ACT500 M4 CT

Complete the following questions using Microsoft Excel. No other submission format is allowed. Review the grading rubric to confirm you are meeting the assignment requirements.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Consider the following information for Hamburg Corporation:

Items

Units

Beginning inventory

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

85,000

Units started during the year

1

55,000

Ending inventory

61,000

Inventory is 100% complete as to materials and 60% complete as to conversion.

Items

Materials

Conversion

Beginning costs (SAR)

4

25,000

686,000

Costs added during the period (SAR)

1,255,000

980,000

Using the WEIGHTED AVERAGE method:

  1. Calculate the number of units completed during the period.
  2. Calculate equivalent units for conversion during the period.
  3. Calculate cost per equivalent units for materials.

Mannheim Corporation manufactures small camping tents and family camping tents. The estimated direct labor time to produce each type of tent is as follows:

Items

per tent

Small

Family

Estimated tents produced

24,500

11,000

Direct labor hours

2.5

4.5

Estimated overhead for the period = 1,300,000 SAR.

  1. Compute the overhead cost assigned to each type of tent assuming direct labor hours are used to allocate overhead costs.

The controller is not satisfied with the traditional method of allocating overhead because he believes that most of the overhead costs relate to the family tent product line because of its complexity. He, therefore, developed the following three activity cost pools and related cost drivers to better understand the costs.

25,000

980,000

Activity Cost Pools

Expected Use of Cost Drivers

Estimated Overhead Costs (SAR)

Setting up machines

1,000 setups

Assembling

90,000 labor hours

Inspection

1,200 inspections

230,000

  1. Calculate the activity-based overhead rates for these three cost pools.
  2. Compute the cost that is assigned to each tent using activity-based costing system, given the following information.

ItemsSmallFamily

Direct labor hours

55,000

Expected Use of Cost Drivers per Product

Number of setups

130

825

29,000

Number of inspections

125

1,125

  1. What do you believe the controller should do and why?

You must show your work for credit.

Name
QT Rubric_100_7q
Description
7 problems, 100 points
Rubric Detail
Levels of Achievement
Criteria
Exceeds Expectation
Meets Expectation
Some Expectations
Unsatifactory
Problem
1
14 to 14 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
2
14 to 14 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
3
14 to 14 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
4
14 to 14 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
5
14 to 14 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
6
14 to 15 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
Problem
7
14 to 15 points
12 to 13 points
10 to 11 points
0 to 9 points
All components are correct,
with no errors or omissions. All
work is shown.
Some significant but not
major errors exist. Some
work is shown.
Some major errors or
omissions exist. Limited
work is shown.
Fails to demonstrate
adequate comprehension
of the concept.
View Associated Items
Print
Close Window

Still stressed from student homework?
Get quality assistance from academic writers!

Order your essay today and save 25% with the discount code LAVENDER