Need to do a time cost trade off table and Pert chart

Just look at the attachment

2

A

2

1

A

6

B

6

200

D

10

6

E

4

200

E

8

6

200

6

100

F,G

10

6

8

J

8

6

200

J

2

1

200

G

8

G

14

K

6

4

300

M

A

ctivity

Normal time (days)

Fastest time (days)

Total additional cost to reduce entire amount of time ($)

Predecessors

(Prereq’s)

On Critical Path

Order tasks

M

in.

New Times

D

ays Saved

E

xtra cost

A

Rough-in driveway

2

1

200

none

B

Dig foundation

4

5

00

C

Finish driveway

10

0

D

Pour foundation

6

E

Construct framing

10

F

Construct roof

400

G

Siding

8

H

Plumbing

F,G

I

Wiring

5

J

Interior walls

300

H,I

K

Interior carpentry

14

800

L

Flooring

M

Finish lawn grading

N

Exterior painting

12

160

O

Interior painting

18

240

P

Landscaping

First do a PERT chart for the information given in the table above. The days in the end should be 82. Next task is to complete the table which should result in the activity time shortened by atleast 24 days. Then do a PERT chart for the new shortened information in the table.

You should be able to explain to me what you did because I have to write a report on it.