/13 5/14/13 Approved n/a Yes 1/31/13 5/14/13 Approved n/a No Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/26/13 Mary Tower Nick 3 97′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Shane M. 5/7/13 Lane Caltrop Yes 5/20/13 Approved n/a Yes 1/31/13 6/17/13 Approved No MA has been corrected. Nick Utah Single Outdoor 90 90 90 n/a 1/25/13 1/25/13 5/28/13 Mary Tower Nick 3 44′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 2/15/13 Lane 2/27/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Steve Mann 3/6/13 Lane 1/23/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved Yes 6/11/13 6/11/13 Approved Yes Nick Utah Single Outdoor 240 240 240 n/a 1/28/13 1/28/13 3/25/13 Will have to be a temporary install, no room until decomm. Mary Nick 3 55′ Rooftop 3 6 3 O S/O Steel Platform in Steeple
100 A N Y Jacob Walker n/a 2/15/13 Lane 3/12/13 Caltrop Yes 12/6/12 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/25/13 1/25/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker n/a Lane Caltrop Yes 12/10/12 5/20/13 Approved n/a No n/a 6/7/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/28/13 1/28/13 5/28/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Jacob Walker Clay Schutzer 3/20/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/28/13 1/28/13 3/26/13 Mary Tower Nick 3 98′ Monopole 3 6 3 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Jacob Walker Clay Schutzer 4/10/13 Lane 3/15/13 Caltrop Yes 5/20/13 Approved n/a Yes 2/6/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 135 1/28/13 1/28/13 4/18/13 Mary Tower Nick 95′ Monopole 4 8 7 O S/O Steel Platform 4/18/13 4/18/13 100 A Y Y Jacob Walker Shane M. 5/1/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a 3/9/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/28/13 1/28/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 58′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Shane M. Lane 3/5/13 Caltrop Yes 12/6/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 225 225 225 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 187′ Self Support 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 Daren Holt Steve Mann Lane 1/31/13 TAIC No n/a 6/12/13 n/a No Structural ran at this time Yes 6/3/13 6/12/13 Approved MA has been corrected and approved Yes , we are using 3′ standoffs. SA still hasn’t been completed.
Nick Utah Single Outdoor 150 150 150 n/a 1/29/13 1/29/13 3/26/13 Mary Tower Nick 3 100′ Self Support 3 6 4 O S/O Steel Platform 3/27/13 3/27/13 100 A N Y Jacob Walker n/a 4/11/13 4/10/13 Lane 2/11/13 TAIC No n/a 5/8/13 n/a No Structural Yes n/a 5/8/13 Approved No n/a Nick Utah Single Outdoor 120 120 120 120 1/29/13 1/29/13 Mary Tower Nick 4 Monopole 4 8 6 O S/O Steel Platform 3/29/13 3/29/13 100 A Y Y Jacob Walker n/a 2/15/13 Lane 2/20/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 1/29/13 1/29/13 3/25/13 No possible dual install, small platform Mary Tower Nick 3 117′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 N Y Jacob Walker Shane M. 3/28/13 Lane 2/28/13 Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/28/13 Mary Tower Nick 3 99′ Monopole 3 6 3 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Jacob Walker Shane M. 5/22/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time n/a No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a 2/15/13 Lane Caltrop Yes 5/15/13 Approved n/a Yes 2/11/13 5/15/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/25/13 No possible dual install, small covered platform Mary Tower Nick 3 97′ Monopole 3 6 4 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Jacob Walker Clay Schutzer 3/30/13 Lane 2/27/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 3/28/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Jacob Walker Clay Schutzer 6/5/13 4/6/13 Lane 3/6/13 Caltrop Yes 5/14/13 Approved No n/a 5/14/13 n/a No MA provided at this time Yes Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 Mary Tower Nick 3 Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N N Jacob Walker n/a 4/30/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved n/a Yes 5/31/13 5/31/13 Approved Yes Nick Utah Single Indoor 150 150 180 n/a 1/29/13 1/29/13 5/28/13 Mary Tower Nick 3 /26′
Rooftop 3 6 5 I 5/28/13 5/28/13 200 A N N Daren Holt Steve Mann 4/26/13 5/23/13 Lane 4/1/13 Caltrop Yes 5/29/13 Approved n/a Yes 1/28/13 6/18/13 Rejected No n/a Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/31/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Steel Platform 5/31/13 5/31/13 100 A N Y Jacob Walker Shane M. 5/14/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved Yes 5/31/13 6/3/13 Approved Yes Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3 170′ Rooftop 3 6 3 O S/O 5/9/13 5/9/13 100 A N Y Jacob Walker Shane M. 4/27/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved Yes 5/23/13 5/23/13 Approved Yes Nick Utah Single Outdoor 135 225 210 n/a 1/29/13 1/29/13 Mary Tower Nick 3 90′ Rooftop 3 6 4 O S/O Roof Platform 5/28/13 5/28/13 100 A N Y Jacob Walker n/a 5/24/13 5/23/13 Lane n/a TAIC Yes 4/3/13 6/13/13 Rejected – If we are to use the sled mounts, they are nit identified in the SA for using on both sectors, and a specific sled mount was called out. Sled Mount is not in the Calculations page.,
Yes 4/3/13 6/13/13 Rejected RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.) No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a 4/19/13 Lane 1/9/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 6/7/13 6/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135H 135H 135H n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 79′ Monopole 6 9 6 O S/O Steel Platform 4/18/13 4/18/13 100A Y Y Jacob Walker Clay Schutzer 4/15/13 Lane 1/16/13 Caltrop Yes 1/19/13 5/13/13 Yes 2/11/13 5/13/13 Need Letter Yes Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 68′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Jacob Walker Clay Schutzer Lane Smith Hyatt Yes 5/31/13 6/3/13 Approved Yes 5/31/13 6/3/13 Approved n/a Yes Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 Mary Tower Nick 3 Rooftop 3 6 4 100 A N Y Jacob Walker Shane M. 4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 n/a No SA provided at this time. Yes 5/31/13 6/21/13 Approved n/a Yes Nick Utah Single Outdoor 150 225 150 n/a 1/29/13 1/29/13 Mary Nick 3 95′ Rooftop 3 6 3 Jacob Walker n/a 5/16/13 Lane Smith Hyatt Yes 4/13/13 6/13/13 Approved n/a Yes 2/25/13 6/13/13 Approved n/a No n/a Dez Utah Single Outdoor 90H 180H 150H 1/29/13 1/29/13 Mary Nick 4 Rooftop 8 12 10 O 2 – S/O Jacob Walker n/a 4/27/13 Lane Smith Hyatt Yes 2/27/13 5/29/13 Approved n/a Yes 2/27/13 5/29/13 Approved n/a No Nick Utah Single Outdoor 210 240 240 n/a 2/1/13 2/1/13 Mary Tower Nick 3 45′ Rooftop 3 6 3 Jacob Walker n/a 5/29/13 Lane Caltrop Yes 12/11/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Jacob Walker n/a 6/3/13 Lane n/a TAIC No n/a 6/13/13 n/a No SA provided at this time. No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Daren Holt n/a 4/27/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved Yes n/a 5/7/13 Rejected Yes Nick Utah Outdoor 195 90 90 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3 Rooftop 3 6 3 O O Steel Platform 5/9/13 5/9/13 100 A N Y Jacob Walker Shane M. 7/1/13 Lane 4/12/13 Smith Hyatt Yes 4/17/13 6/13/13 Approved n/a Yes 4/17/13 6/13/13 Approved n/a No n/a Dez Utah Single Outdoor 195 285 165 165 1/25/13 1/25/13 Mary Nick 4 Rooftop 4 8 5 O S/O Jacob Walker n/a Lane 3/5/13 Caltrop Yes 12/12/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 59′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100A N Y Daren Holt 6/3/13 Lane 2/26/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a 5/25/13 Lane n/a TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah Jacob Walker n/a Lane Caltrop Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No Hot Slide needed No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/29/13 1/29/13 5/9/13 Mary Tower Nick 3 Monopole 3 6 4 O S/O Steel Platform 5/9/13 5/9/13 100 A N Y Daren Holt Chris E. 5/4/13 Lane Caltrop Yes 12/7/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O 5/30/13 5/30/13 200 A N N Daren Holt n/a 4/25/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/20/13 Approved n/a Yes 2/13/13 5/20/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 4/18/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 100A N Y Daren Holt Chris E. 5/29/13 Lane Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/28/13 Mary Tower Nick 3 61′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Chris E. 4/28/13 Lane 2/20/13 Yes Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 90 90 90 n/a 1/29/13 1/29/13 5/28/13 Mary Tower Nick 3 Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Chris E. Lane Caltrop Yes 5/29/13 Approved n/a Yes 2/13/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 101′ Monopole 3 6 5 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a 5/27/13 Lane Caltrop Yes 1/16/13 5/29/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a 5/27/13 Lane Caltrop Yes 12/31/12 6/7/13 Approved n/a Yes 2/13/13 6/7/13 Approved n/a No n/a Nick Utah Single Outdoor 150H 150H 150H n/a 1/29/13 1/29/13 6/15/13 Mary Tower Nick 3 95′ Monopole 6 9 6 O S/O Concrete Pad w/ I-Beam 6/15/13 6/16/13 100 A Y N Daren Holt n/a 5/7/13 Lane Caltrop Yes 5/29/13 Approved n/a Yes 2/13/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 5/30/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a 6/17/13 Lane 3/19/13 Caltrop Yes 12/17/12 6/14/13 Approved n/a Yes 1/31/13 6/14/13 Approved n/a No n/a Dez Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 6/15/13 Mary Tower Nick 3 Monopole 3 6 3 O S/O Steel Platform 6/15/13 6/16/13 100 A N Y Daren Holt n/a Lane Smith Hyatt Yes 3/12/13 6/14/13 Approved n/a Yes 3/12/13 6/14/13 Approved No n/a Dez Utah Single Outdoor 195 105 255 n/a 1/29/13 1/29/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt n/a 3/23/13 Lane 2/11/13 Smith Hyatt Yes 6/3/13 4/30/13 Approved Yes 6/3/13 6/3/13 Approved No Nick Utah Single Outdoor 105 240 165 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 10′ 3 6 6 O S/O Steel Platform 3/27/13 3/27/13 100 A N Y Daren Holt n/a 4/9/13 6/7/13 Lane n/a Smith Hyatt Yes 3/20/13 6/14/13 No n/a 6/14/13 Failed Yes Dez Utah Daren Holt n/a 3/20/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 1/2/13 1/2/13 3/26/13 Mary Tower Nick 3 100′ Self Support 3 6 4 O S/O Concrete Pad w/ I-Beam 3/26/13 3/26/13 200 A N N Jerry Tweden Jerry Tweden 4/24/13 4/22/13 Lane Caltrop Yes 12/19/12 5/21/13 Approved n/a Yes 1/31/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 1/29/13 1/29/13 4/18/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 4/18/13 4/18/13 100A N Y Daren Holt Steve Mann 6/24/13 Lane 4/5/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 90 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 95′ Rooftop 3 6 3 I S/O Shelter 5/3/13 5/3/13 100 A N Y Daren Holt Steve Mann 6/10/13 Lane 2/28/13 Caltrop Yes 12/10/12 6/18/13 Approved N/A Yes 1/31/13 6/18/13 Approved No n/a Dez Utah Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 6/19/13 6/19/13 100 A N Y Daren Holt n/a 5/30/13 Lane 3/15/13 Caltrop Yes 5/30/13 Rejected Yes 1/31/13 5/30/13 Rejected Yes Nick Utah Single Outdoor 180 180 180 n/a 1/29/13 1/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O Daren Holt n/a Lane 3/8/13 Caltrop Yes 1/11/13 5/8/13 Approved No Hot Slide needed Yes 2/6/13 5/31/13 Approved No Hot Slide needed No n/a Nick Utah Single Outdoor 105 105 105 n/a 1/29/13 1/29/13 3/29/13 Mary Tower Nick 3 59′ Monopole 3 6 4 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt n/a 5/7/13 Lane Caltrop Yes 12/4/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 79′ Monopole 3 6 4 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 4/16/13 Lane 2/26/13 Caltrop Yes 12/5/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N N Daren Holt Steve Mann 6/6/13 Beehive Storage 6/11/13 Lane Caltrop Yes 1/17/13 5/31/13 Approved n/a Yes 2/6/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 5/31/13 Mary Tower Nick 3 68′ Monopole 3 6 4 I S/O Concrete Pad w/ I-Beam 5/31/13 5/31/13 100 A N Y Daren Holt n/a n/a Lane n/a ERROR:#N/A No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Dez Utah n/a n/a Lane Caltrop Yes 1/10/13 6/7/13 Approved Yes 2/8/13 6/7/13 Approved n/a No Nick Utah Single Outdoor 150 150 150 n/a 2/9/13 Mary Tower Nick 3 92′ Monopole 3 6 4 O S/O Steel Platform 6/15/13 6/16/13 100 A N N Daren Holt Steve Mann 5/7/13 Lane Caltrop Yes 12/6/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/28/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 6/5/13 Lane Caltrop Yes 12/5/12 5/24/13 Approved n/a Yes 2/6/13 5/24/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/8/13 2/8/13 Mary Tower Nick 3 60′ Monopole 3 6 5 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt n/a 9/9/13 Lane Caltrop Yes 12/7/13 6/7/13 Failed Yes 2/6/13 6/7/13 Approved n/a Yes Nick Utah Single Outdoor 255 255 255 n/a 2/8/13 2/8/13 Mary Tower Nick 3 96′ Monopole 3 6 4 O S/O Steel Platform 6/15/13 6/16/13 of conduit, under concert, parking lot and through a park. Will need to band the tower.
100 A N Y Daren Holt n/a Lane Caltrop Yes 1/11/13 5/24/13 Failed No n/a 5/31/13 n/a No MA provided at this time Yes Nick Utah Single Outdoor 330 330 330 n/a 2/9/13 2/9/13 Mary Tower Nick 3 98′ Monopole 3 6 3 Daren Holt n/a Lane Caltrop Yes 1/3/13 6/7/13 Rejected Yes 2/8/13 6/7/13 Rejected CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount No Nick Utah Daren Holt n/a Lane 3/9/13 Caltrop Yes 12/7/12 6/14/13 Failed Yes 2/6/13 6/14/13 Approved n/a No n/a Dez Utah Single Outdoor 150 150 150 n/a 2/8/13 2/8/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a 5/30/13 Lane Caltrop Yes 12/7/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 Mary Tower Nick 3 90′ Monopole 3 6 3 O S/O Steel Platform 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 6/5/13 4/24/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved Yes 2/22/13 5/22/13 Approved Yes Nick Utah Single Outdoor 255 150 255 n/a 2/7/13 2/7/13 Mary Tower Nick 3 25′ Rooftop 3 6 4 O S/O Concrete Pad 5/3/13 5/3/13 100 A N Y Daren Holt Steve Mann 4/27/13 Lane Smith Hyatt Yes 4/25/13 6/14/13 N/A No N/A N/A N/A No MA provided at this time No Dez Utah Daren Holt n/a Lane Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 2/6/13 5/30/13 Approved n/a No No Hot Slide needed Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Concrete Pad 5/28/13 5/28/13 100 A N N Daren Holt n/a 5/28/13 Lane Caltrop Yes 12/7/12 5/31/13 Approved n/a Yes 2/8/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/31/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a 5/31/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/8/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 165 165 165 n/a 2/6/13 2/6/13 5/10/13 Mary Tower Nick 3 Monopole 3 6 5 O S/O Steel Platform 5/10/13 5/10/13 100 A N Y Daren Holt Chris E. 4/17/13 Lane 3/5/13 Caltrop Yes n/a 5/2/13 Approved n/a Yes n/a 5/2/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 Mary Tower Nick 3 95′ Monopole 3 6 6 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt n/a 4/2/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/6/13 2/6/13 3/28/13 Mary Tower Nick 3 94′ Monopole 3 6 4 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Chris E. 4/29/13 Lane Smith Hyatt Yes 3/13/13 6/16/13 Approved Yes 3/13/13 6/16/13 Approved No Dez Utah Rooftop Jacob Walker n/a 5/17/13 Lane Caltrop Yes 12/5/12 5/29/13 Approved n/a Yes 2/8/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/6/13 2/6/13 5/30/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Steel Platform 5/30/13 5/30/13 100 A N Y Daren Holt n/a 5/15/13 Lane Smith Hyatt Yes 3/1/13 6/16/13 Approved N/A Yes 3/1/13 6/16/13 Approved N/A No Dez Utah Rooftop Daren Holt n/a 3/12/13 Lane 2/4/13 Smith Hyatt Yes 6/1/13 6/5/13 Approved Yes 6/1/13 6/5/13 Approved No n/a Nick Utah Single Outdoor 135 165 135 165 2/7/13 2/7/13 Mary Tower Nick 4 80′ Silo 4 8 4 O O Steel Platform sent to Mary to look at 100 A Y Y Daren Holt n/a 4/29/13 Lane Smith Hyatt No n/a 6/16/13 n/a No SA provided at this time. No n/a 6/16/13 n/a No MA provided at this time No N/A Dez Utah Daren Holt n/a 5/30/13 Lane TAIC Yes n/a 5/1/13 Rejected , but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction. Equipment structural was ran for Hot Swap and not a 2 – Step.
Yes n/a 5/14/13 Rejected Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was ran for consolidation, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction. Equipment structural was ran for Hot Swap and not a 2 – Step. Yes Nick Utah Single Outdoor 240H 240H 240H n/a 2/6/13 2/6/13 Mary Tower Nick 3 6 9 6 Daren Holt n/a 4/23/13 4/24/13 Lane 3/13/13 Caltrop Yes 12/11/12 5/21/13 Approved n/a Yes 2/11/13 5/21/13 Approved n/a No n/a Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 4/18/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Concrete Pad 4/18/13 4/18/13 100A N Y Daren Holt Chris E. 5/5/13 Lane Caltrop Yes 12/10/12 5/31/13 Approved n/a Yes 2/11/13 5/31/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/7/13 2/7/13 5/31/13 Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a 4/15/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/31/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a Nick Utah Single Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 97′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N N Daren Holt n/a 4/29/13 Lane Smith Hyatt Yes 6/3/13 6/3/13 Approved Yes 6/3/13 6/3/13 Approved MA has been corrected and approved No Nick Utah Single Outdoor 165 165 165 n/a 2/7/13 2/7/13 Mary Tower Nick 3 3 6 4 O S/O Daren Holt n/a 4/29/13 2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N N Daren Holt Steve Mann 6/4/13 Lane CD redlined on 6/13/13 Caltrop Yes 1/19/13 6/13/13 Approved Yes 2/8/13 6/13/13 Approved N/A No n/a Dez Utah Single Outdoor 75 75 75 n/a 2/8/13 2/8/13 Mary Tower Nick 3 /18’/22′
Wooden Pole 3 6 5 O S/O Steel Platform 6/16/13 6/16/13 100 A N Y Daren Holt n/a 2/15/13 Lane 2/15/13 Caltrop Yes 12/17/12 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A Dez Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Steve Mann 2/15/13 Lane 2/19/13 Caltrop Yes 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A Dez Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 96′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E. 4/29/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved Yes n/a 5/6/13 Approved Approved w/ Consolidation No n/a Nick Utah Single Outdoor 105 105 105 n/a 2/6/13 2/6/13 5/9/13 Mary Tower Nick 3 35′ Rooftop 3 6 3 O S/O Shelter 5/9/13 5/9/13 200 A N N Daren Holt Chris E. 4/30/13 2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E. 6/20/13 Lane Fullerton No n/a 6/12/13 n/a No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Daren Holt n/a 5/30/13 Lane Caltrop Yes 12/11/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 95′ Monopole 3 6 5 O S/O Steel Platform 5/29/13 5/29/13 100 A N Y Daren Holt Steve Mann 3/21/13 Lane 2/20/13 Caltrop Yes 12/14/12 5/14/13 Approved n/a Yes 2/11/13 5/14/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/26/13 Mary Tower Nick 3 98′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Daren Holt Chris E. 3/14/13 Lane 2/20/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 100′ Monopole 3 6 3 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Steve Mann 3/14/13 Lane 2/15/13 Caltrop Yes 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/25/13 Could be a temporary DUAL, no room until decomm. Mary Tower Nick 3 100′ Monopole 3 6 5 O S/O Steel Platform 3/25/13 3/25/13 100 A N Y Daren Holt Chris E. 5/30/13 2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/8/13 2/8/13 3/26/13 Mary Tower Nick 3 96′ Monopole 3 6 5 O S/O Steel Platform 3/26/13 3/26/13 100 A N Y Daren Holt Chris E. 4/1/13 Lane 3/14/13 Caltrop Yes 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/9/13 2/9/13 3/28/13 Mary Tower Nick 3 79′ Monopole 3 6 5 O S/O Steel Platform 3/28/13 3/28/13 100 A N Y Daren Holt Steve Mann 5/30/13 4/8/13 Lane 2/28/13 Caltrop Yes 12/15/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt Chris E. 4/8/13 Lane 3/5/13 Caltrop Yes 12/17/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a Nick Utah Single Outdoor 135 135 135 n/a 2/9/13 2/9/13 3/29/13 Mary Tower Nick 3 95′ Monopole 3 6 3 O S/O Steel Platform 3/29/13 3/29/13 100 A N Y Daren Holt Steve Mann 5/7/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a Nick Utah Single Outdoor 120 120 120 n/a 2/7/13 2/7/13 5/10/13 Mary Tower Nick 3 95′ Monopole 3 6 4 O S/O Steel Platform 5/10/13 5/10/13 100 A N Y Daren Holt Chris E. Lane Crown No n/a 6/12/13 n/a no SA available in Siterra Yes 2/11/13 6/12/13 Approved No Hot Slide needed No Craig Utah Daren Holt n/a 5/25/13 Lane Smith Hyatt Yes 3/3/13 6/4/13 Approved n/a Yes 6/10/13 6/11/13 Approved MA has been corrected and approved No Nick Utah Single Outdoor 105 120 90 n/a 2/8/13 2/8/13 Mary Nick 3 Rooftop 3 6 3 O S/O Daren Holt n/a 4/30/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved Yes 6/1/13 6/3/13 Approved Yes Nick Utah Single Outdoor 240 315 240 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt n/a 4/29/13 6/8/13 Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Jacob Walker n/a 4/13/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved Yes 6/1/13 6/3/13 Approved Yes Nick Utah Single Outdoor 315 75 135 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 Daren Holt Shane M. 5/15/13 n/a Lane ERROR:#N/A No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No Craig Utah n/a n/a 3/13/13 Lane 1/16/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 2/4/13 2/4/13 Mary Non-Tower Nick 3 26′ Silo 3 6 6 I S/O Shelter 5/3/13 5/3/13 100 A N Y Daren Holt n/a 4/17/13 3/13/13 Lane 2/4/13 Smith Hyatt Yes 3/5/13 5/23/13 Approved Yes 5/22/13 5/23/13 Approved Yes Nick Utah Single Outdoor 105 105 180 n/a 2/8/13 2/8/13 5/28/13 Mary Tower Nick 3 35′ Rooftop 3 6 4 I S/O 5/28/13 5/28/13 100 A N Y Daren Holt Steve Mann 6/4/13 Lane Caltrop Yes 6/3/13 6/6/13 Approved SA has been corrected and approved Yes 6/3/13 6/6/13 Approved MA has been corrected and approved No n/a Nick Utah Single Indoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 65′ Monopole 3 6 3 I S/I Shelter 5/9/13 5/9/13 100 A N N Daren Holt Clay Schutzer 3/30/13 Lane 2/25/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved Yes 5/23/13 5/23/13 Approved No n/a Nick Utah Outdoor 105 105 105 n/a 12/31/12 12/31/12 3/28/13 Mary Tower Nick 3 60′ Rooftop 3 6 4 O O Steel Platform 5/28/13 5/28/13 200 A N Y Daren Holt Clay Schutzer 5/24/13 3/8/13 Lane 1/10/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved Yes 5/22/13 5/23/13 Approved No n/a Nick Utah Single Outdoor 255 240 255 n/a 2/6/13 2/6/13 Mary Non-Tower Nick 3 58′ Rooftop 3 6 3 I S/O Shelter 5/28/13 5/28/13 100 A N N Daren Holt n/a 4/15/13 3/21/13 Lane 2/18/13 Smith Hyatt Yes 5/23/13 5/24/13 Approved Yes 5/23/13 5/24/13 Approved Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. No Nick Utah Outdoor 195 105 150 n/a 12/31/12 12/31/12 Mary Non-Tower Nick 3 Rooftop 3 6 3 O S/O Steel Platform 3/26/13 3/26/13 100 A N N Daren Holt n/a 4/18/13 4/24/13 Lane 3/6/13 Caltrop Yes 12/19/12 6/12/13 Approved Yes 2/11/13 6/12/13 Approved No n/a Craig Utah Single Outdoor 105 105 105 n/a 2/9/13 2/9/13 4/18/13 Mary Tower Nick 3 77′ Monopole 3 6 3 O S/O Steel Platform 4/18/13 4/18/13 200A N N Daren Holt n/a Ball Park 7/26/13 Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No Craig Utah Daren Holt n/a 5/7/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved Yes n/a 5/8/13 Approved No Nick Utah Single Outdoor 105 120 120 n/a 2/9/13 2/9/13 Mary Tower Nick 3 117′ Rooftop 3 6 5 O S/O 5/9/13 5/9/13 200A N Y Daren Holt Chris E. 5/14/13 Lane Fullerton No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Daren Holt n/a Lane 3/6/13 3/6/13 Crown Yes 3/7/13 6/3/13 Approved n/a No n/a 6/3/13 n/a No MA provided at this time No n/a Nick Utah Mary Tower Nick 3 101′ 3 6 3 Daren Holt n/a n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 n/a No n/a 4/30/13 Stop Work Site n/a No n/a Nick n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Jacob Walker n/a n/a n/a n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 Stop Work Site n/a No n/a 4/30/13 Stop Work Site n/a No n/a Nick n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Jacob Walker n/a n/a n/a 3/9/13 Lane 2/11/13 TAIC Yes 1/23/13 5/13/13 Approved n/a Yes 3/31/13 5/13/13 Approved n/a No Nick Utah Outdoor 120 120 120 n/a 1/31/13 1/31/13 3/25/13 Mary Tower Nick 3 80′ Monopole 3 6 3 O O Steel Platform 3/25/13 3/25/13 100 A N N Jacob Walker Clay Schutzer 5/9/13 Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a Craig Utah Jacob Walker n/a 3/30/13 Lane 1/24/13 TAIC Yes n/a 5/7/13 Approved ran for consolidation Yes n/a 5/7/13 Approved ran for consolidation No n/a Nick Utah Outdoor 120 75 75 n/a 2/7/13 2/7/13 3/28/13 Mary Non-Tower Nick 3 48′ Rooftop 3 6 4 I O s
3/28/13 3/28/13 Need to order 3 additional NV antennas 200 A N N Jacob Walker n/a 5/1/13 5/22/13 Lane 3/21/13 Crown Yes 1/2/13 6/13/13 Approved n/a Yes 2/11/13 6/13/13 Approved n/a No n/a Craig Utah Outdoor 105 105 105 n/a 2/7/13 2/7/13 6/16/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O O Steel Platform 6/16/13 6/16/13 Jacob Walker n/a 5/4/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved n/a Yes 6/3/13 6/6/13 Approved MA was corrected and approved No MA was corrected and provided Nick Utah Outdoor 150 150 150 n/a 2/6/13 2/6/13 Mary Tower Nick 3 78′ Monopole 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N Y Jerry Tweden Jerry Tweden 6/16/13 Lane 3/28/13 Crown Yes 12/15/12 6/13/13 Approved n/a No n/a 6/13/13 n/a No MA provided at this time No n/a Craig Utah Mary Daren Holt n/a 4/30/13 Lane Caltrop Yes 1/29/13 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved No n/a Nick Utah Outdoor 105 105 105 n/a 2/7/13 2/7/13 Mary Tower Nick 3 55′ Monopole 3 6 3 O O Steel Platform 5/30/13 5/30/13 200 A N Y Daren Holt n/a 5/2/13 Lane Yes 3/12/13 6/13/13 Approved Yes 3/12/13 6/13/13 Approved rooftop No rooftop Craig Utah Single Outdoor 225 300 330 n/a 2/7/13 2/7/13 Mary Nick 3 Rooftop 3 6 3 O S/O Daren Holt n/a 6/11/13 Lane Crown Yes 12/11/12 6/12/13 Approved n/a Yes 2/11/13 6/12/13 Approved n/a No Craig Utah Indoor 105 105 105 n/a 2/8/13 2/8/13 Mary Tower Nick 3 Monopole 3 6 3 I I Shelter 6/16/13 6/16/13 Daren Holt n/a 7/26/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a 5/4/13 Lane Smith Hyatt Yes n/a 4/29/13 Rejected Yes 6/7/13 4/29/13 Rejected No n/a Nick Utah Outdoor 180 180 180 n/a 2/6/13 2/6/13 Mary Tower Nick 3 100′ Guyed 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Jerry Tweden Jerry Tweden 4/30/13 5/11/13 Lane Caltrop Yes 1/16/13 5/23/13 Approved n/a Yes 2/13/13 5/23/13 Approved No n/a Nick Utah Outdoor 150 150 150 n/a 2/8/13 2/8/13 5/29/13 Mary Tower Nick 3 103′ Monopole 3 6 5 O O Steel Platform 5/29/13 5/29/13 100 A N N Daren Holt Steve Mann Need to install a 12′ hand rail 4/29/13 Lane 3/9/13 Crown Yes 1/4/13 6/13/13 Rejected Yes 2/11/13 6/13/13 Approved Yes Craig Utah Outdoor 120 120 120 n/a 2/8/13 2/8/13 6/16/13 Mary Tower Nick 3 77′ Wooden Pole 3 6 5 O O Steel Platform 200 A N Y Daren Holt n/a Lane Caltrop Yes 12/11/12 5/13/13 Approved n/a Yes 2/13/13 6/18/13 Approved N/A No n/a Nick, Dez (MA) Utah Outdoor 120 120 120 n/a 2/8/13 2/8/13 Mary Tower Nick 3 58′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13 100 A N Y Daren Holt Chris E. 4/29/13 Lane 2/15/13 Rage Yes 6/13/13 Approved n/a Yes 3/20/13 6/13/13 Rejected Yes Craig Utah Single Outdoor 135 135 135 n/a 2/5/13 2/5/13 6/16/13 Mary Tower Nick 3 60′ Monopole 3 6 4 I S/O Shelter w/ I-Beam 6/16/13 6/16/13 200 A N Y Daren Holt n/a Lane Caltrop Yes 12/15/12 5/13/13 Yes 2/13/13 6/14/13 Approved No n/a Nick Utah Outdoor 135 135 135 n/a 2/8/13 2/8/13 5/29/13 Mary Tower Nick 3 60′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13 200 A N N Daren Holt n/a 8/3/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra Craig Utah Daren Holt n/a 5/8/13 Lane Caltrop Yes 1/14/13 6/14/13 Approved n/a Yes 3/11/13 6/17/13 Approved n/a No n/a Craig Utah Mary Nick 3 Monopole 3 6 4 Daren Holt Steve Mann 4/30/13 Lane Caltrop Yes 12/13/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a Nick Utah Outdoor 105 105 105 n/a 2/8/13 2/8/13 5/30/13 Mary Tower Nick 3 68′ Monopine 3 6 4 O O Steel Platform 5/30/13 5/30/13 200 A N N Daren Holt n/a 6/22/13 Lane 5/28/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 4/13/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved Yes n/a 5/1/13 Rejected Yes Nick Utah Single Outdoor 90 180 135 n/a 2/5/13 2/5/13 Mary Tower Nick 3 /156’/162′
Rooftop 3 6 3 O S/O Steel Plaform 5/3/13 5/3/13 200 A N Y Jacob Walker n/a 6/24/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 5/11/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 3/29/13 Lane 2/11/13 TAIC Yes 4/18/13 5/14/13 Approved n/a Yes 4/18/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 120 90 120 n/a 2/4/13 2/4/13 3/28/13 Mary Tower Nick 3 27′ Rooftop 3 6 4 I S/I 3/28/13 3/28/13 200 A N Y Jacob Walker Shane M. 5/15/13 4/6/13 Lane 2/28/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 Mary Tower Nick 3 59′ Monopole 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N Y Jacob Walker n/a 5/7/13 Lane Smith Hyatt Yes 3/7/13 6/14/13 Rejected from subject line.
Yes 3/7/13 6/14/13 Yes n/a No rooftop Craig Daren Holt n/a 2/20/13 Lane 2/26/13 Caltrop Yes n/a 5/6/13 Approved Yes n/a 5/6/13 Approved No n/a Nick Utah Outdoor 150 150 150 n/a 2/9/13 2/9/13 3/25/13 Mary Tower Nick 3 100′ Monopole 3 6 4 O O Steel Platform 3/25/13 3/25/13 200 A N N Jacob Walker n/a Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. Yes 3/31/13 6/14/13 Approved n/a No n/a Craig Jacob Walker n/a 3/13/13 Lane 1/10/13 Smith Hyatt Yes 5/23/13 5/31/13 Approved .
Yes 5/23/13 5/31/13 Approved New Structural and Mount analysis is approved, RF Approved Yes Nick Utah Outdoor 105 105 210 n/a 2/9/13 2/9/13 Mary Tower Nick 3 13′ Wooden Pole 3 6 3 I O 5/28/13 5/28/13 Need a CS to walk and provide pictures 200 A N Y Jacob Walker n/a 4/24/13 5/7/13 Lane Smith Hyatt Yes 3/4/13 6/14/13 Rejected No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 4/27/13 Lane Smith Hyatt Yes 1/18/13 5/28/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No n/a Nick Utah Outdoor 180 180 180 n/a 2/6/13 2/6/13 Mary Tower Nick 3 90′ Monopole 3 6 3 O O Steel Platform 5/29/13 5/29/13 200 A N N Jerry Tweden Jerry Tweden 5/21/13 4/29/13 Lane Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Outdoor 120 120 n/a n/a 2/6/13 2/6/13 5/2/13 Mary Tower Nick 2 85′ Monopole 2 4 4 O O Steel Platform 5/2/13 5/2/13 200 A N Y Jerry Tweden Jerry Tweden 4/30/13 Lane Caltrop Yes 1/10/13 6/14/13 Approved n/a Yes 2/15/13 6/14/13 Approved New antenna mounting system to replace cluster mount No n/a Craig Utah Outdoor 150 150 n/a n/a 1/29/13 1/29/13 Mary Tower Nick 2 22′ Monopole 2 4 3 O O Steel Platform 6/16/13 6/16/13 Daren Holt n/a 4/27/13 Lane Smith Hyatt Yes 3/7/13 5/15/13 Approved n/a Yes 6/4/13 6/5/13 Approved MA has been corrected and approved No n/a Nick Utah Outdoor 90 165 225 n/a 2/8/13 2/8/13 Mary Tower Nick 3 Rooftop 3 6 4 O O Daren Holt n/a 5/21/13 3/30/13 Lane 2/6/13 Caltrop Yes 2/7/13 5/14/13 Fails No n/a 5/14/13 n/a No MA provided at this time Yes Nick Utah Outdoor 135 135 135 n/a 2/7/13 2/7/13 Mary Tower Nick 3 81′ Monopole 3 6 3 O O Steel Platform 3/28/13 3/28/13 200 A N N Daren Holt Steve Mann 4/30/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a Nick Utah Outdoor 270 180 180 n/a 1/29/13 1/29/13 Mary Non-Tower Nick 3 70′ Rooftop 3 6 3 O O Steel Platform 5/9/13 5/9/13 200 A N N Daren Holt Chris E. 4/26/13 7/1/13 Lane Caltrop Yes 12/11/12 5/29/13 Yes 2/15/13 5/29/13 Approved n/a Yes Nick Utah Outdoor 120 120 120 n/a 2/7/13 2/7/13 5/30/13 Mary Tower Nick 3 75′ Monopole 3 6 3 O O Steel Platform 5/30/13 5/30/13 200 A N Y Daren Holt n/a 3/14/13 Lane 1/18/13 Smith Hyatt Yes 6/4/13 6/5/13 Approved Yes 6/4/13 6/5/13 Approved No Nick Utah Single Outdoor 210 210 210 n/a 2/9/13 2/9/13 Existing equipment is indoor/site is indoor Mary Non-Tower Nick 3 55′ Rooftop 3 6 3 I S/I Shelter w/ I-Beams 200 A N Y Daren Holt n/a 6/16/13 Lane Caltrop Yes 12/11/12 6/14/13 Approved Yes 2/15/13 6/14/13 Approved No n/a Craig Utah Outdoor 135 135 135 n/a 2/8/13 2/8/13 Mary Tower Nick 3 87′ Monopole 3 6 3 O O Steel Platform 6/16/13 6/16/13 200 A N N Daren Holt n/a 6/24/13 Lane Smith Hyatt Yes 3/21/13 6/14/13 Approved n/a No n/a 6/14/13 n/a No n/a Craig Utah Mary Daren Holt n/a Lane 1/28/13 TAIC No n/a 5/31/13 n/a Yes 2/27/13 5/15/13 Approved n/a No n/a Nick Utah Outdoor 90 105 135 n/a 2/4/13 2/4/13 Mary Non-Tower Nick 3 48′ Rooftop 3 6 3 O O Steel Platform 3/29/13 3/29/13 200 A N N Jacob Walker n/a 6/3/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 9/17/13 Lane Caltrop No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Daren Holt n/a 6/21/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a Craig Jacob Walker n/a 3/1/13 Lane Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a Nick Utah Indoor 225 135 135 n/a 3/5/13 3/5/13 3/25/13 Mary Non-Tower Nick 3 44′ Rooftop 3 6 4 I I Shelter w/ I-Beams 3/25/13 3/25/13 200 A N Y Daren Holt n/a 4/19/13 5/4/13 Lane Smith Hyatt Yes 3/11/13 5/13/13 Approved n/a Yes 6/5/13 6/5/13 Approved MA has been corrected and approved No n/a Nick Utah Single Outdoor 210 180 120 n/a 2/6/13 2/6/13 Mary Nick 3 Rooftop 3 6 3 S/O Daren Holt n/a 5/17/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a Emily Jacob Walker n/a 3/26/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Outdoor 150 150 150 n/a 3/27/13 3/27/13 Mary Tower Nick 3 Self Support 3 6 5 O O Steel Platform 3/27/13 3/27/13 100 A N Y Jacob Walker n/a 6/1/13 Lane Caltrop No n/a 5/14/13 n/a No Structural at this time No n/a 5/14/13 n/a No MA provided at this time No n/a Nick Utah Outdoor 150 150 150 n/a 2/9/13 2/9/13 Mary Tower Nick 3 Monopole 3 6 4 Daren Holt n/a 5/2/13 Lane Fullerton Emily Daren Holt n/a 5/27/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No No recent owner approved drawings or signed/stamped drawings in siterra Emily Jacob Walker n/a 3/9/13 Lane Smith Hyatt Yes 6/5/13 6/5/13 Approved SA has been corrected and approved Yes 6/5/13 6/5/13 Approved No Nick Utah Indoor 75 75 75 n/a 2/10/13 3/26/13 Existing equipment is indoor/site is indoor Mary Non-Tower Nick 3 60′ Rooftop 3 6 3 I I Shelter 3/26/13 3/26/13 200 A N N Daren Holt n/a 5/7/13 6/11/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a Emily Daren Holt n/a 3/21/13 Lane 1/29/13 TAIC No n/a 5/7/13 n/a Yes n/a 5/7/13 Approved n/a No n/a Nick Utah Single Outdoor 90 90 90 n/a 2/6/13 2/6/13 3/26/13 Mary Tower Nick 3 58′ Monopole 3 6 4 O S/O Concrete Pad 3/26/13 3/26/13 100 A N N Jacob Walker n/a 5/24/13 6/3/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. Yes 2/28/13 6/18/13 Approved n/a No n/a Emily Jacob Walker n/a 5/25/13 Lane Smith Hyatt Yes 6/21/13 6/21/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No Emily Daren Holt n/a 3/29/13 Lane 2/21/13 TAIC Emily Utah Single Outdoor 120 120 120 n/a 2/1/13 2/1/13 3/28/13 Mary Tower Nick 3 80′ Monopole 3 6 4 O S/O Concrete Pad 3/28/13 3/28/13 200 A N N Jacob Walker n/a 3/25/13 Lane 2/13/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Outdoor 75 165 45 n/a 2/10/13 2/10/13 5/3/13 Mary Tower Nick 3 45′ Rooftop 3 6 3 O O Steel Platform 5/3/13 5/3/13 200 A N N Daren Holt n/a 5/15/13 6/15/13 Lane Fullerton Emily Daren Holt n/a Lane Smith Hyatt Yes 5/1/13 6/18/13 Rejected Yes 5/1/13 6/18/13 Rejected Emily Daren Holt n/a 4/28/13 Lane Smith Hyatt Yes 4/24/13 6/18/13 Approved Yes 4/24/13 6/18/13 Approved n/a No n/a Emily Nick 3 Monopole 3 6 3 S/O Daren Holt n/a 6/15/13 Lane Fullerton Yes 3/1/13 6/17/13 Yes No n/a n/a n/a n/a n/a Craig Daren Holt n/a 4/28/13 Lane Smith Hyatt Yes 3/6/13 6/17/13 Yes Yes 3/6/13 6/17/13 Yes n/a No n/a Craig Daren Holt Chris E. 5/12/13 4/30/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Daren Holt n/a 4/26/13 Lane TAIC No n/a 5/29/13 n/a No Structural Analysis at this time Yes 4/18/13 5/29/13 Approved n/a No n/a Nick Utah Single Outdoor 120 150 120 n/a 2/9/13 2/9/13 Mary Tower Nick 3 Water Tank 3 6 4 O S/O Concrete Pad 200 A N N Jacob Walker n/a Need to paint antennas, RRUs, Hybrid Cables & mounts, also will need to run 3 new conduits from the Equipment to the tower where they go up. Welding will need to be done on the side of the tank for the new mounts and coax brackets. 5/19/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Jacob Walker n/a Lane Smith Hyatt Yes 4/12/13 6/17/13 Yes Yes 4/12/13 6/17/13 Yes No Craig Daren Holt n/a 4/30/13 Lane Smith Hyatt Yes 3/14/13 6/17/13 Yes No n/a 6/17/13 n/a n/a n/a Craig Daren Holt n/a Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a 4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved Yes n/a 5/8/13 Approved Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed No n/a Nick Utah Indoor 150 300 300 n/a 2/8/13 2/8/13 Mary Non-Tower Nick 3 40′ Rooftop 3 6 3 I I Shelter 5/9/13 5/9/13 200 A N N Jacob Walker Shane M. 5/14/13 3/12/13 Lane 2/1/13 Smith Hyatt Yes 6/5/13 6/5/13 Approved Yes 6/5/13 6/5/13 Approved No Nick Utah Indoor 120 120 120 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3 70′ Guyed 3 6 4 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/20/13 Lane 2/21/13 Smith Hyatt Yes 1/21/13 5/29/13 Approved n/a Yes 3/15/13 5/29/13 Approved n/a No n/a Nick Utah Single Indoor 210 210 210 n/a 2/6/13 2/6/13 3/29/13 Mary Tower Nick 3 150′ Monopole 3 6 3 I S/I Shelter 3/29/13 3/29/13 200 A N N Jerry Tweden Jerry Tweden 5/1/13 Lane TAIC No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a Craig Jacob Walker n/a 4/8/13 Lane Smith Hyatt Yes 6/5/13 6/6/13 Approved Yes 6/5/13 6/6/13 Approved MA was corrected and approved No n/a Nick Utah Indoor 195H 195H 195H n/a 2/4/13 2/4/13 5/2/13 Mary Tower Nick 3 Self Support 6 9 6 I I Shelter 5/2/13 5/2/13 200 A N N Jerry Tweden Jerry Tweden 2/27/13 Lane 1/4/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/17/13 Approved Yes Nick Utah Indoor 195 195 195 n/a 2/6/13 2/6/13 Will have to be a temporary install, no room until decomm. Mary Tower Nick 3 110′ Monopole 3 6 3 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/24/13 3/23/13 Lane 2/25/13 Smith Hyatt Yes 1/25/13 5/1/13 Approved n/a Yes 6/5/13 6/6/13 Approved MA was corrected and approved No Nick Utah Indoor 150 150 150 n/a 2/6/13 2/6/13 3/27/13 Mary Tower Nick 3 100′ Monopole 3 6 3 I I Shelter 3/27/13 3/27/13 200 A N N Daren Holt Chris E. 4/23/13 6/6/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a 5/24/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 Craig Daren Holt n/a 5/25/13 Lane Smith Hyatt Dez Jerry Tweden Jerry Tweden 4/26/13 Lane Caltrop 6/10/13 Failed No n/a 06/18/13 n/a No MA provided at this time No n/a Dez Utah Jacob Walker n/a 4/6/13 Lane 2/25/13 Smith Hyatt Yes 3/26/13 6/18/13 Approved Yes 3/26/13 6/18/13 Approved No N/A Dez Utah Indoor 75 75 75 n/a 2/4/13 2/4/13 3/29/13 Mary Tower Nick 3 Guyed 3 6 3 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a 7/4/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time No N/A Dez Daren Holt n/a 3/4/13 Lane 2/1/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved Yes 6/11/13 6/11/13 Approved No Nick Utah Indoor 105 105 n/a n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 2 35′ Self Support 2 4 2 I I Shelter 3/25/13 3/25/13 200 A N N Jerry Tweden Jerry Tweden 5/31/13 2/28/13 Lane 2/8/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No Nick Utah Indoor 165 165 165 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3 Self Support 3 6 3 I I Shelter 3/25/13 3/25/13 200 A N N Jerry Tweden Jerry Tweden 5/31/13 5/5/13 Lane n/a Caltrop Yes 1/18/13 6/18/13 N/A No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Daren Holt n/a 2/28/13 Lane 1/15/13 Smith Hyatt Yes 6/6/13 6/6/13 Rejected Yes 6/6/13 6/7/13 Approved No n/a Nick Utah Indoor 120 120 n/a n/a 2/4/13 2/4/13 3/25/13 Mary Tower Nick 2 73′ Monopole 2 4 2 I I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 4/23/13 Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Jacob Walker n/a 6/12/13 Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Jacob Walker n/a 3/31/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Rejected Yes n/a 5/7/13 Approved n/a No n/a Nick Idaho Single Indoor 300 300 300 n/a 1/15/13 1/15/13 3/27/13 Mary Tower Nick 3 Self Support 3 6 3 ID S/I Shelter 3/27/13 3/27/13 200 A N N Jacob Walker Shane M. 4/14/13 Lane 2/20/13 n/a TAIC Yes 3/4/13 6/18/13 N/A No owner approved drawings to compare to. No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Idaho Indoor 135 135 135 n/a 1/15/13 1/15/13 4/23/13 Mary Tower Nick 3 80′ Self Support 3 6 3 ID I Shelter 4/23/13 4/23/13 200 A N Y Jacob Walker Shane M. 7/17/13 Lane Smith Hyatt Yes 6/6/13 6/6/13 Approved Yes 6/6/13 6/6/13 Approved MA was corrected No Nick Utah Single Indoor 240 60 165 n/a 5/8/13 5/8/13 5/9/13 Mary Tower Nick 3 Rooftop 3 6 4 I S/I Shelter 5/9/13 5/9/13 200 A N N Daren Holt Steve Mann 3/8/13 Lane 1/18/13 Smith Hyatt Yes 2/21/13 5/14/13 Approved n/a Yes 2/19/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 135 135 135 n/a 2/6/13 2/6/13 3/25/13 Mary Tower Nick 3 110′ Monopole 3 6 5 I S/I Shelter 3/25/13 3/25/13 200 A N N Daren Holt n/a 5/7/13 Lane n/a Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra Dez Daren Holt n/a 3/26/13 Lane 2/20/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 2/27/13 5/14/13 Approved n/a No n/a Nick Utah Single Indoor 165 165 165 n/a 2/6/13 2/6/13 3/27/13 Mary Tower Nick 3 120′ Monopole 3 6 4 I S/I Shelter 3/27/13 3/27/13 200 A N Y Jerry Tweden Jerry Tweden 5/24/13 4/29/13 Lane Smith Hyatt Yes 3/28/13 6/14/13 Approved n/a Yes 6/19/13 6/21/13 Approved No n/a Nick Utah Mary Daren Holt n/a 5/2/13 Lane Smith Hyatt Dez Daren Holt n/a 4/27/13 Lane 2/11/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a Nick Utah Indoor 135 135 135 n/a 2/6/13 2/6/13 5/3/13 Mary Tower Nick 3 55′ Monopole 3 6 5 I I Shelter 5/3/13 5/3/13 200 A N N Daren Holt n/a 5/12/13 Remove 3 of the dead antennas on iDEN and there lines. 3/27/13 Lane 1/11/13 Fullerton Yes 1/17/13 5/14/13 Rejected No n/a 5/14/13 n/a No MA provided at this time No n/a Nick Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3 60′ Monopole 3 6 5 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt n/a 4/2/13 Lane 3/1/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No n/a Nick Utah Indoor 165 165 135 n/a 2/9/13 2/9/13 Mary Tower Nick 3 Rooftop 3 6 5 I I Shelter Daren Holt Steve Mann 4/19/13 3/23/13 Lane 3/2/13 Smith Hyatt Yes n/a 4/29/13 Rejected Yes n/a 4/29/13 Rejected CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole No Nick Utah Indoor 90 90 90 n/a 1/31/13 1/31/13 3/27/13 Mary Tower Nick 3 56′ Monopole 3 6 3 I I Shelter 5/9/13 5/9/13 200 A N N Jacob Walker n/a 4/29/13 3/31/13 Lane 2/15/13 Fullerton Yes 1/16/13 5/10/13 Approved n/a Yes 2/6/13 5/10/13 Approved n/a No n/a Nick Utah Indoor 105 105 105 n/a 1/2/13 1/2/13 3/28/13 Mary Tower Nick 3 60′ Monopole 3 6 4 I I Shelter 3/28/13 3/28/13 200 A N N Daren Holt Clay Schutzer 5/28/13 4/13/13 Lane 2/11/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 4/4/13 6/6/13 Approved MA is corrected & approved. No Nick Utah Indoor 105 105 105 n/a 1/31/13 1/31/13 3/29/13 Mary Tower Nick 3 60′ Monopole 3 6 5 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a 5/15/13 4/14/13 Lane 2/11/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No Nick Utah Indoor 105 105 105 n/a 1/31/13 1/31/13 3/29/13 Mary Tower Nick 3 57′ Monopole 3 6 4 I I Shelter 3/29/13 3/29/13 200 A N N Daren Holt n/a 5/13/13 n/a Lane TAIC n/a n/a n/a n/a Lane TAIC n/a n/a n/a n/a Lane Smith Hyatt n/a n/a n/a n/a Lane TAIC n/a n/a n/a n/a Lane Smith Hyatt n/a n/a n/a n/a Lane Smith Hyatt n/a n/a n/a n/a Lane Smith Hyatt n/a n/a n/a 6/14/13 6/24/13 Wooden Pole O S/O Steel Platform 200 A N Y Information
tes
Date Reviewed Approved Notes Notes Yes 5/20/13 Approved Yes Lane Yes n/a Yes 2/12/13 Rejected Yes JS Utah Lane TAIC Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah Lane TAIC No n/a n/a Structural Analysis at this time
Yes 5/29/13 n/a No JS Utah Lane 2/12/13 TAIC Yes n/a n/a Yes n/a 5/1/13 Approved n/a No JS Utah Lane Yes 5/14/13 Approved at Inerim at the base at 150.9%, but Passes at Final at 100.8%
Yes 5/14/13 Approved n/a No n/a JS Utah 5/25/13 Lane Yes Approved n/a Yes 6/21/13 Approved n/a No n/a JS Utah Lane 1/25/13 TAIC Yes n/a n/a Yes 6/11/13 Approved No JS Utah 5/29/13 Lane TAIC No n/a 5/29/13 n/a Analysis at this time
Yes 5/29/13 Approved n/a No JS Utah Lane TAIC No n/a 5/14/13 n/a Yes 2/20/13 Approved No n/a JS Utah Lane TAIC Yes n/a 4/30/13 Rejected Yes n/a 4/30/13 Rejected “Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap. Yes JS Utah Lane Yes n/a 4/30/13 Approved Yes 5/24/13 Approved No n/a JS Utah 3/30/13 Lane Caltrop Yes n/a Approved Yes n/a 5/17/13 Approved No n/a JS Utah Lane Smith Hyatt Yes Approved n/a Yes 5/30/13 Approved and showing the 6 RRUs
Yes JS Utah 4/6/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Utah Lane 2/8/13 Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No n/a JS Utah Lane 1/30/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah Lane Smith Hyatt Yes 6/11/13 n/a No n/a 6/11/13 n/a No n/a JS Utah Lane Smith Hyatt Yes 5/31/13 . Install 3 Cantilever mounts and have 3 existing antennas standing off the existing mount.
Yes 5/31/13 6/3/13 Approved No JS Utah Lane Smith Hyatt Yes 6/11/13 Yes 6/7/13 6/11/13 Approved No n/a JS Utah Lane 2/21/13 Smith Hyatt Yes 6/7/13 Yes 6/21/13 Approved Recommend adding a brace from the end of mount frame to Tower. Brace willforma triangle w/ mount frame, face of tower, and the brace.
Yes JS Utah 3/30/13 Lane Fullerton Yes 1/23/13 6/11/13 Yes 6/11/13 Rejected the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame. No n/a JS Utah Lane Smith Hyatt Yes n/a 4/30/13 n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah Lane Smith Hyatt No n/a 5/29/13 No n/a 5/29/13 n/a No MA provided at this time No n/a JS Utah 5/2/13 Lane Smith Hyatt Yes 6/11/13 No n/a 6/11/13 n/a No MA provided at this time Yes JS Utah Lane Smith Hyatt Yes Yes 3/27/13 6/11/13 Approved n/a Yes JS Utah 4/29/13 Lane Smith Hyatt Yes 4/24/13 6/11/13 Yes 6/21/13 6/21/13 Approved n/a Yes JS Utah Lane Smith Hyatt Yes 4/22/13 6/11/13 n/a Yes 6/19/13 Approved n/a No n/a JS Utah 3/30/13 Lane TAIC Yes n/a 5/1/13 n/a Yes n/a 5/1/13 Approved No n/a JS Lane TAIC Yes n/a Yes n/a 5/14/13 Rejected No n/a JS Idaho 3/30/13 Lane TAIC Yes n/a 5/7/13 n/a Yes n/a 5/7/13 Approved n/a No n/a JS Idaho 3/30/13 Lane 2/18/13 TAIC Yes n/a 5/1/13 n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho 3/30/13 Lane 2/12/13 TAIC Yes n/a Yes 5/13/13 Approved Yes JS Idaho 5/13/13 Lane 2/7/13 WT Yes n/a 5/7/13 Approved n/a Yes 2/14/13 Rejected No n/a JS Idaho 3/27/13 Lane 2/21/13 TAIC Yes 5/13/13 Rejected Yes 4/22/13 5/13/13 Rejected Yes JS Idaho 4/24/13 Lane TAIC Yes 6/11/13 Approved No n/a 6/11/13 n/a No MA provided at this time No JS Idaho Lane n/a TAIC Yes 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho Lane 1/24/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho 2/21/13 Lane TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho 4/10/13 Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho 4/24/13 Lane 3/29/13 TAIC Yes 3/1/13 6/11/13 Approved n/a No n/a 6/11/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho 4/24/13 Lane 3/29/13 TAIC Yes 6/3/13 Approved n/a Yes 4/1/13 6/3/13 Approved n/a No JS Idaho Lane 3/29/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No JS Idaho 3/5/13 Lane 1/31/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 6/11/13 Approved No MA is corrected and approved JS Idaho 5/17/13 Lane TAIC Yes 4/9/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho 5/6/13 TAIC Yes 3/27/13 Rejected Yes 4/1/13 Rejected Yes No owner approved CD uploaded to Siterra JS Idaho Lane 1/31/13 TAIC Yes n/a Approved Yes n/a 5/14/13 Rejected Yes JS Idaho 3/19/13 Lane 2/8/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho Lane TAIC Yes 6/12/13 Rejected Yes 5/15/13 6/12/13 Rejected Calculations need to be shown for high capacitiy and for stand off mounts. No n/a JS Idaho 6/19/13 Lane TAIC No n/a 6/12/13 n/a .
No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho n/a Lane Yes n/a 6/12/13 n/a Yes n/a 6/12/13 n/a No No owner approved CD uploaded to Siterra JS Idaho Lane TAIC No n/a 6/12/13 n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho 6/17/13 Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time Yes 4/23/13 6/11/13 Rejected Yes JS Idaho Lane TAIC No n/a 6/12/13 n/a No SA has been provided at this time. No n/a 6/12/13 n/a No MA provided at this time No n/a JS Idaho 3/30/13 Lane TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho Lane 2/4/13 TAIC Yes 1/24/13 6/13/13 Approved Yes 3/26/13 6/13/13 Rejected Letter needed to show how many atennas and RRUs were used in the MA Yes JS Idaho 3/31/13 Lane 2/6/13 TAIC Yes 5/13/13 Approved n/a Yes 5/15/13 Approved n/a No n/a JS Idaho 4/9/13 Lane 3/28/13 TAIC Yes 1/24/13 5/13/13 Approved n/a Yes 5/13/13 Approved n/a No n/a JS Idaho 4/29/13 Lane WT Yes 3/4/13 5/14/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Idaho Lane WT Yes 1/23/13 6/14/13 Rejected Yes 2/14/13 Approved n/a No n/a JS Idaho 3/27/13 Lane 1/25/13 TAIC Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Idaho 5/6/13 Lane Yes WT Yes 2/15/13 6/3/13 Approved n/a Yes 6/3/13 Approved n/a No n/a JS Idaho 5/10/13 Lane WT Yes 6/14/13 Approved n/a Yes 2/13/13 6/14/13 Approved n/a No n/a JS Idaho 3/31/13 Lane 2/8/13 TAIC Yes 2/8/13 5/14/13 Approved n/a Yes 4/3/13 5/14/13 Approved n/a No n/a JS Idaho Lane 3/29/13 TAIC Yes 6/5/13 Approved SA has been corrected Yes 4/1/13 6/5/13 Approved n/a No n/a JS Idaho 3/1/13 Lane 1/29/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho 3/29/13 Lane TAIC Yes 3/12/13 6/5/13 Approved Yes 2/12/13 6/5/13 Approved No n/a JS Idaho Lane 2/15/13 Yes WT Yes 2/1/13 6/3/13 Approved Yes 2/13/13 6/3/13 Approved n/a No n/a JS Idaho 5/4/13 Lane WT Yes 2/1/13 6/14/13 Approved No n/a 6/14/13 n/a No n/a JS Idaho Lane 2/4/13 WT Yes 1/31/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a JS Idaho 5/10/13 Lane WT Yes 2/12/13 6/14/13 Approved See SA for location to install Hybrid cables No n/a 6/14/13 n/a No MA has been provided at this time. No n/a JS Idaho 6/7/13 Lane Yes 5/6/13 Approved n/a Yes 6/14/13 Approved MA has been corrected and approved No JS Idaho Lane TAIC No n/a 6/14/13 n/a No SA has been provided at this time. Yes 3/5/13 6/14/13 Approved n/a No No owner approved CD uploaded to Siterra JS Idaho 4/22/13 Lane 3/28/13 TAIC No Yes 5/1/13 Rejected No No 5/14/13 Rejected Yes JS Idaho 3/31/13 Lane Powder River Yes 5/6/13 Approved will allow to build as long as the Interim will only be in place for 6 months.
Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No JS Idaho Lane Powder River Yes 5/6/13 Approved n/a Yes 5/22/13 6/3/13 Approved MA has been corrected and approved No Everything has been cleared for Construction JS Idaho Lane 3/28/13 TAIC No n/a 5/14/13 n/a n/a Yes 5/8/13 Approved n/a No n/a JS Idaho Lane Powder River Yes 4/29/13 6/14/13 Approved n/a Yes 1/8/13 6/14/13 Approved n/a No n/a JS Idaho 3/30/13 Lane 1/8/13 TAIC Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Idaho 5/14/13 Lane WT Yes 2/1/13 Rejected No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho Lane WT n/a n/a 6/16/13 n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho 5/16/13 Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho Lane TAIC No n/a 6/6/13 n/a Yes 6/3/13 6/6/13 Approved No JS Idaho 4/3/13 Lane TAIC No n/a 5/13/13 n/a Yes 5/13/13 Approved No n/a JS 4/11/13 Lane TAIC Yes 5/13/13 Approved n/a Yes 5/13/13 Approved n/a No n/a JS Idaho 3/6/13 Lane 2/4/13 TAIC Yes n/a 4/30/13 Approved n/a Yes 6/3/13 6/3/13 Approved No JS Idaho n/a Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho 4/24/13 Lane 2/21/13 TAIC Yes 2/22/13 5/10/13 Approved Yes 2/22/13 5/10/13 Approved No n/a JS Idaho 6/23/13 Lane 3/29/13 Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Yes JS Idaho 5/2/13 Lane 3/28/13 TAIC Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Idaho Ubiquitel Kuna 5/19/13 Lane TAIC No n/a 5/24/13 n/a Yes 4/26/13 5/24/13 Rejected No n/a JS Idaho 6/7/13 Lane WT Yes 2/1/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA provided at this time No n/a JS Idaho 6/5/13 Lane 2/15/13 Yes WT Yes 6/3/13 Approved See SA for Hybrid cable installment Yes 2/13/13 6/3/13 Approved No n/a JS Idaho 4/24/13 Lane 2/11/13 TAIC Yes 2/13/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No No owner approved CD uploaded to Siterra JS Idaho Lane TAIC Yes 5/6/13 6/7/13 Rejected Yes 5/6/13 6/7/13 Rejected SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed Yes JS Idaho 5/30/13 Lane TAIC Yes 4/11/13 5/10/13 Approved Yes 4/11/13 5/10/13 Approved Wooden Pole, 2 mounts to be installed, with 3 collars No n/a JS Idaho Lane TAIC Yes 3/9/13 6/16/13 Approved n/a No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho Lane TAIC No n/a 6/16/13 n/a No SA has been provided at this time. Yes 2/11/13 6/16/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 4/5/13 Lane 3/4/13 TAIC No n/a 4/30/13 n/a No n/a 4/30/13 n/a No MA provided at this time n/a JS Idaho Lane WT Yes 2/11/13 Approved See SA for location to install Hybrid cables No n/a 6/17/13 n/a No MA has been provided at this time. No n/a JS Idaho 3/31/13 Lane 1/9/13 Fullerton Yes 3/13/13 6/16/13 Approved See SA for location to install Hybrid cables No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Utah 4/17/13 Lane 2/11/13 TAIC Yes 3/12/13 5/10/13 Approved n/a Yes 4/30/13 5/10/13 Approved n/a No n/a JS Idaho 5/22/13 Lane Yes WT Yes 1/30/13 6/3/13 Approved n/a Yes 2/14/13 6/3/13 Approved n/a No JS Idaho 5/17/13 Lane Powder River Yes 5/13/13 Approved n/a Yes 1/24/13 5/13/13 Approved n/a No JS Idaho Lane WT Yes 1/31/13 6/17/13 Approved See SA for location to install Hybrid cables Yes 2/14/13 6/17/13 Rejected Yes JS Idaho 5/29/13 Lane WT No n/a 6/16/13 n/a No SA has been provided at this time. No n/a 6/16/13 n/a No MA has been provided at this time. No n/a JS Idaho 5/10/13 Lane WT Yes 2/6/13 5/10/13 Approved n/a Yes 6/3/13 6/7/13 Approved MA has been corrected and approved No n/a JS Idaho 6/21/13 Lane 5/29/13 TAIC Yes 6/12/13 Approved n/a Yes Yes 6/12/13 Approved n/a No JS Idaho 5/20/13 Lane TAIC No n/a 5/13/13 n/a Yes 3/5/13 5/13/13 Rejected Yes JS Idaho 3/21/13 Lane 2/8/13 TAIC Yes 6/11/13 6/11/13 Approved Yes n/a 5/14/13 Rejected Yes JS Idaho 6/13/13 Lane 1/31/13 Powder River Yes 4/22/13 6/12/13 Approved Yes Yes 6/12/13 Approved n/a No n/a JS Idaho 5/4/13 Lane Powder River Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Rejected Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural. Yes JS Idaho Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho 3/31/13 Lane 2/19/13 TAIC No n/a 5/13/13 n/a No n/a 5/13/13 n/a No MA provided at this time No n/a JS Wyoming 4/15/13 Lane 1/28/13 TAIC Yes n/a 5/7/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time Yes JS Idaho 6/3/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Idaho 6/5/13 Lane Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah 2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved No n/a JS Utah 2/27/13 Lane 2/18/13 Caltrop Yes 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah 6/14/13 Lane Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah 4/15/13 Lane 2/28/13 Caltrop Yes 5/13/13 Approved n/a Yes 2/4/13 5/13/13 Approved n/a No n/a JS Utah 4/23/13 Lane 3/4/13 Caltrop Yes 12/4/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah 4/14/13 Lane 3/12/13 Caltrop Yes 12/5/12 5/20/13 Approved n/a Yes 2/4/13 5/20/13 Approved n/a No n/a JS Utah 4/22/13 Lane Caltrop Yes 5/13/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah 2/21/13 Lane 2/27/13 Caltrop Yes 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No JS Utah 6/13/13 Lane n/a TAIC Yes 6/12/13 Rejected No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah n/a Lane n/a No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 6/17/13 Lane Caltrop Yes 12/6/12 5/13/13 Approved n/a Yes 2/6/13 5/13/13 Approved n/a No n/a JS Utah 2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah Lane n/a Caltrop Yes 11/30/12 6/12/13 Approved n/a No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 2/20/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 3/31/13 Lane 3/5/13 TAIC No n/a 5/31/13 n/a No Structural Analysis at this time No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah 2/20/13 Lane 2/25/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah Lane n/a Caltrop No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 3/19/13 Lane 3/4/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 2/15/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 2/20/13 Lane 2/19/13 Caltrop Yes 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah 6/3/13 Lane 4/29/13 TAIC Yes 2/28/13 6/12/13 Approved n/a Yes n/a 6/12/13 Approved n/a No n/a JS Utah 7/11/13 Lane Caltrop Yes 12/4/12 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a JS Utah 6/11/13 Lane Caltrop Yes 5/29/13 Approved n/a Yes 1/31/13 5/29/13 Approved n/a No n/a JS Utah 5/6/13 Lane Caltrop Yes 12/7/13 5/13/13 Approved Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah 3/30/13 Lane 3/4/13 Caltrop Yes 12/6/12 5/20/13 Approved n/a Yes 1/28/13 5/20/13 Approved n/a No n/a JS Utah Lane 2/28/13 Caltrop Yes 1/19/13 5/14/13 Approved n/a Yes 1/31/13 5/14/13 Approved n/a No JS Utah 5/7/13 Lane Caltrop Yes 5/20/13 Approved n/a Yes 1/31/13 6/17/13 Approved No MA has been corrected. JS Utah 2/15/13 Lane 2/27/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a JS Utah 3/6/13 Lane 1/23/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved Yes 6/11/13 6/11/13 Approved Yes JS Utah 2/15/13 Lane 3/12/13 Caltrop Yes 12/6/12 5/14/13 Approved n/a Yes 1/28/13 5/14/13 Approved n/a No n/a JS Utah Lane Caltrop Yes 12/10/12 5/20/13 Approved n/a No n/a 6/7/13 n/a No MA provided at this time No n/a JS Utah 3/20/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 4/10/13 Lane 3/15/13 Caltrop Yes 5/20/13 Approved n/a Yes 2/6/13 5/20/13 Approved n/a No n/a JS Utah 5/1/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 3/9/13 Lane Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah Lane 3/5/13 Caltrop Yes 12/6/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah Lane 1/31/13 TAIC No n/a 6/12/13 n/a No Structural ran at this time Yes 6/3/13 6/12/13 Approved MA has been corrected and approved Yes , we are using 3′ standoffs. SA still hasn’t been completed.
JS Utah 4/10/13 Lane 2/11/13 TAIC No n/a 5/8/13 n/a No Structural Yes n/a 5/8/13 Approved No n/a JS Utah 2/15/13 Lane 2/20/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved n/a No n/a JS Utah 3/28/13 Lane 2/28/13 Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 1/28/13 5/13/13 Approved n/a No n/a JS Utah 5/22/13 Lane n/a TAIC No n/a 6/12/13 n/a No SA provided at this time. No n/a 6/12/13 n/a No MA provided at this time n/a No owner approved CD uploaded to Siterra JS Utah 2/15/13 Lane Caltrop Yes 5/15/13 Approved n/a Yes 2/11/13 5/15/13 Approved n/a No n/a JS Utah 3/30/13 Lane 2/27/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah 4/6/13 Lane 3/6/13 Caltrop Yes 5/14/13 Approved No n/a 5/14/13 n/a No MA provided at this time Yes JS Utah 4/30/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved n/a Yes 5/31/13 5/31/13 Approved Yes JS Utah 5/23/13 Lane 4/1/13 Caltrop Yes 5/29/13 Approved n/a Yes 1/28/13 6/18/13 Rejected No n/a JS Utah 5/14/13 Lane Smith Hyatt Yes 5/31/13 5/31/13 Approved Yes 5/31/13 6/3/13 Approved Yes JS Utah 4/27/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved Yes 5/23/13 5/23/13 Approved Yes JS Utah 5/23/13 Lane n/a TAIC Yes 4/3/13 6/13/13 Rejected – If we are to use the sled mounts, they are nit identified in the SA for using on both sectors, and a specific sled mount was called out. Sled Mount is not in the Calculations page.,
Yes 4/3/13 6/13/13 Rejected RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.) No No owner approved CD uploaded to Siterra JS Utah 4/19/13 Lane 1/9/13 Caltrop Yes 12/17/12 5/10/13 Approved n/a Yes 6/7/13 6/7/13 Approved n/a No n/a JS Utah 4/15/13 Lane 1/16/13 Caltrop Yes 1/19/13 5/13/13 Yes 2/11/13 5/13/13 Need Letter Yes JS Utah Lane Smith Hyatt Yes 5/31/13 6/3/13 Approved Yes 5/31/13 6/3/13 Approved n/a Yes JS Utah 4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 n/a No SA provided at this time. Yes 5/31/13 6/21/13 Approved n/a Yes JS Utah 5/16/13 Lane Smith Hyatt Yes 4/13/13 6/13/13 Approved n/a Yes 2/25/13 6/13/13 Approved n/a No n/a JS Utah 4/27/13 Lane Smith Hyatt Yes 2/27/13 5/29/13 Approved n/a Yes 2/27/13 5/29/13 Approved n/a No JS Utah 5/29/13 Lane Caltrop Yes 12/11/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah 6/3/13 Lane n/a TAIC No n/a 6/13/13 n/a No SA provided at this time. No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 4/27/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved Yes n/a 5/7/13 Rejected Yes JS Utah 7/1/13 Lane Smith Hyatt Yes 4/17/13 6/13/13 Approved n/a Yes 4/17/13 6/13/13 Approved n/a No n/a JS Utah Lane 3/5/13 Caltrop Yes 12/12/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah 6/3/13 Lane 2/26/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 5/25/13 Lane n/a TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah Lane Caltrop Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved No Hot Slide needed No n/a JS Utah 5/4/13 Lane Caltrop Yes 12/7/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah 4/25/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/20/13 Approved n/a Yes 2/13/13 5/20/13 Approved n/a No n/a JS Utah 5/29/13 Lane Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah 4/28/13 Lane 2/20/13 Yes Caltrop Yes 12/12/12 5/20/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah Lane Caltrop Yes 5/29/13 Approved n/a Yes 2/13/13 5/31/13 Approved n/a No n/a JS Utah 5/27/13 Lane Caltrop Yes 1/16/13 5/29/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah 5/27/13 Lane Caltrop Yes 6/7/13 Approved n/a Yes 2/13/13 6/7/13 Approved n/a No n/a JS Utah 5/7/13 Lane Caltrop Yes 5/29/13 Approved n/a Yes 2/13/13 5/29/13 Approved n/a No n/a JS Utah 6/17/13 Lane 3/19/13 Caltrop Yes 12/17/12 6/14/13 Approved n/a Yes 1/31/13 6/14/13 Approved n/a No n/a JS Utah Lane Smith Hyatt Yes 3/12/13 6/14/13 Approved n/a Yes 3/12/13 6/14/13 Approved No n/a JS Utah 3/23/13 Lane 2/11/13 Smith Hyatt Yes 6/3/13 4/30/13 Approved Yes 6/3/13 6/3/13 Approved No JS Utah 6/7/13 Lane n/a Smith Hyatt Yes 3/20/13 6/14/13 No n/a 6/14/13 Failed Yes JS Utah 3/20/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Utah 4/22/13 Lane Caltrop Yes 12/19/12 5/21/13 Approved n/a Yes 1/31/13 5/21/13 Approved n/a No n/a JS Utah 6/24/13 Lane 4/5/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No n/a JS Utah 6/10/13 Lane 2/28/13 Caltrop Yes 12/10/12 6/18/13 Approved N/A Yes 1/31/13 6/18/13 Approved No n/a JS Utah 5/30/13 Lane 3/15/13 Caltrop Yes 5/30/13 Rejected Yes 1/31/13 5/30/13 Rejected Yes JS Utah Lane 3/8/13 Caltrop Yes 1/11/13 5/8/13 Approved No Hot Slide needed Yes 2/6/13 5/31/13 Approved No Hot Slide needed No n/a JS Utah 5/7/13 Lane Caltrop Yes 12/4/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a JS Utah Lane 2/26/13 Caltrop Yes 12/5/12 5/21/13 Approved n/a Yes 1/28/13 5/21/13 Approved n/a No n/a JS Utah Beehive Storage 6/11/13 Lane Caltrop Yes 1/17/13 5/31/13 Approved n/a Yes 2/6/13 5/31/13 Approved n/a No n/a JS Utah n/a Lane n/a ERROR:#N/A No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah Lane Caltrop Yes 6/7/13 Approved Yes 2/8/13 6/7/13 Approved n/a No JS Utah 5/7/13 Lane Caltrop Yes 12/6/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a JS Utah Lane Caltrop Yes 12/5/12 5/24/13 Approved n/a Yes 2/6/13 5/24/13 Approved n/a No n/a JS Utah 9/9/13 Lane Caltrop Yes 12/7/13 6/7/13 Yes 2/6/13 6/7/13 Approved n/a Yes JS Utah Lane Caltrop Yes 1/11/13 5/24/13 No n/a 5/31/13 n/a No MA provided at this time Yes JS Utah Lane Caltrop Yes 6/7/13 Rejected Yes 2/8/13 6/7/13 Rejected CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount No JS Utah Lane 3/9/13 Caltrop Yes 12/7/12 6/14/13 Yes 2/6/13 6/14/13 Approved n/a No n/a JS Utah 5/30/13 Lane Caltrop Yes 12/7/12 5/21/13 Approved n/a Yes 2/6/13 5/21/13 Approved n/a No n/a JS Utah 4/24/13 Lane Smith Hyatt Yes 5/23/13 5/23/13 Approved Yes 2/22/13 5/22/13 Approved Yes JS Utah Lane Smith Hyatt Yes 4/25/13 6/14/13 N/A No N/A N/A N/A No MA provided at this time No JS Utah Lane Caltrop Yes 12/7/13 5/13/13 Approved n/a Yes 2/6/13 5/30/13 Approved n/a No No Hot Slide needed JS Utah 5/28/13 Lane Caltrop Yes 12/7/12 5/31/13 Approved n/a Yes 2/8/13 5/31/13 Approved n/a No n/a JS Utah 5/31/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/8/13 5/10/13 Approved n/a No n/a JS Utah 4/17/13 Lane 3/5/13 Caltrop Yes n/a 5/2/13 Approved n/a Yes n/a 5/2/13 Approved n/a No n/a JS Utah 4/2/13 Lane 2/19/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 4/29/13 Lane Smith Hyatt Yes 3/13/13 6/16/13 Approved Yes 3/13/13 6/16/13 Approved No JS Utah 5/17/13 Lane Caltrop Yes 12/5/12 5/29/13 Approved n/a Yes 2/8/13 5/29/13 Approved n/a No n/a JS Utah 5/15/13 Lane Smith Hyatt Yes 3/1/13 6/16/13 Approved N/A Yes 3/1/13 6/16/13 Approved N/A No JS Utah 3/12/13 Lane 2/4/13 Smith Hyatt Yes 6/1/13 6/5/13 Approved Yes 6/1/13 6/5/13 Approved No n/a JS Utah Lane Smith Hyatt No n/a 6/16/13 n/a No SA provided at this time. No n/a 6/16/13 n/a No MA provided at this time No N/A JS Utah 5/30/13 Lane TAIC Yes n/a 5/1/13 Rejected , but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction. Equipment structural was ran for Hot Swap and not a 2 – Step.
Yes n/a 5/14/13 Rejected Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was ran for consolidation, but the weight of the RRUs was not included. Wet Stamp CD needs to be corrected or Red Lined for construction. Equipment structural was ran for Hot Swap and not a 2 – Step. Yes JS Utah 4/24/13 Lane 3/13/13 Caltrop Yes 12/11/12 5/21/13 Approved n/a Yes 2/11/13 5/21/13 Approved n/a No n/a JS Utah 5/5/13 Lane Caltrop Yes 12/10/12 5/31/13 Approved n/a Yes 2/11/13 5/31/13 Approved n/a No n/a JS Utah 4/15/13 Lane 3/4/13 Caltrop Yes 12/12/12 5/31/13 Approved n/a No n/a 5/31/13 n/a No MA provided at this time No n/a JS Utah 4/29/13 Lane Smith Hyatt Yes 6/3/13 6/3/13 Approved Yes 6/3/13 6/3/13 Approved MA has been corrected and approved No JS Utah 2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a JS Utah 6/4/13 Lane CD redlined on 6/13/13 Caltrop Yes 1/19/13 6/13/13 Approved Yes 2/8/13 6/13/13 Approved N/A No n/a JS Utah 2/15/13 Lane 2/15/13 Caltrop Yes 12/17/12 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A JS Utah 2/15/13 Lane 2/19/13 Caltrop Yes 6/17/13 Approved N/A Yes 2/8/13 6/17/13 Approved No Hot Slide needed No N/A JS Utah 4/29/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved Yes n/a 5/6/13 Approved Approved w/ Consolidation No n/a JS Utah 2/13/13 Lane 2/11/13 Caltrop Yes n/a 5/8/13 Approved n/a Yes n/a 5/8/13 Approved Hot slide not needed No n/a JS Utah Lane Fullerton No n/a 6/12/13 n/a No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah 5/30/13 Lane Caltrop Yes 12/11/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah 3/21/13 Lane 2/20/13 Caltrop Yes 12/14/12 5/14/13 Approved n/a Yes 2/11/13 5/14/13 Approved n/a No n/a JS Utah 3/14/13 Lane 2/20/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 3/14/13 Lane 2/15/13 Caltrop Yes 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah 2/15/13 Lane 2/15/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 4/1/13 Lane 3/14/13 Caltrop Yes 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved No n/a JS Utah 4/8/13 Lane 2/28/13 Caltrop Yes 12/15/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah 4/8/13 Lane 3/5/13 Caltrop Yes 12/17/12 5/23/13 Approved n/a Yes 2/11/13 5/23/13 Approved n/a No n/a JS Utah 5/7/13 Lane Caltrop Yes 12/7/12 5/10/13 Approved n/a Yes 2/11/13 5/10/13 Approved n/a No n/a JS Utah Lane Crown No n/a 6/12/13 n/a no SA available in Siterra Yes 2/11/13 6/12/13 Approved No Hot Slide needed No JS Utah 5/25/13 Lane Smith Hyatt Yes 3/3/13 6/4/13 Approved n/a Yes 6/10/13 6/11/13 Approved MA has been corrected and approved No JS Utah 4/30/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved Yes 6/1/13 6/3/13 Approved Yes JS Utah 6/8/13 Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 4/13/13 Lane Smith Hyatt Yes 6/1/13 6/3/13 Approved Yes 6/1/13 6/3/13 Approved Yes JS Utah n/a Lane ERROR:#N/A No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No JS Utah 3/13/13 Lane 1/16/13 Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah 3/13/13 Lane 2/4/13 Smith Hyatt Yes 3/5/13 5/23/13 Approved Yes 5/22/13 5/23/13 Approved Yes JS Utah 6/4/13 Lane Caltrop Yes 6/3/13 6/6/13 Approved SA has been corrected and approved Yes 6/3/13 6/6/13 Approved MA has been corrected and approved No n/a JS Utah 3/30/13 Lane 2/25/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved Yes 5/23/13 5/23/13 Approved No n/a JS Utah 3/8/13 Lane 1/10/13 Smith Hyatt Yes 5/22/13 5/23/13 Approved Yes 5/22/13 5/23/13 Approved No n/a JS Utah 3/21/13 Lane 2/18/13 Smith Hyatt Yes 5/23/13 5/24/13 Approved Yes 5/23/13 5/24/13 Approved Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set. No JS Utah 4/24/13 Lane 3/6/13 Caltrop Yes 12/19/12 6/12/13 Approved Yes 2/11/13 6/12/13 Approved No n/a JS Utah Ball Park 7/26/13 Lane Crown No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No JS Utah 5/7/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved Yes n/a 5/8/13 Approved No JS Utah 5/14/13 Lane Fullerton No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah Lane 3/6/13 3/6/13 Crown Yes 3/7/13 6/3/13 Approved n/a No n/a 6/3/13 n/a No MA provided at this time No n/a JS Utah n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 n/a No n/a 4/30/13 Stop Work Site n/a No n/a JS n/a n/a n/a n/a n/a n/a n/a ERROR:#N/A No n/a 4/30/13 Stop Work Site n/a No n/a 4/30/13 Stop Work Site n/a No n/a JS n/a 3/9/13 Lane 2/11/13 TAIC Yes 1/23/13 5/13/13 Approved n/a Yes 3/31/13 5/13/13 Approved n/a No JS Utah Lane TAIC No n/a 6/12/13 n/a no SA available in Siterra No n/a 6/12/13 n/a No MA provided at this time No n/a JS Utah 3/30/13 Lane 1/24/13 TAIC Yes n/a 5/7/13 Approved ran for consolidation Yes n/a 5/7/13 Approved ran for consolidation No n/a JS Utah 5/22/13 Lane 3/21/13 Crown Yes 6/13/13 Approved n/a Yes 2/11/13 6/13/13 Approved n/a No n/a JS Utah 5/4/13 Lane Smith Hyatt Yes n/a 5/7/13 Approved n/a Yes 6/3/13 6/6/13 Approved MA was corrected and approved No MA was corrected and provided JS Utah 6/16/13 Lane 3/28/13 Crown Yes 12/15/12 6/13/13 Approved n/a No n/a 6/13/13 n/a No MA provided at this time No n/a JS Utah 4/30/13 Lane Caltrop Yes 1/29/13 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved No n/a JS Utah 5/2/13 Lane Yes 3/12/13 6/13/13 Approved Yes 3/12/13 6/13/13 Approved rooftop No rooftop JS Utah 6/11/13 Lane Crown Yes 12/11/12 6/12/13 Approved n/a Yes 2/11/13 6/12/13 Approved n/a No JS Utah 7/26/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 5/4/13 Lane Smith Hyatt Yes n/a 4/29/13 Rejected Yes 6/7/13 4/29/13 Rejected No n/a JS Utah 5/11/13 Lane Caltrop Yes 1/16/13 5/23/13 Approved n/a Yes 2/13/13 5/23/13 Approved No n/a JS Utah 4/29/13 Lane 3/9/13 Crown Yes 6/13/13 Rejected Yes 2/11/13 6/13/13 Approved Yes JS Utah Lane Caltrop Yes 12/11/12 5/13/13 Approved n/a Yes 2/13/13 6/18/13 Approved N/A No n/a JS Utah 4/29/13 Lane 2/15/13 Rage Yes 6/13/13 Approved n/a Yes 3/20/13 6/13/13 Rejected Yes JS Utah Lane Caltrop Yes 12/15/12 5/13/13 Yes 2/13/13 6/14/13 Approved No n/a JS Utah 8/3/13 Lane Crown No n/a 6/13/13 n/a no SA available in Siterra No n/a 6/13/13 n/a No MA provided at this time No No owner approved CD uploaded to Siterra JS Utah 5/8/13 Lane Caltrop Yes 1/14/13 6/14/13 Approved n/a Yes 3/11/13 6/17/13 Approved n/a No n/a JS Utah 4/30/13 Lane Caltrop Yes 12/13/12 5/29/13 Approved n/a Yes 2/11/13 5/29/13 Approved n/a No n/a JS Utah 6/22/13 Lane 5/28/13 Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 4/13/13 Lane Smith Hyatt Yes n/a 5/1/13 Approved Yes n/a 5/1/13 Rejected Yes JS Utah 6/24/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 5/11/13 Lane Smith Hyatt No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 3/29/13 Lane 2/11/13 TAIC Yes 4/18/13 5/14/13 Approved n/a Yes 4/18/13 5/14/13 Approved n/a No n/a JS Utah 4/6/13 Lane 2/28/13 Caltrop Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 5/7/13 Lane Smith Hyatt Yes 3/7/13 6/14/13 Rejected from subject line.
Yes 3/7/13 6/14/13 Yes n/a No rooftop JS 2/20/13 Lane 2/26/13 Caltrop Yes n/a 5/6/13 Approved Yes n/a 5/6/13 Approved No n/a JS Utah Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. Yes 3/31/13 6/14/13 Approved n/a No n/a JS 3/13/13 Lane 1/10/13 Smith Hyatt Yes 5/23/13 5/31/13 Approved .
Yes 5/23/13 5/31/13 Approved New Structural and Mount analysis is approved, RF Approved Yes JS Utah 5/7/13 Lane Smith Hyatt Yes 3/4/13 6/14/13 Rejected No n/a 6/14/13 n/a No MA provided at this time No n/a JS 4/27/13 Lane Smith Hyatt Yes 1/18/13 5/28/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No n/a JS Utah 4/29/13 Lane Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah Lane Caltrop Yes 1/10/13 6/14/13 Approved n/a Yes 2/15/13 6/14/13 Approved New antenna mounting system to replace cluster mount No n/a JS Utah 4/27/13 Lane Smith Hyatt Yes 3/7/13 5/15/13 Approved n/a Yes 6/4/13 6/5/13 Approved MA has been corrected and approved No n/a JS Utah 3/30/13 Lane 2/6/13 Caltrop Yes 2/7/13 5/14/13 No n/a 5/14/13 n/a No MA provided at this time Yes JS Utah 4/30/13 Lane Smith Hyatt Yes n/a 5/6/13 Approved n/a Yes n/a 5/6/13 Approved n/a No n/a JS Utah 7/1/13 Lane Caltrop Yes 12/11/12 5/29/13 Yes 2/15/13 5/29/13 Approved n/a Yes JS Utah 3/14/13 Lane 1/18/13 Smith Hyatt Yes 6/4/13 6/5/13 Approved Yes 6/4/13 6/5/13 Approved No JS Utah 6/16/13 Lane Caltrop Yes 12/11/12 6/14/13 Approved Yes 2/15/13 6/14/13 Approved No n/a JS Utah 6/24/13 Lane Smith Hyatt Yes 3/21/13 6/14/13 Approved n/a No n/a 6/14/13 n/a No n/a JS Utah Lane 1/28/13 TAIC No n/a 5/31/13 n/a Yes 2/27/13 5/15/13 Approved n/a No n/a JS Utah 6/3/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 9/17/13 Lane Caltrop No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 6/21/13 Lane TAIC No n/a 6/14/13 n/a No SA provided at this time. No n/a 6/14/13 n/a No MA provided at this time No n/a JS 3/1/13 Lane Smith Hyatt Yes n/a 4/30/13 Approved n/a Yes n/a 4/30/13 Approved n/a No n/a JS Utah 5/4/13 Lane Smith Hyatt Yes 3/11/13 5/13/13 Approved n/a Yes 6/5/13 6/5/13 Approved MA has been corrected and approved No n/a JS Utah 5/17/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a JS 3/26/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Approved n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 6/1/13 Lane Caltrop No n/a 5/14/13 n/a No Structural at this time No n/a 5/14/13 n/a No MA provided at this time No n/a JS Utah 5/2/13 Lane Fullerton JS 5/27/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No No recent owner approved drawings or signed/stamped drawings in siterra JS 3/9/13 Lane Smith Hyatt Yes 6/5/13 6/5/13 Approved SA has been corrected and approved Yes 6/5/13 6/5/13 Approved No JS Utah 6/11/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA has been provided at this time. No n/a 6/18/13 n/a No MA has been provided at this time. No n/a JS 3/21/13 Lane 1/29/13 TAIC No n/a 5/7/13 n/a Yes n/a 5/7/13 Approved n/a No n/a JS Utah 6/3/13 Lane TAIC No n/a 6/18/13 n/a No SA has been provided at this time. Yes 2/28/13 6/18/13 Approved n/a No n/a JS 5/25/13 Lane Smith Hyatt Yes 6/21/13 6/21/13 Approved n/a Yes 6/21/13 6/21/13 Approved n/a No JS 3/29/13 Lane 2/21/13 TAIC JS Utah Lane 2/13/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah Lane Fullerton JS Lane Smith Hyatt Yes 5/1/13 6/18/13 Rejected Yes 5/1/13 6/18/13 Rejected JS 4/28/13 Lane Smith Hyatt Yes 4/24/13 6/18/13 Approved Yes 4/24/13 6/18/13 Approved n/a No n/a JS 6/15/13 Lane Fullerton Yes 3/1/13 6/17/13 Yes No n/a n/a n/a n/a n/a JS 4/28/13 Lane Smith Hyatt Yes 3/6/13 6/17/13 Yes Yes 3/6/13 6/17/13 Yes n/a No n/a JS 4/30/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS 4/26/13 Lane TAIC No n/a 5/29/13 n/a No Structural Analysis at this time Yes 4/18/13 5/29/13 Approved n/a No n/a JS Utah 5/19/13 Lane Smith Hyatt No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS Lane Smith Hyatt Yes 4/12/13 6/17/13 Yes Yes 4/12/13 6/17/13 Yes No JS 4/30/13 Lane Smith Hyatt Yes 3/14/13 6/17/13 Yes No n/a 6/17/13 n/a n/a n/a JS Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS 4/13/13 Lane Smith Hyatt Yes n/a 5/8/13 Approved Yes n/a 5/8/13 Approved Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed No n/a JS Utah 3/12/13 Lane 2/1/13 Smith Hyatt Yes 6/5/13 6/5/13 Approved Yes 6/5/13 6/5/13 Approved No JS Utah 4/20/13 Lane 2/21/13 Smith Hyatt Yes 1/21/13 5/29/13 Approved n/a Yes 3/15/13 5/29/13 Approved n/a No n/a JS Utah 5/1/13 Lane TAIC No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a JS 4/8/13 Lane Smith Hyatt Yes 6/5/13 6/6/13 Approved Yes 6/5/13 6/6/13 Approved MA was corrected and approved No n/a JS Utah 2/27/13 Lane 1/4/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/17/13 Approved Yes JS Utah 3/23/13 Lane 2/25/13 Smith Hyatt Yes 1/25/13 5/1/13 Approved n/a Yes 6/5/13 6/6/13 Approved MA was corrected and approved No JS Utah 6/6/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS 5/24/13 Lane Fullerton No n/a 6/17/13 n/a No n/a 6/17/13 n/a n/a n/a wrong CDs uploaded in 315.2 JS 5/25/13 Lane Smith Hyatt JS 4/26/13 Lane Caltrop 6/10/13 No n/a 06/18/13 n/a No MA provided at this time No n/a JS Utah 4/6/13 Lane 2/25/13 Smith Hyatt Yes 3/26/13 6/18/13 Approved Yes 3/26/13 6/18/13 Approved No N/A JS Utah 7/4/13 Lane Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time No N/A JS 3/4/13 Lane 2/1/13 Smith Hyatt Yes 6/11/13 6/11/13 Approved Yes 6/11/13 6/11/13 Approved No JS Utah 2/28/13 Lane 2/8/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No JS Utah 5/5/13 Lane n/a Caltrop Yes 1/18/13 6/18/13 N/A No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra JS 2/28/13 Lane 1/15/13 Smith Hyatt Yes 6/6/13 6/6/13 Rejected Yes 6/6/13 6/7/13 Approved No n/a JS Utah Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS 6/12/13 Lane n/a TAIC No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS 3/31/13 Lane 2/12/13 TAIC Yes n/a 5/7/13 Rejected Yes n/a 5/7/13 Approved n/a No n/a JS Idaho 4/14/13 Lane 2/20/13 n/a TAIC Yes 3/4/13 6/18/13 N/A No owner approved drawings to compare to. No N/A 6/18/13 N/A No MA provided at this time N/A No owner approved CD uploaded to Siterra JS Idaho 7/17/13 Lane Smith Hyatt Yes 6/6/13 6/6/13 Approved Yes 6/6/13 6/6/13 Approved MA was corrected No JS Utah 3/8/13 Lane 1/18/13 Smith Hyatt Yes 2/21/13 5/14/13 Approved n/a Yes 2/19/13 5/14/13 Approved n/a No n/a JS Utah Lane n/a Smith Hyatt No n/a 6/18/13 n/a No SA provided at this time. No n/a 6/18/13 n/a No MA provided at this time N/A No owner approved CD uploaded to Siterra JS 3/26/13 Lane 2/20/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 2/27/13 5/14/13 Approved n/a No n/a JS Utah 4/29/13 Lane Smith Hyatt Yes 3/28/13 6/14/13 Approved n/a Yes 6/19/13 6/21/13 Approved No n/a JS Utah 5/2/13 Lane Smith Hyatt JS 4/27/13 Lane 2/11/13 Smith Hyatt Yes n/a 4/29/13 Approved n/a Yes n/a 4/29/13 Approved n/a No n/a JS Utah 3/27/13 Lane 1/11/13 Fullerton Yes 1/17/13 5/14/13 Rejected No n/a 5/14/13 n/a No MA provided at this time No n/a JS Utah 4/2/13 Lane 3/1/13 Smith Hyatt Yes 6/6/13 6/6/13 Approved n/a Yes 6/6/13 6/6/13 Approved MA has been corrected and approved No n/a JS Utah 3/23/13 Lane 3/2/13 Smith Hyatt Yes n/a 4/29/13 Rejected Yes n/a 4/29/13 Rejected CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole No JS Utah 3/31/13 Lane 2/15/13 Fullerton Yes 1/16/13 5/10/13 Approved n/a Yes 2/6/13 5/10/13 Approved n/a No n/a JS Utah 4/13/13 Lane 2/11/13 Smith Hyatt Yes 1/16/13 5/14/13 Approved n/a Yes 4/4/13 6/6/13 Approved MA is corrected & approved. No JS Utah 4/14/13 Lane 2/11/13 Smith Hyatt Yes n/a 5/1/13 Approved n/a Yes n/a 5/1/13 Approved n/a No JS Utah n/a Lane TAIC JS n/a Lane TAIC JS n/a Lane Smith Hyatt JS n/a Lane TAIC JS n/a Lane Smith Hyatt JS n/a Lane Smith Hyatt JS n/a Lane Smith Hyatt JS
2
Site
I
CDs
Structural
Samsung B
O
Scoping
GD BOMs
N
AC Panel
Construction
Cascade #
Site Name
Task #
NTP Dates
SAMs
9
CD Uploaded for Review
AE Vendors
Tower
Structural Completed
Date Reviewed
Approved
No
Mount Structural Recv.
Mount Analysis Completed
Letter Approval Needed
CM
State
Cabinet Type
Alpha
Beta
Gamma
Delta
Completion Date
Submitted Date
Revised Date
CM Name
Review Date
Site Type
Submit Date
Approved Date
Sector Count
Rad Center
Tower Type
Ant#
RRU #
RET Cable #
Indoor
Outdoor
Eqpt Type
Platform Style
Complete Date
Ordered Date
Received Date
Power Upgrade
Need Sub Panel
CS
Site Walk
Pre-Con Walk
CNX Start
5
4
Special Notes
DE05AL522
Green River East
H142
5/25/1
3
Lane
1/25/13
Fullerton
Y
1/23/13
5/20/13
Letter is going to be provided to show everything will be cleared.
Yes
n/a
Letter will be provided to show everything is cleared.
Cleared
Nick
Utah
1
8
180
1/2/13
3/29/13
Mary
150
Monopole
6
Concrete Pad
200 A
Daren
Steve Mann
5/30/13
SL03UB
10
Ubiquitel-Dry Canyon
H149
3/
12
2/12/13
TAIC
4/29/13
Rejected
Structural was ran for the 2 existing mounts, not the third that we are adding.
5/14/13
MA was ran for installing the Hy-Cap site in a two step and we are putting all the antennas and RRUS up at one time. Also the MA doesn’t spec the mount that is to be used on the Lam pole, antenna weights are not correct b/c we have 2 different styles. MA also shows Monopole and
Self Support
(Nick’s reply – I see it in the top notes two antennas and 3 RRUs, but in the calculations part, it states how many antennas per mount, and 1 was put in and the same with the RRUs. So the correct weight is not showing on this document. Total weight should be 34
7
75
1/10/13
30′
Wooden Pole
Steel Platform
Hy-Cap site and need to verify if tower will be able to hold the additional mount and weight.
Jacob Walker
4/12/13
SL03UB104
Downtown Logan
H150
4/6/13
2/7/13
Single Outdoor
150H
76′
S/O
3/28/13
Need to order 3 additional NV antennas
Jerry Tweden
5/7/13
SL03UB106
Crow Mountain
H151
7/10/13
2/14/13
5/29/13
No
4/15/13
Need Rad Center verification from RF
Need SA approved and RF verify.
90
90H
sent back to Mary, not showing additional 2 cabinets
40′
50′
Sent Back to Mary.
Hy-Cap Site
Clay Schutzer
SL03UB110
Ubiquitel Hyrum
H152
3/30/13
5/1/13
Hot Slide not needed
105
Shelter
4/24/13
SL03UB111
Silage
H010
3/6/13
3/13/13
Caltrop
12/5/12
Failed
2/4/13
120
3/22/13
103′
SL03UB113
Ubiquitel Brigham
H153
5/25/13
2/20/13
WT
12/20/12
6/11/13
6/21/13
Group
135
100′
SL03UB116
Ubiquitel – Tremonton – UT
H154
3/9/13
4/30/13
MA has been corrected and uploaded to Siterra.
MA is corrected and approved
195
154′
100 A
4/16/13
SL03UB120
Preston
H156
2/8/13
No Structural
4/8/13
install standoff mount off the existing mount.
87′
Sent back to Mary to verify
Install 3′ standoff mount.
SL03UB130
Ubiquitel S&S Fun Center
H158
3/19/13
1/30/13
No Structural ran so far
5/10/13
4 Sector Mount to be installed
80′
Shelter inside Tower
sent to Mary to look at
SL03UB131
Ubiquitel – Riverside Cornwall
H159
3/21/13
“Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap.
(Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.)
Sent back this is a Wooden Pole, not a Monopole
47′
4/17/13
SL03UB401
Mona
H1
60
3/5/13
2/6/13
Smith Hyatt
Tower Structural was ran correctly, no standoff mount for Gamma, install it on the leg of the tower and the other two sectors will be placed on the existing mounts.
5/24/13
Mount analysis was ran for installing 2 antennas and 4 RRUs on the two existing mounts and Gamma antenna and 2 RRUs will be mounted on the back of the antenna on the leg.
255
1
92′
3/25/13
Daren Holt
4/10/13
SL03UB414
Ubiquitel UT003 Exit 112
H014
3/14/13
5/17/13
Fails
remove exiting Pipe mounts
285
251′
5/23/13
SL03UB419
Jones-Enoch
H163
3/31/13
2/11/13
2/28/13
5/6/13
5/31/13
MA was corrected
MA was corrected and provided
240
1/11/13
1
90′
5/15/13
SL03UB420
Ceader City State Lands
H164
2/27/13
75′
SL03UB421
Ubiquitel Kanarraville
H
165
5/2/13
Needs Hand rails
120′
SL03UB425
Harrisburg Junction
H167
2/21/13
4/9/13
SL03UB426
Ubiquitel Washington
H168
5/28/13
4/22/13
No MA provided at this time
SL03UB427
Ubiquitel Rococo
H169
6/3/13
SA has been corrected
MA has been corrected and reflects what is shown in the CD.
MA and SA are corrected and reflect the CD.
60H
Rooftop
6/20/13
Coax will need to be painted
SL03UB428
Ubiquitel Santa Clara
H170
6/1/13
6/7/13
SA has been corrected and approved
MA has been corrected and approved
70′
6/15/13
6/16/13
installing 12′ 6″ Mount, need to install conduit about
45
SL03UB429
Webb Hill
H171
4/26/13
1/24/13
SA states mount is at 43′ and RAD Center is 50′. Plus it was ran for 6 hybrid cables instead of 3.
6/18/13
Provide 2″ std pipe with plates and ubolts to tie
the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame.
Need to have the SA verify RAD Center and correct the MA.
120H
55′
4/18/13
SL03UB430
Ubiquitel Santaquin
H172
1/9/13
SA was ran for the existing mount, didn’t run for the new 12′ mount that is called out in the CD, MA specifiies new mount.
1/31/13
94′
SL03UB450
Ubiquitel-Nephi
H173
3/7/13
1/14/13
12/31/12
No possible dual install, small platform
1
35′
SL03UB471
Ubiquitel Red Cliffs
H174
4/23/13
No Structural Analysis at this time
105H
SL03UB472
Hurricane Rim
H175
SA – Needs to specify weight and size of mount used in the calculations in the SA. – PE will be accepted
PE letter stating for mount calculations used in SA
SL03UB474
Ubiquitel Rockville
H176
5/16/13
3/27/13
6/17/13
Need verification on RAD Center, SA state 70′ and the CD states
77′
CD needs to be corrected to show the RAD Center at
73′
Emily
SL03UB480
Ubiquitel Ivins
H178
2/24/13
Need letter. CD calls for powerwave attenna on Gamma. SA lists 3 KMW attennas. Need letter saying powerwave will not create any structural or mount analysis issues.
PE letter stating powerwave will not create any structural or mount analysis issues.
Dez
SL03UB481
Ubiquitel Fiddlers Canyon
H179
6/4/13
6/19/13
Craig
85′
SL03UB500
Payette Bluff
G019
2/18/13
Mount analysis was ran for more than what’s currently on the mount.
Idaho
1/3/13
140′
Need to paint coax Red and White
SL03UB503
Ubiquitel Payette Co Sheriff
G020
2/19/13
a Tower Mapping was uploaded as a Structural, nothing is mentioned of the new Equipment going on the Tower
Mount analysis was ran at 87′ and our mount is at 100′. Need to be redone. – New mount analysis was ordered 5/14/13
OD
Shane M.
SL03UB504
Ubiquitel Langley Gulch
G021
1/19/13
300
1/4/13
250′
5/8/13
SL03UB505
Ubiquitel – Parma ATC
G022
Shelter has no Ventalation
SL03UB506
Rookstool Corner
G023
1/18/13
5/13/13
3/26/13
Letter needs to be signed on the Stamp
Stamp needs to be signed and dated
315
270
SL03UB508
Ubiquitel Emmett
G024
5/21/13
Mount Analysis was ran on the wrong Mount. We are at
117′
25′
Bird Nest on the Tower. Site on Hold
SL03UB510
Ubiquitel Christian Gulch
G025
12/11/13
Structural says 1
88′
200′
Mount analysis says everything is good, but it was ran off both CD and Structural and they both disagree.
See notes in Mount and Structural
Guyed
SL03UB511
Purple Sage
G026
3/4/13
No microwave on CDs. Install lines beside existing cables
No owner approved CD uploaded to Siterra
210
SL03UB512
Ubiquitel Sommers
G027
7/1/13
3/11/13
SL03UB514
Ubiquitel – Van Slyke Farms
G029
3/1/13
1/13/13
SL03UB515
Ubiquitel – Weitz
G030
1/8/13
SL03UB516
Ubiquitel Main St.
G031
135H
106′
2 – S/O
200A
SL03UB517
Deer Flat
G032
225
240H
SL03UB518
Ubiquitel Sugar Factory
G033
4/1/13
Received letter on 6/03/13 stating the SA is completed and good.
180H
1
10′
5/3/13
SL03UB519
Ubiquitel Town Square
G034
CD not showing the correct mount that is on the tower.
SL03UB520
White Town
G035
MA is corrected & approved.
187′
SL03UB521
Ubiquitel McRae
G036
6/12/13
SL03UB522
Ubiquitel McMillian
G037
6/13/13
SA does not match CD, SA needs to show calcualtions for 6 antenas instead of 3.
6/13/12
Letter needed to show how many atennas and RRUs were used in the MA
330
SL03UB523
Ubiquitel Glenwood
G038
4/114/13
Mount analysis was ran off the CD and the CD was done for a regular 3 antennas and 6 RRHs. There are a total of 6 antennas and 9 RRUs going on the tower. Letter is not stamped or Signed – Approved – Rejected – new mount analysis ordered 5/14/13
Need mount analysis redone and have it signed and dated
165H
Given back to STA
110′
SL03UB524
State & Dewey
G039
Concrete Pad w/ Steal Platform
SL03UB526
Idaho Power Downtown
G040
7/3/13
Calculations need to be shown for high capacitiy and for stand off mounts.
Single Indoor
Site Walk Needed
SL03UB527
Ubiquitel Choctaw
G041
No SA has been provided at this time
SL03UB528
Ubiquitel Jack’s Tire & Oil
G042
ERROR:#
N/A
Need site photos to verify SA
Site walk needed
SL03UB529
Black Creek
G043
6/23/13
No SA has been provided at this time.
SL03UB531
Ubiquitel Ditto Creek
G044
6/14/13
SL03UB533
Ubiquitel Shell Station
G045
The MA doesn’t identify the interim dual position mount and it’s calculation, and than it doesn’t indetify the single mount that it will change to at final. Also the collar weight is never mention. This needs to be corrected and provided.
MA needs to have the correct configuration.
SL03UB534
Ubiquitel Rocky Butte
G046
7/5/13
SL03UB535
Mt. Home AFB
G047
1/28/13
SL03UB536
Hammett ATC
G048
Coax needs to be double stacked
Letter is neeed to show the number of antennas and RRUs were used in the calculations.
345
290′
SL03UB538
Ubiquitel Rocky Trail
G049
3/17/13
4/3/13
2
81′
SL03UB540
Ubiquitel Jerome West
G050
4/2/13
SL03UB543
Ubiquitel Jerome 99
G051
177′
Need to remove existing dead lines to install new Hybrid cables
SL03UB545
Ubiquitel Magic Valley Mall
G052
6/5/13
SA does not match CD, SA calls for the dragonwave CD does not
6/1413
SL03UB547
Ubiquitel Twin Falls
G053
Hy-Cap site need more room for all the cabinets
SL03UB548
Ubiquitel Buhl
G054
2/15/13
2/13/13
1
45′
SL03UB549
Ubiquitel Kimberly
G055
2/1/13
SL03UB550
Ubiquitel Hazelton Butte
G056
SL03UB552
Ubiquitel Burley Butte
G057
4/19/13
1/29/13
195H
SL03UB553
Ubiquitel – Burley Highway
G058
4/11/13
SL03UB554
Ubiquitel Rupert Junction
G059
1/15/13
3/12/13
SA was corrected to show proper weight.
MA was corrected to show it matches. CD and SA.
SL03UB556
Ubiquitel Boarder Site
G060
5/4/13
See SA for Hybrid cable installment
1
98′
SL03UB559
Ubiquitel Lamar
G061
See SA for location to install Hybrid cables
No MA has been provided at this time.
SL03UB560
American Falls
G062
4/25/13
1
95′
SL03UB562
Ubiquitel Frasure
G063
SL03UB563
Ubiquitel Logan
G010
Powder River
12/3/12
5/22/13
MA has been corrected.
5/9/13
Steel Plaform
SL03UB564
Ubiquitel Layman
G064
5/5/13
SL03UB568
Blackfoot
G065
Did Structural and CD on wrong site – Self Support Tower is Failing
Did mount analysis on wrong site this is a self support not a monpole
(Nick’s reply – Understand and agree fully on your comment, but there is an incorrect document uploaded.)
Send back, rejected -Wet Stamp – Site is completely wrong
180′
ID
Sent back, rejected
SL03UB572
Ubiquitel Jamestown
G011
12/4/12
Structural fails at Interim at 114%, but passes at Final at 104.3%,
Crown
Everything has been cleared for Construction
189′
SL03UB573
Ubiquitel Telecom
G012
6/6/13
11/30/12
78′
SL03UB574
Ubiquitel Utah
G066
4/14/13
2/22/13
SL03UB575
Ubiquitel Majestic
G013
5/11/13
SL03UB576
Ubiquitel Rigby
G067
176′
SL03UB578
Ubiquitel Rexburg
G068
SA does not match the CD, SA lists 6 c2A, CD calls for 3.
SL03UB580
Ubiquitel St. Anthony
G069
5/26/13
No SA provided at this time.
SL03UB586
Ubiquitel Snow King Mountain
G071
SL03UB589
Ubiquitel Jackson Airport
G072
5/19/13
No Structural has been ran
MA was corrected and Approved
there are two towers and to carriers at the samse RAD Center shooting right at each other. Safety issues and performance issues will be felt.
SL03UB590
Ubiquitel Lower Valley
G073
No Structural ran at this time
2 – Collars being added
Wyoming
SL03UB591
Ubiquitel Table Rock
G074
2/25/13
1/17/13
4/5/13
99′
SL03UB592
Ubiquitel Cloverdale
G075
MA has been corrected and states that interim load was taken into calculations.
If they will provide a letter stating everything is good we can sign off. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.) – MA was corrected and everyting is approved.
SL03UB593
Boise
Water Tank
G076
SL03UB594
Ubiguitel Vista
G077
6/24/13
SL03UB595
Ubiquitel North Eagle
G078
New mount to be installed on Wooden Pole
new mount on wooden Pole
Supplemental BOM Created
SL03UB596
Ubiquitel Watson
G014
Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural.
Verifing everything is good
SL03UB597
Ubiquitel Kuna
G079
181′
SL03UB600
G081
MA was uploaded as a SA
MA – MA doesn’t identify the three new mounts and the two different towers that the three are going to be installed on. It was ran for the mount that will be placed on Tower 1 at 18’ Nothing is showing for Tower 2. Also there is not mention of the weight of the existing antennas on the new mount. Please have these corrected and sent back to the AE Team. CD – CD is showing swapping out the only BBU on the site. There is not Batteries in the existing CDMA cabinet. There is a generator on site but it is labeled not installed on the AC panel. Please review this, b/c for what I see we are going to need to expand the pad 3’ x 3’ to install the MMBS.
SL03UB609
Ubiquitel Hampton
G084
SL03UB610
Ubiquitel West Twin Falls
G085
2/26/13
CD needs to have the RAD Center corrected from
175′
170′
SL03UB611
Ubiquitel South Nampa
G086
Install 3 hand rails
SL03UB613
Ubiquitel Broadway
G087
6/8/13
SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed
a letter needs to be provided stating everything is voorected.
SL03UB614
Ubiquitel Stone
G088
Wooden Pole, 2 mounts to be installed, with 3 collars
65′
SL03UB615
Ubiquitel North Meridian
G089
4/28/13
SL03UB617
Ubiquitel Eccles Theatre
H180
8/13/13
SL03UB620
Ubiquitel East Nampa
G090
Nothing received
CD needs corrections
SL03UB622
Ubiquitel South Meridian
G091
6/9/13
617/13
SL03UB623
Ubiquitel E. St. George
H181
SL03UB624
Ubiquitel West Nampa
G092
SL03UB627
Ubiquitel East Eagle
G093
3/3/13
Bird Nest in the Tower
118′
Birds Nest
SL03UB633
Ubiquitel – North Rexburg
G015
12/4/13
No Hot Slide needed
116′
SL03UB634
Ubiquitel East Twin Falls
G095
MA does not match CD and SA, RAD center is 99′ MA states 199′
Letter needed to show that the statement of one hundred and ninety nine feet, on MA was a typed in error and that RAD center is ninety nine feet
SL03UB636
Ubiquitel Maple Grove
G096
SL03UB637
Cassia
G097
1
13′
SL03UB639
Ubiquitel Western Aircraft
G098
Three Cantaliver mounts needed.
SL03UB642
View Point Buildiing
G100
No Structural as of this time
Mount analysis was ran for adding 2 new cantilever mount to the building. Not a Stand off mount as the CD shows.
Need a letter approving this land owner.
SL03UB659
Ubiquitel – Williamson
G101
SA was ran at the correct height. The CD and mA are being corrected.
Mount analysis needs to be reran with correct information, It states in the letter that everything appears to be correct, from the Structural and CD, but we have conflicting information.
Letter stating where the mount calculations were run and with what information. – New Structural and Mount analysis to be reran.
SL03UB660
Teton Mall
G016
See SA for beef up. No tower work allowed till structure is beefed up. No hot slide needed.
173′
SL03UB665
Ubiquitel Shelley
G017
verifing the calculations and everything is good.
SL03UB668
Ubiquitel Signal Mountain
G102
8/30/13
SL03UB670
Ubiquitel Apre Vous
G104
No Structural received at this time
Monopine
Need to run 2 Conduits for new coax.
SL03UB675
Ubiquitel Weiser
G105
verifing everything is correct.
Concrete Floor
SL03UB686
Ubiquitel Alameda
G108
SL03XC010
Ernies Auto
H018
58′
SL03XC102
North Ogden City
H019
Hot slide not needed
Cabinet will have to be turned, very small platform
SL03XC104
Plain City
H020
12/7/13
SL03XC106
Doc Holiday & Frank Kuba
H021
SL03XC108
Mt. Eyre City Park
H022
12/6/12
1/111/13
SL03XC110
Norma Elliot
H023
97′
SL03XC112
4th St.
Ball Park
H024
SL03XC114
TCI
H025
3/15/13
12/6/13
79′
SL03XC118
Clair Baur
H027
1
2/5/13
No Hot Slide is needed
No possible dual install, small covered platform
SL03XC120
Ogden City Municipal Building
H182
4/4/13
No cantilever brackets called for in SA.
SL03XC122
Mt. Ogden Water Tank
H183
ERROR:#N/A
SL03XC124
Carl Favero
H028
Need to remove BBU to set MMBS
SL03XC126
Kenneth Baldwin
H029
Will have to be a temporary install, no room until decomm.
SL03XC128
Ogden Municipal Airport
H030
7/4/13
SL03XC130
Washington Heights Corp
H031
SL03XC132
South Ogden Water Tank
H184
42′
Water Tank/Wooden Pole
Sent to Mary for Verification
SL03XC134
Dallas Green
H032
SL03XC136
Kwik City Muffler
H033
7/11/13
SL03XC138
Roy Water Conservacy
H034
Birds Nest – sent to Lane
SL03XC140
Ron Nitler
H035
SL03XC142
Ray’s Valley Service
H036
12/1/13
96′
SL03XC144
Prime Communications
H185
SL03XC146
Weber Basin Water
H037
SL03XC148
Lovell
H038
12/12/12
SL03XC150
Sunset City
H039
Fails at Interim at 107.7%, Passes at Final 104.5%, new and existing equpt can’t be on tower longer than 6 months
SL03XC152
Peters
H040
SL03XC154
Fire Station #2
H041
3/20/13
SL03XC156
Bates Canyon
H042
12/10/12
MA wsa corrected to show
44′
SL03XC158
Nancy Gardner
H043
SL03XC160
St. Ambrose Church
H186
SA was corrected. Need a Mason to fix the brick and walls before antennas and RRUS can be installed.
MA has been corrected. Consolidation on the Alpha Sector and Mason needs to be hired and fix the Bricks before wwe proceed with hanging the antennas and RRUs.
Need a mason to fix brick work. MA & SA are corrected and approved.
Non-Tower
Need a CS to walk and provide pictures
Must contact Church to scheule construction dates and times. ContactMirko at 801-560-3042
SL03XC162
JP’s Texaco
H044
SL03XC164
Public Works
H045
8/1/13
SL03XC166
Andy Adams Park
H046
SL03XC168
Stoken’s Nursery
H047
12/17/12
Need more Lease space to set all 4 cabinets
Need to expand the Pad – 2 MMBS and 2 BBUs
SL03XC172
Kaysville
H187
SL03XC174
Cherry Hill
H048
12/21/13
SL03XC176
Burmester
H049
4/27/13
SL03XC178
Davis County Sheriff
H188
3/23/13
MA was corrected and approved
SL03XC180
Fruit Heights
H189
New 4 sector mount
Sent to Mary for Corrections
68′
Sent to Mary for corrections, – 4 Sector Site not enough room for the additional Cabinets.
Need to paint to match and replace existing 7/8 snap-ins to make room.
SL03XC182
Bangeter Wood Warehouse
H050
100A
SL03XC184
Bountiful Police Dept.
H051
SL03XC186
Western Wireless Collocate
H190
SL03XC188
Beehive Storage
H052
12/19/12
12/7/12
SL03XC192
Kulmer & Schumacher
H054
SL03XC194
Justice
H055
1/16/13
CD shows stand off on the existing pipe, structural was ran for 10′ mount, GD BOM was ordered with a small dual stand-off arm (30″x19″) Need a Letter verifing we can use the smaller mount
Need a letter approving the smaller mount.
CD needs to be changed to show changing out the existing mount.
59′
SL03XC202
Sons of Pioneers
H191
CD/ MA and SA match. Everything is approved
Everything is approved and good to go.
Need Site Walk
20’/
26′
S/I
Storage Closet
SL03XC204
Robert Wolff
H056
12/11/12
OA drawings call for 2 powerwaves and one KMW. MA calls for two powerwaves and two KMW attennas. MA needs to be adjusted.
Nick, Dez (MA)
SL03XC206
Sunset Tower
H192
3/2/13
2 – step only for Equipment – Do not sit both BBU Cabinets together
MA has been corrected to install 3 Cantilever Mounts to the side of the building. MA matches the CD.
SA & MA have been corrected and they match the CD.
Roof Platform
SL03XC208
University Park
H193
Structure is approved to with hold the new Eqipment
Install 2 antennas on the 2 skids and install new antenna on new cantilever mount and remove the old antennas and mounts at Final
Letter verifing the Blastard is good. – Letter confirmed everything is good – 5/23/13
consolidate the alpha CDMA antennas on one of the existing mass pipes and add 2 new mass pipes for the sleds for Beta and Gamma.
SL03XC210
Salt Lake City Airport
H194
RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.)
SL03XC212
Robert Wallace
H057
SL03XC214
North Temple Storage
H058
Need Letter
Need Letter, CD shows stand-off on the existing and new chain mount, Structural shows 10′ mount
Need Letter, Mount analysis was done on a new 12′ 6″ mount and not Standoff or 6 position chain mount for RRUs.
BOM was ordered with a single collar and dual standoff small 30″ x 19″ mount.
SL03XC216
Tribune
H195
4/13/13
Structural was corrected
Letter stating the Structure will be okay to with stand the RRUs and Cantilever mount on the inside of the wall.
1
48′
SL03XC218
St. Mark’s
H196
Verifing that the current mount can with stand another 60 lbs.
SL03XC220
Charleston Apartments
H197
CD redlined on 6/13/13
210H
SL03XC224
Freedom Mortgage
H199
Need Site visit to order GD Materials
SL03XC228
Evans
H059
61′
SL03XC230
Smith’s Credit Union
H200
SL03XC232
SL County Housing Authority
H201
ran for installing 3 new cantilever mounts, not a standoff
RRUs were not calcuated ing the weigh and nothing is shown for mounting the antennas
Letter verifing everything is good
230′
SL03XC234
Parkview Plaza (Mecham)
H202
SL03XC236
Dan’s Grocery
H060
4/20/13
Chris E.
SL03XC238
Eagel Point
H203
SL03XC240
International Center
H204
SL03XC242
Maverik
H061
6/22/13
57′
SL03XC244
Sprint Spectrum
H062
101′
Concrete Pad w/ I-Beam
SL03XC246
Flinders Trucking
H063
SL03XC248
Lori Riddle
H064
SL03XC250
Frampton
H065
62′
SL03XC252
OMS Diesel
H066
5/27/13
12/14/12
SL03XC254
All Steel FAB
H067
SL03XC256
Anderson Truss
H068
SL03XC258
B&B Auto Body
H069
12/12/13
SL03XC260
Sunburst Auto
H070
60′
SL03XC262
Cottonwood Corp.
H205
7/29/13
6/10/13
New NV antennas to be placed on existing empty wall mounts.
SL03XC264
Ferguson Canyon
H206
Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided, see SA and MA
Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided please see the MA & SA.
Mount is Failing – Corrective measures were given for this site. Please see the SA & MA.
3 Steel Poles
SL03XC268
Assembly of God
H207
Rejected/Failed
Interim failed at 176.2%. Final failed at 166.3%. Tower shaft failed from 0-65′. Base plate failed. Base foundation structural failed. Not identifing the 2 existing mounts and the third one that will be installed.
Needs 6 position collar mount w/3 dual standoff mounts.
Need a letter stating the mount can withstand the load.
SL03XC270
U.S. Satelite
H208
SL03XC272
Kramer Construction
H071
3/8/13
SL03XC274
Union Woods
H209
Need to order consolidation antennas
SL03XC276
Flat Iron Mesa
H072
No hot slide needed. Possible consolidation. Check drawings.
SL03XC278
Towne Storage
H073
1/7/13
SA was done on a 10′ mount and we speced a 4′ mount.
MA was done on a 10′ mount and we speced a 4′ mount.
Need a letter approving the 4′ mount.
SL03XC280
Karen Poulsen
H074
4/21/13
SL03XC282
Hand Cart Park
H075
SL03XC284
Fire Station #26
H076
SL03XC286
H077
SL03XC288
Sand Lot
H078
SL03XC290
Hand Tank
H079
9/9/13
Interim Fails at 107.0%, Final passes at 103.4%
Install a 10′ T-Boom
2/9/13
Installing dual poistion stand off mount
SL03XC292
Taylor Property
H080
SL03XC294
Bonnoco
H081
11/17/13
SL03XC296
Crescent Park
H082
Fails at Interim at 126.1% and Fails at Final at 115.8% – Base plate needs to be modified. Upgrades are to be provided.
Need specifics given for beefup to base plate and achors.
Need to run over
150′
SL03XC298
Bell Canyon Park
H083
7/30/13
Site Fails both Interim and Final. SA is ran for a 10′ T-Arm and the CD is showing a standoff coming off the existing mass pipe. We need to use a 30″ x 19″ dual position standoff mount.
Need a proper break down on everything that needs to be done to upgrade the site
SL03XC300
Glenmoor Golf Course
H084
8/5/13
CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount
Need a L of C to approve the 40″ mount we are showing in the CD.
SL03XC302
Equestrian Park
H085
7/7/13
Intirim failed at 119.9%. Final Failed at 108.5%. Further engineering and detailing is required to design the necessary modifications. Anchor rods at 0′ require modifications. Foundation is significant.
SL03XC304
Carolyn White
H086
SL03XC306
Ron Raddon
H210
Approved – received updated information
Approved by Scott Giles
Need a letter verifing everything is good. No Conduit available, must install new conduit across the parking lot, under asphalt – Signed off and approved.
No available conduit, need to run 3 new conduits across the parking lot under the asphalt, need to order 3 consolidation antennas
SL03XC308
Taylorsville Collocate
H211
8/8/13
Passed
Owner approved drawings did not reflect correct RAD center. They’ve been redlined and approved by RF.
SL03XC310
Riverton Park
H087
9/17/13
SL03XC312
Petersen Marine
H088
SL03XC314
Shelby
H089
1
27′
SL03XC402
Trans West Auto
H090
SL03XC404
Highland Water
H091
SL03XC406
Canyon Road Tower
H212
Cool cell cabinet platform needs to be removed.
The wall mount on sector A has a cosmetic issue. The flexing of the EFIS exterior finish is cracking in
the area of the mount plate. Over time the exterior finish will fail and spall. We recommend adding a
single Valmont slider bracket near the top of the mast to reduce the flexing.Has a pipe mount planned in Sector Gamma.
SL03XC408
Waymon
H092
SL03XC410
JJG Investments
H213
Owner Approved drawings do not reflect 4 sectors. Plus they show a pipe mount. MA reflects four sectors.
SL03XC412
Smart
Silo
H214
SA has passed and been uploaded to Siterra.
MA is approved and uploaded
SL03XC414
Mangum
H215
6/2/13
SL03XC416
Peck Sons
H216
Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was
ran for consolidation
If you can get a letter, stating everything is good, we can sign off. (Nick’s reply – First this is a Hy-Cap Site and there are 2 antennas and 3 RRUs per sector, calculations isn’t correct. Nothing is showing the weight of the standoff from the existing mass pipe or the weight of the existing antennas. This is need to provide clear and correct information. – Eqpt – Certified Letter stating everything is in good standing at the Interim, will need to be provided before Construction can begin.)
Smokestack
SL03XC418
Tooele City Fire
H093
SL03XC420
Thad Beal
H094
SL03XC422
Lindon Park
H095
SL03XC424
Seven Peaks
H217
SA has been corrected and shows what needs to be done
SA & MA are corrected and reflect what needs to be done.
Water Slide/ RFT
SL03XC426
Cherrywood Sunstation
H096
Could be a temporary DUAL, no room until decomm.
SL03XC428
Eagle Ridge
H097
Interim fails at 114%. Final Passes at 101.8%.
22′
SL03XC430
Richard Gornichec
H098
SL03XC432
Orem Firestation
H099
12/14/13
SL03XC434
Fruit Stand
H218
Approved w/ Consolidation
SL03XC436
Utah County EQ/Richard Gornichec
H100
SL03XC438
David Gardner
H219
no SA available in Siterra
SL03XC440
EXCEL Graphics
H101
SL03XC442
Dr. Fullmer
H102
SL03XC444
Evan Trucking
H103
SL03XC446
Bird Storage
H104
12/13/12
SL03XC448
Mapleton City Park
H105
SL03XC450
Industrial Park
H106
12/15/12
CD shows Hot Slide and the wrong Mount is shown on the Final. Hot Slide not needed
SL03XC452
East Bench
H107
SL03XC454
G&W Investments
H108
SL03XC456
Salem’s Lot
H109
SL03XC458
Payson City
H110
6/29/13
CDs redlined for A-2 platform corrections
SL13XC572
Brickyard
H220
Antenna swap out due to LL not allowing any additional material on the site.
SL13XC574
Van Winkle
H221
SA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″
MA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″
SA & MA is approved and everything is corrected.
SL13XC580
Bicycle City
H222
SL13XC582
Eaglewood
H111
7/26/13
SL13XC584
Unversity of Utah Hosptial
H223
SA was corrected for the calculation of the 6 RRUs
MA was corrected for the weight of the 6 RRUs.
SA & MA were corrected and approved.
SL13XC588
Olympus Collocate
H224
relocation site, no active site in Siterra, no data
SL13XC601
Parley’s Summit
H226
Can be Dual Indoor, inside of an old silo/tank
SL13XC602
Kimball Junction
H227
ran for a 2 – Step on the Equipment, nothing ran for the building – SA is approved.
ran for colsolidation, MA states Skid Mount and it doesn’t call out removing all the existing CDMA antennas and consolidating them to 3 antennas. – Approved – received Certified. 05/23/13
verifing there was a structural ran on the building. – received letter – 5/23/13
Underground VAULT, NO ROOM, BBU will have to come out
Bunker Shelter
SL13XC603
Quarry Mountain
H112
Need to core drill 4 holes
SL13XC604
Yarrow Hotel
H228
Equipment must be a 2 – Step, Tower – states standoffs can only be 12″ but doesn’t include the weight of standoffs and 12″ isn’t enough room – Hot Swap is palnned, cabinets will be set as a 2 – Step.
Hot Swap on Alpha nad Gamma and consolidate the Beta antennas. All RRUs will be mounted on the inside of the tower on the roof.
Beta will be consolidated on the back of the wall and Alpha and Gamma will be hot swaps. All RRUs will be mounted inside the tower.
SL13XC605
Caledonian
H229
Platform Structural was ran for a Hot Swap only, No Interim config, Structural states one cabinet one cabinet off and one than can go on. Need to pull the existing BBU before setting MMBS – Mount analysis shows installing 3 new cantilever mounts to the side of the building, not standing pipes off the existing cantilever mount – Structural for equipment is good to go to set the cabinets. – Installing 3 new cantilever brackets inside and out for the new antennas and RRUs.
Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Install 4″ boot on both sides of the wall behind the antennas and run the jumpers from the RRUs inside to the antennas mounted on the wall outside. Remove CDMA antennas and brackets at the end.
Indoor Site
Will need to core dril 7 holes and install 6 cantilever mounts, 3 inside and 3 out.
SL17XC651
Doctor Rooftop
H235
Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set.
SA & MA match the BOM and CD.
63′
SL17XC652
Alley
H116
Handrail 12.6″ required for twist and sway
SL17XC653
H117
no documents in Siterra
SL17XC654
Marriot
H236
Ran for antennas and RRUs to mounted on the wall
Mount analysis is ran for 3 new cantilever mounts to be installed and the new antennas and RRUs to be installed on the new Mounts.
CD shows standoffs off the existing mass pipes.
Penthouse on I-Beams
SL17XC655
Golf Course Orchard
H237
SL25XC170
Keith Potter Relocation
H238
8/3/13
Monpole
SL25XC288
Stop Work Site
SL25XC588
SL29XC106
Building 87
H239
No Hot Slide Needed
SL29XC107
Layton Hills Western Wireless
H240
7/17/13
SL29XC111
Sahara Inc.
H241
Shelter w/ I-Beam
SL29XC122
Utah LP Gas
H118
SL29XC141
L&N Uniform
H242
SL29XC149
City Property
H119
SL29XC152
Johnson Trucking II
H120
Need to install a 12′ Hand Rail
Need to install a 12′ hand rail
SL29XC159
High School Auditorium
H243
Rage
rooftop
SL33XC022
Rogers Ranch
H121
No hot slide required
38′
SL33XC078
Jordanelle Point
H122
SL33XC132
US West @ SR111 – Site 162
H245
Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected
Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected. Need to add new mounts and consolidate the Beta sector for CDMA.
SL33XC133
Towers – Site 164
H123
Need to add a 12′ 6″ Handrail
SL35XC001
BYU/Park Plaza – Site 172
H124
Failed at Inerim at the base at 122.7%, but Passes at Final at 101.7% – SA was ran on a Monopole and not a telephone pole, also the SA was ran for a new 10′ mount and we are calling out a dual stand off mount 40″ x19″, the MA specs a small dual 40″ x 19″ mount.
New antenna mounting system to replace cluster mount
SO/CDs need redlined. Wooden pole. – Need a letter stating that a 40″ x 19″ dual standoff mount will be sufficent on the wooden pole istead of the 10′ mount the SA specs.
New Dual Position standoff mount 10 1/2″ collar
Wooden Pole sent a request to have a smaller mount added to the BOM.
SL35XC002
PAC Butler Substation – Site 137
H125
8/15/13
SL35XC003
Bulls Eye – Site 169
H246
3/18/13
The MA states it was ran for 1 antenna and 2 RRUs, instead of 3 antennas and 6 RRUs.
PE Letter correcting the Verbiage will be sufficent.
The Conduit should be sufficent to withhold 1 more cable per each of the 3 existing Conduit. Have CS verify to make sure.
SL36XC004
RLK Properties
H126
8/18/13
Failed – Interim 109.8% and Final 109.8%
Need to make base mods
Need Namd rail for a 12′ 6″ mount
Need to order a Hand rail
SL36XC005
Oak Canyon Jr High
H127
SL36XC006
Hogi Yogi
H128
SL36XC009
Beauty Bark Trucking
H129
SL37XC002
E Center
H247
SL37XC005
Multi-Ethnic – Senior Housing
H249
Equipment structural is good
Mount analysis was not ran to capture the whirligig that the CD is showing. Mount analysis was ran for a consolidation, but it doesn’t specify the type of mount that needs to be used on the building. Need to consolidate CDMA antennas
Need a Letter stating everything is good.
1
56′
Need to order consolidation antennas for Beta and Gamma antennas on CDMA
Updated BOM 6/5/13
SL40XC020
Provo High School
H250
SL40XC029
PACX Businees Park
H251
SL40XC034
Bridal Image
H252
Shelter – Closet
SL40XC052
Magcorp
H130
SL40XC053
Granger Medical
H253
Need to calculate for weight of sled mounts. Need to remove
SL54XC030
SL40XC061
Chelemes
H131
Add hand rails
Add Hand rails to mount
SL41XC040
SL41XC040-C
H254
9/19/13
SL54XC001
Elggren Property
H255
New Structural and Mount analysis is approved, RF Approved
Waiting on Approval from RF.RF Approved. Received Email.
Existing equipment is indoor/site is indoor
Shelter w/ I-Beams
SL54XC012
South Hills – Site 206
H256
Rad Center of structural at 68′ vs. Rad center of CDs at 62′. Need to verify which is corrected.
SL54XC013
Big Daddy – Site 195
H257
Need to remove 3 of the existing lines and snap-in the new hybrid cable and restack the existing lines.
SL54XC020
Provo Gun Club
H258
SL54XC024
Shepard’s Hill
H133
11/16/13
CD needs to be corrected to show Dual position Mount
New Dual Position standoff mount, need to install new conduit form Eqpt to tower, 50′ through a retaining wall up the hill.
SL54XC030
Oak Hallow Elementry
H260
SL54XC031
Christensen Property
H134
Tower Fails at Interim at 134.6% and Fails at Final at 122.5% – Tower needs the Base plate upgraded and the tower from 0 to 15′.
Verifing exactly what needs to be done.
SL54XC060
Highland Springs
H261
SL54XC061
Utah Medical Products II
H136
Fails SA
SA Fails at Interim at 134.3% and Fails at Final at 117% – Need to get information on beefing up from 0-38′ and the base plate.
need a letter on what needs to be done for Beef up.
SL54XC062
Hampton Inn
H262
SA has bee ncorrected
SA has been corrected an approved
Everything has been corrected and cleared.
Need a CS to walk and provide pictures in Steeple
SL54XC063
T-B Improvement District
H137
Interim at 106%, final passing at 97.5
proposed handrail to to support additional loading
Need to install a handrail – 12′ 6″ – MA specs it
Need to paint to match the tower.
SL54XC064
Keene Coatings
H263
Mo MA provided at this time
SL54XC065
Centennial Building
H264
4/7/13
No Structural at this time
SL54XC068
Huntsville
H266
SL54XC094
Granite
H138
SL54XC097
Northridge Heights
H267
SL55XC101
Central Park West
H268
1/21/13
Going to need to run Conduit
SL57XC001
Orchard Elementry
H269
SL60XC001
Hale Bakery SLC068 Keebler
H270
SL60XC017
Spectrasite Colocation
H271
66′
SL60XC020
Nextel Collocation
H139
SL60XC028
Saratoga
H272
No recent owner approved drawings or signed/stamped drawings in siterra
SL62XC002
North Layton Jr. High – Site 220
H273
SL62XC012
Jordan Landing – Site 219
H274
1/22/13
MA has been coorected and approved
Everything is orrected an Approved.
2/10/13
SL62XC022
Howland Building – Site 218
H275
SL63XC002
Newgate Mall – Site 221
H276
No Structural has been ran so far.
SL63XC006
Boyer-Madsen Building – Site 217
H277
SL63XC008
3900 South State – Site 211
H278
Existing mast will fail under the conditions purposed in the drawings. The new T-Arm supports will provide adequate support for the new antennas and the existing antennas over the interim period of time.
SL63XC020
Qwest Clearfield – Site 222
H279
no space to set MMBS Cabinet
SL63XC022
Riverton HS – Site 232
H280
SL63XC026
Boys Ranch – Site 230
H281
CD not signed/stamped-Preliminary not for construction
SL63XC028
Copper Hills – Site 231
H282
5/12/13
SA does not match CD, SA list 3 exisiting antennas CD lists 4
MA does not match CD, MA list 3 exisiting antennas CD lists 4
SL63XC030
Storage Plus – Site 226
H283
The top section of the pole shall be replaced with a 3″ std. pipe or better if the existing is less than the size
SL63XC032
Classic Trends – Site 227
H284
assumed.
wrong CDs uploaded in 315.2
SL63XC034
Cottonwood Theaters – Site 225
H285
SL63XC036
I-215 Mini Storage – Site 228
H286
SL63XC038
Layton Water Tanks – Site 223
H287
36’/36’/40′
Need to paint antennas, RRUs, Hybrid Cables & mounts, also will need to run 3 new conduits from the Equipment to the tower where they go up. Welding will need to be done on the side of the tank for the new mounts and coax brackets.
SL63XC135
Qwest Main Building – Site 224
H288
SL63XC164
Jordan Commons – Site 229
H289
6/27/13
SL70XC003
RC Riley – T-Moblie Bennion Conservancy Collocate
H290
SL70XC004
North Star Coatings – Site 234
H291
6/25/13
SL70XC007
RC Riley (foothill UT0095)
H292
Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed
SL72XC002
West Mountain
H293
SA was ran and we are to do a antenna swap out and mount the RRUs below the antennas.
MA was corrected and it was stated that the tower could not withhold the weight, so we are doing an antenna swap and mounting the RRUs below the antennas.
SA & MA were corrected.
SL72XC049
UT0049-Phase 1 B – Eagle Mountain
H294
SL72XC069
UT0069 – Phase 1A – Morgan
H296
SL72XC101
UT0101 – Phase 1A
H299
SA was coorected and Approved
157′
SL72XC102
Roosevelt
H300
Received letter verifing RAD Center
Receieved Letter – Uploaded to Siterra
SL72XC103
UT0103 – Phase1 A – Duchesne
H301
MA was corrected.
SL72XC105
UT0105 – Phase 1A
H302
SL72XC106
UT0106 – Phase 1A
H303
SL72XC113
UT0113 – Phase 1A – Loafer – Mtn
H304
SL72XC117
UT0117 – Phase 1A – Bear Lake
H306
01/29/13
06/18/13
Structure fails at interim (197.4%) AND at Final (179.9%). Engineer recommends 1) If the load differs from that described in Tables 1 and 2 of this report, “Appendix B – Base Level
Drawing” or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower does not have sufficient capacity to carry the existing, reserved, and proposed loads. Modifications will be required to bring the tower into compliance with the ANSI/TIA-222-G standard for the existing, reserved, and proposed loading. The following components require
modifications: a) Tower legs from 0’ to 140’ b) Tower diagonals from 0’ to 80’, 100’ to 120’ c) Tower diagonal bolts from 120’ to 160’ d) Anchor rods e) Foundation Further engineering and detailing is required to design the necessary modifications.
3) A Professional Engineer licensed in the state of Utah shall issue design drawings for the above
modifications. This analysis report is not a construction document.
SL72XC122
UT0122 – Phase 1A – Price
H307
Need three standoff arms.
Letter only received, nothing to verify what was measured.
28′
SL72XC123
UT0123 – Phase 1A – Helper
H308
SL72XC127
Horn Mountain
H312
SA was corrected and approved
MA was corrrected and approved
CD needs to be corrected for the mount we are installing.
SL72XC128
Four Mile Hill
H313
Everything is matching
115′
SL72XC138
UT0138 – Phase 1A – Kamas
H316
No owner approved drawings to compare to.
SL72XC143
Moab
H319
No calculations were provided in the SA.
MA corrected and approved
SL72XC255
UT0255 – Phase 1A – Powder Mountain
H321
9/4/13
SL72XC413
UT0413 – Phase 1B (Devils Slide)
H325
SL72XC703
ID034P- Phase 1B – Melba
G110
Structural is ran for the wrong type of mount. Ran for a Side Arm Mount, not a Sector Frame
258′
SL72XC737
ID211P – Phase 1B – McCall
G112
SL73XC004
UT0004 – Phase 1C – Brighton HS
H330
Ran for installing NV antennas on cantilever mounts
CD needs to show the iDEN antennas that are installed beside the CDMA and NV antennas.
42’/9’/35′
SL73XC011
North Orem
H331
SL73XC052
UT0052 – Phase 1C – Dimple Dell
H332
7/20/13
SL73XC085
UT0085 – Phase 1C – South Salt Lake
H333
SL73XC114
UT0114 – Phase 1C – South Jordan
H334
MA suggests adding bracing to prevent rotation of the horizontal pipe mounts
SL73XC173
UT0173 – Phase 1C – Bell Canyon
H335
SL73XC188
UT0188 – Phase 1C – Century 16
H336
Remove 3 of the dead antennas on iDEN and there lines.
SL73XC198
UT0198 – Phase 1C – SLCC
H337
Cd shows 12′ T-Arms to be installed and the Structural was ran for the new equipment to go on the existing mount. They are flushed mounted to the tower.
SL73XC304
UT0304 – Phase 1C – Jordan Commans
H338
35’/45′
SL73XC341
UT0341 – Phase 1C – Franklin Covey Stadium
H339
CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole
Structural for Mount and Tower need to be redone.
On Hold until we get proper Structurals and mount analysis
SL73XC364
UT0364 – Phase 1C – North Salt Lake
H340
SL73XC373
UT0373 – Phase 1C – Interstate 15 & 1700 S
H341
MA is coorected.
SL73XC381
UT0381 – Phase 1C – 33rd & Interstate 15
H342
CD showing pulling CDMA and iDEN off at Iterim and it is not needed . Please correct for construction
SL97XC002
BYU Rexburg
G114
SL97XC003
BYU Rexburg BTS #2
G115
SL97XC004
CNSUT00055 Movie Set
H343
SL97XC005
SL97XC005 BTS #2 (CNS DPT ENRGY)
G116
SL98XC004
SL98XC007
LDS Headquarters – BTS
H345
SL98XC008
CNSUT00058 (CNS Montage)
H346
Sheet2
SL03UB511
Conditional NTP – waiting on MA emailed Jared
SL03UB563
Full NTP
SL03UB572 Full NTP 4/19/13
SL03UB573 Full NTP 4/12/13
SL03UB596 Full NTP 4/23/13
SL03UB633 Full NTP 6/10/13
SL03UB665 Full NTP 3/29/13
SL03UB611
Incomplete
emailed taec for completion of lease tasks
SL03UB512 Conditional NTP – waiting on MA emailed Jared 6/20/13
waiting on MA, emailed taec
SL03UB517 Incomplete 6/24/13
Missing MA, NTP, tasks 122, 190, 200 and 315.3
180 180
Tower 150′ Monopole O O Concrete Pad 3/29/13 3/29/13 200 A N N
2/20/13 135 135 135 3/29/13 Tower 100′ Monopole O O Steel Platform 3/29/13 3/29/13 200 A N N
2/8/13 Tower 87′ Wooden Pole O S/O Steel Platform Sent back to Mary to verify 200 A N Y
2/14/13 sent back to Mary, not showing additional 2 cabinets Tower
40’/50′
Sheet3
Sheet4
Sheet1
Site
CDs
Structural
Cascade #
Site Name
Task #
NTP Dates
SAMs
90% Review Completed
CD Uploaded for Review
AE Vendors
Tower & Equipment Structural Recv.
Structural Completed
Date Reviewed
Approved
No
Mount Structural Recv.
Mount Analysis Completed
Letter Approval Needed
CM review
State
DE05AL522
Green River East
H142
5/25/13
Lane
1/25/13
Fullerton
Yes
1/23/13
5/20/13
Letter is going to be provided to show everything will be cleared.
n/a
Letter will be provided to show everything is cleared.
Cleared
JS
Utah
SL03UB103
Ubiquitel-Dry Canyon
H149
3/12/13
2/12/13
TAIC
4/29/13
Rejected
Structural was ran for the 2 existing mounts, not the third that we are adding.
5/14/13
MA was ran for installing the Hy-Cap site in a two step and we are putting all the antennas and RRUS up at one time. Also the MA doesn’t spec the mount that is to be used on the Lam pole, antenna weights are not correct b/c we have 2 different styles. MA also shows Monopole and Self Support tower and this is a Lam
(Nick’s reply – I see it in the top notes two antennas and 3 RRUs, but in the calculations part, it states how many antennas per mount, and 1 was put in and the same with the RRUs. So the correct weight is not showing on this document. Total weight should be 347 lbs. not 201 lbs. as it shows.)
SL03UB104
Downtown Logan
H150
4/6/13
2/7/13
SL03UB106
Crow Mountain
H151
7/10/13
2/14/13
5/29/13
No
4/15/13
Need Rad Center verification from RF
Need SA approved and RF verify.
SL03UB110
Ubiquitel Hyrum
H152
3/30/13
5/1/13
Hot Slide not needed
SL03UB111
Silage
H010
3/6/13
3/13/13
Caltrop
12/5/12
Failed
2/4/13
SL03UB113
Ubiquitel Brigham
H153
2/20/13
WT
12/20/12
6/11/13
6/21/13
SL03UB116
Ubiquitel – Tremonton – UT
H154
3/9/13
4/30/13
5/30/13
MA has been corrected and uploaded to Siterra.
MA is corrected and approved
SL03UB120
Preston
H156
2/8/13
No Structural
4/8/13
install standoff mount off the existing mount.
SL03UB130
Ubiquitel S&S Fun Center
H158
3/19/13
1/30/13
No Structural ran so far
5/10/13
4 Sector Mount to be installed
SL03UB131
Ubiquitel – Riverside Cornwall
H159
3/21/13
“Wooden Pole” – Mount analysis was ran for “Monopole” – doesn’t specify new mount or type – No Structural ran on Wooden Pole – CD states Monopole on the very first page. Platform Structural was ran for a Hot Swap.
(Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.)
SL03UB401
Mona
H160
3/5/13
2/6/13
Smith Hyatt
Tower Structural was ran correctly, no standoff mount for Gamma, install it on the leg of the tower and the other two sectors will be placed on the existing mounts.
5/24/13
Mount analysis was ran for installing 2 antennas and 4 RRUs on the two existing mounts and Gamma antenna and 2 RRUs will be mounted on the back of the antenna on the leg.
SL03UB414
Ubiquitel UT003 Exit 112
H014
3/14/13
5/17/13
Fails Structural at Interim at 133%, but passes at Final at 100.6% – need to remove the existing pipe mounts.
remove exiting Pipe mounts
SL03UB419
Jones-Enoch
H163
3/31/13
2/11/13
2/28/13
5/6/13
5/31/13
MA was corrected
MA was corrected and provided
SL03UB420
Ceader City State Lands
H164
2/27/13
SL03UB421
Ubiquitel Kanarraville
H165
5/2/13
Needs Hand rails
SL03UB425
Harrisburg Junction
H167
2/21/13
SL03UB426
Ubiquitel Washington
H168
5/28/13
4/22/13
No MA provided at this time
SL03UB427
Ubiquitel Rococo
H169
4/10/13
6/3/13
SA has been corrected
MA has been corrected and reflects what is shown in the CD.
MA and SA are corrected and reflect the CD.
SL03UB428
Ubiquitel Santa Clara
H170
6/1/13
6/7/13
SA has been corrected and approved
MA has been corrected and approved
SL03UB429
Webb Hill
H171
4/26/13
1/24/13
SA states mount is at 43′ and RAD Center is 50′. Plus it was ran for 6 hybrid cables instead of 3.
6/18/13
Provide 2″ std pipe with plates and ubolts to tie
the end of the frame back to the tower. This will provide a point to resist rotation of the antenna support frame.
Need to have the SA verify RAD Center and correct the MA.
SL03UB430
Ubiquitel Santaquin
H172
1/9/13
SA was ran for the existing mount, didn’t run for the new 12′ mount that is called out in the CD, MA specifiies new mount.
1/31/13
SL03UB450
Ubiquitel-Nephi
H173
3/7/13
1/14/13
SL03UB471
Ubiquitel Red Cliffs
H174
4/23/13
No Structural Analysis at this time
SL03UB472
Hurricane Rim
H175
4/24/13
SA – Needs to specify weight and size of mount used in the calculations in the SA. – PE will be accepted
PE letter stating for mount calculations used in SA
SL03UB474
Ubiquitel Rockville
H176
5/16/13
3/27/13
6/17/13
Need verification on RAD Center, SA state 70′ and the CD states 77′ – Verified and approved.
CD needs to be corrected to show the RAD Center at 73”
SL03UB480
Ubiquitel Ivins
H178
2/24/13
Need letter. CD calls for powerwave attenna on Gamma. SA lists 3 KMW attennas. Need letter saying powerwave will not create any structural or mount analysis issues.
PE letter stating powerwave will not create any structural or mount analysis issues.
SL03UB481
Ubiquitel Fiddlers Canyon
H179
6/4/13
6/19/13
SL03UB500
Payette Bluff
G019
2/18/13
Mount analysis was ran for more than what’s currently on the mount.
Idaho
SL03UB503
Ubiquitel Payette Co Sheriff
G020
4/17/13
2/19/13
5/7/13
a Tower Mapping was uploaded as a Structural, nothing is mentioned of the new Equipment going on the Tower
Mount analysis was ran at 87′ and our mount is at 100′. Need to be redone. – New mount analysis was ordered 5/14/13
SL03UB504
Ubiquitel Langley Gulch
G021
1/19/13
SL03UB505
Ubiquitel – Parma ATC
G022
SL03UB506
Rookstool Corner
G023
1/18/13
5/13/13
3/26/13
Letter needs to be signed on the Stamp
Stamp needs to be signed and dated
SL03UB508
Ubiquitel Emmett
G024
5/21/13
Mount Analysis was ran on the wrong Mount. We are at 117′ not at 125′ that the mount was ran at.
SL03UB510
Ubiquitel Christian Gulch
G025
12/11/13
Structural says 188′ CD shows 200′ Need verifications
Mount analysis says everything is good, but it was ran off both CD and Structural and they both disagree.
See notes in Mount and Structural
SL03UB511
Purple Sage
G026
3/29/13
3/4/13
No microwave on CDs. Install lines beside existing cables
No owner approved CD uploaded to Siterra
SL03UB512
Ubiquitel Sommers
G027
7/1/13
3/11/13
SL03UB514
Ubiquitel – Van Slyke Farms
G029
3/1/13
SL03UB515
Ubiquitel – Weitz
G030
1/8/13
SL03UB516
Ubiquitel Main St.
G031
SL03UB517
Deer Flat
G032
SL03UB518
Ubiquitel Sugar Factory
G033
4/1/13
Received letter on 6/03/13 stating the SA is completed and good.
SL03UB519
Ubiquitel Town Square
G034
4/9/13
CD not showing the correct mount that is on the tower.
SL03UB520
White Town
G035
5/23/13
MA is corrected & approved.
SL03UB521
Ubiquitel McRae
G036
6/12/13
SL03UB522
Ubiquitel McMillian
G037
6/13/13
SA does not match CD, SA needs to show calcualtions for 6 antenas instead of 3.
6/13/12
Letter needed to show how many atennas and RRUs were used in the MA
SL03UB523
Ubiquitel Glenwood
G038
4/114/13
5/8/13
Hy-Cap Site
Mount analysis was ran off the CD and the CD was done for a regular 3 antennas and 6 RRHs. There are a total of 6 antennas and 9 RRUs going on the tower. Letter is not stamped or Signed – Approved – Rejected – new mount analysis ordered 5/14/13
Need mount analysis redone and have it signed and dated
SL03UB524
State & Dewey
G039
SL03UB526
Idaho Power Downtown
G040
7/3/13
5/15/13
Calculations need to be shown for high capacitiy and for stand off mounts.
SL03UB527
Ubiquitel Choctaw
G041
No SA has been provided at this time
SL03UB528
Ubiquitel Jack’s Tire & Oil
G042
ERROR:#
N/A
Need site photos to verify SA
Site walk needed
SL03UB529
Black Creek
G043
6/23/13
No SA has been provided at this time.
SL03UB531
Ubiquitel Ditto Creek
G044
6/14/13
SL03UB533
Ubiquitel Shell Station
G045
The MA doesn’t identify the interim dual position mount and it’s calculation, and than it doesn’t indetify the single mount that it will change to at final. Also the collar weight is never mention. This needs to be corrected and provided.
MA needs to have the correct configuration.
SL03UB534
Ubiquitel Rocky Butte
G046
7/5/13
SL03UB535
Mt. Home AFB
G047
1/28/13
SL03UB536
Hammett ATC
G048
3/28/13
Coax needs to be double stacked
Letter is neeed to show the number of antennas and RRUs were used in the calculations.
SL03UB538
Ubiquitel Rocky Trail
G049
3/17/13
4/3/13
SL03UB540
Ubiquitel Jerome West
G050
4/2/13
SL03UB543
Ubiquitel Jerome 99
G051
SL03UB545
Ubiquitel Magic Valley Mall
G052
6/5/13
SA does not match CD, SA calls for the dragonwave CD does not
6/1413
SL03UB547
Ubiquitel Twin Falls
G053
SL03UB548
Ubiquitel Buhl
G054
2/15/13
2/13/13
SL03UB549
Ubiquitel Kimberly
G055
2/1/13
SL03UB550
Ubiquitel Hazelton Butte
G056
SL03UB552
Ubiquitel Burley Butte
G057
4/19/13
1/29/13
SL03UB553
Ubiquitel – Burley Highway
G058
SL03UB554
Ubiquitel Rupert Junction
G059
1/15/13
SA was corrected to show proper weight.
MA was corrected to show it matches. CD and SA.
SL03UB556
Ubiquitel Boarder Site
G060
5/4/13
See SA for Hybrid cable installment
SL03UB559
Ubiquitel Lamar
G061
See SA for location to install Hybrid cables
No MA has been provided at this time.
SL03UB560
American Falls
G062
4/25/13
SL03UB562
Ubiquitel Frasure
G063
SL03UB563
Ubiquitel Logan
G010
Powder River
12/3/12
5/22/13
MA has been corrected.
SL03UB564
Ubiquitel Layman
G064
5/5/13
SL03UB568
Blackfoot
G065
Did Structural and CD on wrong site – Self Support Tower is Failing
Did mount analysis on wrong site this is a self support not a monpole
(Nick’s reply – Understand and agree fully on your comment, but there is an incorrect document uploaded.)
SL03UB572
Ubiquitel Jamestown
G011
1/11/13
12/4/12
Structural fails at Interim at 114%, but passes at Final at 104.3%,
Crown
Everything has been cleared for Construction
SL03UB573
Ubiquitel Telecom
G012
6/6/13
11/30/12
SL03UB574
Ubiquitel Utah
G066
4/14/13
2/22/13
SL03UB575
Ubiquitel Majestic
G013
5/11/13
SL03UB576
Ubiquitel Rigby
G067
SL03UB578
Ubiquitel Rexburg
G068
6/16/13
SA does not match the CD, SA lists 6 c2A, CD calls for 3.
SL03UB580
Ubiquitel St. Anthony
G069
5/26/13
No SA provided at this time.
SL03UB586
Ubiquitel Snow King Mountain
G071
SL03UB589
Ubiquitel Jackson Airport
G072
5/19/13
No Structural has been ran
MA was corrected and Approved
there are two towers and to carriers at the samse RAD Center shooting right at each other. Safety issues and performance issues will be felt.
SL03UB590
Ubiquitel Lower Valley
G073
No Structural ran at this time
4/11/13
2 – Collars being added
Wyoming
SL03UB591
Ubiquitel Table Rock
G074
2/25/13
1/17/13
4/5/13
SL03UB592
Ubiquitel Cloverdale
G075
MA has been corrected and states that interim load was taken into calculations.
If they will provide a letter stating everything is good we can sign off. (Nick’s reply – Long as a Certified Letter is provided stating the Interim is good with everything on the mount, than this will be sufficient but we must have the Letter First, before Construction can begin.) – MA was corrected and everyting is approved.
SL03UB593
Boise Water Tank
G076
SL03UB594
Ubiguitel Vista
G077
6/24/13
SL03UB595
Ubiquitel North Eagle
G078
New mount to be installed on Wooden Pole
new mount on wooden Pole
SL03UB596
Ubiquitel Watson
G014
Mount analysis was not ran for the 6 RRUs, only calculated 3 of the 6. Need a Letter verifing everything is clear or redo the Structural.
Verifing everything is good
SL03UB597
Ubiquitel Kuna
G079
SL03UB600
G081
MA was uploaded as a SA
MA – MA doesn’t identify the three new mounts and the two different towers that the three are going to be installed on. It was ran for the mount that will be placed on Tower 1 at 18’ Nothing is showing for Tower 2. Also there is not mention of the weight of the existing antennas on the new mount. Please have these corrected and sent back to the AE Team. CD – CD is showing swapping out the only BBU on the site. There is not Batteries in the existing CDMA cabinet. There is a generator on site but it is labeled not installed on the AC panel. Please review this, b/c for what I see we are going to need to expand the pad 3’ x 3’ to install the MMBS.
SL03UB609
Ubiquitel Hampton
G084
SL03UB610
Ubiquitel West Twin Falls
G085
2/26/13
CD needs to have the RAD Center corrected from 175′ to 170′
SL03UB611
Ubiquitel South Nampa
G086
SL03UB613
Ubiquitel Broadway
G087
6/8/13
SA & MA was not ran for hanging 1 standoff mount off each mount. This site was ran as a antenna swap out. MA & SA both need to be corrected to show what is designed
a letter needs to be provided stating everything is voorected.
SL03UB614
Ubiquitel Stone
G088
Wooden Pole, 2 mounts to be installed, with 3 collars
SL03UB615
Ubiquitel North Meridian
G089
4/28/13
SL03UB617
Ubiquitel Eccles Theatre
H180
8/13/13
SL03UB620
Ubiquitel East Nampa
G090
Nothing received
CD needs corrections
SL03UB622
Ubiquitel South Meridian
G091
6/9/13
617/13
SL03UB623
Ubiquitel E. St. George
H181
SL03UB624
Ubiquitel West Nampa
G092
SL03UB627
Ubiquitel East Eagle
G093
3/3/13
Bird Nest in the Tower
SL03UB633
Ubiquitel – North Rexburg
G015
12/4/13
No Hot Slide needed
SL03UB634
Ubiquitel East Twin Falls
G095
5/9/13
MA does not match CD and SA, RAD center is 99′ MA states 199′
Letter needed to show that the statement of one hundred and ninety nine feet, on MA was a typed in error and that RAD center is ninety nine feet
SL03UB636
Ubiquitel Maple Grove
G096
SL03UB637
Cassia
G097
SL03UB639
Ubiquitel Western Aircraft
G098
4/18/13
Three Cantaliver mounts needed.
SL03UB642
View Point Buildiing
G100
No Structural as of this time
Mount analysis was ran for adding 2 new cantilever mount to the building. Not a Stand off mount as the CD shows.
Need a letter approving this land owner.
SL03UB659
Ubiquitel – Williamson
G101
SA was ran at the correct height. The CD and mA are being corrected.
Mount analysis needs to be reran with correct information, It states in the letter that everything appears to be correct, from the Structural and CD, but we have conflicting information.
Letter stating where the mount calculations were run and with what information. – New Structural and Mount analysis to be reran.
SL03UB660
Teton Mall
G016
See SA for beef up. No tower work allowed till structure is beefed up. No hot slide needed.
SL03UB665
Ubiquitel Shelley
G017
verifing the calculations and everything is good.
SL03UB668
Ubiquitel Signal Mountain
G102
8/30/13
SL03UB670
Ubiquitel Apre Vous
G104
No Structural received at this time
SL03UB675
Ubiquitel Weiser
G105
verifing everything is correct.
SL03UB686
Ubiquitel Alameda
G108
SL03XC010
Ernies Auto
H018
SL03XC102
North Ogden City
H019
Hot slide not needed
SL03XC104
Plain City
H020
12/7/13
SL03XC106
Doc Holiday & Frank Kuba
H021
SL03XC108
Mt. Eyre City Park
H022
12/6/12
SL03XC110
Norma Elliot
H023
SL03XC112
4th St.
Ball Park
H024
SL03XC114
TCI
H025
3/15/13
12/6/13
SL03XC118
Clair Baur
H027
12/5/13
No Hot Slide is needed
SL03XC120
Ogden City Municipal Building
H182
4/4/13
No cantilever brackets called for in SA.
SL03XC122
Mt. Ogden Water Tank
H183
ERROR:#N/A
SL03XC124
Carl Favero
H028
SL03XC126
Kenneth Baldwin
H029
SL03XC128
Ogden Municipal Airport
H030
7/4/13
SL03XC130
Washington Heights Corp
H031
SL03XC132
South Ogden Water Tank
H184
SL03XC134
Dallas Green
H032
SL03XC136
Kwik City Muffler
H033
7/11/13
SL03XC138
Roy Water Conservacy
H034
SL03XC140
Ron Nitler
H035
SL03XC142
Ray’s Valley Service
H036
12/1/13
SL03XC144
Prime Communications
H185
SL03XC146
Weber Basin Water
H037
SL03XC148
Lovell
H038
12/12/12
SL03XC150
Sunset City
H039
Fails at Interim at 107.7%, Passes at Final 104.5%, new and existing equpt can’t be on tower longer than 6 months
SL03XC152
Peters
H040
SL03XC154
Fire Station #2
H041
3/20/13
SL03XC156
Bates Canyon
H042
12/10/12
MA wsa corrected to show 44′
SL03XC158
Nancy Gardner
H043
SL03XC160
St. Ambrose Church
H186
SA was corrected. Need a Mason to fix the brick and walls before antennas and RRUS can be installed.
MA has been corrected. Consolidation on the Alpha Sector and Mason needs to be hired and fix the Bricks before wwe proceed with hanging the antennas and RRUs.
Need a mason to fix brick work. MA & SA are corrected and approved.
SL03XC162
JP’s Texaco
H044
SL03XC164
Public Works
H045
8/1/13
SL03XC166
Andy Adams Park
H046
SL03XC168
Stoken’s Nursery
H047
12/17/12
SL03XC172
Kaysville
H187
SL03XC174
Cherry Hill
H048
12/21/13
SL03XC176
Burmester
H049
4/27/13
SL03XC178
Davis County Sheriff
H188
3/23/13
MA was corrected and approved
SL03XC180
Fruit Heights
H189
New 4 sector mount
SL03XC182
Bangeter Wood Warehouse
H050
SL03XC184
Bountiful Police Dept.
H051
SL03XC186
Western Wireless Collocate
H190
SL03XC188
Beehive Storage
H052
12/19/12
12/7/12
SL03XC192
Kulmer & Schumacher
H054
SL03XC194
Justice
H055
1/16/13
CD shows stand off on the existing pipe, structural was ran for 10′ mount, GD BOM was ordered with a small dual stand-off arm (30″x19″) Need a Letter verifing we can use the smaller mount
Need a letter approving the smaller mount.
SL03XC202
Sons of Pioneers
H191
CD/ MA and SA match. Everything is approved
Everything is approved and good to go.
SL03XC204
Robert Wolff
H056
12/11/12
OA drawings call for 2 powerwaves and one KMW. MA calls for two powerwaves and two KMW attennas. MA needs to be adjusted.
SL03XC206
Sunset Tower
H192
3/2/13
2 – step only for Equipment – Do not sit both BBU Cabinets together
MA has been corrected to install 3 Cantilever Mounts to the side of the building. MA matches the CD.
SA & MA have been corrected and they match the CD.
SL03XC208
University Park
H193
Structure is approved to with hold the new Eqipment
Install 2 antennas on the 2 skids and install new antenna on new cantilever mount and remove the old antennas and mounts at Final
Letter verifing the Blastard is good. – Letter confirmed everything is good – 5/23/13
SL03XC210
Salt Lake City Airport
H194
RRU’s need to be mounted on cantiliver mounts behind the walls on alpha and beta. Antennas need to be painted to match. (GD note: Two 4″ holes per sector need to be drilled for jumpers to come through the walls with boots.)
SL03XC212
Robert Wallace
H057
SL03XC214
North Temple Storage
H058
Need Letter
Need Letter, CD shows stand-off on the existing and new chain mount, Structural shows 10′ mount
Need Letter, Mount analysis was done on a new 12′ 6″ mount and not Standoff or 6 position chain mount for RRUs.
BOM was ordered with a single collar and dual standoff small 30″ x 19″ mount.
SL03XC216
Tribune
H195
4/13/13
Structural was corrected
Letter stating the Structure will be okay to with stand the RRUs and Cantilever mount on the inside of the wall.
SL03XC218
St. Mark’s
H196
Verifing that the current mount can with stand another 60 lbs.
SL03XC220
Charleston Apartments
H197
CD redlined on 6/13/13
SL03XC224
Freedom Mortgage
H199
Need Site visit to order GD Materials
SL03XC228
Evans
H059
SL03XC230
Smith’s Credit Union
H200
SL03XC232
SL County Housing Authority
H201
ran for installing 3 new cantilever mounts, not a standoff
RRUs were not calcuated ing the weigh and nothing is shown for mounting the antennas
Letter verifing everything is good
SL03XC234
Parkview Plaza (Mecham)
H202
4/12/13
SL03XC236
Dan’s Grocery
H060
4/20/13
SL03XC238
Eagel Point
H203
SL03XC240
International Center
H204
SL03XC242
Maverik
H061
6/22/13
SL03XC244
Sprint Spectrum
H062
SL03XC246
Flinders Trucking
H063
SL03XC248
Lori Riddle
H064
SL03XC250
Frampton
H065
SL03XC252
OMS Diesel
H066
5/27/13
12/14/12
SL03XC254
All Steel FAB
H067
SL03XC256
Anderson Truss
H068
12/31/12
SL03XC258
B&B Auto Body
H069
12/12/13
SL03XC260
Sunburst Auto
H070
SL03XC262
Cottonwood Corp.
H205
7/29/13
6/10/13
New NV antennas to be placed on existing empty wall mounts.
SL03XC264
Ferguson Canyon
H206
Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided, see SA and MA
Mount Structural is showing the Beta mount (pole) is failing and needs to be replaces with a new 3” pipe. Pipe needs to be ordered – Correct information was provided please see the MA & SA.
Mount is Failing – Corrective measures were given for this site. Please see the SA & MA.
SL03XC268
Assembly of God
H207
Rejected/Failed
Interim failed at 176.2%. Final failed at 166.3%. Tower shaft failed from 0-65′. Base plate failed. Base foundation structural failed. Not identifing the 2 existing mounts and the third one that will be installed.
Needs 6 position collar mount w/3 dual standoff mounts.
Need a letter stating the mount can withstand the load.
SL03XC270
U.S. Satelite
H208
SL03XC272
Kramer Construction
H071
3/8/13
SL03XC274
Union Woods
H209
SL03XC276
Flat Iron Mesa
H072
No hot slide needed. Possible consolidation. Check drawings.
SL03XC278
Towne Storage
H073
1/7/13
SA was done on a 10′ mount and we speced a 4′ mount.
MA was done on a 10′ mount and we speced a 4′ mount.
Need a letter approving the 4′ mount.
SL03XC280
Karen Poulsen
H074
4/21/13
SL03XC282
Hand Cart Park
H075
SL03XC284
Fire Station #26
H076
4/16/13
SL03XC286
H077
SL03XC288
Sand Lot
H078
SL03XC290
Hand Tank
H079
9/9/13
1/10/13
Interim Fails at 107.0%, Final passes at 103.4%
Install a 10′ T-Boom
SL03XC292
Taylor Property
H080
SL03XC294
Bonnoco
H081
11/17/13
SL03XC296
Crescent Park
H082
Fails at Interim at 126.1% and Fails at Final at 115.8% – Base plate needs to be modified. Upgrades are to be provided.
Need specifics given for beefup to base plate and achors.
SL03XC298
Bell Canyon Park
H083
7/30/13
Site Fails both Interim and Final. SA is ran for a 10′ T-Arm and the CD is showing a standoff coming off the existing mass pipe. We need to use a 30″ x 19″ dual position standoff mount.
Need a proper break down on everything that needs to be done to upgrade the site
SL03XC300
Glenmoor Golf Course
H084
8/5/13
1/3/13
CD shows a 40″ mount and CC ran it for a generic 10′ mount and the MA ran for a 12′ 6″. We need a leet stating we are clear with the 40″ mount
Need a L of C to approve the 40″ mount we are showing in the CD.
SL03XC302
Equestrian Park
H085
7/7/13
Intirim failed at 119.9%. Final Failed at 108.5%. Further engineering and detailing is required to design the necessary modifications. Anchor rods at 0′ require modifications. Foundation is significant.
SL03XC304
Carolyn White
H086
SL03XC306
Ron Raddon
H210
Approved – received updated information
Approved by Scott Giles
Need a letter verifing everything is good. No Conduit available, must install new conduit across the parking lot, under asphalt – Signed off and approved.
SL03XC308
Taylorsville Collocate
H211
8/8/13
Owner approved drawings did not reflect correct RAD center. They’ve been redlined and approved by RF.
SL03XC310
Riverton Park
H087
9/17/13
SL03XC312
Petersen Marine
H088
SL03XC314
Shelby
H089
SL03XC402
Trans West Auto
H090
SL03XC404
Highland Water
H091
SL03XC406
Canyon Road Tower
H212
Cool cell cabinet platform needs to be removed.
The wall mount on sector A has a cosmetic issue. The flexing of the EFIS exterior finish is cracking in
the area of the mount plate. Over time the exterior finish will fail and spall. We recommend adding a
single Valmont slider bracket near the top of the mast to reduce the flexing.Has a pipe mount planned in Sector Gamma.
SL03XC408
Waymon
H092
SL03XC410
JJG Investments
H213
Owner Approved drawings do not reflect 4 sectors. Plus they show a pipe mount. MA reflects four sectors.
SL03XC412
Smart Silo
H214
SA has passed and been uploaded to Siterra.
MA is approved and uploaded
SL03XC414
Mangum
H215
6/2/13
SL03XC416
Peck Sons
H216
Smoke Stack – Mount analysis wasn’t ran to do a whirligig (Stand antennas 3’ off the existing mass pipe) – mount analysis was
ran for consolidation
If you can get a letter, stating everything is good, we can sign off. (Nick’s reply – First this is a Hy-Cap Site and there are 2 antennas and 3 RRUs per sector, calculations isn’t correct. Nothing is showing the weight of the standoff from the existing mass pipe or the weight of the existing antennas. This is need to provide clear and correct information. – Eqpt – Certified Letter stating everything is in good standing at the Interim, will need to be provided before Construction can begin.)
SL03XC418
Tooele City Fire
H093
SL03XC420
Thad Beal
H094
SL03XC422
Lindon Park
H095
SL03XC424
Seven Peaks
H217
SA has been corrected and shows what needs to be done
SA & MA are corrected and reflect what needs to be done.
SL03XC426
Cherrywood Sunstation
H096
SL03XC428
Eagle Ridge
H097
Interim fails at 114%. Final Passes at 101.8%.
SL03XC430
Richard Gornichec
H098
SL03XC432
Orem Firestation
H099
12/14/13
SL03XC434
Fruit Stand
H218
Approved w/ Consolidation
SL03XC436
Utah County EQ/Richard Gornichec
H100
SL03XC438
David Gardner
H219
6/20/13
no SA available in Siterra
SL03XC440
EXCEL Graphics
H101
SL03XC442
Dr. Fullmer
H102
SL03XC444
Evan Trucking
H103
SL03XC446
Bird Storage
H104
12/13/12
SL03XC448
Mapleton City Park
H105
SL03XC450
Industrial Park
H106
12/15/12
CD shows Hot Slide and the wrong Mount is shown on the Final. Hot Slide not needed
SL03XC452
East Bench
H107
SL03XC454
G&W Investments
H108
SL03XC456
Salem’s Lot
H109
SL03XC458
Payson City
H110
6/29/13
CDs redlined for A-2 platform corrections
SL13XC572
Brickyard
H220
Antenna swap out due to LL not allowing any additional material on the site.
SL13XC574
Van Winkle
H221
SA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″
MA was corrected and RRUs were calcuated, also the mass pipe size was corrected to 2 1/2″
SA & MA is approved and everything is corrected.
SL13XC580
Bicycle City
H222
SL13XC582
Eaglewood
H111
7/26/13
SL13XC584
Unversity of Utah Hosptial
H223
SA was corrected for the calculation of the 6 RRUs
MA was corrected for the weight of the 6 RRUs.
SA & MA were corrected and approved.
SL13XC588
Olympus Collocate
H224
relocation site, no active site in Siterra, no data
SL13XC601
Parley’s Summit
H226
SL13XC602
Kimball Junction
H227
ran for a 2 – Step on the Equipment, nothing ran for the building – SA is approved.
ran for colsolidation, MA states Skid Mount and it doesn’t call out removing all the existing CDMA antennas and consolidating them to 3 antennas. – Approved – received Certified. 05/23/13
verifing there was a structural ran on the building. – received letter – 5/23/13
SL13XC603
Quarry Mountain
H112
SL13XC604
Yarrow Hotel
H228
Equipment must be a 2 – Step, Tower – states standoffs can only be 12″ but doesn’t include the weight of standoffs and 12″ isn’t enough room – Hot Swap is palnned, cabinets will be set as a 2 – Step.
Hot Swap on Alpha nad Gamma and consolidate the Beta antennas. All RRUs will be mounted on the inside of the tower on the roof.
SL13XC605
Caledonian
H229
Platform Structural was ran for a Hot Swap only, No Interim config, Structural states one cabinet one cabinet off and one than can go on. Need to pull the existing BBU before setting MMBS – Mount analysis shows installing 3 new cantilever mounts to the side of the building, not standing pipes off the existing cantilever mount – Structural for equipment is good to go to set the cabinets. – Installing 3 new cantilever brackets inside and out for the new antennas and RRUs.
Installing 3 new cantilever brackets inside and out for the new antennas and RRUs. Install 4″ boot on both sides of the wall behind the antennas and run the jumpers from the RRUs inside to the antennas mounted on the wall outside. Remove CDMA antennas and brackets at the end.
SL17XC651
Doctor Rooftop
H235
Structural reflexs what is being done on the CD. Install new NV antennas on the middle position, change out the support arms on all three sectors. Eqpt okay to set.
SA & MA match the BOM and CD.
SL17XC652
Alley
H116
Handrail 12.6″ required for twist and sway
SL17XC653
H117
no documents in Siterra
SL17XC654
Marriot
H236
Ran for antennas and RRUs to mounted on the wall
Mount analysis is ran for 3 new cantilever mounts to be installed and the new antennas and RRUs to be installed on the new Mounts.
CD shows standoffs off the existing mass pipes.
SL17XC655
Golf Course Orchard
H237
SL25XC170
Keith Potter Relocation
H238
8/3/13
SL25XC288
Stop Work Site
SL25XC588
SL29XC106
Building 87
H239
No Hot Slide Needed
SL29XC107
Layton Hills Western Wireless
H240
7/17/13
SL29XC111
Sahara Inc.
H241
SL29XC122
Utah LP Gas
H118
1/2/13
SL29XC141
L&N Uniform
H242
SL29XC149
City Property
H119
SL29XC152
Johnson Trucking II
H120
Need to install a 12′ Hand Rail
SL29XC159
High School Auditorium
H243
Rage
rooftop
SL33XC022
Rogers Ranch
H121
No hot slide required
SL33XC078
Jordanelle Point
H122
SL33XC132
US West @ SR111 – Site 162
H245
Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected
Mount analysis ran on the wrong style mount, and the mount analysis was ran at 168’ and not 100’. Wet Stamp CD shows antennas to be mounted on the stiff arm which is wrong. Structural was ran for only 1 antenna and 1 mount existing on the tower. Structural for both need to be reran and CD needs to be corrected. Need to add new mounts and consolidate the Beta sector for CDMA.
SL33XC133
Towers – Site 164
H123
Need to add a 12′ 6″ Handrail
SL35XC001
BYU/Park Plaza – Site 172
H124
1/4/13
Failed at Inerim at the base at 122.7%, but Passes at Final at 101.7% – SA was ran on a Monopole and not a telephone pole, also the SA was ran for a new 10′ mount and we are calling out a dual stand off mount 40″ x19″, the MA specs a small dual 40″ x 19″ mount.
New antenna mounting system to replace cluster mount
SO/CDs need redlined. Wooden pole. – Need a letter stating that a 40″ x 19″ dual standoff mount will be sufficent on the wooden pole istead of the 10′ mount the SA specs.
SL35XC002
PAC Butler Substation – Site 137
H125
8/15/13
SL35XC003
Bulls Eye – Site 169
H246
3/18/13
The MA states it was ran for 1 antenna and 2 RRUs, instead of 3 antennas and 6 RRUs.
PE Letter correcting the Verbiage will be sufficent.
SL36XC004
RLK Properties
H126
8/18/13
Need to make base mods
Need Namd rail for a 12′ 6″ mount
SL36XC005
Oak Canyon Jr High
H127
SL36XC006
Hogi Yogi
H128
SL36XC009
Beauty Bark Trucking
H129
SL37XC002
E Center
H247
SL37XC005
Multi-Ethnic – Senior Housing
H249
Equipment structural is good
Mount analysis was not ran to capture the whirligig that the CD is showing. Mount analysis was ran for a consolidation, but it doesn’t specify the type of mount that needs to be used on the building. Need to consolidate CDMA antennas
Need a Letter stating everything is good.
SL40XC020
Provo High School
H250
SL40XC029
PACX Businees Park
H251
SL40XC034
Bridal Image
H252
SL40XC052
Magcorp
H130
SL40XC053
Granger Medical
H253
Need to calculate for weight of sled mounts. Need to remove
SL54XC030
SL40XC061
Chelemes
H131
Add hand rails
Add Hand rails to mount
SL41XC040
SL41XC040-C
H254
9/19/13
SL54XC001
Elggren Property
H255
New Structural and Mount analysis is approved, RF Approved
Waiting on Approval from RF.RF Approved. Received Email.
SL54XC012
South Hills – Site 206
H256
Rad Center of structural at 68′ vs. Rad center of CDs at 62′. Need to verify which is corrected.
SL54XC013
Big Daddy – Site 195
H257
SL54XC020
Provo Gun Club
H258
SL54XC024
Shepard’s Hill
H133
11/16/13
CD needs to be corrected to show Dual position Mount
SL54XC030
Oak Hallow Elementry
H260
SL54XC031
Christensen Property
H134
Tower Fails at Interim at 134.6% and Fails at Final at 122.5% – Tower needs the Base plate upgraded and the tower from 0 to 15′.
Verifing exactly what needs to be done.
SL54XC060
Highland Springs
H261
SL54XC061
Utah Medical Products II
H136
SA Fails at Interim at 134.3% and Fails at Final at 117% – Need to get information on beefing up from 0-38′ and the base plate.
need a letter on what needs to be done for Beef up.
SL54XC062
Hampton Inn
H262
SA has bee ncorrected
SA has been corrected an approved
Everything has been corrected and cleared.
SL54XC063
T-B Improvement District
H137
Interim at 106%, final passing at 97.5
proposed handrail to to support additional loading
SL54XC064
Keene Coatings
H263
Mo MA provided at this time
SL54XC065
Centennial Building
H264
4/7/13
No Structural at this time
SL54XC068
Huntsville
H266
SL54XC094
Granite
H138
SL54XC097
Northridge Heights
H267
SL55XC101
Central Park West
H268
1/21/13
SL57XC001
Orchard Elementry
H269
SL60XC001
Hale Bakery SLC068 Keebler
H270
SL60XC017
Spectrasite Colocation
H271
SL60XC020
Nextel Collocation
H139
SL60XC028
Saratoga
H272
No recent owner approved drawings or signed/stamped drawings in siterra
SL62XC002
North Layton Jr. High – Site 220
H273
SL62XC012
Jordan Landing – Site 219
H274
1/22/13
MA has been coorected and approved
Everything is orrected an Approved.
SL62XC022
Howland Building – Site 218
H275
SL63XC002
Newgate Mall – Site 221
H276
No Structural has been ran so far.
SL63XC006
Boyer-Madsen Building – Site 217
H277
SL63XC008
3900 South State – Site 211
H278
Existing mast will fail under the conditions purposed in the drawings. The new T-Arm supports will provide adequate support for the new antennas and the existing antennas over the interim period of time.
SL63XC020
Qwest Clearfield – Site 222
H279
SL63XC022
Riverton HS – Site 232
H280
3/25/13
SL63XC026
Boys Ranch – Site 230
H281
6/15/13
CD not signed/stamped-Preliminary not for construction
SL63XC028
Copper Hills – Site 231
H282
5/12/13
SA does not match CD, SA list 3 exisiting antennas CD lists 4
MA does not match CD, MA list 3 exisiting antennas CD lists 4
SL63XC030
Storage Plus – Site 226
H283
The top section of the pole shall be replaced with a 3″ std. pipe or better if the existing is less than the size
SL63XC032
Classic Trends – Site 227
H284
assumed.
wrong CDs uploaded in 315.2
SL63XC034
Cottonwood Theaters – Site 225
H285
SL63XC036
I-215 Mini Storage – Site 228
H286
SL63XC038
Layton Water Tanks – Site 223
H287
SL63XC135
Qwest Main Building – Site 224
H288
SL63XC164
Jordan Commons – Site 229
H289
6/27/13
SL70XC003
RC Riley – T-Moblie Bennion Conservancy Collocate
H290
SL70XC004
North Star Coatings – Site 234
H291
6/25/13
SL70XC007
RC Riley (foothill UT0095)
H292
Need to add 14 more 30 lbs blocks to the Beta sector – remove dead iDEN antennas to make room for NV antennas, Standoff not run or needed
SL72XC002
West Mountain
H293
SA was ran and we are to do a antenna swap out and mount the RRUs below the antennas.
MA was corrected and it was stated that the tower could not withhold the weight, so we are doing an antenna swap and mounting the RRUs below the antennas.
SA & MA were corrected.
SL72XC049
UT0049-Phase 1 B – Eagle Mountain
H294
SL72XC069
UT0069 – Phase 1A – Morgan
H296
SL72XC101
UT0101 – Phase 1A
H299
SA was coorected and Approved
SL72XC102
Roosevelt
H300
Received letter verifing RAD Center
Receieved Letter – Uploaded to Siterra
SL72XC103
UT0103 – Phase1 A – Duchesne
H301
MA was corrected.
SL72XC105
UT0105 – Phase 1A
H302
SL72XC106
UT0106 – Phase 1A
H303
SL72XC113
UT0113 – Phase 1A – Loafer – Mtn
H304
SL72XC117
UT0117 – Phase 1A – Bear Lake
H306
01/29/13
06/18/13
Structure fails at interim (197.4%) AND at Final (179.9%). Engineer recommends 1) If the load differs from that described in Tables 1 and 2 of this report, “Appendix B – Base Level
Drawing” or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower does not have sufficient capacity to carry the existing, reserved, and proposed loads. Modifications will be required to bring the tower into compliance with the ANSI/TIA-222-G standard for the existing, reserved, and proposed loading. The following components require
modifications: a) Tower legs from 0’ to 140’ b) Tower diagonals from 0’ to 80’, 100’ to 120’ c) Tower diagonal bolts from 120’ to 160’ d) Anchor rods e) Foundation Further engineering and detailing is required to design the necessary modifications.
3) A Professional Engineer licensed in the state of Utah shall issue design drawings for the above
modifications. This analysis report is not a construction document.
SL72XC122
UT0122 – Phase 1A – Price
H307
Need three standoff arms.
Letter only received, nothing to verify what was measured.
SL72XC123
UT0123 – Phase 1A – Helper
H308
SL72XC127
Horn Mountain
H312
SA was corrected and approved
MA was corrrected and approved
CD needs to be corrected for the mount we are installing.
SL72XC128
Four Mile Hill
H313
Everything is matching
SL72XC138
UT0138 – Phase 1A – Kamas
H316
No owner approved drawings to compare to.
SL72XC143
Moab
H319
No calculations were provided in the SA.
MA corrected and approved
SL72XC255
UT0255 – Phase 1A – Powder Mountain
H321
9/4/13
SL72XC413
UT0413 – Phase 1B (Devils Slide)
H325
SL72XC703
ID034P- Phase 1B – Melba
G110
Structural is ran for the wrong type of mount. Ran for a Side Arm Mount, not a Sector Frame
SL72XC737
ID211P – Phase 1B – McCall
G112
SL73XC004
UT0004 – Phase 1C – Brighton HS
H330
Ran for installing NV antennas on cantilever mounts
CD needs to show the iDEN antennas that are installed beside the CDMA and NV antennas.
SL73XC011
North Orem
H331
SL73XC052
UT0052 – Phase 1C – Dimple Dell
H332
7/20/13
SL73XC085
UT0085 – Phase 1C – South Salt Lake
H333
SL73XC114
UT0114 – Phase 1C – South Jordan
H334
MA suggests adding bracing to prevent rotation of the horizontal pipe mounts
SL73XC173
UT0173 – Phase 1C – Bell Canyon
H335
SL73XC188
UT0188 – Phase 1C – Century 16
H336
SL73XC198
UT0198 – Phase 1C – SLCC
H337
Cd shows 12′ T-Arms to be installed and the Structural was ran for the new equipment to go on the existing mount. They are flushed mounted to the tower.
SL73XC304
UT0304 – Phase 1C – Jordan Commans
H338
SL73XC341
UT0341 – Phase 1C – Franklin Covey Stadium
H339
CD doesn’t match Structural ran on tower or mount. Structural ran at 50’ of the monopole and not 56’ on the 3” pipe sticking off the top of the Monopole. Nothing is captured in the Structural for adding a mount for the RRUs on the monopole
Structural for Mount and Tower need to be redone.
SL73XC364
UT0364 – Phase 1C – North Salt Lake
H340
SL73XC373
UT0373 – Phase 1C – Interstate 15 & 1700 S
H341
MA is coorected.
SL73XC381
UT0381 – Phase 1C – 33rd & Interstate 15
H342
CD showing pulling CDMA and iDEN off at Iterim and it is not needed . Please correct for construction
SL97XC002
BYU Rexburg
G114
SL97XC003
BYU Rexburg BTS #2
G115
SL97XC004
CNSUT00055 Movie Set
H343
SL97XC005
SL97XC005 BTS #2 (CNS DPT ENRGY)
G116
SL98XC004
SL98XC007
LDS Headquarters – BTS
H345
SL98XC008
CNSUT00058 (CNS Montage)
H346
Sheet3
Sheet4