Job Costing

GoPack Corporation completed work on three jobs in the most recent period. Only these three jobs
were worked on for the period. Information for the three jobs is as follows:                                     Pounds (lb.) of Direct Material           # of Direct Labor Hours Job 1                            550                                                                  1,250 Job 2                            275                                                                     875 Job 3                            485                                                                  1,675 Cost of direct materials per pound     $15.00 / lb.
‐‐‐
Cost of direct labor per hour
  ‐‐‐‐
       $24.00 / DL hour
GoPack incurred overhead costs of $304,000 for the period. GoPack currently uses a volume based system to allocate overhead costs to jobs. Direct labor hours is the allocation base for this volume
based allocation. 1.
Calculate the overhead allocation rate using the current allocation system.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

                       

2. Calculate the total cost of each job: Job 1, Job 2 and Job 3 using the current allocation system.

Still stressed from student homework?
Get quality assistance from academic writers!

Order your essay today and save 25% with the discount code LAVENDER